You are on page 1of 21

Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment.Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* Apex Infrastructure PVT LTD
Site location* Jamshedpur, Jharkhand, India
Number of workers 250
Apex infrastructure PVT LTD is a one of the leading construction company in Jamshedpur
Jharkhand who are engaged in various constructions project like residential building,commercial
building, Industrial building, over bridge and road construction.The company is ISO 9001: 2015
certified.

During construction various work activities are being carried out like concrete work, reinforcement
General description of the organisation work, cementing work, manual handling, work at height, excavation, fabrication, gas cutting,
welding, painting, scaffolding erection, lifting, plastering, vehicle movement at site, material
shifting, loading and unloading etc.

The company working on a 8 hrs 2 shift Monday to Saturday , Sunday is weekly off
A shift start from 6:00 am to 2:00 pm
B shift start from 2:00 pm to 10:00 pm
I have taken risk assessment for construction of commercial building area which include concrete
Description of the area to be included in the work, reinforcement work, cementing work, manual handling, work at height, excavation,
risk assessment fabrication, gas cutting, welding, painting,plastering, scaffolding erection, lifting,vehicle movement
at site, material shifting, loading and unloading
Any other relevant information The Safety Manager is responsible for overall Health and safety in the construction site. He

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 1 of 21


reported to the Project Manager.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
For completion of risk assessment, I refer various source of information related to construction
work and machining process from ILO convection and recommendations ( www.ilo.org ) The ILO
code of practice for identifying the best standards should be followed for managing health and
safety.
https://www.ilo.org/global/topics/safety-and-health-at-work/normative-instruments/code-of-
Outline how the risk assessment was carried practice/WCMS_107826/lang--en/index.htm
out this should include: Then I also refer HSE website for analysis of existing control measure relevant form the HSE
 sources of information consulted; guide are available at website: https://www.hse.gov.uk/work-at-height/index.htm

After the source of information I discussed with Safety Manager about health and safety
 who you spoke to; and management system in organisation and requested to share past 12 month record related to
health and safety of the organisation and the Safety Manager shares various records like training
records, accident & incident records, medical records, staff turnover records, absence records,
 how you identified: H&S policy ,copy previous risk assessment, maintenance records, meeting records, complaint
- the hazards; register, audit and investigation report previous accident etc.
- what is already being done; and
- any additional controls/actions that I went to construction site and meet with workers, site engineers, site supervisor and
may be required. Consult with them about various work activity in the site and associated hazard and understand
their feedback about health and safety in the site. I visited on the site and I made various
observation of activity on going in the site example: worker are doing welding near by the
combustible material ( Waste used cotton), I noticed existing control measure and the notes I took
during the inspection and the sources of information I have already reviewed helped me to
determine which additional control measures were needed after the inspection.

Part 2: Risk Assessment

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 2 of 21


Organisation name : Apex Infrastructure PVT LTD
Date of assessment : 8th May 2022
Scope of risk assessment : I have taken risk assessment for construction of commercial building area which include concrete work, reinforcement
work, cementing work, manual handling, work at height, excavation, fabrication, gas cutting, welding, painting,plastering, scaffolding erection,
lifting,vehicle movement at site, material shifting, loading and unloading

Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
1. Vibration Worker who operating The operator was wearing 1. Jack hammer should be
jackhammer and helper face shield, helmet, and other replaced by concrete – breaker 4 month Procurement
Worker were who is nearby in job. PPE. mounted on an excavator arm. manger
using hand
operated As worker was exposed Area was barricaded during 2. Maintenance of the machine
jackhammer while to long working hours activity. should be done regular basic to 2 week Maintenance
concrete breaking with the jackhammer it reduce the vibration. engineer
task and was may cause suffer from Power tools were inspected.
exposed to Hand –Arm vibration 3. Reduce the exposure by the job 2 week Shift manager
vibration for long syndrome (HAVS), Nerve frequent break.
duration damage, Joint damage,
vibration white finger 4. Reduce the exposure of worker 2 week Shift manager
(VWF) whole –body with shift rotation or job rotation.
vibration, muscle
weakening. 5. Training should be given to the
worker related to risk of vibration 2 month Training
and its precaution. officer

6. Monitoring and supervision 1 month


should be done during activity. Site
supervisor
7. Health surveillance for the
operator and other worker. 3 month Project

