ATEX execution
Supplementary information in
the technical description
“The ATEX execution“ has to be observed!

OPERATING INSTRUCTIONS
TS

Save this document for future reference


Pos : 2 /Allgemei n/ATEX ( Standar d-Modul e)/D ec kblatt - ATEX-Ausführung @ 8\mod_1384411788802_41.doc m @ 118826 @ @ 1

Pos : 3 /Allgemei n/Spezi elleM odule (Forts etzung, Leerz eile us w.)/--------------------- Seitenumbruc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1
Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 4.1 /Allgemei n/Impressum/Impress um - T eil 1 (Betri ebs anleitung) @ 9\mod_1399446736030_41.doc m @ 129879 @ @ 1

Imprint

Device assignment
Device names: TS
Device variant: ATEX

Document
Document status: Original document
Type of document: Operating instructions
File designation: e2113447
Document ID: 447
Revision: 1.3
Date: 16-06-22
Editor: Brabender Technologie GmbH&Co.KG
Copyright: © 2016, Brabender Technologie GmbH&Co.KG

Pos : 4.2 /Allgemei n/Impressum/ Impr ess um - T eil 2 (Sc hutz ver mer k gemäß DIN EN 16016) @ 4\mod_1360740377131_41.doc m @ 81651 @ @ 1

Protection notice (refer to DIN EN ISO 16016)


The reproduction, distribution and utilization of this document as well as the
communication of its contents to others without express authorization is
prohibited. Offenders will be held liable for the payment of damages. All rights
reserved in the event of the grant of a patent, utility model or design.
Pos : 4.3 /Allgemei n/Impressum/ Impr ess um - T eil 3 (Bestandteil des Ger ätes) @ 4\mod_1360739623096_41.doc m @ 81570 @ @ 1

Save this document for future reference


The document is an integral part of the device stated above. It has to be saved
completely, ready to hand and close to the device for later usage.
Pos : 4.4 /Allgemei n/Spezi elleM odule (Forts etz ung, Leerzeil e us w.)/--------------------- Seitenumbruc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

2 Safety ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 4.5 /Allgemei n/Impressum/Impress um - T eil 4 (Inhalts verz eichnis) @ 4\mod_1355303253132_41.docm @ 72688 @ @ 1

Table of contents
Imprint ........................................................................................................ 2
Table of contents ......................................................................................... 3
1. Safety ................................................................................................... 5
The use of the device ................................................................................... 6
Safety instructions........................................................................................ 8
Specifications for the type approval of the device ............................... 8
Qualification of the operating personnel ............................................. 8
Dangerous contact voltages on the device ........................................... 8
Disconnecting the device ...................................................................... 9
Discharging of storages of residual energy ........................................... 9
Earthing of the device ........................................................................... 9
Sound level............................................................................................ 9
Warning symbols on the device.......................................................... 10
Residual dangers ........................................................................................ 11
2. The description of the device .............................................................. 12
Description of the design of the device ..................................................... 13
The component groups of the device ........................................................ 14
The trough cover ................................................................................. 14
Feeding organ and feed drive ............................................................. 15
Technical data ............................................................................................ 16
3. Mounting ........................................................................................... 17
Mounting instructions................................................................................ 18
The place of the installation ....................................................................... 19
Assembly work ........................................................................................... 20
Installation on site .............................................................................. 20
Electrical mounting work ........................................................................... 21
4. Commissioning ................................................................................... 24
Notes on commissioning ............................................................................ 25
Commissioning sequence........................................................................... 26
Step 1: Tests on the device ............................................................ 26
Step 2: Connection of supply media .............................................. 26
Step 3: Verification of the sense of rotation ................................. 26
The product feeding ................................................................................... 27
5. Decommissioning................................................................................ 28
6. Fault shutdowns ................................................................................. 29
Causes of malfunction ................................................................................ 30
7. Maintenance ...................................................................................... 31
Information on maintenance ..................................................................... 32
Component list ........................................................................................... 33
Care and examination ................................................................................ 34

©Operating instructions TS Safety 3


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Assembly/disassembly of individual components ..................................... 35


Disassembly of drive motor ................................................................ 35
Packings .............................................................................................. 35
Disassembly of the screw.................................................................... 36
8. Storage and disposal ........................................................................... 37
Storage of the device, of individual components ...................................... 38
Disposal of the device, of individual components ..................................... 39
Index ......................................................................................................... 40

Pos : 5 /Allgemei n/Spezi elleM odule (Forts etzung, Leerz eile us w.)/--------------------- Seitenumbruc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

4 Safety ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 6 /Allgemei n/Ü bers chriften Sicherheit/Ü berschrift 1 - Sicherheit @ 0\mod_1312192048130_41.doc m @ 1309 @ 1 @ 1

1. Safety

Pos : 7 /D osi ergeräte/Sicher heit/ 1. Seite - Inhal t Sicherheit @ 1\mod_1336565783129_41.doc m @ 46243 @ @ 1

This chapter describes the use of the device and the safety instructions for the
use of the device.

Content of the chapter “safety”:

Subject Page
The use of the device 6
Safety instructions 8
Residual danger 11
Pos : 8 /Allgemei n/Spezi elleM odule (Forts etzung, Leerz eile us w.)/--------------------- Seitenumbruc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Safety 5


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 9 /Allgemei n/Ü bers chriften Sicherheit/Ü berschrift 2 - Di e Ver wendung des Gerätes @ 0\mod_1312192145847_41.doc m @ 1332 @ 2 @ 1

The use of the device

Pos : 10 /D osierger äte/Sic herheit/D okID _447 - T SR (Tr ogför dersc hnec ke)/ Verwendung - Besti mmungsgemäß e Ver wendung T SR @ 2\mod_1345099179343_41.doc m @ 61108 @ @ 1

Intended purpose The “TS (troughed screw conveyor)” is a feeding device for conveying bulk
solids that can be conveyed by means of a screw (= feeding device).
The products are filled directly into the screw trough. The product supplies on
site are connected to the available inlet pipes. The inlet pipes (= “feed zones”)
are located at various positions along the direction of the product transport.
The number and the position of the feed zones are determined by the on-site
specifications for the use of the TS. The screw conveys the products to the
outlet of the device, the products are mixed while being conveyed. At the
outlet the product mixture is discharged in free fall via the outlet. The screw
functions with a constant operating speed and is driven by a drive motor (=
feed drive). The operating speed and the execution of the screw determine the
maximum output (product quantity/time unit) of the device. For a safe
operation of the device the total amount of the product supplies must not
exceed the maximum feed rate.

Pos : 11 /D osierger äte/Sic herheit/D okID _447 - T SR (Tr ogför dersc hnec ke)/ Verwendung - Geeignete Produkte für die TSR (Tr ogför dersc hnec ke) @ 2\mod_1345110826373_41.doc m @ 61216 @ @ 1

Appropriate products For the discharge/feeding with the device bulk solids (no liquids) with the
following product characteristics are appropriate:
• suitable size of product particles,
• appropriate flowability,
• free from contaminations, foreign bodies etc.
• there is no ignition capability due to friction or strokes,
• no explosive characteristics,
• no reaction if the product is blended with other products,
• no change of the product characteristics due to the transport with the
screw,
• no inadmissibly high wear of the machine parts in contact with the
product.

