FEED FOR MSTB FIELD DEVELOPMENT PROJECT

CALCULATION
CRUDE OIL STORAGE TANK SIZING

9-Nov-21 DC

0 08/11/21 REA Issued For Design KHS/SGW DC/SP IW


B 21/09/21 REA Issued For Approval KHS/SGW DC/SP IW
A 11/08/21 REA Issued For Review KHS/SGW DC/SP IW
REV DATE BY DESCRIPTION CHECK REVIEW APPD
STATUS CODE : IFR = Issued for Review ; IFA = Issued for Approval ; IFD = Issued for Design

TOTAL OR PARTIAL REPRODUCTION AND/OR UTILISATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN
AUTHORIZATION OF THE OWNER

DOCUMENT NO
EMP MALACCA STRAIT S.A
SEL-TBD-O-CA-003

REVISION STATUS
PT LOKA WAHANA USAHA
0 IFD
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 2 of 9

TABLE OF CONTENT

1. INTRODUCTION ................................................................................................................ 3
2. OBJECTIVE ....................................................................................................................... 3
3. TERMINOLOGY AND ABBREVIATIONS.......................................................................... 3
3.1 Terminology........................................................................................................................ 3
3.2 Abbreviations ..................................................................................................................... 4
4. REFERENCE ..................................................................................................................... 5
5. FACILITY DESCRIPTION .................................................................................................. 5
6. BASIS AND ASSUMPTION ............................................................................................... 5
6.1 Design Capacity ................................................................................................................. 5
6.2 Operating Condition........................................................................................................... 5
7. METHODOLOGY AND CRITERIA .................................................................................... 6
7.1 Tank Dimension ................................................................................................................. 6
7.2 Inbreathing and Outbreathing Capacity ........................................................................... 6
8. RESULT ............................................................................................................................. 8

ATTACHMENT A – CRUDE OIL TANK, VENTING, AND BUND WALL CALCULATION


CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 3 of 9

1. INTRODUCTION

MSTB production field is located in Desa Tanjung, Kecamatan Tebing Tinggi Barat, Kabupaten
Kepulauan Meranti. Currently fluid transfer is carried out via barging from MSTB to FSO Gandini/Kurau
Plant. Wells currently operating are MSTB-01, MSTB-02, MSTB-03, MSTB-05, MSTB-06, MSTB-08,
MSTB-09 with production rate of around 1,900 BFPD and BSW ranges between 1.00-56.00% (based
on Production Daily Report 18 November 2019).
MSTB-01 is part of a scattered discovery in the eastern region of the Malacca Strait, which is located
in the inland area onshore in the Ringgit area and the surface conditions are swampy. The eastern
region of Malacca Strait is quite far from existing production facilities.
Along with the MSTB field development program, efforts will be made to increase production capacity
by carrying out a series of drilling programs with the target of increasing production to 4,500 BFPD
from MSTB Field, and 4,000 BFPD from Ringgit Field.

Figure 1 – MSTB Field Location

2. OBJECTIVE

The objective of this document is to presents optimum crude oil storage tank dimension including
venting device dimension on the crude oil tank for the MSTB and MSAI Facility. The physical properties
of the fluid is taken from the process simulation results document.

3. TERMINOLOGY AND ABBREVIATIONS

3.1 Terminology

COMPANY EMP Malacca Strait


CONTRACTOR PT Loka Wahana Usaha
PROJECT MSTB Field Development Project
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 4 of 9

SUBCONTRACTOR Party who provides services to perform part of the contractual scope
of work on behalf of CONTRACTOR
VENDOR Party who supplies and manufactures equipment / materials or
services part of the contractual scope of work
Shall Means absolute requirement to be followed strictly in order to
conform the strategy
Should Means recommendation, that alternative solutions having the same
functionality and quality are acceptable
May Means course of action that is permissible within the limits of the
philosophy (permission)

3.2 Abbreviations
API American Petroelum Institute
BFPD Barrel Fluid per Day
BoD Basis of Design
BOV Botton of Vessel
LIAHH High High Interface Level
LAHH High High Liquid Level
LIAH High Interface Level
LAH High Liquid Level
NIL Normal Interface Level
NLL Normal Liquid Level
LIAL Low Interface Level
LIALL Low Low Interface Level
LAL Low Liquid Level
LALL Low Low Liquid Level
MMscfd Million standard cubic feet per day
MW Molecular Weight
P&ID Piping and Instrumentation Diagram
PFD Process Flow Diagram
POD Plan of Development
TBA To be announced
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 5 of 9