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 3 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
manager
2. Working The worker who working Tool box talk was done before 1. Instead of using scaffold, mobile
at height on scaffold and the starting work elevated work platform MWEP 2 month Project
worker who passing should to be use. engineers
Worker is doing nearby or below scaffold. Work at height training was
plastering work on given on monthly basis 2. Scaffold must be protected with 2 weeks Scaffold
scaffold above 10 Working on unprotected guardrail system, toe board. supervisor
meter height edges without safety Emergency and first aid
which is erected harness may lead to risk arrangement was provided. 3. Provide safe means of access 2 weeks Site
in unsafe of falling from height and and egress to perform job engineers
condition , without it can result in death, Mandatory PPE was safely.
providing guard neck injuries, spinal provided.
rail system injuries, broken bones or 4. Work at height work to be 1 month Project
multiple fracture. properly planned and manager
supervised by competent
person.

5. Scaffolding Erection and 1 month Site


inspection should be done by engineers
competent person.

6. Area must be barricade with 1 weeks Safety officer


safety sign board (working at
height work is progress)

7. All workers who involved in work 3 weeks EHS


at height job must be manager
competent.

8. Provide Full body safety 1 month Site manager


harness for work at height job

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 4 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)

3. Fire Worker who involved in Mandatory PPE and job 1. Combustible materials and 1 week Site manager
job and other worker who specific PPE was provided flammable substances must
Welding work was nearby by the job , visitor like. be removed from the hot
performing by and staff work area
worker near by Welding machine was
stored flammable Sources of ignition inspected. 2. If the Combustible and 1 week Site
substances( paint from welding work can flammable is not removed supervisor
& solvent) come into contact with Worker was trained and possibly at time covered by
flammable substances competent. with the fire retardant blanket.
that can cause fire which
can lead to severe burn, Job specific training was 3. Paint and solvent should be
death, property damage, provided. stored in designated area 2 weeks Project
suffocation with ventilation and proper manager
marking/ labeling.

4. Suitable fire extinguisher to 2 weeks Safety


placed near hot work area supervisor

5. Fire watcher should be 1 month Site manager


appointed during hot work
carried out

6. Regular monitoring must be 1 month Safety officer


done during job carried out.

7. Hot work activity must be 2 month Site


carried out under competent supervisor

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 5 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
supervisor

Safety
8. Area barricading should be 1 week supervisor
done during hot work activity.

9. The work area should be 1 month Safety officer


visited after the work has
finished checking the area.
4. Noise Worker, visitors, Nose area are barricaded 1. Eliminate the diesel 6 month Procurement
supervisor, engineer with the sign board generator to use of battery manager
Mason worker is might get harmed operated inverter or
working near Training is given about noise electricity.
diesel generator As poorly maintained hazards. 5 month Procurement
which was old and diesel generator 2. Replaced the old generator to manager
poorly maintained producing excessive Induction training was given new one which produces low
creating noise more than 95 dB, to the all worker. noise level.
excessive noise, working under such noise
above 95dB for long period of time 3 month Maintenance
may cause temporary 3. Maintenance must be done engineer
reduction in hearing loss, on regular basis.
noise induced hearing
loss(NIHL), tinnitus, 4. Silencer should be fitted with 2 month Maintenance
temporary ringing in the generator on the exhaust to engineer
ear, inability to hear, suppress noise.
stress.
3 month Site engineer
5. Diesel generator might be
placed in separate building
with sound insulation wall.
3 weeks Site

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 6 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
6. Provide frequent rest outside supervisor
the noise area to minimize
the exposure of noise.
3 weeks Shift
7. Provide job rotation to reduce supervisor
the exposure of noise from
long time.

2 weeks Site manager


8. Provide hearing protection
and Ensure the worker are
wearing ear muff or ear plug.

5. Electricity The worker who perform Housekeeping was 1. Electrical cable and plug 1 month Procurement
grinding activity and the maintained in site should be replaced with new manager
Worker was other co worker and staff one with appropriate and
performing and visitor. Mandatory PPE and job adequate capacity, strength
grinding activity specific PPE was provided and rating
with electrical Using a damaged cable ( gloves, dust mask face
grinder whose and plug of electrical shield) 2. Cable and plug appear to be 1 month Electrical
cable and plug equipment may cause fully insulated with no splits engineer
was found in electric shock, electric Tool box talk was given in the and maintained by competent
damage condition. burn, head injury, electric site before starting work. person.
fire & explosion
Guard is fitted in grinder
machine 3. Locate cable carefully away 1 weeks Foreman
from hazards.