Pos : 12 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnittfortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

6 Safety ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

The use of the device, continuation

Pos : 13 /D osierger äte/Sic herheitVer wendung - Vorgaben für den Ei ns atz bereic h (0- 60°C) @ 8\mod_1393949549538_41.doc m @ 127905 @ @ 1

Specifications for the The standard dimensioning of the device requires the following environmental
use and operating data for the field of application:
Temperature: 0°C to +40°C
Humidity: up to 85% without condensation
Medium: Air or inert gas
Wind/draught: < 0.3 m/s
Max. underpressure/overpressure: 2 mbar (20mm water column)
Product temperature: 0°C to +40°C
Voltage supply: AC 230/400V
Pos : 14 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/ - -----> Leerzeil e (For mat: Text) <----- @ 0\mod_1317890599730_41.doc m @ 12133 @ @ 1

Pos : 15 /D osierger äte/Sic herheit/Ver wendung - Anpass ung an den kundensei tigen Ei ns atz ber eich @ 1\mod_1336569707234_41.doc m @ 46324 @ @ 1

Adaptation to the The device is dimensioned according to the application conditions known
application on site when awarding the contract. They result from the customer’s indications
concerning
• the products employed and their characteristics,
• the environmental and operating conditions,
• the desired feed rate range

Adaptations to the field of application on site are listed in the order


confirmation and are part of the intended use of the device.

Modification of the field of application on site


In case of a modification of the field of application on site a new release for the
operation of the device has to be emitted by the manufacturer.

Pos : 16 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Safety 7


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 17 /Allgemein/Übersc hriften Sic herheit/Ü bersc hrift 2 - Sic herheits hinweise @ 0\mod_1312267862879_41.doc m @ 1450 @ 2 @ 1

Safety instructions

Pos : 18 /D osierger äte/Sic herheit/ Sicherheit - Vorgaben für die Betriebs erlaubnis des Ger ätes @ 1\mod_1337084667276_41.docm @ 47988 @ 3 @ 1

Specifications for the type approval of the device

Any operation shall be permitted only if the following specifications have been
complied with:
• The indications on the operating instruction have been complied with.
• Mounting, commissioning have been carried out correctly.
• The device must only be used for its intended purpose.
• The device is maintained regularly.
• For necessary repair work be sure to employ original spare parts of the
manufacturer or spare parts with identical technical characteristics (to be
approved by the manufacturer).

Pos : 19 /D osierger äte/Sic herheit/ Sicherheit - Qualifi kati on Bedienpers onal @ 1\mod_1326461216317_41.doc m @ 25535 @ 3 @ 1

Qualification of the operating personnel

The following qualifications are required for the operating personnel:


• Trained on the device and the corresponding activities
• Authorised to carry out the required activities
• Knowledge of the regulations concerning the operator protection
• Knowledge of the actual operating conditions as far as the device and its
environment are concerned

Pos : 20 /D osierger äte/Sic herheit/ Sicherheit - Berührungsgefährliche Spannung en am Ger ät @ 4\mod_1361350725974_41.doc m @ 82197 @ 3 @ 1

Dangerous contact voltages on the device

Dangerous contact voltages are required for the operation of the device. The
following specifications have to be respected for the protection of the
operating personnel:
• The device must not be operated with freely accessible terminals.
• Before commencing any work on the electrical connections, you must first
disconnect the device from the mains.
• The device must not be operated with damaged electrical components.
Damaged component groups have to be repaired or exchanged
immediately.
Pos : 21 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnitt fortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

8 Safety ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Safety instructions, continuation

Pos : 22 /D osierger äte/Sic herheit/Sic her heit - Definiti on Freis chalten @ 1\mod_1336642891907_41.doc m @ 46465 @ 3 @ 1

Disconnecting the device

In the operating instructions below use the term "disconnection".


“Disconnection” means:
Definition • Disconnect the device from all supply media.
• Protection against unauthorised reconnection.
• Discharge all kinds of energy stocks (manually or due to sufficient dwell
times)

Pos : 23 /D osierger äte/Sic herheit/ Sicherheit - Entl eer ung von R estenergies peic her @ 1\mod_1336644580719_41.doc m @ 46546 @ 3 @ 1

Discharging of storages of residual energy

Depending on the execution different storages of residual energy may be


mounted to the device. The table lists measures for the discharge of energy
storages:
Type Component (example) Measure
Electric Condenser, coil Observe the discharge time
Mechanic Spring Relieving
Pneumatic Compressed air Deaeration
Thermic Dissipator, surface Observe the cooling time

Pos : 24 /D osierger äte/Sic herheit/Sic her heit - Er dung des Gerätes @ 1\mod_1336643211619_41.doc m @ 46492 @ 3 @ 1

Earthing of the device

The device must only be operated with a correct earthing. The main earth
connection point is connected to the equipotential bonding on site in a
standard-compliant manner. Earth connections between the device and
Marking of the main earth assembled components that have been mounted in our works must not be
connection point interrupted or removed on site.

Pos : 25 /D osierger äte/Sic herheit/ Sicherheit - Geräusc hpegel @ 1\mod_1336653619383_41.doc m @ 46573 @ 3 @ 1

Sound level

The sound level of the device is < 70dB (acc. to DIN45635)

Pos : 26 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnittfortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

©Operating instructions TS Safety 9


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Safety instructions, continuation

Pos : 27 /D osierger äte/Sic herheit/Sic her heit - War nhi nweis e am Ger ät @ 1\mod_1337072891228_41.doc m @ 47771 @ 3 @ 1

Warning symbols on the device

Sources of danger are marked by the standardised warning symbols on the


device. Additionally the following warning symbols are employed:

Before the start of any work the device has to be disconnected from the mains
and protected against unauthorised reconnection.
In case of non-respect there is a considerable danger of injuries caused by life
Disconnect the device voltage.
from the mains

Marks the allowed sense of rotation for the drive motor.


Allowed sense of In case of non-respect the rotating component groups risk to be torn out of
rotation their fastening during the operation.

Pos : 28 /D osierger äte/Sic herheit/D okID _445 - (DD W-) MT/Sic her heit - War nhi nweis e am Ger ät R ühr wer k @ 1\mod_1337075101475_41.doc m @ 47879 @ @ 1

Do not put arms/fingers into the rotating agitator and use long-shafted gloves
during work on the agitator.
In case of non-respect there is a considerable danger of injuries caused by the
Disconnect the device
sharp-edged agitator.
from the mains

Pos : 29 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

10 Safety ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 30 /Allgemein/Übersc hriften Sic herheit/Ü bersc hrift 2 - Restgefahren @ 1\mod_1336565291593_41.docm @ 46212 @ 2 @ 1

Residual dangers

Pos : 31 /D osierger äte/Sic herheit/ R estg efahr - Einl eitung @ 1\mod_1336654135295_41.doc m @ 46625 @ @ 1

This paragraph describes the possible dangers that might occur in an


admissible field of application and that might be caused by external influences,
e.g. carelessness or connections to equipment on site.
Pos : 32 /D osierger äte/Sic herheit/R estg efahr - Fremdkör per @ 1\mod_1336655243196_41.doc m @ 46651 @ @ 1

Foreign bodies Danger Foreign bodies in the product area of the device
Effects: • Operational failures
• Damage of the device
Measures: • Employ clean product
• Circumspection/special care must be taken when
working on the device
Pos : 33 /D osierger äte/Sic herheit/D okID _447 - T SR (Tr ogför dersc hnec ke)/ R estg efahr - Produkts tau @ 2\mod_1345112556938_41.doc m @ 61243 @ @ 1