4. REFERENCE

[1] Project Design Basis and Philosophy, Doc.No. SEL-TBD-O-ST-001


[2] Process Simulation Report, Doc.No. SEL-TBD-O-PR-001
[3] API Standard 650, Welded Tanks for Oil Storage
[4] API STD 2000, Venting Atmospheric and Low-Pressure Storage Tanks
[5] Flow Assurance Study Report, Doc.No. SEL-TBD-A-ST-003

5. FACILITY DESCRIPTION

Fluid from MSTB wells is transferred through flowlines with a size of 4” with varying lengths to MSTB
Production Facility. Fluid from the Production Manifold flows to the Crude Oil Storage Tank (T-701D/E),
while the fluid from the Test Manifold is routed to the Test Separator to separate Gas, Oil and Water.
The Test Separator outlet gas flows to the KO Drum and Venting System. Oil and Water from the Test
Separator are routed to the Storage Tank.
From Crude Oil Storage Tank (T-701D/E), the fluid is pumped to MSAI facility via 32 km long 4” & 6”
pipeline. In addition to the pumping process, the fluid is also heated by Crude Oil Heater so that the
fluid temperature remains above the pour point when it arrives at MSAI.
At MSAI Facility (Selatan Field), the fluid is stored in a Storage Tank (T-801) before transferred to
Kurau Plant. From Crude Oil Storage Tank, the fluid is heated in order to keep the fluid temperature
remains above the pour point when it arrives at Kurau Facility. Fluid is then pumped from MSAI Facility
to Kurau Facility through the existing 12” pipeline along 27 km.

6. BASIS AND ASSUMPTION

6.1 Design Capacity


The design capacity for the crude oil storage tank sizing is selected by considered the highest actual
volumetric flowrate. The working capacity for the MSTB Crude Oil Storage Tank (T-701D/E) and MSAI
Crude Oil Storage Tank (T-801) has been determined as 5000 BBL.
6.2 Operating Condition
Tanks are operated at atmospheric condition. The inlet operating condition is taken from process
simulation result as below.
Table 6.1 – Crude Oil Storage Tank Inlet Operating Condition

Working Capacity, Pressure, Temperature,


Tank
BBL psig o
F
MSTB Crude Oil Storage 135
5000 5
Tank (T-701D/E)
MSAI Crude Oil Storage 106 Note-1
5000 5
Tank (T-801)

Note: 1. Based on Flow Assurance Study Result [Ref.5]


CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 6 of 9

Crude Oil Storage Tank will be equipped with venting system. The venting requirement should be sized
to anticipate required venting condition. The venting scenario which considered to be calculate are normal
venting, liquid movement, and thermal effect.
Crude Oil Storage Tank will also be equipped with immersed heater to maintain the fluid temperature at
100 oF

7. METHODOLOGY AND CRITERIA

The tank sizing calculation is performed with In-house vessel calculation spreadsheet. The methodology
based on API STD 2000 is applied to select the proper pressure and vacuum relief size based on the tank
service condition and flow requirement.
In-house venting requirement spreadsheet for atmospheric tank based on API 2000 is also used to
performed tank venting calculation.
Tank working capacity is liquid volume between minimum operating liquid level (LLL) and maximum
operating liquid level (HLL). The required working capacity for new Crude Oil Storage Tank at MSTB and
MSAI has been determined as 5,000 BBL refer to the latest production profile flowrate with some margin.
As limiting criteria, the height – diameter ratio of the Tank should be equal to or less than 1 (H/D < 1).
Tank dimension is determined based on Table A.1b of Annex A in API STD 650, 12th edition.
Minimum height between center line of outlet nozzle and bottom of tank is determined based on Table
5-6, API STD 650, 12th edition. Outlet nozzle type is assumed as regular type.
Crude Oil Storage Tank is assumed to be designed to use 72-inch height courses.
Basis for calculating outbreathing and inbreathing capacity:
- Crude Oil Storage Tank is not insulated
- MSTB Facility is located in Indonesia. Hence, belongs to latitude below 42°.
- Operating temperature of Crude Oil Storage Tank is refer to Process Simulation Report
- Vapor pressure of crude oil is 0.2 psi (at 100 °F) based on laboratory analysis.
7.1 Tank Dimension

Crude Oil Storage Tank and Diesel Oil Storage Tank are cylindrical tanks where the volume is
calculated based on this equation:

Where:
V : Tank volume
D : Tank diameter
H : Tank height
7.2 Inbreathing and Outbreathing Capacity

Inbreathing and outbreathing calculation refers to API STD 2000, 7th edition.

