This document provides a checklist for documenting a change control process. It contains questions to ensure all change request (CR) documents from 2007 to 2008 are properly filed, logged with status updates, and follow standard numbering systems and formats. It also checks that all CRs have the required signatures, are closed within timelines, and any corrections are signed and dated. Finally, it confirms CRs are in place for reviewing standard operating procedures, new distributors or contracts, and storage facilities.
This document provides a checklist for documenting a change control process. It contains questions to ensure all change request (CR) documents from 2007 to 2008 are properly filed, logged with status updates, and follow standard numbering systems and formats. It also checks that all CRs have the required signatures, are closed within timelines, and any corrections are signed and dated. Finally, it confirms CRs are in place for reviewing standard operating procedures, new distributors or contracts, and storage facilities.
This document provides a checklist for documenting a change control process. It contains questions to ensure all change request (CR) documents from 2007 to 2008 are properly filed, logged with status updates, and follow standard numbering systems and formats. It also checks that all CRs have the required signatures, are closed within timelines, and any corrections are signed and dated. Finally, it confirms CRs are in place for reviewing standard operating procedures, new distributors or contracts, and storage facilities.
Sl No Change Control Ref Doc No -112409; 116288 Report
1. Are all the CRs issued in 2007 and 2008 filed separately Yes 2 Do you have a log of all CRs for 2007, 2008 with the status yes 3 Do you print the log every month with the updated status and The Log has print each update sign and date the printed log monthly.
This is to document that QA does follow up for the completion of
implementation plans 4 Check if all the CRs have CR numbers. Is the numbering system Yes, some are different numbering in a sequence and in the correct format system ( jan-July is different to Augt – Dec) 6 Are all the documents leading to close of CR are filed. (eg; follow up mails/ CR4, CR6) 7 Are all the CRs closed within the timelines Some cases was extended the Maximum of 6 months deadline 9 Are all the enclosures numbered yes Are all the enclosures mentioned the related CR number 10 Check if all the required signatures and dates are present yes 11 Check if correct edition of CR forms are used yes 12 Are there any corrections made in the form by striking off. If yes yes are the corrections signed and dated 13 Do you have a CR in place for all these cases if applicable Yes, review SOP 1. Review of SOP (part of 3in1 from 2008) 2. New distributor/ new contract