Product jam Danger No free product flow


Effects: • Operational failures
• Damage of the device
Measures: • The free product flow into the device and out of the
device has to be guaranteed.
• Stop the operation of the device if connected
equipment on site is troubled.
• Reduce the total amount of product supplies, so
that the maximum feed rate is not reached.
Pos : 34 /D osierger äte/Sic herheit/D okID _447 - T SR (Tr ogför dersc hnec ke)/ R estg efahr - Offener Ansc hlus sstutz en @ 2\mod_1345115703426_41.doc m @ 61270 @ @ 1

Open connection pipe Danger Open product zone


Effects: • Screw, freely accessible
• Contamination caused by foreign bodies
• Contamination of the environment
Measures: • The device must only be operated, if all connection
pipes have been closed correctly or if they have
been connected to product supply equipment on
site.
Pos : 35 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Safety 11


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 36 /Allgemein/Übersc hriften Gerätebeschr eibung/Übersc hrift 1 - Di e Bes chr eibung des Ger ätes @ 0\mod_1312279135874_41.doc m @ 1810 @ 1 @ 1

2. The description of the device

Pos : 37 /D osierger äte/Gerätebesc hrei bung/ 1. Seite - Inhalt Ger ätebesc hrei bung @ 1\mod_1337071571470_41.doc m @ 47744 @ @ 1

This chapter describes the construction and the function of the device and of
individual component groups.

Content of the chapter “device descriptions”:

Subject Page
Construction of the device 13
The component groups of the device 14
Technical data 16
Pos : 38 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

12 The description of the device ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 39 /Allgemein/Übersc hriften Gerätebeschr eibung/Übersc hrift 2 - Beschr eibung des Ger äteaufbaus @ 1\mod_1322656106540_41.doc m @ 24287 @ 2 @ 1

Description of the design of the device

Pos : 40 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Aufbau - Abbil dung @ 2\mod_1345116792958_41.doc m @ 61298 @ @ 1

Illustration of the device

Pos : 41 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Aufbau - Legende @ 2\mod_1345116793582_41.doc m @ 61325 @ @ 1

Legend No Meaning
1 Drive motor
2 Cover of coupling
3 Rear bearing of screw shaft
4 Trough cover (here: 3 parts)
5 Screw
6 Trough
7 Front bearing of screw shaft
8 Outlet
Pos : 42 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS The description of the device 13


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 43 /Allgemein/Übersc hriften Gerätebeschr eibung/Übersc hrift 2 - Di e Baugruppen des Gerätes @ 1\mod_1336739928870_41.doc m @ 46923 @ 2 @ 1

The component groups of the device

Pos : 44 /Allgemein/Übersc hriften Gerätebeschr eibung/Übersc hrift 3 - Di e Trog abdec kung @ 2\mod_1345117140786_41.doc m @ 61352 @ 3 @ 1

The trough cover


Pos : 45 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Trog abdec kung - Einl eitung @ 2\mod_1345117255555_41.doc m @ 61379 @ @ 1

The trough cover closes the product zone of the device. The connection pipes
of the trough cover are employed for the connection of the equipment on site.
The position of the connection pipes and thus the execution of the trough
cover are adjusted to the application conditions.
The number and the use of the connection pipes are a function of the
corresponding application. As a general rule, the following definition applies to
the identification of the order of use:

Definition Order of the connection pipes:


First = smallest distance to the drive motor
Last = maximum distance to the drive motor

Pos : 46 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Trog abdec kung - Sicherheits einric htung @ 2\mod_1345118428170_41.doc m @ 61406 @ @ 1

Safety equipment The trough cover is a safety equipment. It prevents the operating staff from
reaching into the rotating screw of the device. The protective function is
obtained by different measures:
• The trough cover is screwed tightly.
• When using quick release fastenings (instead of screwing) the parts of the
trough cover that have not been screwed in a tight manner are equipped
with a position monitoring (e.g. magnetic field sensor).

Operating requirement: evaluation of the position monitoring


Taking into account the position monitoring during the electrical mounting of
the device is an operating requirement.
• The device cannot be started, if the trough cover has not been closed
properly.
• The device is stopped immediately, if the trough cover is opened during
the operation.
Pos : 47 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnittfortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

14 The description of the device ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

The component groups of the device, continuation

Pos : 48 /Allgemein/Übersc hriften Gerätebeschr eibung/Übersc hrift 3 - D osier organ und D osier antrieb @ 1\mod_1336973989337_41.doc m @ 47211 @ 3 @ 1

Feeding organ and feed drive


Pos : 49 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Dosierorg an, Dosier antri eb - Dosierantri eb @ 2\mod_1345121811219_41.doc m @ 61514 @ @ 1

A gear motor (= threephase current drive + gear;(1)) is employed as feed drive.


A coupling (3) connects the gear motor to the screw drive shaft (4). The
operating speed of the screw is corresponding to the nominal speed of the
transmission shaft (mains operation of the gear motor).

Pos : 50 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Dosierorg an, Dosier antri eb - Drehz ahl über wachung (indukt. N S) @ 2\mod_1345124876807_41.doc m @ 61541 @ @ 1

Speed monitoring The speed monitoring is provided by an inductive proximity switch (2) the
pulses of which are evaluated by a suitable electrical unit. The functions of
speed monitoring (min/max monitoring, visualisation etc.) are a function of the
possibilities of the electrical component group that is employed for evaluation.
Pos : 51 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS The description of the device 15


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 52 /Allgemein/Übersc hriften Technisc he Daten/Ü bers chrift 2 - T echnisc he Daten @ 1\mod_1332489019264_41.doc m @ 40267 @ 2 @ 1

Technical data

Pos : 53 /D osierger äte/Sic herheitVer wendung - Vorgaben für den Ei ns atz bereic h (0- 60°C) @ 8\mod_1393949549538_41.doc m @ 127905 @ @ 1

Specifications for the The standard dimensioning of the device requires the following environmental
use and operating data for the field of application:
Temperature: 0°C to +40°C
Humidity: up to 85% without condensation
Medium: Air or inert gas
Wind/draught: < 0.3 m/s
Max. underpressure/overpressure: 2 mbar (20mm water column)
Product temperature: 0°C to +40°C
Voltage supply: AC 230/400V
Pos : 54 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/ - -----> Leerzeil e (For mat: Text) <----- @ 0\mod_1317890599730_41.doc m @ 12133 @ @ 1

Pos : 55 /D osierger äte/Gerätebesc hrei bung/DokID _447 - T SR (Trogförderschnec ke)/ Technisc he Daten - D osi ergerät @ 2\mod_1345127740538_41.doc m @ 61568 @ @ 1

Feeding device Data for the execution of the device:


Dimensions: See separate drawing of the device
Weight: See separate drawing of the device
Sound level: < 70dB(A)
Feeding device: Screw
Drive: Threephase current drive + gear
Drive controller: No (mains operation)
Operating range: Nominal speed
Speed monitoring: Inductive proximity switch
Scanning distance: 1 mm
Pos : 56 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/ - -----> Leerzeil e (For mat: Text) <----- @ 0\mod_1317890599730_41.doc m @ 12133 @ @ 1

Pos : 57 /D osierger äte/Gerätebesc hrei bungTec hnische D aten - T ypens child @ 9\mod_1396429355087_41.doc m @ 129458 @ @ 1

Nameplate The nameplate indicates the type of device, the machine number and the year
of construction of the device.
Clear marking of the device:
Pos : 58 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1
Machine number

16 The description of the device ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 59 /Allgemein/Übersc hriften Montagearbeiten/Übersc hrift 1 - M ontag e @ 0\mod_1317291591778_41.doc m @ 11522 @ 1 @ 1

3. Mounting

Pos : 60 /D osierger äte/Montage/1. Seite - Inhalt M ontage des Gerätes @ 1\mod_1337083351476_41.doc m @ 47934 @ @ 1

This chapter describes the mounting work required to make the system ready
for operation.