4. Provide increase in protection 2 month Electrical


through the use of residual engineer

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 7 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
current device (RCD)

5. Carry out pre-use check of 1 month Site


electrical equipment and supervisor
cable for sign of damage.

6. Train operator to safe use of 3 weeks Training


equipment. officer

7. Implement program for 1 month Project


routine inspection and testing engineers
of electrical equipment by
competent person.

6. Manual Worker who is direct Health surveillance was 1. To eliminate the manual 6 month Procurement
handling involved in manual conducted every 3 month. handling by automation manager
handling job. provide forklift truck to shift
worker are shifting Required PPE for manual materials.
construction handling like gloves was
material like provided. 2. Provide trolley to minimize 3 month Procurement
cement, bricks, Performing manual the exposure of manual manager
metal rod, from handling task on regular First aid arrangement was handling.
site store room to basis by the worker for provided.
site by manual shifting material may 3. Provide training to the worker 2 month Training
handling on cause serious injury like about manual handling. officer
regular basis. work related upper - limb
disorder, muscle injuries, 4. Control repetitive handling by

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 8 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
tendon and ligament introducing frequent rest 1 month Safety officer
injuries, back injuries, breaks or job rotation.
hernias etc.
5. Break down a heavy load 2 weeks Shift manager
into smaller parts.

6. Use several workers to 2 weeks Site


handle a large, bulky load supervisor
rather than just one.

7. Ensure that load should not 2 weeks Site


hot or too much cold and supervisor
sharp edges.

8. Stabilize an unstable load by 1 weeks Site


securing it, or putting it into a supervisor
container.
1 weeks
9. Ensure individual capabilities
are matched to the activity. Foreman

7. Movemen Forklift truck operator, Banks man was assigned for 1. Load must be suitable for the 3 weeks Site
t of other worker who working FLT operations. movement with clear visibility supervisor
people on site, pedestrians, for moving forward.
and visitor, and other vehicle. Beacon or flashing light was
vehicles fitted on FLT. 2. Standard must be set for 1 month Project
in Obstructed visibility of according to capacity of load engineers
workplace FLT operator may chance Pre use check carried out by in forklift.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 9 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
of collision with person, operator before use FLT.
Observed vehicles and fixed object
overloaded forklift or overturn. 3. Segregation of vehicle and 3 month Project
truck moving pedestrians provide separate manager
forward with Which may cause serious walkway for pedestrians.
obstructed injury, neck or spinal
visibility of FLT injury, brain damage; 4. Appoint competent and 2 month Hr manager
operator in the multiple broken bones skilled operator and driver
site. blood loss, fatality, with valid driving licence.
property loss or damage.

5. Implement one way traffic 4 month Project


route system for minimize the manager
risk of collisions.

6. Speed limit to be set and 2 month Project


Clearly displayed on the engineers
board.

7. Driver / operator specific site 1 month Training


induction training may have officer
to be provides.

8. Ensure vehicle are suitable 3 weeks Site


for intend use, suitable for engineers
environment and condition.

8.Slips & trips Staff ,worker ,employees Sign board was displayed for 1. Walkway and escape route 3 weeks Site
and visitor who visit in the caution slip trip hazards. should be clear without any engineers
Observed site obstacle.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 10 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
scaffolding Worker was trained how to
material was avoid slip trip hazards. 2. Material should be kept in 4 weeks Project
found in kept in Due to scaffolding designated area with proper engineers
escape route and material kept on the Mandatory PPE was provided way with sign board
walkways area. walkway and escape at site.
route may causes trip
hazards in workplace. 3. Ensure the construction area 2 weeks Project
Which may lead to neck and walkway should be clean engineers
or spinal injury, multiple and tidy with regular
fracture ,broken bones , housekeeping
blood loss etc
4. Carry out regular safety audit 2 month Project
of cleaning and manager
housekeeping procedure and
include trip hazards in safety
survey.

