F26_001
Z.R. ZB-Elektro
Nikola Milanović
nikola85milanovic@gmail.com
Užice
Company / customer
Project description Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš
Drawing number Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala
Commission EPLAN
Manufacturer (company) Z.R. ZB-Elektro
Path
Project name EPLAN Podstanice N. Varos 08 2019
Make Z.R. ZB-Elektro
Type AT Control cabinet
Place of installation +ET1
Responsible for project Nikola Milanović
Part feature
Created on 7/18/2018
Edit date 5/21/2019 by (short name) nikola.milanovic Number of pages 33
=EB3+RO-EMP-NROS/1
Date 8/20/2019 EPLAN Z.R. ZB-Elektro COVER PAGE = CA1
Ed. pb + EAA
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
BK
2.5
-L1 / 2.0
-LK / 2.0
10x38, 1p,gG, 24
L N
Imax=32A 2
-V1 N:3
Eaton
UNO-PS/1AC/24VDC/100W
-XNS 1 2
C10-SLS/32/1 11
230VAC/24VDC BN
- Fuse 10A PE:3
5A -KES 0.75
V+ V- BU BN
L1 2902993 2.5
.9 12 x1
0.75
CAUTION
-Q1S 1 YG
-H1
3p, 400VAC, In=25A T1 -FDC1 2.5
GY Green, 24VDC x2 A2
0.75
Eaton (5X20) Eaton
P1-25/IVS 3046032 C22-L-G-24
-KES
2 Phoenix 2CO, 24VDC, 8A A1
Remains energized when main 2A, BR UT 4-HESI Phoenix
RIF-1-RSC-LDP-24DC/2X21
switch is opened 1
-FDC2 2903350
(5X20)
3046032
BN 2 Phoenix
1.5 BN
BK BU 2A, BR UT 4-HESI 0.75
2.5 2.5 -MP
2p,16A
PE:1 GY
Eaton
1.5
Z-SD230 266875 + - - - - - -
-RO--OP
-Q1M
1p, gG,
In=16A, 14x51 N PE
L1
=CA1+EAA/1 2
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Dovod napajanje = EB3
Ed. pb + RO-EMP-NROS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC5
(5X20)
3046032
2 Phoenix
BN BN BN BN BN BN BN PE:10
0.75 0.75 0.75 0.75 0.75 0.75 0.75
1A, BR UT 4-HESI
21
21 11 11 11 13 13
-QP2
-KES -K1 -K2 -K3 -KM1 -KM2 /5.3 22
/1.9 22 /4.6 14/5.2 14/5.5 14/3.2 14/3.5 14
+ - -
21 24V 0V PE
ST1
-QP1 -BTP
/5.1 22 /2.5
Touch Panel
Phoenix Contact
-WTP BTP 2043W - 1050387
IFS-RS232-DATACABLE - 2320490
S
PLC-ASC-PT100-IN
T-BUT2
T3
T1
24V 0V IN0 IN1 IN2 IN3 IN4 IN5 IN6 IN7 PLC-ASC-PT100-IN
ST1 2906918 2906918
-PLC BUS/ 3.0
Mod n
-A1
ule
/2.4
nsio
Controller D/V uC D/V
uC
Exte
Phoenix Contact
PLC-V8C/SC-24DC/BM2
RAD
NUŽNI KVAR PUMPA 1 MZP +24 GND +24 GND
STOP PUMPA1 PUMPA 1,2 1 2 3 4 1 2 3 4
TRENUTNA POZICIJA
TROKRAKOG -XS 1 2 PE -XS 3 4 PE
VENTILA
-W1S -W2S
LiHCH LiHCH
25.00 m 20.00 m
2x0,75 2x0,75
24V 24V
RD BK RD BK
GY
0.75 BN BN BN BN
0.75 0.75 0.75 0.75
T1 T1
1
2
3
1
2
3
-SA1 -SA2
2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
L1 0 T4 Schrack L1 0 T4
Schrack
IN086220 IN086220
A1 A1
-KM1 -KM2
A2 A2
GY
0.75
-IO13 A1 A2
-IO10 5-Data- 6-Data+ -IO11 A1 A2 -IO12 A1 A2 Relay output
Analog output Relay output Relay output Phoenix contact
Phoenix contact Phoenix contact Phoenix contact PLC-RSC-24DC/21
PLC-ASC-UI-OUT PLC-RSC-24DC/21 PLC-RSC-24DC/21 2966171
2906920 2966171 2966171
11 14 12
4-U/I- 3-GND 2+24 1-U/I+ 11 14 12 11 14 12
GY
0.75
-LY0-10 / 5.7
-GND /
ZADATA POZICIJA