The descriptions were formulated in a very general manner and only take into
account the standard assemblies of the manufacturer.

Content of the chapter “mounting”:

Subject Page
Mounting instructions 18
The place of the installation 19
Mounting work 20
Electrical mounting work 21
Pos : 61 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Mounting 17


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 62 /Allgemein/Übersc hriften Montagearbeiten/Übersc hrift 2 - M ontag ehi nweis e @ 0\mod_1317294863142_41.doc m @ 11545 @ 2 @ 1

Mounting instructions

Pos : 63 /D osierger äte/Montage/ Montagehinweise - Achtung akti ve Vers orgungs medi en @ 1\mod_1337088095962_41.doc m @ 48067 @ @ 1

Connection work with supply media being active


» Danger caused by dangerous life voltage
» Danger caused by uncontrolled actions during the connection of the
Attention
supply medium
Therefore
- Connections shall only be made to connection points that are
disconnected from the corresponding supply medium.

Pos : 64 /D osierger äte/MontageM ontagehi nweise - Montageaus führung @ 9\mod_1396440111803_41.docm @ 129493 @ @ 1

Assembly execution Make sure to observe the following points for mounting:
• Horizontal alignment
• Max. 2mm offset for the connection of the device to equipment on site
• Connection of the device to an equipment on site via a flexible connection
The following connections are allowed (direction of view is the direction of the
product flow):
• From a smaller cross-section to a larger cross-section
• Both product lines have the same cross-section.

Pos : 65 /D osierger äte/Montage/ Montagehinweise - Montageunterbrechung @ 1\mod_1337149955238_41.doc m @ 48410 @ @ 1

Interruption of To be observed in case of an interruption of mounting:


mounting
• Protect the device against foreign bodies.
• Mark that the device is partly mounted.
• Protect the device against an unauthorised commissioning.

Pos : 66 /D osierger äte/Montage/ Montagehinweise - Montagehilfs mittel @ 1\mod_1337087521901_41.doc m @ 48041 @ @ 1

Mounting tools The following auxiliaries are required for mounting:


Work equipment Auxiliary equipment
General locksmith’s tools Cover tarpaulin
General electrician's tools Lining sheets
Level Cleaning rag
Suitable detergents

Pos : 67 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

18 Mounting ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 68 /Allgemein/Übersc hriften Montagearbeiten/Übersc hrift 2 - D er Aufstellungsort @ 1\mod_1337089891966_41.doc m @ 48093 @ 2 @ 1

The place of the installation

Pos : 69 /D osierger äte/Montage/ Aufs tell ungs ort - Eigenschaften @ 1\mod_1337090202416_41.doc m @ 48145 @ @ 1

Characteristics The place of the installation has the following characteristics:


• corresponds to the valid standards
• stable, dry, free from vibrations and sufficiently suitable to take weight
• protected against weather conditions
• permissible ambient temperature
• free from oils, fats, gases, vapours etc.
• no explosive atmosphere

Pos : 70 /D osierger äte/Montage/ Aufs tell ungs ort - Ausstattung @ 1\mod_1337090618165_41.doc m @ 48171 @ @ 1

Equipment The place of the installation has to be equipped as follows:


• sufficient illumination
• sufficiently dimensioned for all necessary workflow paths
• possibilities for connecting the required supply media

Pos : 71 /D osierger äte/Montage/ Aufs tell ungs ort - Tr ans port z um Aufstellungsort @ 1\mod_1337091181947_41.doc m @ 48197 @ @ 1

Transport to the place of Suitable lifting equipment (fork lift truck, crane, etc.) permits to transport the
the installation following items to the place of the installation.
Pos : 72 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Mounting 19


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 73 /Allgemein/Übersc hriften Montagearbeiten/Übersc hrift 2 - M ontag ear beiten @ 0\mod_1317294916105_41.docm @ 11568 @ 2 @ 1

Assembly work

Pos : 74 /D osierger äte/Montage/ Montagearbeiten - Aufs tell ung @ 4\mod_1361356030395_41.doc m @ 82332 @ 3 @ 1

Installation on site

Assembly of the device at the place of the installation:


1. Transport the device to the place of the installation.
2. Align the device at the place of the installation.
3. Align the device in horizontal position.
4. Screw the device to the floor construction.

Pos : 75 /D osierger äte/Montage/DokID_447 - TSR (Trogförderschnec ke)/ Montagearbeiten - Ansc hlus s Ei n-/Ausl auf (M ans chette) @ 2\mod_1345130764649_41.doc m @ 61624 @ @ 1

Connection The connection of the inlet/outlet of the device to equipment on site has to be
inlet/outlet executed in a flexible manner. The materials for a flexible connection, i.e.
sleeve/step bellow, are delivered with the device.
The illustration shows the construction principle of a flexible connection:

No Meaning
1 Product line1
2 Tightening strap1
3 Sleeve
4 Tightening strap2
5 Product line1

Step Activity
1 Slide the sleeve over line1.
2 Fix the sleeve by means of the tightening strap1.
3 Slide the tightening strap2 over the sleeve.
4 Slide the sleeve over line2.
5 Fix the sleeve by means of the tightening strap2.
Pos : 76 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

20 Mounting ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 77 /Allgemein/Übersc hriften Montagearbeiten/Übersc hrift 2 - Elektrische M ontag ear bei ten @ 0\mod_1317297556015_41.doc m @ 11683 @ 2 @ 1

Electrical mounting work

Pos : 78 /D osierger äte/Montage/E-M ontagearbeiten - Achtung ber ühr ungsgefährliche Spannung @ 1\mod_1337154364433_41.doc m @ 48488 @ @ 1

Voltages that are hazardous upon contact


» Danger caused by dangerous life voltages
» Danger caused by improper execution of the work
Attention
Therefore
- Employ trained electrical personnel.
- After the connection work the junction boxes have to be closed
correctly.

Pos : 79 /D osierger äte/Montage/ E-M ontagearbeiten - Kl emmenkästen @ 4\mod_1361366654211_41.doc m @ 82439 @ @ 1

Junction boxes The connection of the electrical assemblies in junction boxes is provided in our
works in order to facilitate the connection on site. The junction boxes are
marked “-JB n” (n= 1, 2, 3,…). The following assignments apply to the junction
boxes
• The marking ”-JB 1“is reserved for the junction box of the weighing system
and is only employed, if the device is mounted on a weighing system.
• The electrical assemblies of the device are connected in the junction boxes
“-JB 2,3,4,…“. The number is adapted to demand.
• In case of a standard execution the terminals are connected according to
the determined terminal assignment of the junction boxes.
• Executions that deviate from the standard are described in the specific
wiring plans related to the order. Due to the specific execution a deviation
from the standard terminal assignments is possible. The wiring plans are a
separate document and complement the operating instructions.

Pos : 80 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnittfortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

©Operating instructions TS Mounting 21


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Electrical mounting work, continuation

Pos : 81 /Steuerungen/ISC plus - System/M ontage/ Montage Arbeiten - Metallisc he Kabel versc hraubungen @ 0\mod_1317894743356_41.doc m @ 12256 @ @ 1

Cable screwings The following illustration shows the correct use of the metallic cable screwings.

