#- Home run shall be mentioned in SD.

#-All the provided information is a contractor responsibility,


#-Conduits /type size shall be provided.
#- Rated power for equipments is contractor responsibility
any mistake in the provided information’s and related
#-For fixed equipments used especial circuits.. consequences shall be contractor responsibility

Supervision and Management Services for King Faisal Air Academy


Facilities Relocation and Construction Project, Majmaah

DOCUMENT / DESIGN REVIEW - Any special purpose power outlet for IT racks to be supplied from a dedicated
circuit, i.e one circuit per equipment.
A - Approved - Construction / Fabrication / installation may be undertaken. - The panel form, IP, IK and SC ratings shall be as per project specs.
B - Approved as noted - Approval does not authorize changes in contract sum or contract time.
- Panel mounting and cable entry shall be as per approved power layout.
C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken. - Refer and comply with project specs and tender requirements.
D - Rejected - In resubmitting, limit corrections to the items marked.
#-a. Lighting: DF=1.0 as per tender documents.
- Dar Al Riyadh approval of submitted item is not required or the submittal is not
E - Not reviewed complying with contract requirements b. Sockets: DF=0.5 this factor can be adjusted based on the type of building.
Architecture Interior Design Civil Electrical Survey c. HVAC to be divided to two subcategories (A/C: DF=0.7 and Ex. Fan: DF=1.0).
Squad Checking:
Mechanical Structural Telecom Landscape d. EWH: DF=0.65 as proposed in tender documents.
Reviewed By : A.M Date: 06-12-2023 e. Kitchen and laundry equipment: DF=0.65 as proposed in tender documents.
Disclaimer: f. LC systems: DF=0.90.
1. Review and approval are for conformance with the information given and the design concept of the Project as
expressed in the Contract Documents. #- Contract should be correct some missing and errors in calculation.
îX˘„oZ]LjZ„˚À]˚Ávˆ››„}Ào}(ıZ˚}vı„ı}„[’’µu]ııo’’Zoov}ı„˚o]˚À˚ıZ˚}vı„ı}„(„}uvÇ}o]Pı]}v #- All EAF. shall be controlled thru contactor to BMS connection
contained in the Contract Documents.
Consider the following lengths as a guidance and revise the PB sch accordingly:-
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation. #- For 16A, C type MCB (50 m for 2.5 mm2, 80 m for 4 mm2, 120m for 6 mm2)
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials. #- For 20A, C type MCB (40 m for 2.5 mm2, 65 m for 4 mm2, 95m for 6 mm2)
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
FOC tagging to be done in accordance
#- For 32A, C type MCB (25 m for 2.5 mm2, 40 m for 4 mm2, 60m for 6 mm2)
#-Any power circuit shall not less than 4 mm2, for AC shall not less than 6 mm2.
with DCIT Standard for labeling.
#-Minimum cable CSA to feed the final distribution panel should not less than
4x10mm2.
Revise ;All load is single load #-Any special purpose socket outlet to be supplied from a dedicated circuit, i.e one
circuit per equipment.
#-All indicated ratings of the electromechanical equipment is a contractor
responsibility and shall be as per approved material.
Revise ;All load is single load #-Any change in DB schedule (circuit no.) shall be reflected to circuit .layout.
#-K- curve shall be used for all motor loads
#Coordinate with other disciplines.
#-Follow project technical documents.
#-Follow previous comments.

Revise ;All load is single load

RCD

RCD

RCD

RCD

2-1x6+6mm2

RCD

RCD

RCD RCD

RCD RCD

RCD RCD

RCD

RCD

RCD

1. All equipment/devices as per final approved


2. Contractor to fully comply with the selected m
recommendation on the installation to ensure fu
missing items/ calculation mistake are sole resp
strict compliance.
3. Power supply requirements to be fully coordi

Supervision and Management Services for King Faisal Air A


Facilities Relocation and Construction Project, Majm

DOCUMENT / DESIGN REVIEW


☐ A - Approved - Construction / Fabrication / installation may be undertaken.

ü
☐ B - Approved as noted
☐ C - Revise and Resubmit
- Approval does not authorize changes in contract sum or con

- Construction / Fabrication / installation may not be underta


☐ D - Rejected - In resubmitting, limit corrections to the items marked.
- Dar Al Riyadh approval of submitted item is not required or
☐ E - Not reviewed complying with contract requirements
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrica
Squad Checking:
☐ Mechanical ☐ Structural ü
☐ Telecom ☐
Reviewed By : VL | RO Date: 06 December 2022
Disclaimer:
1. Review and approval are for conformance with the information given and the design concept of th
expressed in the Contract Documents.
2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor fr
contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or d
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or inst
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and material
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/con