Due to liquid movement


 Inbreahting capacity calculation due to liquid movement is calculated using these equations:
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 7 of 9

 Outbreahting capacity calculation due to liquid movement is calculated using these


equations:For non-volatile liquid with vapor pressure ≤ 0.73 psi

For volatile liquid with vapor pressure > 0.73 psi

Where:
Vip : Inbreathing venting Requirement (SCFH)
Vpe : maximum rate of liquid discharging (GPM)
Vop : outbreathing volumetric flowrate (ACFH)
Vpf : maximum volumetric filling rate (GPM)

Due to thermal effect

 Inbreahting capacity calculation due to thermal effect is calculated using these equations:

 Outbreahting capacity calculation due to thermal effect is calculated using these equations:

Where
VOT : Thermal outbreathing apacity (SCFH)
VIT : Thermal inbreathing capacity (SCFH)
C : Factor that depends on vapor pressure, average storage temperature and latitude (see
Table 6.2)
Y : Factor for latitude
Vtk : Tank volume (ft3)
Ri : Reduction factor for insulation (Ri = 1 if no insulation)
Table 7.2 – Y-Factor for Various Latitudes
Latitude Y-Factor

Below °42 0.32


Between °42 and °58 0.25
Above °58 0.20
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 8 of 9

Table 7.2 – C Factor

C-factor for various conditions


Vapor pressure similar to Vapor pressure higher
Hexane than hexane, or unknown
Latitude
Average Storage Temperature, oC

<25 ≥25 <25 ≥25

Below °42 4 6.5 6.5 6.5


Between °42 and °58 3 5 5 5
Above °58 2.5 4 4 4

8. RESULT

The working capacity for the Crude Oil Storage Tank of MSTB and MSAI is 5000 BBL based on production
profile with safety margin. Working capacity is liquid volume between Low Liquid Level (LLL) and High
Liquid Level (HLL).
The tank dimension is determined based on Table A.1b of Annex A in API STD 650, 12th edition. Crude
Oil Storage Tank is assumed to be designed to use 72-inch height courses.
Table 8.1 – Nominal Capacities (barrels) for Tanks API STD 650

Refer to Table A.1b API STD 650, by considered dead volume and vapor space area, the selected
nominal volume for the MSTB and MSAI Crude oil tank is 6300 BBL with 50 ft (ID) x 18 ft (Height).
The Crude Oil Storage Tank sizing result is summarized on the following table. Detailed calculation can
be found on Attachment-A.
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 Page 9 of 9

Table 8.2 – Sizing of Crude Oil Storage Tank Summary Result

MSTB Crude Oil Storage Tank MSAI Crude Oil Storage Tank
Description
(T-701D/E) (T-801)
Dimension 50 ft (ID) x 18 ft (Height) 50 ft (ID) x 18 ft (Height)
Low-Low Liquid Level (LLLL) 306 mm 406 mm
Low Liquid Level (LLL) 606 mm 606 mm
High Liquid Level (HLL) 4958 mm 4958 mm
High-High Liquid Level (HHLL) 5079 mm 5086 mm
Working Volume 5000 bbl 5000 bbl
0
Total Volume 6300 bbl 6300 bbl
Holding Time 1.2 day 0.6 day
Inlet Flow 4175 BPD 8000 BPD
Outlet Flow 4175 BPD (122 USGPM) 8000 BPD (234 USGPM)
Inlet Nozzle 4” 6”
Outlet Nozzle 4” 6”
Pump Circulation Nozzle 4” 6”
Design Pressure Full of Water Full of Water
Design Temperature 200 oF 200 oF

The venting requirement during normal is summarized in the following table. Detail calculation can be
found on Attachment A.
Table 8.3 – Venting of Crude Oil Storage Tank Summary Result

Tank Scenario Venting Requirement


Crude Oil Storage Normal Venting
Tank Inbreathing 31563 SCFH
(MSTB T-701 D/E) Outbreathing 6904 SCFH
Crude Oil Storage Normal Venting
Tank Inbreathing 32458 SCFH
(MSTB T-801) Outbreathing 7735 SCFH