5. Ensure work area should be 3 weeks Site


kept free from oil spillage. engineers

6. Provision of training to 1 month Training


reduce the slip trip hazards officer
from workplace.

7. Provide suitable illumination 2 month Site


to avoid and prevent slip trip supervisor
hazards.
9.Health welfare Worker, porter,site Training is provided to the 1. Provide shaded area for 3 month Project
and engineer,safety officer worker before work start performing task to avoid manager
environment. and anyone who is about extreme hot direct sunlight.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 11 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
working under sun temperature, heat stress, and
Observed worker heat stroke 2. Provide good ventilation 2 month Project
is working in an Working in open area in workplace with moving air Manager
open area under direct sunlight in extreme Worker was maintained PPE has a cooling effect.
sun during heat temperature 420c like hard hat and eye
extreme heat in with long duration or long protection. 3. Provide cool refuges where 2 month Procurement
420c temperature. exposure that may cause worker can escape the heat. manager
heat stress, heat stroke, Work was done under regular
dehydration. Heat monitoring. 4. Provide frequent breaks and 1 month Site
exhaustion, skin burn, job rotation. supervisor
cancer from the long
exposure from sun light 5. Change the shift time to early
etc. morning when the area 3 weeks Shift manager
temperature is high.

6. Provide easy access to


drinking water or isotonic 1 weeks Site engineer
drink.

7. Health surveillance should be 3 month Medical


provided to the worker who officer
works in extreme
temperature.

10.Hazardous All worker and helper Material safety data sheet 1. Eliminate exposure by 3 month Procurement
substance who is involved in this job was at the site and discussed automation though use of manager
with worker. concrete and cement mixing
Worker was Exposure of cement machine.
exposed with without using dust mask Chemical and biological
cement dust may cause harmful effect awareness training was given 2. Reduce the exposure by 2 weeks Site

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 12 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)
during mixing irritation and corrosive to the worker. though barricading the area supervisor
operation in both burn to the eye. Irritation to stop unauthorized entry
the dry powder of the respiratory tract, Supervision was provided at and unwanted visit.
and mixed wet Irritant dermatitis on the site.
form and doing repeated skin contact, 3. Provide the frequent rest 2 weeks Site
bricklaying and corrosive burn to the skin. Tool box talk was conducted break to prevent long supervisor
concrete pouring before starting work. exposure.
without dust mask
and eye 4. Instruction to be given to 1 weeks Safety officer
protection. Removal of contaminated
clothing just after work.

5. Provide Training for Good 1 weeks Training


hygiene and washing on skin officer
contact

6. Provision of suitable
arrangement of washing 3 month Project
facilities with soap or body manager
shower and changing room.

7. Provide work clothing and 2 month Site manager


PPE such as gloves, dust
mask, eye protection, and
gum boot.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 13 of 21


Hazard category Who might be harmed What are you already What further controls/actions are Timescalesfor
and hazard and how? doing? required? further actions Responsible
to be person’s job
completed title
(within …)

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 14 of 21


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral and financial arguments for ALL actions

Moral, general legal and financial Moral reason


arguments
It is a moral responsibility of employer to take health and safety or the all worker and provide safe
and healthy working condition. when health and safety is not managed properly people get killed
and injure in gruesome ways or suffer terrible diseases that have massive impact not only on them,
but also their dependent families, friends and colleagues, society as a whole considers these
events to be morally unacceptable, and injury or ill health should not that has to be paid in order for
the work to feed their family.

General legal arguments


As per ILO C155 article-16 Its a duty of the company to ensure fulfillment of legal duties defined in
national and local laws of legislation.The legal reason for managing health and safety relate to the
framework of international and national laws that govern the conduct of business and organisations.
If organisation has failure to archive legal minimum standard can lead to enforcement action by the
authorities or prosecution before the court. Successful prosecution can lead to a fine in criminal
court and imprisonment for the individual.

Financial arguments
If the health and safety is not maintained in the organisation its can lead to accident and ill heath
cost money. When accident occurs there will be direct and indirect cost associated with that event,
some of the losses can be insured but many cannot. Accident and ill health can significantly affect
the profitability of an organisation. Which impact the organisation put in loss or can put out of

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 15 of 21


business.The two types of losses that organisation may face

Direct cost: Medical/ hospital treatment cost, repair cost to buildings, equipment.

