DOCUMENT TRANSMITTAL RECORD

4451-54 Avenue SE.,Calgary, AB T2C 2A2

TO: Elias Zoghbi (elias.zoghbi@harmonyseasia.com) Customer: Harmony Sea Asia


CC: Sandra Patrick <Sandra.Patrick@harmonyseasia.com> Location: Papua New Guinea
Geoffrey Atkinson <Geoffrey.Atkinson@harmonyseasia.com> Contractor: None
Mark Langham <mark.langham@harmonyseasia.com> PO #: 332008
Alvin Li <ALi@westpowergroup.com> Item/Tag Number: TBD
Brendon Boyko-Bridges <BBoyko-Bridges@westpowergroup.com> Pump Size & Type: 4x6x11 WPV-R
Order Date: 20-Dec-2019
Ship Date: 19-Jun-2020
Total # Weeks: 26
Quantity of Units: 3
Description: TBD
Westpower Ref. JOB #: M1602
Revision no.: 0
ATTN: DOCUMENT CONTROL DEPARTMENT Date Transmittal #: 3-Feb-20 1

WESTPOWER DOC DOCUMENT REVISION


ITEM NUMBER DESCRIPTION / TITLE TAG # ISSUE STATUS COPIES
NAME NUMBER
01 M1602-9 Inspection and Test Plan ITP 0 TBA Issued for Information 1E

02 M1602-11 Hydrostatic Test Specification WMHTS1-01 1 TBA Issued for Information 1E

03 M1602-12 Balancing Procedure QAP-WI-6 0 TBA Issued for Information 1E

04 M1602-13 Material Inspection (NDE) Specification WMMIS1-01 0 TBA Issued for Information 1E

05 M1602-14 Packaging, Shipping and Storage Procedure WMLTS1-03 0 TBA Issued for Information 1E

06 M1602-15 Performance Test Specification PTS 0 TBA Issued for Information 1E

07 M1602-16 Painting Procedure for Pump Surfaces QAP-WI4 0 TBA Issued for Information 1E

08 M1602-17 Production Schedule PS 0 TBA Issued for Information 1E

PLEASE RETURN DOCUMENTS TO: documentcontrol@westpowergroup.com


From: Dwight Capili / 403-720-3300

PAGE 1 / 1
DC-FO-003 | REV 0 | 2019-09-09