KOMANDA UKLJUČENJA KOMANDA UKLJUČENJA
TROKRAKOG
PUMPA 1 PUMPA 2
VENTILA 0-100%
13 14 /2.2 13 14 /2.2
2 4
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 2 = EB3
Ed. pb + RO-EMP-NROS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 3
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC6
(5X20)
3046032
2 Phoenix
1A, BR UT 4-HESI
GY
0.75
BN
0.75
-IO14 -IO15 A1 A2
A1 A2
Relay output Relay output
Phoenix contact Phoenix contact
PLC-RSC-24DC/21 PLC-RSC-24DC/21
2966171 2966171 A2
-K1
2CO, 24VDC, 8A A1
Phoenix
-PLC BUS/ / RIF-1-RSC-LDP-24DC/2X21
2903350
BN
0.75
11 14 12 11 14 12
PE:8
-XS 5 6
-W4S
LiHCH
10.00 m
2x0,75
24V
11 14 /2.1
+SAUTER TUC105F001 1 2 4
Safety temperature
TEM1
GRANIČNI TERMOSTAT
KRUGA GREJANJA
NIŽI RAZREDI OŠ
3 5
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 3 = EB3
Ed. pb + RO-EMP-NROS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 4
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1 3 5 1 3 5
1 1 1
-QP1 -FDC7 -QP2 -FDC8 -FDC9
/2.3 (5X20) /2.3 (5X20) (5X20)
1.10-1.60A 3046032 1.10-1.60A 3046032 3046032
Schrack I> I> I> 2 Phoenix Schrack I> I> I> 2 Phoenix GY 2 Phoenix
BES00160 2 4 6 1A, BR UT 4-HESI GY BES00160 2 4 6 1A, BR UT 4-HESI 0.75 2A, BR UT 4-HESI
0.75
GY
0.75
BN BN
0.75 0.75 -LY0-10 / 3.1
BN
0.75
A2 A2 -LYO0-10 / 2.2
1L1 3L2 5L3 A1 13
-K2 1L1 3L2 5L3 A1 13
-K3
2CO, 24VDC, 8A A1 2CO, 24VDC, 8A A1
-KM1 Phoenix -KM2 Phoenix
3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14 3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14
2T1 4T2 6T3 GY 2T1 4T2 6T3 GY
24VDC/1NO/vel.00 2903350 24VDC/1NO/vel.00 2903350
/3.2
/2.2
/3.5
/2.2
0,75 0,75
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
GY GY
N:5 0,75
N:6 0,75
BU BU
1.5 1.5
PE:7
L N L N
M
-PUMP1 - - M
-PUMP2 - -
+ - - - - -
MM 01 02 03 05 06
1~ SSM SSM 1~ SSM SSM
-WILO YONOS MAXO PE -WILO YONOS MAXO PE -RV1
40/0,5-8 PN6/PN10 40/0,5-8 PN6/PN10 BQE080F701D, DN80, Kvs=80m3/h,
230VAC, 4800o/min, 0,3kW, 1,33A 230VAC, 4800o/min, 0,3kW, 1,33A PN16, 3way flanged
SAUTER
AVM322SF132
4 +RO-EMP-SS/1
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 4 = EB3
Ed. pb + RO-EMP-NROS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 5
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
BK
2.5
-L1 / 2.0
-LK / 2.0
10x38, 1p,gG, 24
L N
Imax=32A 2
-V1 N:3
Eaton
UNO-PS/1AC/24VDC/100W
-XNS 1 2
C10-SLS/32/1 11
230VAC/24VDC BN
- Fuse 10A PE:3
5A -KES 0.75
V+ V- BU BN
L1 2902993 2.5
.9 12 x1
0.75
CAUTION
-Q1S 1 YG
-H1
3p, 400VAC, In=25A T1 -FDC1 2.5
GY Green, 24VDC x2 A2
0.75
Eaton (5X20) Eaton
P1-25/IVS 3046032 C22-L-G-24
-KES
2 Phoenix 2CO, 24VDC, 8A A1
Remains energized when main 2A, BR UT 4-HESI Phoenix
RIF-1-RSC-LDP-24DC/2X21
switch is opened 1
-FDC2 2903350
(5X20)
3046032
BN 2 Phoenix
1.5 BN
BK BU 2A, BR UT 4-HESI 0.75
2.5 2.5 -MP
2p,16A
PE:1 GY
Eaton
1.5
Z-SD230 266875 + - - - - - -
-RO--OP
-Q1M
1p, gG,
