Warehouse layout. Narrow or poorly Serious injuries 5 4 20 H Ensure that aisles are wide enough Manager 5 2 10 L
designed aisles. Property damage for safe movement of equipment operations.
Poor lighting. Process delay and personnel.
Uneven flooring Keep aisles clear of obstacles and Supervisors.
or surfaces. disorder.
Blocked exits and HSE personnel.
Implement traffic management
emergency
guideline for both rolling objects
Routes.
and staff movement.
Lack of Signage
and markings. Install adequate lighting throughout
Inadequate the warehouse, especially in work
ventilation. areas, aisles, and storage areas.
Improperly Regularly maintain and replace light
maintained fixtures to ensure consistent
equipment. illumination.
Inadequate fire Installation of sky light sheets to
safety measures. enhance lighting during the day.
Repair any damaged flooring
promptly to prevent trip hazards.
Use floor markings to highlight
uneven areas and encourage
caution.
Keep emergency exits and routes
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-01-Rev-01- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 2 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 3 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
facility.
Develop and practice fire
evacuation plans regularly.
Forklift Operations. Overturning. Serious injuries. 4 5 20 H Ensure that forklift operators are Supervisors. 4 3 12 M
Property damage. trained and certified.
Process delay. Ensure clear safety guidelines are HSE personnel.
fixed on walls for operating a forklift
in the warehouse and on uneven
surfaces.
Use forklifts only in designated area
and appropriate load capacity for
the intended tasks and height.
A per-work equipment inspection
checklist must be completed.
Ensure equipment has completed
the quarterly 3rd party inspection
and maintenance.
Operator should be allowed to carry
only a suitable and safe load.
Lifting should be planned.
Ensure safety housekeeping of
dollies and trollies for aisle.
Avoid blind spots in the forklift aisle.
Falling objects (Product). Serious injuries. 3 4 12 M Secure loads using attachments, Supervisors. 3 2 6 L
Property damage. pallets, and straps before
Process delay. transporting. HSE personnel.
Avoid stacking loads higher than
safe limits for the specific
forklift/VNA operating conditions.
Inspect loads for stability before
lifting and adjustment.
Maintain equipment speed limit of
10 km/h.
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 4 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 5 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 6 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Smoking area / users. Smoke Exposure. Ill health. 4 4 16 M Designate well-ventilated area away Supervisors. 4 2 8 L
Fire Hazard. Property damage. from entrances and air intake vents
Accumulate for smoking. HSE personnel.
cigarette butts. Install smoking shelters with proper
Ventilation Issues ventilation to contain smoke.
Unsafe site Prohibit smoking in areas with
flammable materials or where fire
hazards are present with safety
posters.
Provide fire-resistant receptacles for
cigarette disposal.
Install designated ashtrays or
cigarette disposal bins.
Regularly empty and clean ashtrays
to prevent overflow.
Ensure adequate ventilation in
smoking areas to prevent the
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 7 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
buildup of smoke.
Ensure that the designated smoking
area is well-lit and free from
tripping hazards.
Clearly mark the smoking area with
signage to prevent accidental entry
by non-smokers.
Fix clearly communicate smoking
policies to employees and visitors
Enforce no-smoking policies in non-
designated areas safety posters/
policy.
Provide training to employees on
the hazards of smoking and the
importance of adhering to
designated smoking areas.
Conduct regular inspections to
ensure compliance with smoking
policies and safety measures.
Kitchen activities & Contact with hot Senior personnel 3 4 12 M Clean spills promptly and ensure the Supervisors. 3 3 9 L
utensils. surfaces. injuries. floor is dry to prevent slips and falls.
Contact with Property damage. Use oven heat-resistant gloves HSE personnel.
harmful when handling hot items.
chemicals. Store knives in a safe manner, e.g
Unsafe on a magnetic strip, to prevent
accidental cuts.
housekeeping.
Dispose of broken glass properly
and clean up any glass fragments
immediately.
Store flammable materials in
designated areas away from heat
sources and ensure proper
ventilation.
Regularly inspect electrical
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 8 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 9 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
accessible locations.
Train staff on spill response
procedures and the importance of
promptly addressing spills.
Maintain clear and unobstructed
pathways throughout the pantry.
Use storage solutions that keep
items off the floor and away from
pathways.
Educate staff on the importance of
keeping pathways clear and report
any obstructions immediately
through safety posters.
Install and regularly maintain fire
detection and suppression systems.
Store flammable materials, such as
cooking oils, in designated areas
away from ignition sources.
Educate staff on fire safety
procedures, including evacuation
routes and the use of fire
extinguishers.
Regularly inspect all electrical
equipment for damage or wear and
fixe safety poster about safe use.
Ensure that electrical outlets are
not overloaded and are properly
grounded.
Provide training to staff on electrical
safety, including how to identify
potential hazards and report them.
Ensure unwanted items should not
be stored in the cabinet
Ensure no heavy items are kept in
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 10 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 11 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 12 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Waste & storage. Poorly managed Senior personnel 3 4 12 M Implement a proper waste Supervisors. 3 2 6 L
waste and injuries. management system with
storage can Property damage. designated areas for different types HSE personnel.
increase fire of waste (e.g., recycling, hazardous
risks. materials).
Blocked Regularly inspect waste storage
Emergency areas to ensure they are well-
Equipment. organized and free from clutter.
Unsafe Waste Install firefighting equipment in
Disposal waste storage areas.
Practices. Keep waste storage areas clear of
ignition sources such as electrical
equipment or smoking.
Establish clear procedures for the
disposal of different types of waste,
especially hazardous materials.
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 13 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 14 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Strapping Machine Machine Senior personnel 3 4 12 M Provide training with workers on Supervisor 3 2 6 L
operations Entanglement. injuries. the safe operations.
Electrocution. Property damage. Ensure that the strap dispenser is HSE personnel
Manual Handling. covered to prevent accidental
Hot surface. contact with moving parts
Regularly inspect the cover to
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 15 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment
13
Assessment Number: Assessment Date: Revision Date: Page Number: 16 of 16
RISK
Activity/ Process or INITIAL FINAL
HAZARDS RISKS RISK RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
Task L S RR LEVEL S L RR LEVEL
RISK RATING
Risk
SEVERITY (S) Risk Rating level Action And Timescale
(RL)
Work should not be started or continued until the risk has been reduced. If it is not
1 2 3 4 5 RR1 =20 to 36 Intolerable INTOLERABLE possible to reduce the risk even with unlimited resources, work has to remain
prohibited.
HIGH
Work should not be started until the risk has been reduced. Considerable resources
2 4 6 8 10 RR2 =20 to 25= High HIGH may have to be allocated to reduce the risk. Where the impact involves work in
LIKELIHOOD (L)
Notes :S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSE-R-01; Rev-00- Risk Assessment