Professional Documents
Culture Documents
Revision 02
Effective date Oct. 01, 2012
No. S-0201-CHO
Authorized DPA-QMR
SMS RECORDS/INVENTORY
To be verified by In-coming Chief Engineer. Enter ( √ ) in box.
( ) Operations of machinery
( )
( ) Others:
1. The Chief Engineer Hand-Over Note is to be prepared by the out-going Chief Engineer.
2. The in-coming Chief Engineer must verify the contents before taking over responsibility.
3. The In-coming Chief Engineer will be fully responsible for the above after acknowledging this document.
4. The Hand-Over Note shall be made in three copies and filed onboard with copies to the out-going Chief Engineer and the Company.
_______________________ _______________________
Signature/Date : Signature/Date :