In=16A, 14x51 N PE
L1
+RO-EMP-NROS/5 2
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Dovod napajanje = EB3
Ed. pb + RO-EMP-SS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
T1 T1
1 3 5 1 3 5
1
2
3
1 1
1
2
3
-QP1 -FDC7 -QP2 -FDC8 -SA1 -SA2
1.10-1.60A (5X20) 1.10-1.60A (5X20) 2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
3046032 3046032 L1 0 T4 Schrack L1 0 T4
Schrack Schrack Schrack
BES00160 I> I> I> 2 Phoenix BES00160 I> I> I> 2 Phoenix GY IN086220 IN086220
2 4 6 1A, BR UT 4-HESI GY 2 4 6 1A, BR UT 4-HESI 0.75
0.75
BN BN
0.75 0.75
A1 A1
-KM1 -KM2
A2 A2 A2 A2
1L1 3L2 5L3 A1
-K2 1L1 3L2 5L3 A1
-K3 GY
0.75
2CO, 24VDC, 8A A1 2CO, 24VDC, 8A A1
-KM1 Phoenix -KM2 Phoenix
3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2
2T1 4T2 6T3 GY 2T1 4T2 6T3 GY
24VDC/1NO/vel.00 2903350 24VDC/1NO/vel.00 2903350
.6
.7
0,75 0,75
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
GY GY
N:5 0,75
N:6 0,75
BU BU
1.5 1.5
-WK1
LiHCH -XK 1 2
-XK 3 4
-XP 1 2N 3PE-XS 7 8 -XP 4 5N 6PE-XS 9 10
15.00 m
-WP1 -WKP1 -WP2 -WKP2 4x0.75mm²
N2XH-J LiHCH N2XH-J LiHCH 24V
15.00 m 15.00 m 15.00 m 15.00 m
3x1.5mm² 2x0.75mm² 3x1.5mm² 2x0.75mm²
230V 24V 230V 24V
11 11
-K1 -K2
14 .2 14
L N L N
M
-PUMP1 - -
-PUMP2
M - -
1 3
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Pumpe / sheet 1 = EB3
Ed. pb + RO-EMP-SS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 2
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
T1 T1
1 3 5 1 3 5
1
2
3
1
2
3
-QP3 -QP4 -SA3 -SA4
0.28-0.40A 0.28-0.40A 2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
L1 0 T4 Schrack L1 0 T4
Schrack Schrack Schrack
BES00040 I> I> I> BES00040 I> I> I> IN086220 IN086220
2 4 6 2 4 6
A1 A1
-KM3 -KM4
A2 A2
1L1 3L2 5L3 1L1 3L2 5L3 GY
A1 A1 0.75
-KM3 -KM4
3KW, 7A (AC3)/ A2 3KW, 7A (AC3)/ A2
2T1 4T2 6T3 2T1 4T2 6T3
24VDC/1NO/vel.00 24VDC/1NO/vel.00
.6
.7
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
N:5 N:6
BU BU
1.5 1.5
-WK2
LiHCH -XK 5 6
-XK 7 8
-XP 7 8N 9PE -XP 10 11N 12PE
15.00 m
-WP3 -WP4 4x0.75mm²
N2XH-J N2XH-J 24V
15.00 m 15.00 m
3x1.5mm² 3x1.5mm²
230V 230V
11 11
-K3 -K4
/2.5 14 14
L N L N
M
-PUMP3 -PUMP4
M
1~ 1~
-WILO STRATOS PICO PE -WILO STRATOS PICO PE
25/1-6 25/1-6 VEZA SA POSTOJEĆIM ORMANOM AUTOMATIKE
230VAC, 4230o/min, 0,04kW, 0,44A 230VAC, 4230o/min, 0,04kW, 0,44A
2 4
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Pumpe / sheet 2 = EB3
Ed. pb + RO-EMP-SS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 3
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
T1 T1
1 3 5 1 3 5
1
2
3
1
2
3
-QP5 -QP6 -SA5 -SA6
0.28-0.40A 0.28-0.40A 2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
L1 0 T4 Schrack L1 0 T4
Schrack Schrack Schrack
BES00040 I> I> I> BES00040 I> I> I> IN086220 IN086220
2 4 6 2 4 6
A1 A1
-KM5 -KM6
A2 A2
1L1 3L2 5L3 1L1 3L2 5L3 GY
A1 A1 0.75
-KM5 -KM6
3KW, 7A (AC3)/ A2 3KW, 7A (AC3)/ A2
2T1 4T2 6T3 2T1 4T2 6T3