The cable is isolated according to the illustration and inserted into the cable
screwing. The screening (A) is pushed over the metal cap (M), then the
screwing is tightened.

Pos : 82 /D osierger äte/Montage/E-M ontagearbeiten - Legende Kabelfarben @ 2\mod_1339397622698_41.doc m @ 53328 @ @ 1

Cable colours The following abbreviations (Abbr.) for the cable colours are employed in the
wiring plans:
Abbr. Colour Abbr. Colour Abbr. Colour
BN Brown GN Green BU/WH Blue/White
BK Black GY Grey WH/BU White/Blue
BU Blue PK Rose GNYE Green/Yellow
WH White RD Red
VT Violet YE Yellow

Pos : 83 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/-----> Abs chnittfortsetzung Ü bersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

22 Mounting ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Electrical mounting work, continuation

Pos : 84 /D osierger äte/Montage/DokID_447 - TSR (Trogförderschnec ke)/ Montagearbeiten - Ansc hlus spl an @ 2\mod_1345466986698_41.doc m @ 61725 @ @ 1

Connection plan TS

The drive motor is connected to the mains supply via a motor protection
switch (-Q1). The relay (-K1M) permits to establish an interlocking chain for the
operating release of the drive motor. It is triggered by the evaluation unit of
the monitoring (e.g. speed, safety switch) and disconnects the main supply of
the drive motor.
Pos : 85 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Mounting 23


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 86 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 1 - Inbetriebnahme @ 1\mod_1327905414686_41.doc m @ 27475 @ 1 @ 1

4. Commissioning

Pos : 87 /D osierger äte/Inbetri ebnahme/D okID _447 - T SR (Tr ogför dersc hnec ke)/ 1. Seite - Inhalt Inbetriebnahme des Gerätes @ 2\mod_1345473638288_41.doc m @ 61886 @ @ 1

This chapter describes the activities required for the commissioning of the
device.

The descriptions were formulated in a very general manner and only take into
account the standard assemblies of the manufacturer.

Content of the chapter “commissioning”:

Subject Page
Notes on commissioning 25
Commissioning sequence 26
Product feeding 27
Pos : 88 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

24 Commissioning ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 89 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 2 - Hinweise für di e Inbetriebnahme @ 1\mod_1337589602937_41.doc m @ 48655 @ 2 @ 1

Notes on commissioning

Pos : 90 /D osierger äte/Inbetri ebnahme/ InbetriebnahmeHi nweis e - Warnhinweis g efährliche Produkteigenschaften @ 1\mod_1337589739890_41.doc m @ 48707 @ @ 1

Product with hazardous characteristics


» Danger due to leakages or malfunctions of the device

Danger Therefore
- Employ a replacement product with non-hazardous, otherwise
identical product characteristics.
- Take all necessary security measures, if no replacement product is
available.

Pos : 91 /D osierger äte/Inbetri ebnahme/D okID _447 - T SR (Tr ogför dersc hnec ke)/ InbetriebnahmeHi nweis e - Produktdosi erung @ 2\mod_1345469261307_41.doc m @ 61778 @ @ 1

Product feeding The product feeding is started after completion of commissioning. An active
product feeding requires
• free product flow into/out of the device,
• a unit for further processing that is ready for operation for the product
quantity conveyed,
• a suitable containment for the product quantity that has been fed, if the
unit for further processing is not ready for operation.

Products are blended


When feeding different products into the troughed screw conveyor, the
product is blended due to the product feeding.

Pos : 92 /D osierger äte/Inbetri ebnahme/ InbetriebnahmeHi nweis e - U nterbr echnung der Inbetriebnahme @ 1\mod_1337593978614_41.doc m @ 48786 @ @ 1

Interruption of Commissioning is interrupted, if


commissioning
• there are problems during commissioning.
• it is required to correct the assembly of the device or other connected
equipment.

Corrections of the assembly


In case of corrections of the assembly make sure to observe the specifications
and notes on the mounting of the device.
Pos : 93 /Allgemein/Speziell eModul e (F orts etz ung, Leerzeil e us w.)/--------------------- Seitenumbr uc h -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Commissioning 25


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 94 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 2 - Ablauf der Inbetri ebnahme @ 1\mod_1337599576121_41.doc m @ 48839 @ 2 @ 1

Commissioning sequence

Pos : 95 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 3 - Pr üfungen am Ger ät @ 1\mod_1337599806399_41.doc m @ 48891 @ 3 @ 1

Step 1: Tests on the device


Pos : 96 /D osierger äte/Inbetri ebnahme/Abl aufInbetri ebnahme - PrüfungenGerät Pr üfpunkte @ 1\mod_1337605002030_41.doc m @ 48917 @ @ 1

Commissioning must only be carried out, if the following specifications are duly
fulfilled.
1. Has all mounting work been finished?
2. Have all supply media been connected?
3. Are all supply media available as required?
4. Sufficient product quantities are available.
5. All foreign bodies and contaminations have been removed.
6. All necessary measures to ensure the safety of operations have been
taken.
7. The device and the other equipment required are ready for operation.
8. Sample measurements can be carried out.

Pos : 97 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 3 - Versorgungs medi en zus chalten @ 1\mod_1337613686310_41.doc m @ 49050 @ 3 @ 1

Step 2: Connection of supply media


Pos : 98 /D osierger äte/Inbetri ebnahme/ Abl aufInbetri ebnahme - Vers orgungs medien z usc hal ten @ 1\mod_1337613757838_41.doc m @ 49077 @ @ 1

1. Connect all supply media.


2. Warm up of approx. 30 min.
3. Continue the commissioning.

Pos : 99 /Allgemein/Übersc hriften Inbetriebnahme/Ü bersc hrift 3 - Pr üfungen der Drehrichtung @ 1\mod_1337607373039_41.doc m @ 48943 @ 3 @ 1

Step 3: Verification of the sense of rotation


Pos : 100 /Dosi ergeräte/Inbetriebnahme/AblaufInbetriebnahme - Pr üfungDrehrichtung Drehs trommotor @ 1\mod_1337607471774_41.doc m @ 48970 @ @ 1

Fehler!Fehler! A direction arrow marks the prescribed sense of rotation on each drive motor.
Unbekanntes During this step the sense of rotation is checked by means of a visual check.
Schalterargument. 1. Enter a small speed (~10%).
2. Start the device and check the sense of rotation.
3. Stop the device.

In case of a wrong sense of rotation the sense of rotation has to be changed.


4. Switch off the power supply.
5. Protection against unauthorised reconnection.
6. Exchange two of the connection lines (U, V, W), (e.g. U, V).
7. Switch on the voltage supply.

Pos : 101 /Allgemein/Spezi elleM odul e (Fortse tzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

26 Commissioning ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 102 /Allgemein/Ü berschriften Betrieb/Ü bersc hrift 2 - Die Produktför der ung @ 2\mod_1345473694434_41.doc m @ 61913 @ 2 @ 1

The product feeding

Pos : 103 /Dosi ergeräte/Inbetriebnahme/DokID _447 - T SR (Trogfördersc hnec ke)/ Pr oduktför derung - Vorbereitung @ 2\mod_1345470375716_41.doc m @ 61832 @ @ 1

Preparations The commissioning is terminated by making the system ready for operation.
For this, the following preparations are required:
• Remove the auxiliaries used.
• Restore connections that have eventually been separated or close opened
closures.
• Possibly, conversions that have been made for the function test have to be
made undone.
• Discharge the device completely, if a replacement product has been
employed.
• If required, clean the device and the environment.