Indirect cost: Production delays, loss of reputation, loss of workers morale, training for new
recruiters, and loosing clients.

Justification for action 1

Combustible and flammable materials are removed from the work area or covered by with the fire
Action
retardant blanket. ( Hazards category - Fire )

As per ILO Code of Practice Convention C167 - Safety and Health in Construction
Specific legal arguments
Convention, 1988

Article 29 Fire precautions

1. The employer shall take all appropriate measures to-


 (a) avoid the risk of fire

2. Sufficient and suitable storage shall be provided for flammable liquids, solids and gases.
As per ILO Code of Practices safety and Health in construction
3.6 Fire Prevention and fire Fighting
(3.6.3) Secure storage area should be provide for flammable liquid, solid ,gases such as liquefied
petroleum gas cylinder, paints and other such material in order to deter trespassers.

As per ILO code of Recommendation R175 - Safety and Health in Construction


Recommendation, 1988,

46. Where necessary to guard against danger, workers should be suitably trained in the action to be
taken in the event of fire, including the use of means of escape

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 16 of 21


Likelihood, I set following categories
Consideration of likelihood AND severity
Certain: it will happen again and soon;
Likely: it will reoccur, but not as an everyday event;
Possible: it may occur from time to time;
Unlikely: it is not expected to happen again in the foreseeable future;
Rare: so unlikely that it is not expected to happen again.

In The justification one. Likelihood is taken – certain because naked flames or sparkles of fire
coming from the welding activity near by the flammable substance if comes in contact may catch
fire. In this work activity total 5-6 worker were engaged for 7- 8 hours of work.

Severity, I set following categories:


Minimal: no injury or damage occurred
Minor: injury requiring first-aid and/or slight damage caused to plant/equipment/buildings
Major: injury requiring hospital treatment/stay and/or significant damage caused to
plant/equipment/buildings
Catastrophic: death and/or irreparable damage to plant/equipment/buildings.

Severity is taken in this – catastrophic as worker was carried out welding activity near flammable
material (paint & solvent) which can catch fire in site which will result to personal burn injury, death,
property damage, equipment damage, and explosion.

How effective the action is likely to be in


controlling the risk. This should include:
If the combustible materials and flammable substances removed from the site will reduce the
 the intended impact of the action;
chance of fire in the site which can save company from enforcement action, direct and indirect cost.

 justification for the timescale that you I consider for timescale for this action 1 week which may required for arrangement of storage area
indicated in your risk assessment; that may take 1 week to arrange in proper manner in with good ventilation with labeling.
and

 Whether you think the action will fully


control the risk. In this case I have suggested fully control measure which can prevent from fire hazards and reduce
the risk of multiple causality accident and property damage and business loss of organisation.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 17 of 21


Justification for action 2

Action Scaffolding Erection and inspection should be done by competent person (Hazards category-
Working at height)
Specific legal arguments AS per C167 - Safety and Health in Construction Convention, 1988
Article 14 scaffold and ladders
4. Scaffolds shall be inspected by a competent person in such cases and at such times as
shall be prescribed by national laws or regulations.
As per ILO, R175 - Safety and Health in Construction Recommendation, 1988 (No. 175)
13. Where workers cannot be protected against falls from heights by any other means-
 (a) adequate safety nets or safety sheets should be erected and maintained; or

 (b) Adequate safety harnesses should be provided and used.

18. The working platforms, gangways and stairways of scaffolds should be of such
dimensions and so constructed and guarded as to protect persons against falling or being
endangered by falling objects.

20. A scaffold should not be erected, substantially altered or dismantled except by or under
the supervision of a competent person.

Consideration of likelihood AND severity In the justification two. Likelihood is taken - certain because worker is working at height without
guard rail or edge protection and without full body harness above 5 meter height can be chance of
falling from height. In this activity 3-4 worker were engaged in maintenance work.
The severity is taken is – catastrophic as worker is working at height without a guard rail and
without full boy harness which will result to fatality ,death, neck injuries, spinal injuries, broken
bones or multiple fracture.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 18 of 21


How effective the action is likely to be in
If the scaffold will be erected and inspected by competent person and will help to reduce the
controlling the risk. This should include:
hazards from work at height and it also reduce the likelihood and severity from falling from height
 the intended impact of the action; which may company save money from associated with work at height accident.
 justification for the timescale that you
I have take timescale for this action is 1 month because which required hire competent scaffolder
indicated in your risk assessment;
and developed inspection procedure which may need approval by the management to set safe
and
working procedure in company.
 whether you think the action will fully
control the risk. Work at height is a high risk activity I have suggested control measure which is help in the case to
minimize and control the risk from work at height activity if the additional control measure is taken
or developed safe working procedure in the organisation.

