You are on page 1of 1

7.

35M
M

7.
17

42
4

M
7.

5.20M

Legends:

1. Major Contour
2. Minor Contour

Notes:
1. The pit size has been considered for all pit as +9.0m approved foundation size which may vary with respect to the
approved foundation design of the raised chimney.
2. The lowering/raising of RL (CPG) is confirmed with profile and weight span and ground clearance is found O.K.
3. The Leg combinations are selected as the best economical, as per the available ground profile.
4. The lowering/raising of RL (CPG) is confirmed with profile and weight span and ground clearance is found O.k

You might also like