Observe the residual quantity


The screw trough cannot be discharged completely by the operation of the
screw. If required, the residual quantity has to be eliminated manually by the
operating personnel.

Pos : 104 /Dosi ergeräte/Inbetriebnahme/DokID _447 - T SR (Trogfördersc hnec ke)/ Pr oduktför derung - Ablauf der Pr oduktförderung @ 2\mod_1345470409787_41.doc m @ 61859 @ @ 1

The product feeding Start of the product feeding:


process
1. Start the operation of the troughed screwed conveyor.
2. Start the operation of the first product supply
The first product supply is connected to the inlet pipe that is nearest to
the drive motor.
3. Start the operation of the further product supplies one after the other.
The order of the individual product supplies and thus the actual product
feeding process is a function of the customer’s application and is limited by the
specification concerning the safety of operations:

Specifications for the operation


The definition of the order and the quantity of the product supplies must not
cause any product jam or damage of the device or of individual component
groups.
Pos : 105 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Commissioning 27


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 106.1 /Allgemein/Ü berschriften Außer betriebnahme/Ü berschrift 1 - Auß erbetriebnahme @ 1\mod_1334563497135_41.doc m @ 42926 @ 1 @ 1

5. Decommissioning

Pos : 106.2 /D osi ergeräte/Außer betriebnahme, Stör ung/ Aussc halten - Hi nweis @ 2\mod_1338453081214_41.doc m @ 51314 @ @ 1

The following process descriptions do not take into account influences that
occur due to product characteristics or the operation in a production plant. If
additional activities result from these influences they have to be integrated
into the corresponding processes.
Example: Product characteristics
In cases of a product that is not allowed to stay in the device, the device has to be
• discharged completely before shutdown and cleaned thoroughly after
shutdown.
• discharged by means of suitable measures after a fault shutdown, if the
elimination of the cause of the malfunction takes too long.

Pos : 106.3 /D osi ergeräte/Außer betriebnahme, Stör ung/ Aussc halten - kurzz eitig Absc hal tung @ 2\mod_1338454076598_41.doc m @ 51393 @ @ 1

Brief disconnection The device is stopped for operational reasons.


Activation: Stop command on the operating unit
How to continue Start command on the operating unit
the operation

Pos : 106.4 /D osi ergeräte/Außer betriebnahme, Stör ung/ Aussc halten - Wartung, R epar atur @ 2\mod_1338454904943_41.doc m @ 51419 @ @ 1

Maintenance, Switch off the device for maintenance work.


repair
Activation: 1. Discharge the device.
2. Stop the operation.
3. Disconnect the device (see page 9)
4. Carry out the necessary work.
How to continue Commissioning has to be carried out
the operation

Pos : 106.5 /D osi ergeräte/Außer betriebnahme, Stör ung/ Aussc halten - Stilllegung @ 2\mod_1338456252683_41.doc m @ 51446 @ @ 1

Decommissioning Disconnect the device for storage or disposal.


Activation: 1. Switch off the device as described in “maintenance,
repair”.
2. Disconnect the device from all supply media,
connections, etc.
3. Disassemble the device.
4. As described in “storage and disposal”
How to continue 1. Reassemble the device.
the operation 2. Mount the device.
3. Commission the device.
Pos : 107 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

28 Decommissioning ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 108 /Allgemein/Ü berschriften Störabsc hal tung/Ü bersc hrift 1 - Störabsc haltung @ 2\mod_1338532494993_41.docm @ 51669 @ 1 @ 1

6. Fault shutdowns

Pos : 109 /Dosi ergeräte/Störabsc haltung/ Störabsc haltung - Hinweis @ 2\mod_1338456696888_41.doc m @ 51473 @ @ 1

Fault shutdowns protect the device and the environment


Fault shutdowns occur in operational situations that do not permit to continue
the operation of the device. They are either triggered manually by the
operating personnel (“emergency stop”) or automatically by a monitoring
function or an interlocking chain.

Immediate stop
The fault shutdown of the device may have an effect on
upstream/downstream production processes. Further measures are possibly
required.

Operational readiness requires the elimination of causes


Before renewed commissioning be sure to find and eliminate the reason for
the fault shutdown.

Pos : 110 /Dosi ergeräte/Störabsc haltung/ Störabsc haltung - Aufhebung Störabsc hal tung @ 2\mod_1338458129434_41.doc m @ 51499 @ @ 1

How to continue the Steps to be taken in order to continue the operation after a fault shutdown:
operation after a fault
1. Find the cause for the malfunction.
shutdown
2. Eliminate the cause for the malfunction.
3. Make sure that the device is ready for operation.
Pos : 111 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Fault shutdowns 29


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 112 /Allgemein/Ü berschriften Störabsc hal tung/Ü bersc hrift 2 - Störungsurs ac hen @ 2\mod_1338453910996_41.doc m @ 51367 @ 2 @ 1

Causes of malfunction

Pos : 113 /Dosi ergeräte/Störabsc haltung/ Störung - Austr agung startet nicht @ 2\mod_1338463282175_41.doc m @ 51554 @ @ 1

Discharge Voltage supply is missing


does not start » Connect the voltage supply.
» Replace defective fuses if required.
Execution of connection lines is incorrect
» Eliminate errors in the connections.
» Eliminate interruptions/damage.
» Replace wrong cable types.
Drive components damaged (motor, drive controller etc.)
» Replace damaged components.

Pos : 114 /Dosi ergeräte/Störabsc haltung/D okID _447 - T SR (Trogfördersc hnec ke)/ Störung - Sc hl eifgeräusc he @ 2\mod_1345542004110_41.doc m @ 62056 @ @ 1

Grinding noises Product deposits in the screw trough or on the screw


» Clean the screw trough.
» Clean the screw.
Unbalance of the screw
» Disassemble and substitute the damaged screw.

Pos : 115 /Dosi ergeräte/Störabsc haltung/D okID _447 - T SR (Trogfördersc hnec ke)/ Störung - Trogsc hnec ke ver kl emmt @ 2\mod_1345542262535_41.doc m @ 62083 @ @ 1

Screw jammed Foreign bodies in the product zone


» Remove foreign bodies and replace damaged components.
» Eliminate the reason for the penetration of the foreign body.
Trough screw damaged
» Disassemble and substitute the damaged screw.
Product deposits in the screw trough or on the screw
» Clean the screw trough.
» Clean the screw.

Pos : 116 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

30 Fault shutdowns ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 117 /Allgemein/Ü berschriften Wartung/Ü bers chrift 1 - Wartung @ 0\mod_1317981184761_41.doc m @ 12765 @ 1 @ 1

7. Maintenance

Pos : 118 /Dosi ergeräte/Wartung/ 1. Seite - Inhalt Wartung des Ger ätes @ 1\mod_1337869458402_41.doc m @ 49796 @ @ 1

This chapter describes the activities required for the maintenance of the
device. These activities include the general maintenance and the
disassembly/assembly of components that are subject to wear or require an
increased cleaning effort.