The bund wall dimension for each crude oil storage tank is summarized in the following table. Detail
calculation can be found on Attachment A.
Table 8.4 – Bund Wall Dimensions
Equipment Dimension

MSTB Crude Oil Storage Tank (T-701 D) 30 m (L) x 30 m (W) x 1.4 m (H)
MSTB Crude Oil Storage Tank (T-701 E) 30 m (L) x 30 m (W) x 1.4 m (H)
MSAI Crude Oil Storage Tank (T-801) 30 m (L) x 30 m (W) x 1.4 m (H)
CRUDE OIL STORAGE TANK
CALCULATION

IFD 08 Nov 2021 Doc. No : SEL-TBD-O-CA-003 Rev.0 ATTACHMENT

ATTACHMENT A – CRUDE OIL STORAGE TANK, VENTING, AND BUND WALL


CALCULATION
CALCULATION NOTE

MSTB CRUDE OIL TANK SIZING


(T-701 D/E)

1. Refer to API standard 650: 50 ft(ID ) and 18 ft(H) is 6300 bbl tank volume

Properties Liquid
Temperature C 37.78 100.00 F
Pressure kg/cm2 1.03 0.00 psig ```````
Mass Density kg/m3 864.10 53.94 lb/ft3
Viscosity cP 24.79
Specific Gravity 0.86
Molecular Weight 155.90

Crude Oil Storage


T-701 D/E
Volume bbl 6,300
Volume m3 1002

Holding time day 1.2 H1 407


Inlet Flow bpd 4,175 N1 H2 N3 HLL
H2
Inlet Flow m3/h 27.66 121 HLL

Outlet crude oil flow bpd 4,175


m3/h
LLL
Outlet crude oil flow 27.659375 H3 606
Inlet nozzle Inch 3 H3 306 LLLL
Outlet nozzle (N2) Inch 6 H4 N2 259
H4

Circulation nozzle (N3) Inch 3


Diameter feet 50 H3
m 15.25 D=> 12 (m) 300 mm
Height feet 18 D<=10 (m) 150 mm
m 5.4864
Low liquid level (H3+H4) feet 1.99 CRT D<=18m API 650
m 0.61 Nozzle (in) H1 H4
High liquid level feet 16.27 3 305 239 mm
m 4.9584 4 407 259 mm
Geometric volume bbl 6,303 6 610 306 mm
Geometric volume m3 1002 8 813 349 mm
Net volume bbl 5,000 10 399 mm
Net volume m3 795 12 449 mm

Note:
H1 is based on common practice of ideal distance from top tangent to centre of circulate nozzle which is 4 x nozzle diameter
H2 is estimated by considering working capacity required and also considering required time for liquid to reach High High Level for Operator response time
H3 is based on common practice with minimum distance 150 mm and also considering required time for liquid to reach Low Low Level (Operator response time)
H4 is based on Table 5-6a in API 650

Level Setting Volume Residence Time


Level
mm m3 h min
HHLL (Overfill) 5079 22 1 48
HLL 4958 47 2 102
NLL 4700 748 27 1622
LLL 606 55 2 119
LLLL 306 56 2 121
BOT 0 0 0 0

3
Working Capacity is from NLL to HLL = 795 m
= 5,000 barrel

Selected Nozzle Calculated Criteria


Nozzle NPS ID ρv2 v ρv2 v Remarks
Sch.
(in) (in) (lb/ft.s2) (ft/s) (lb/ft.s2) (ft/s)
Feed Inlet (N1) 4 40 4.026 480.366 3.069 4000 - OK
Liquid Outlet (N2) 4 40 4.026 480.443 3.069 - 6.0 OK
Circulation Nozzle (N3) * 4 40 4.026 120.111 1.535 - 6.0 OK
*assumed 100% outlet flow
INBREATHING/OUTBREATHING CALCULATION

MSTB CRUDE OIL TANK SIZING


(T-701D/E)

4175 BPD 4175 BPD (122 GPM)

1. Liquid Movement Inbreathing/Outbreathing


Actual Liquid Temperature = 100.0 o
F = 37.8 o
C
Actual Liquid Pressure = 0.0 psig = 14.7 psia
Standard Temperature = 60.0 o
F = 15.6 o
C
Standard Pressure = 0.0 psig = 14.7 psia