24VDC/1NO/vel.00 24VDC/1NO/vel.00
.6
.7
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
N:5 N:6
BU BU
1.5 1.5
-WK3
LiHCH -XK 9 10
-XK 11 12
-XP 13 14N 15PE -XP 16 17N 18PE
15.00 m
-WP5 -WP6 4x0.75mm²
N2XH-J N2XH-J 24V
15.00 m 15.00 m
3x1.5mm² 3x1.5mm²
230V 230V
11 11
-K5 -K6
14 14
L N L N
M
-PUMP5 -PUMP6
M
1~ 1~
-WILO STRATOS PICO PE -WILO STRATOS PICO PE
25/1-6 25/1-6 VEZA SA POSTOJEĆIM ORMANOM AUTOMATIKE
230VAC, 4230o/min, 0,04kW, 0,44A 230VAC, 4230o/min, 0,04kW, 0,44A
3 +RO-EMP-TS/1
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Pumpe / sheet 2 = EB3
Ed. pb + RO-EMP-SS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 4
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
BK
2.5
-L1 / 2.0
-LK / 2.0
10x38, 1p,gG, 24
L N
Imax=32A 2
-V1 N:3
Eaton
UNO-PS/1AC/24VDC/100W
-XNS 1 2
C10-SLS/32/1 11
230VAC/24VDC BN
- Fuse 10A PE:3
5A -KES 0.75
V+ V- BU BN
L1 2902993 2.5
.9 12 x1
0.75
CAUTION
-Q1S 1 YG
-H1
3p, 400VAC, In=25A T1 -FDC1 2.5
GY Green, 24VDC x2 A2
0.75
Eaton (5X20) Eaton
P1-25/IVS 3046032 C22-L-G-24
-KES
2 Phoenix 2CO, 24VDC, 8A A1
Remains energized when main 2A, BR UT 4-HESI Phoenix
RIF-1-RSC-LDP-24DC/2X21
switch is opened 1
-FDC2 2903350
(5X20)
3046032
BN 2 Phoenix
1.5 BN
BK BU 2A, BR UT 4-HESI 0.75
2.5 2.5 -MP
2p,16A
PE:1 GY
Eaton
1.5
Z-SD230 266875 + - - - - - -
-RO--OP
-Q1M
1p, gG,
In=16A, 14x51 N PE
L1
+RO-EMP-SS/4 2
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Dovod napajanje = EB3
Ed. pb + RO-EMP-TS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC5
(5X20)
3046032
2 Phoenix
BN BN BN BN BN BN BN PE:10
0.75 0.75 0.75 0.75 0.75 0.75 0.75
1A, BR UT 4-HESI
21
21 11 11 11 13 13
-QP2
-KES -K1 -K2 -K3 -KM1 -KM2 /5.3 22
/1.9 22 /4.6 14/5.2 14/5.5 14/3.2 14/3.5 14
+ - -
21 24V 0V PE
ST1
-QP1 -BTP
/5.1 22 /2.5
Touch Panel
Phoenix Contact
-WTP BTP 2043W - 1050387
IFS-RS232-DATACABLE - 2320490
S
PLC-ASC-PT100-IN
T-BUT2
T3
T1
24V 0V IN0 IN1 IN2 IN3 IN4 IN5 IN6 IN7 PLC-ASC-PT100-IN
ST1 2906918 2906918
-PLC BUS/ 3.0
Mod n
-A1
ule
/2.4
nsio
Controller D/V uC D/V
uC
Exte
Phoenix Contact
PLC-V8C/SC-24DC/BM2
RAD
NUŽNI KVAR PUMPA 1 MZP +24 GND +24 GND
STOP PUMPA1 PUMPA 1,2 1 2 3 4 1 2 3 4
TRENUTNA POZICIJA
TROKRAKOG -XS 1 2 PE -XS 3 4 PE
VENTILA
-W1S -W2S
LiHCH LiHCH
25.00 m 20.00 m
2x0,75 2x0,75
24V 24V
RD BK RD BK
GY
0.75 BN BN BN BN
0.75 0.75 0.75 0.75
T1 T1
1
2
3
1
2
3
-SA1 -SA2
2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
L1 0 T4 Schrack L1 0 T4
Schrack
IN086220 IN086220
A1 A1
-KM1 -KM2
A2 A2
GY
0.75
-IO13 A1 A2
-IO10 5-Data- 6-Data+ -IO11 A1 A2 -IO12 A1 A2 Relay output
Analog output Relay output Relay output Phoenix contact
Phoenix contact Phoenix contact Phoenix contact PLC-RSC-24DC/21
PLC-ASC-UI-OUT PLC-RSC-24DC/21 PLC-RSC-24DC/21 2966171
2906920 2966171 2966171
11 14 12
4-U/I- 3-GND 2+24 1-U/I+ 11 14 12 11 14 12
GY
0.75
-LY0-10 / 5.7
-GND /
ZADATA POZICIJA