Content of the chapter “maintenance”:

Subject Page
Information on maintenance 32
Component list 33
Care and examination 34
Description for the disassembly of individual components 35
Pos : 119 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Maintenance 31


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 120 /Allgemein/Ü berschriften Wartung/Ü bers chrift 2 - Hinweis e für die D urc hfühung der Wartung @ 2\mod_1337871543108_41.doc m @ 49877 @ 2 @ 1

Information on maintenance

Pos : 121 /Dosi ergeräte/Wartung/WartungHinweis - D as Gerät freis chalten @ 2\mod_1337873069572_41.doc m @ 49955 @ @ 1

Before the disconnection – discharge the device


For carrying out the disassembly work of components in contact with the
product, the feeder has to be discharged by means of a “cleaning operation”
Disconnection before the start of work. The "cleaning operation" permits to discharge the
from the mains feeding device as far as possible by means of the feeding organ.
Disconnect the device
Before the start of any work on the device or on individual components of the
device it has to be disconnected from all supply media and stocks of possibly
present residual energy have to be discharged.

Pos : 122 /Dosi ergeräte/Wartung/WartungHinweis - Warnung Pr oduktr este @ 2\mod_1337871794840_41.doc m @ 49929 @ @ 1

Residual product in/on the device


» During the disassembly of the device/of individual assemblies the
operating personnel might come into contact with the product.
Caution
» Reactions with the cleaning agent might occur.
Therefore
- Be sure to observe the indications of the product data sheet.
- Possibly necessary measures before the start of work
- Safety measures
- Measures for correct disposal

Pos : 123 /Dosi ergeräte/Wartung/WartungHinweis - Feuc hte R einigung @ 2\mod_1338274428205_41.doc m @ 50008 @ @ 1

Damp cleaning Be sure to observe for damp cleaning:


• You must only employ detergents authorised by the manufacturer and not
detergents that contain solvents that are combustible, aggressive or
chlorinated.
• No damp cleaning of bearings and electrical components.
• In case of damp cleaning be sure to protect bearings and electrical
components from moisture.
• After the cleaning the device has to be dried thoroughly, standing
moisture has to be removed and components that have possibly been
degreased have to be re-greased.

Pos : 124 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ WartungHinweis - Warnung sc harfkantige Bauteil e @ 2\mod_1345549195964_41.doc m @ 62245 @ @ 1

Caution Sharp-edged components


» Danger of cut injuries caused by the screw
Therefore
- Use gloves when working on this component
Pos : 125 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

32 Maintenance ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 126 /Allgemein/Ü berschriften Wartung/Ü bers chrift 2 - Auflistung der Bauteile @ 1\mod_1337867583723_41.doc m @ 49744 @ 2 @ 1

Component list

Pos : 127 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ Wartung - Bauteilezeic hnung @ 2\mod_1345543638518_41.doc m @ 62138 @ @ 1

Component drawing

Pos : 128 /Dosi ergeräte/Wartung/D okID_ 447 - TSR (Tr ogför dersc hnec ke)/ Wartung - Bauteilelis te @ 2\mod_1345543637520_41.doc m @ 62111 @ @ 1

Component list No Component


1 Trough cover
2 Screw
3 Screw trough
4 Mounting ring
5 Front screw shaft bearing
6, 7 Screw shaft seal
6 Steady rest 7 Packing
8, 9 Fastening of trough cover
8 Quick release fastening 9 Detection of positions
Alternative: Screwing (upper figure)
10 Drive console
11 Junction box
12 Sealing
13 Trough closing plate
14 Speed monitoring
15 Drive motor
16 Cover
17 Toothed rim drive shaft
18 Coupling
19 Toothed rim screw shaft
20 Rear screw shaft bearing
21 Shaft sealing (steady rest and packing)
Pos : 129 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Maintenance 33


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 130 /Allgemein/Ü berschriften Wartung/Ü bers chrift 2 - Pflege und Kontroll e @ 2\mod_1338276781472_41.doc m @ 50034 @ 2 @ 1

Care and examination

Pos : 131 /Dosi ergeräte/Wartung/WartungPflege - Z eitinter valle @ 2\mod_1338277811569_41.doc m @ 50088 @ @ 1

Intervals Marking of the intervals:


W weekly 2W fortnightly
M monthly 3M three-monthly
Y annually H biannually

Pos : 132 /Dosi ergeräte/Wartung/ WartungPflege - Pflegear beiten @ 2\mod_1338279346831_41.doc m @ 50140 @ @ 1

Care Care works (T = time interval):


T Activity
W Clean the filter bag/the deaeration equipment (if existing)
2W Clean the device.
- Dust and loose contaminations have to be removed by means of
an industrial vacuum cleaner.
- Solid impurities have to be removed with a (damp) cloth.
Pos : 133 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ WartungPfleg e - Kontroll e Tr ogför dersc hnec ke @ 2\mod_1345543687472_41.doc m @ 62192 @ @ 1

Examination Examination of the device (T = time interval)


T Component Examination
W Flexible connections Damages
W Fastenings Tight seat
2W Screw Wear, tear
2W Mobile parts Functionality
2W Sealings Tightness
2W Locks Attraction force, tight seat
M Electrical connections Tight seat
Electric cables Damages

Removal of defects
Allowed possibilities for the removal of identified defects:
1. Damaged component is professionally repaired.
2. Damaged component is replaced by a new component.

Pos : 134 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

34 Maintenance ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 135 /Allgemein/Ü berschriften Wartung/Ü bers chrift 2 - Ei n-/Aus bau von einzel nen Bauteilen @ 2\mod_1338283359092_41.doc m @ 50193 @ 2 @ 1

Assembly/disassembly of individual components

Pos : 136 /Allgemein/Ü berschriften Wartung/Ü bers chrift 3 - Aus bau Antriebs motor @ 2\mod_1345551692439_41.doc m @ 62272 @ 3 @ 1

Disassembly of drive motor


Pos : 137 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ Ausbaubesc hrei bung - Aus bau Antriebs motor @ 2\mod_1345551765043_41.doc m @ 62298 @ @ 1

1. Enable the drive motor.


2. Disconnect the electric connection of the drive motor.
3. Support the drive motor by means of a suitable carrying aid (carrying strap
and lifting equipment).
4. Undo the fastening screws of the drive motor.
5. Loosen the drive motor cautiously out of the coupling by means of the
lifting equipment and transport it to a suitable location for storing.

Pos : 138 /Allgemein/Ü berschriften Wartung/Ü bers chrift 3 - Stopfbuchs enpac kungen @ 2\mod_1345552649285_41.doc m @ 62351 @ 3 @ 1

Packings
Pos : 139 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ Ausbaubesc hrei bung - Stoffbuchs en nac hs pannen @ 2\mod_1345552732170_41.doc m @ 62377 @ @ 1

How to readjust the If a packing has a leakage, the packing has


tension of the packings to be retensioned.

Retensioning:
The tensioning element (2) has to be
retensioned evenly by means of the
clamping nuts (3).

Packings have been retensioned too much


» Frictional heat between packing and shaft

Attention Therefore
» The packings only have to be tensioned as much as required for
sealing.
» The packings have to be exchanged, if permissible retensioning is no
longer possible.