Liquid Movement Outbreathing


Equation (4) from API STD 2000 7th edition, March 2014

(Non-Volatile Liquid Vap. Press ≤ 0.73 psi, Liquid Vap Pressure is 0.2 psi)

Inflow of liquid into the Tank (liquid movement in) = 4175.0 BPD from Production Profile
= 121.8 USGPM
Outbreathing Flowrate = 976.7 ACFH
= 906.96 SCFH

Liquid Movement Inbreathing


Equation (6) from API STD 2000 7th edition, March 2014

Outflow of liquid from the Tank (liquid movement out) = 4175.0 BPD ---> 1 x 100% Crude Oil Transfer Pump Running
= 121.8 USGPM
Inbreathing Flowrate = 976.7 SCFH

2. Thermal Inbreathing/Outbreathing
Tank Volume (Critical height/Overflow to bottom), Vtk = 35372.0 ft3

Thermal Outbreathing
Equation (8) from API STD 2000 7th edition, March 2014

Y Factor for the latitude = 0.3 Table 1 API STD 2000 7th edition, March 2014 (Plant is located in Indonesia)
Ri The reduction factor for insulation = 1.0 (no insulation)
Thermal Outbreathing Flowrate = 5996.8 SCFH

Thermal Inbreathing
Equation (10) from API STD 2000 7th edition, March 2014

C Factor = 6.5 Table 2 API STD 2000 7th edition, March 2014 Thermal Inbreathing Flowrate
= 30586.2 SCFH

3. Result of Normal Venting Capacity


Normal Venting Capacity (Inbreathing) = 31562.9 SCFH
Normal Venting Capacity (Outbreathing) = 6903.8 SCFH
BUND WALL CALCULATION FOR MSTB CRUDE OIL STORAGE TANK

Step 1 Minimum Volume Required (100% from Storage Volume) = 1x 1001.62


= 1001.62 m3

Step 2 Minimum Distance from Tank to Wall = 1.5 m NFPA 30


Bund Wall Height = 1.4 m Note-1
Note-1. Bund wall height is refer to Government Regulation of Indonesian Republic No.11 Year 1979

Selected Distance from Tank to Wall = 7.4 m 7.4


Selected Bund Wall Height = 1.4 m
Estimate Length (a) : 30.0 m
Estimate Widhth (b) : 30.0 m
Estimate Height ( c) : 1.4 m

Total Volume : 1260.84 m3


Storage Tank Partial Volume (based on bund wall Height) : 255.716 m3
Bund Wall Volume : 1005.12 m3 > 1001.6 OK

RESULT Selected Bund Wall Size : 30.0 m (L) x 30.0 m (W) x 1.4 m (H)
CALCULATION NOTE

MSAI CRUDE OIL TANK SIZING


(T-801)

1. Refer to API standard 650: 50 ft(ID ) and 18 ft(H) is 6300 bbl tank volume

Properties Liquid
Temperature C 37.78 100.00 F
Pressure kg/cm2 1.03 0.00 psig ```````
Mass Density kg/m3 874.60 54.60 lb/ft3
Viscosity cP 32.48
Specific Gravity 0.87
Molecular Weight 92.32

Crude Oil Storage


T-801
Volume bbl 6,300
3
Volume m 1002

Holding time day 0.6 H1 400


Inlet Flow bpd 8,000 N1 H2 N3 HHLL
H2
Inlet Flow m3/h 53.00 128 HLL

Outlet crude oil flow bpd 8,000


Outlet crude oil flow m3/h 53 606 LLL
Inlet nozzle Inch 4 H3 406 LLLL
Outlet nozzle (N2) Inch 6 H4
N2 306
H4

Circulation nozzle (N3) Inch 6


Diameter feet 50 H3
m 15.25 D=> 12 (m) 300 mm
Height feet 18 D<=10 (m) 150 mm
m 5.4864
Low liquid level (H3+H4) feet 2.99 CRT D<=18m API 650
m 0.91 Nozzle (in) H1 H4
High liquid level feet 16.27 3 305 239 mm
m 4.9584 4 407 259 mm
Geometric volume bbl 6,303 6 610 306 mm
Geometric volume m3 1002 8 813 349 mm
Net volume bbl 4,648 10 399 mm
Net volume m3 739 12 449 mm

