Coldroom

Cold room type modular cold room


Insulation thickness: 100 mm

Floor insulation: yes


Length (inner): 9.00 m

Width (inner): 6.00 m

Height (inner): 2.00 m

Inner volume: 108.00 m³

Application negative temperature refrigeration Room temperature: -45.0 ºC

Product type FROZEN FISH Storage temperature: -45.0 ºC

Storage humidity: 70 % Freezing point: -2.2 ºC

Water content: 73 % Specific heat capacity: 3.3 kJ/kg·K

Respiration heat: 0.0 kJ/kg Specific heat below freezing point: 1.8 kJ/kg·K

Product loading Load rate: 462 kg/m³ Total load: 49896 kg

Daily turnover rate: 20 %/24h Daily turnover: 9979 kg/24h

Inlet temperature: -3.0 ºC

Product cooling Product shape: sphere Weight per piece: 0.25 kg

Product thickness: 81 mm Mass density: 892 kg/m³

Thermal conductivity: 1.4 W/m·K Air speed: 0.1 m/s

Final inner temperature: -45.0 ºC Cooling time: 24.00 h

Air temperature: -45.0 ºC

Location within a building Altitude: 0 m

Ambient temperature: 37.9 ºC Ambient relative humidity: 23 %

Thermal insulation Walls: Injected polyurethane area: 63.8 m² thickness: 100 mm

Roof: Injected polyurethane area: 55.5 m² thickness: 100 mm

Floor: Injected polyurethane area: 55.5 m² thickness: 100 mm

Door: Injected polyurethane area: 8.0 m² thickness: 75 mm

Ventilation through Door openings per day: 5.0 /24h Air volume renewal rate: 4.8 /24h
doors

Door heater Unitary heat rate: 10 W/m Perimeter: 9.0 m

Defrost Defrost type: electrical

Fans Airflow rate: 2160 m³/h Input power: 0.297 kW

Cooling needs Calculation time period: 24.0 h


Products
Refrigeration of goods: 737662 kJ
H. Transfer
Heat transfer: 293840 kJ
Air renewal
Air renewal: 88826 kJ
Loads
Thermal loads: 120021 kJ

TOTAL: 1240349 kJ

Working hours: 18.0 h


Necessary cooling Necessary capacity for preservation of 7758 W Total cooling capacity: 19141 W
capacity goods:

 Too high heat loss through panels: Heat flow through the insulation is higher than the maximum recommended values. We recommend to
increase insulation thickness.

 Floor heating: Floor heating or ventilation might be needed to prevent the ground from freezing.