Professional Documents
Culture Documents
3 MISCELLANEOUS 854520
TOTAL 17986046.72
Architectural Drawings,
Elevations, Structural Drawings,
Estimates and Project
1 557567.45
management including visits and
own transport @ 3.10%
TOTAL - A 17986046.72
1 Add GST @ 18 % 3237488.41
2 Add NAC Corpus @ 0.10 % 17986.05
3 Add Seignorage charges 30000.00
TOTAL - B 3285474.46
GRAND TOTAL (A+B) 21271521.18
659417.16
TOTAL - C 659417.16