KOMANDA UKLJUČENJA KOMANDA UKLJUČENJA
TROKRAKOG
PUMPA 1 PUMPA 2
VENTILA 0-100%
13 14 /2.2 13 14 /2.2
2 4
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 2 = EB3
Ed. pb + RO-EMP-TS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 3
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC6
(5X20)
3046032
2 Phoenix
1A, BR UT 4-HESI
GY
0.75
BN
0.75
-IO14 -IO15 A1 A2
A1 A2
Relay output Relay output
Phoenix contact Phoenix contact
PLC-RSC-24DC/21 PLC-RSC-24DC/21
2966171 2966171 A2
-K1
2CO, 24VDC, 8A A1
Phoenix
-PLC BUS/ / RIF-1-RSC-LDP-24DC/2X21
2903350
BN
0.75
11 14 12 11 14 12
PE:8
-XS 5 6
-W4S
LiHCH
10.00 m
2x0,75
24V
11 14 /2.1
+SAUTER TUC105F001 1 2 4
Safety temperature
TEM1
GRANIČNI TERMOSTAT
KRUGA GREJANJA
TEHNIČKA ŠKOLA
3 5
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 3 = EB3
Ed. pb + RO-EMP-TS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 4
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1 3 5 1 3 5
1 1 1
-QP1 -FDC7 -QP2 -FDC8 -FDC9
/2.3 (5X20) /2.3 (5X20) (5X20)
1.10-1.60A 3046032 1.10-1.60A 3046032 3046032
Schrack I> I> I> 2 Phoenix Schrack I> I> I> 2 Phoenix GY 2 Phoenix
BES00160 2 4 6 1A, BR UT 4-HESI GY BES00160 2 4 6 1A, BR UT 4-HESI 0.75 2A, BR UT 4-HESI
0.75
GY
0.75
BN BN
0.75 0.75 -LY0-10 / 3.1
BN
0.75
A2 A2 -LYO0-10 / 2.2
1L1 3L2 5L3 A1 13
-K2 1L1 3L2 5L3 A1 13
-K3
2CO, 24VDC, 8A A1 2CO, 24VDC, 8A A1
-KM1 Phoenix -KM2 Phoenix
3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14 3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14
2T1 4T2 6T3 GY 2T1 4T2 6T3 GY
24VDC/1NO/vel.00 2903350 24VDC/1NO/vel.00 2903350
/3.2
/2.2
/3.5
/2.2
0,75 0,75
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
GY GY
N:5 0,75
N:6 0,75
BU BU
1.5 1.5
PE:7
L N L N
M
-PUMP1 - - M
-PUMP2 - -
+ - - - - -
MM 01 02 03 05 06
1~ SSM SSM 1~ SSM SSM
-WILO YONOS MAXO PE -WILO YONOS MAXO PE -RV1
40/0,5-8 PN6/PN10 40/0,5-8 PN6/PN10 BQE080F701D, DN80, Kvs=80m3/h,
230VAC, 4800o/min, 0,3kW, 1,33A 230VAC, 4800o/min, 0,3kW, 1,33A PN16, 3way flanged
SAUTER
AVM322SF132
4 +RO-EMP-GIM/1
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 4 = EB3
Ed. pb + RO-EMP-TS
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 5
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
BK
2.5
-L1 / 2.0
-LK / 2.0
10x38, 1p,gG, 24
L N
Imax=32A 2
-V1 N:3
Eaton
UNO-PS/1AC/24VDC/100W
-XNS 1 2
C10-SLS/32/1 11
230VAC/24VDC BN
- Fuse 10A PE:3
5A -KES 0.75
V+ V- BU BN
L1 2902993 2.5
.9 12 x1
0.75
CAUTION
-Q1S 1 YG
-H1
3p, 400VAC, In=25A T1 -FDC1 2.5
GY Green, 24VDC x2 A2
0.75
Eaton (5X20) Eaton
P1-25/IVS 3046032 C22-L-G-24
-KES
2 Phoenix 2CO, 24VDC, 8A A1
Remains energized when main 2A, BR UT 4-HESI Phoenix
RIF-1-RSC-LDP-24DC/2X21
switch is opened 1
-FDC2 2903350
(5X20)
3046032
BN 2 Phoenix
1.5 BN
BK BU 2A, BR UT 4-HESI 0.75
2.5 2.5 -MP
2p,16A
PE:1 GY
Eaton
1.5
Z-SD230 266875 + - - - - - -
-RO-OP
-Q1M
1p, gG,