Justification for action 3

Action Cable and plug appear to be fully insulated with no splits and maintained by competent person.
( hazards category – Electricity)
Specific legal arguments AS per C167 - Safety and Health in Construction Convention, 1988
Article 26 Electricity
1. All electrical equipment and installations shall be constructed, installed and maintained by a
competent person, and so used as to guard against danger
3. The laying and maintenance of electrical cables and apparatus on construction sites shall
be governed by the technical rules and standards applied at the national level.
Article 13 safety of workplace
. All appropriate precautions shall be taken to ensure that all workplaces are safe and without risk of
injury to the safety and health of workers.

ILO code of practice for ambient factor


6.2.5. In assessing the hazard and risk, the employer should take account of the need to prevent
cardiac accidents which may result from exposure of workers with pacemakers or similar medical
implants to electric and magnetic fields, as well as the special needs of workers for protection in

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 19 of 21


relation to their health condition, for example in the case of pregnant women.

Consideration of likelihood AND severity In the justification two. Likelihood is taken – likely because Worker was performing grinding activity
grinder electrical cable and plug was found in damage condition which may cause chance of
electrocute to the worker and other staff and visitor. There are 3 workers who perform this job for 5
to 6 hours.

In this event I have taken severity is – catastrophic because if the worker are in contact with live
electrical cable and damage pug it can lead to electrocuted which may result in electric shock,
electric burn, head injury, multiple fracture electric fire & explosion,

How effective the action is likely to be in


If the Cable and plug appear to be fully insulated maintained by competent person that can
controlling the risk. This should include:
eliminate and reduce the chance to electrical shock and electrical fire that may impact on the
 the intended impact of the action; company financially and morally and prevent from the enforcement action and property loss.
I consider time scale for this action is 1 month because it’s required insulation material and
 justification for the timescale that you
competent electrical specialist for maintenance which need to approval from by the company to
indicated in your risk assessment;
follow the procedure.
and
 whether you think the action will fully The action will control and minimize the risk of electrical hazards if the suggested control measure
control the risk. is taken it can reduce the risk of electrical shock and electrical burn injury and property damage by
electrical fire.

Part 4: Review, communicate and check


Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.

Planned review date/periodwith As per company policy risk assessment should be reviewed every 12 month. Therefore I set the
reasoning review date on 7th May 2023
However review can done if this significant changes -:
1. Change workplace environment.
2. Change in legislation.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 20 of 21


3. After an accident.
4. After if suggested by enforcement authorities.
5. Due to pattern chance in shift.
6. Any management changes.
How the risk assessment findings will be After the completion of risk assessment I will organize meeting with the project manager of Apex
communicatedAND who you need to tell Infrastructure and their project engineers, site engineers, site supervisor, shift manager, safety
officer, HSE manger and worker representative. To communicate with them purpose of review and
discussed and highlights the hazards & risk present in the site and I also consider the risk
assessment. I informed them about top three urgent actions required to minimize to risk of worker
to prevent occupational health and safety injuries and diseases.

I discussed and shared summary of risk assessment to the worker and other staff with through
safety meeting , tool box talk , induction training and notice board and also highlights the Control
measure and precaution to improve the knowledge about health and safety in the site and
developed the awareness by communicating.
How you will follow up on the risk I will visit after some month and check work area or site and review the control measure and
assessment to check that the actions precaution have been taken or not and also communicate with the worker regards risk assessment
have been carried out which I have done some month ago.Get feedback about the how much improvement has been
done after risk assessment implemented and how positively impacted on the organisation towards
health and safety. I will routinely check the work equipment and working procedure and suggest
control measure and discussed and circulate with their project manager, HSE manager and site
engineers for continuously improvement in the site.

Learner number: 00677003 Learner name: Arsh Wasim Raza Page 21 of 21