Note:
H1 is assumed 400 mm height due to limited height, since the residence time is still adequate for operator response
H2 is estimated by considering working capacity required and also considering required time for liquid to reach High High Level for Operator response time
H3 is based on common practice with minimum distance 150 mm and also considering required time for liquid to reach Low Low Level (Operator response time)
H4 is based on Table 5-6a in API 650

Level Setting Volume Residence Time


Level
mm m3 h min
HHLL (Overfill) 5086 23 0.4 26
HLL 4958 47 0.9 53
NLL 4700 748 14.1 847
LLL 606 37 0.7 41
LLLL 406 74 1.4 84
BOT 0 0 0 0

3
Working Capacity is from NLL to HLL = 795 m
= 5,000 barrel

Selected Nozzle Calculated Criteria


Nozzle NPS ID ρv2 v ρv2 v Remarks
Sch.
(in) (in) (lb/ft.s2) (ft/s) (lb/ft.s2) (ft/s)
Feed Inlet (N1) 6 40 6.065 342.461 2.591 4000 - OK
Liquid Outlet (N2) 6 40 6.065 342.516 2.591 - 6.0 OK
Circulation Nozzle (N3) * 6 40 6.065 342.516 1.296 - 6.0 OK
*assumed 100% outlet flow
INBREATHING/OUTBREATHING CALCULATION

MSAI CRUDE OIL TANK SIZING


(T-801)

8000 BPD
8000 BPD

1. Liquid Movement Inbreathing/Outbreathing


Actual Liquid Temperature = 100.0 o
F = 37.8 o
C
Actual Liquid Pressure = 0.0 psig = 14.7 psia
Standard Temperature = 60.0 o
F = 15.6 o
C
Standard Pressure = 0.0 psig = 14.7 psia

Liquid Movement Outbreathing


Equation (4) from API STD 2000 7th edition, March 2014

(Non-Volatile Liquid Vap. Press ≤ 0.73 psi, Liquid Vap Pressure is 0.2 psi)

Inflow of liquid into the Tank (liquid movement in) = 8000.0 BPD from Production Profile
= 233.4 USGPM
Outbreathing Flowrate = 1871.5 ACFH
= 1737.89 SCFH

Liquid Movement Inbreathing


Equation (6) from API STD 2000 7th edition, March 2014

Outflow of liquid from the Tank (liquid movement out) = 8000.0 BPD ---> 1 x 100% Crude Oil Transfer Pump Running
= 233.4 USGPM
Inbreathing Flowrate = 1871.5 SCFH

2. Thermal Inbreathing/Outbreathing
Tank Volume (Critical height/Overflow to bottom), Vtk = 35372.0 ft3

Thermal Outbreathing
Equation (8) from API STD 2000 7th edition, March 2014

Y Factor for the latitude = 0.3 Table 1 API STD 2000 7th edition, March 2014 (Plant is located in Indonesia)
Ri The reduction factor for insulation = 1.0 (no insulation)
Thermal Outbreathing Flowrate = 5996.8 SCFH

Thermal Inbreathing
Equation (10) from API STD 2000 7th edition, March 2014

C Factor = 6.5 Table 2 API STD 2000 7th edition, March 2014 Thermal Inbreathing Flowrate
= 30586.2 SCFH

3. Result of Normal Venting Capacity


Normal Venting Capacity (Inbreathing) = 32457.8 SCFH
Normal Venting Capacity (Outbreathing) = 7734.7 SCFH
BUND WALL CALCULATION FOR MSAI CRUDE OIL STORAGE TANK

Step 1 Minimum Volume Required (100% from Storage Volume) = 1x 1001.62


= 1001.62 m3

Step 2 Minimum Distance from Tank to Wall = 1.5 m NFPA 30


Minimum Bund Wall Height = 1.4 m Note-1
Note-1. Bund wall height is refer to Government Regulation of Indonesian Republic No.11 Year 1979

Selected Distance from Tank to Wall = 7.4 m 7.4


Selected Bund Wall Height = 1.4 m
Estimate Length (a) : 30.0 m
Estimate Widhth (b) : 30.0 m
Estimate Height ( c) : 1.4 m

Total Volume : 1260.84 m3


Storage Tank Partial Volume (based on bund wall Height) : 255.716 m3
Bund Wall Volume : 1005.12 m3 > 1001.6 OK

RESULT Selected Bund Wall Size : 30.0 m (L) x 30.0 m (W) x 1.4 m (H)