In=16A, 14x51 N PE
L1
+RO-EMP-TS/5 2
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Dovod napajanje = EB3
Ed. pb + RO-EMP-GIM
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC5
(5X20)
3046032
2 Phoenix
BN BN BN BN BN BN BN PE:10
0.75 0.75 0.75 0.75 0.75 0.75 0.75
1A, BR UT 4-HESI
21
21 11 11 11 13 13
-QP2
-KES -K1 -K2 -K3 -KM1 -KM2 /5.3 22
/1.9 22 /4.6 14/5.2 14/5.5 14/3.2 14/3.5 14
+ - -
21 24V 0V PE
ST1
-QP1 -BTP
/5.1 22 /2.5
Touch Panel
Phoenix Contact
-WTP BTP 2043W - 1050387
IFS-RS232-DATACABLE - 2320490
S
PLC-ASC-PT100-IN
T-BUT2
T3
T1
24V 0V IN0 IN1 IN2 IN3 IN4 IN5 IN6 IN7 PLC-ASC-PT100-IN
ST1 2906918 2906918
-PLC BUS/ 3.0
Mod n
-A1
ule
/2.4
nsio
Controller D/V uC D/V
uC
Exte
Phoenix Contact
PLC-V8C/SC-24DC/BM2
RAD
NUŽNI KVAR PUMPA 1 MZP +24 GND +24 GND
STOP PUMPA1 PUMPA 1,2 1 2 3 4 1 2 3 4
TRENUTNA POZICIJA
TROKRAKOG -XS 1 2 PE -XS 3 4 PE
VENTILA
-W1S -W2S
LiHCH LiHCH
25.00 m 20.00 m
2x0,75 2x0,75
24V 24V
RD BK RD BK
+SAUTER +SAUTER
EGT401F102 PT1000 EGT447F102 PT1000
Temperature sensor Temperature sensor
TEMP1 1 2 TEMP2 1 2
GY
0.75 BN BN BN BN
0.75 0.75 0.75 0.75
T1 T1
1
2
3
1
2
3
-SA1 -SA2
2p,In=20A,1-0-2, na DIN 2p,In=20A,1-0-2, na DIN
L1 0 T4 Schrack L1 0 T4
Schrack
IN086220 IN086220
A1 A1
-KM1 -KM2
A2 A2
GY
0.75
-IO13 A1 A2
-IO10 5-Data- 6-Data+ -IO11 A1 A2 -IO12 A1 A2 Relay output
Analog output Relay output Relay output Phoenix contact
Phoenix contact Phoenix contact Phoenix contact PLC-RSC-24DC/21
PLC-ASC-UI-OUT PLC-RSC-24DC/21 PLC-RSC-24DC/21 2966171
2906920 2966171 2966171
11 14 12
4-U/I- 3-GND 2+24 1-U/I+ 11 14 12 11 14 12
GY
0.75
-LY0-10 / 5.7
-GND /
ZADATA POZICIJA
KOMANDA UKLJUČENJA KOMANDA UKLJUČENJA
TROKRAKOG
PUMPA 1 PUMPA 2
VENTILA 0-100%
13 14 /2.2 13 14 /2.2
2 4
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 2 = EB3
Ed. pb + RO-EMP-GIM
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 3
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1
-FDC6
(5X20)
3046032
2 Phoenix
1A, BR UT 4-HESI
GY
0.75
BN
0.75
-IO14 -IO15 A1 A2
A1 A2
Relay output Relay output
Phoenix contact Phoenix contact
PLC-RSC-24DC/21 PLC-RSC-24DC/21
2966171 2966171 A2
-K1
2CO, 24VDC, 8A A1
Phoenix
-PLC BUS/ / RIF-1-RSC-LDP-24DC/2X21
2903350
BN
0.75
11 14 12 11 14 12
PE:8
-XS 5 6
-W4S
LiHCH
10.00 m
2x0,75
24V
11 14 /2.1
+SAUTER TUC105F001 1 2 4
Safety temperature
TEM1
GRANIČNI TERMOSTAT
KRUGA GREJANJA
GIMNAZIJA
3 5
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 3 = EB3
Ed. pb + RO-EMP-GIM
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 4
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
1 3 5 1 3 5
1 1 1
-QP1 -FDC7 -QP2 -FDC8 -FDC9
/2.3 (5X20) /2.3 (5X20) (5X20)
1.10-1.60A 3046032 1.10-1.60A 3046032 3046032
Schrack I> I> I> 2 Phoenix Schrack I> I> I> 2 Phoenix GY 2 Phoenix
BES00160 2 4 6 1A, BR UT 4-HESI GY BES00160 2 4 6 1A, BR UT 4-HESI 0.75 2A, BR UT 4-HESI
0.75
GY
0.75
BN BN