Pos : 140 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ Ausbaubesc hrei bung - Stoffbuchs enpac kungen aus tausc hen @ 2\mod_1345554356365_41.doc m @ 62403 @ @ 1

How to exchange the 1. Loosen the clamping nuts (3).


packings 2. Pull the tensioning element (2) completely to the rear side.
3. Remove the old packing completely.
4. Clean the seat of the packing thoroughly.
5. Insert the new packings.
6. The clamping element has to be put on and tightened in an even manner.
Pos : 141 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/-----> Absc hnittforts etz ung Übersc hrift 2 <----- @ 0\mod_1312351301920_41.doc m @ 2150 @ @ 1

©Operating instructions TS Maintenance 35


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Assembly/disassembly of individual components, continuation

Pos : 142 /Allgemein/Ü berschriften Wartung/Ü bers chrift 3 - Aus bau der Trogsc hnec ke @ 2\mod_1345554647717_41.doc m @ 62429 @ 3 @ 1

Disassembly of the screw


Pos : 143 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ Ausbaubesc hrei bung - Aus bau Trogsc hnec ke @ 2\mod_1345554769869_41.doc m @ 62455 @ @ 1

1. Disassemble the drive motor.


2. Loosen the connections of the trough cover.
3. Disassemble the trough cover.
4. Loosen the mounting ring at the front end of the screw shaft.
5. Loosen the packing at the front end of the screw shaft.
6. Disassemble the cover.
7. Pull off the coupling.
8. Loosen the fastening of the toothed rim and remove it from the screw
shaft.
9. Loosen the packing.
10. Loosen the fixing screws of the drive console and cautiously remove the
drive console.
11. Support the rear end of the screw shaft by means of a carrying aid
(carrying strap + lifting equipment).
12. An operator supports the front screw shaft.
13. The second operator cautiously removes the screw out of the trough
towards the rear by means of the carrying aid.
14. If the front screw shaft reaches the last cross brace of the screw trough, a
second carrying aid is fastened in the front part of the screw. Be sure to
observe an even weight distribution between two carrying straps.
15. Cautiously lift the screw out of the screw trough and store it in a suitable
storage location.
16. Immobilise the screw by means of the wooden wedges, to secure it
against rolling away.

Pos : 144 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

36 Maintenance ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 145 /Allgemein/Ü berschriften Einl ager ung, Ents orgung/Ü berschrift 1 - Einl agerung und Entsorgung @ 2\mod_1338369185674_41.doc m @ 50961 @ 1 @ 1

8. Storage and disposal

Pos : 146 /Dosi ergeräte/Ei nlager ung, Ents orgung/ 1. Seite - Inhal t Ei nlag erung und Entsorgung @ 2\mod_1338370219258_41.doc m @ 51066 @ @ 1

This chapter describes the conditions for the storage and the disposal of the
device or of its individual components.

Content of the chapter “storage and disposal”:

Subject Page
Storage of the device, of individual assemblies 38
Disposal of the device, of individual assemblies 39
Pos : 147 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Storage and disposal 37


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 148 /Allgemein/Ü berschriften Einl ager ung, Ents orgung/Ü berschrift 2 - Einl agerung des Gerätes , ei nz elner Bauteile @ 2\mod_1338369361660_41.doc m @ 50988 @ 2 @ 1

Storage of the device, of individual components

Pos : 149 /Dosi ergeräte/Ei nlager ung, Ents orgung/ Ei nlager ung - Ausführ ung Gerät @ 2\mod_1338370523194_41.doc m @ 51120 @ @ 1

Execution of the device Execution of the device for storage:


• The device is completely discharged and thoroughly cleaned.
• The protective coating of the painted parts is okay or has been
renewed/touched up.
• The following components have to be disassembled:
- In general all sleeves and compensators have to be disassembled and
have to be stored together with the device under appropriate storage
conditions.
- Components with special storage conditions

Pos : 150 /Dosi ergeräte/Ei nlager ung, Ents orgung / Ei nlager ung - Lagerbedingungen @ 2\mod_1338370440604_41.doc m @ 51093 @ @ 1

Storage conditions Storage conditions for the storage of the device/individual assemblies:
Temperature: +10°C to +40°C
Humidity: 40% to 70% No standing moisture
Medium: Air (well ventilated and free from ozone, chemicals,
solvents)
Storage room Weather-proof, enclosed building
Clean, possibly free from dust
Packaging: suitable packaging box, provide spacers under the
cover (air circulation)
Miscellaneous: For sleeves, compensators:
protected against incident light

Pos : 151 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

38 Storage and disposal ©Operating instructions TS


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 152 /Allgemein/Ü berschriften Einl ager ung, Ents orgung/Ü berschrift 2 - Entsorgung des Gerätes , einz elner Bauteile @ 2\mod_1338369512608_41.doc m @ 51014 @ 2 @ 1

Disposal of the device, of individual components

Pos : 153 /Dosi ergeräte/Wartung/WartungHinweis - Warnung Pr oduktr este @ 2\mod_1337871794840_41.doc m @ 49929 @ @ 1

Residual product in/on the device


» During the disassembly of the device/of individual assemblies the
operating personnel might come into contact with the product.
Caution
» Reactions with the cleaning agent might occur.
Therefore
- Be sure to observe the indications of the product data sheet.
- Possibly necessary measures before the start of work
- Safety measures
- Measures for correct disposal

Pos : 154 /Dosi ergeräte/Wartung/D okID_447 - TSR (Tr ogför dersc hnec ke)/ WartungHinweis - Warnung sc harfkantige Bauteil e @ 2\mod_1345549195964_41.doc m @ 62245 @ @ 1

Caution Sharp-edged components


» Danger of cut injuries caused by the screw
Therefore
- Use gloves when working on this component
Pos : 155 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/ - -----> Leerz eile (For mat: T ext) <----- @ 0\mod_1317890599730_41.doc m @ 12133 @ @ 1

Pos : 156 /Dosi ergeräte/Ei nlager ung, Ents orgung/ Ents orgung - Vor der Ents orgung @ 2\mod_1338386778340_41.doc m @ 51173 @ @ 1

Before the disposal Before the disposal the following procedures have to be carried out:
1. Disconnect the device from all supply media.
2. Disassemble all connections from the device.
3. The device has to be disassembled completely.
4. The component groups have to be cleaned from product rests and
lubricant residues.

Pos : 157 /Dosi ergeräte/Ei nlager ung, Ents orgung/ Ents orgung - Ents orgung Bauteil e @ 2\mod_1338386408815_41.doc m @ 51146 @ @ 1

Disposal The individual components of the device have to be disposed separately.


Component Disposal
Drive, gear see manufacturer's indications
Electrical cables Cable scrap
Sleeves, compensator etc. PU, EPDM, silicone or similar
Hopper, pipes, sheets Metal scrap
Insulations according to material specifications
boards Special waste
accumulators, batteries Special waste
Plastic Disposal of plastics
Pos : 158 /Allgemein/Spezi elleM odul e (Fortsetzung, Leerz eile us w.)/--------------------- Seitenumbr uch -------------------------- @ 0\mod_1317195024148_0.doc m @ 10973 @ @ 1

©Operating instructions TS Storage and disposal 39


Bulk Solids Feeding ● Weighing ● Discharging ● Flow Metering

Pos : 159 /Allgemein/Index/Ü bers chrift 1 - Index @ 8\mod_1384844103046_41.doc m @ 118949 @ @ 1

Index Pos : 160 /Allgemein/Index/Index - Index- Eintr äge @ 8\mod_1384844278307_0.doc m @ 118975 @ @ 1

A I
Agitator 10 Intended purpose 8
Assembly, execution 18 M
D Mounting, tools 18
Disconnection, warning symbol 8, O
10 Operating personnel, protection 8
Drive 6, 10, 13, 14, 23, 26, 27, 33, Operating personnel, qualification8
35, 36 P
Drive shaft 15, 33 Product, appropriate 6
Drive shaft, screw 13, 33, 36 Product, characteristics 6, 25, 28
E S
Earthing, correct 9 Safety switch 23
Environment, data 7, 16 Shaft sealing 33
G Speed monitoring 15, 16, 33
Gear 15, 16, 39 U
Use in accordance with the
intended purpose 6