0.75 0.75 LY0-10 / 3.1
BN
0.75
A2 A2 -LYO0-10 / 2.2
1L1 3L2 5L3 A1 13
-K2 1L1 3L2 5L3 A1 13
-K3
2CO, 24VDC, 8A A1 2CO, 24VDC, 8A A1
-KM1 Phoenix -KM2 Phoenix
3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14 3KW, 7A (AC3)/ RIF-1-RSC-LDP-24DC/2X21
A2 14
2T1 4T2 6T3 GY 2T1 4T2 6T3 GY
24VDC/1NO/vel.00 2903350 24VDC/1NO/vel.00 2903350
/3.2
/2.2
/3.5
/2.2
0,75 0,75
Schraack Schraack
LSDD0715 LSDD0715
BK PE:9 BK PE:6
1,5 1,5
GY GY
N:5 0,75
N:6 0,75
BU BU
1.5 1.5
PE:7
L N L N
M
-PUMP1 - - M
-PUMP2 - -
+ - - - - -
MM 01 02 03 05 06
1~ SSM SSM 1~ SSM SSM
-WILO YONOS MAXO PE -WILO YONOS MAXO PE -RV1
40/0,5-8 PN6/PN10 40/0,5-8 PN6/PN10 BQE080F701D, DN80, Kvs=80m3/h,
230VAC, 4800o/min, 0,3kW, 1,33A 230VAC, 4800o/min, 0,3kW, 1,33A PN16, 3way flanged
SAUTER
AVM322SF132
4 =REPORT+CON_VBL/1
Date 8/20/2019 EPLAN Z.R. ZB-Elektro PLC / sheet 4 = EB3
Ed. pb + RO-EMP-GIM
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 5
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
=EB3+RO-EMP-GIM/5 2
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 1
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
1 3
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 2
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
2 4
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 3
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
3 5
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 4
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
4 6
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 5
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
5 7
Date 8/20/2019 EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. pb + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 6
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
6 8
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 7
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
7 9
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 8
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
8 10
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 9
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
9 11
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 10
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
10 12
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 11
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
11 13
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 12
Modification Date Name Original Replaced by Replaced by Page 33
0 1 2 3 4 5 6 7 8 9
Connection source Target Cross-section Color Length Page / column 1 Page / column 2 Function definition
12
Date EPLAN Z.R. ZB-Elektro Connection list = REPORT
Ed. + CON_VBL
Appr Projekat EMP instalacija - Idejno rešenje - Podstanice Nova Varoš Gimnazija, Niži razredi OŠ, Tehnička škola, Sportska sala Page 13
Modification Date Name Original Replaced by Replaced by Page 33