As on 31-01-2024
S.No Package Vendor Raised by Raised on Building / Floor / Area Location Snag Point / Pending Works Present Photos Action Taken by Vendor Rectification photos Target Completion Status Actual Completion Remarks
M/s Shakthi
1 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office ELR & Shunt coil needs to be fixed in VTPN DB M/s Shakthi Electrical O
Electrical
M/s Shakthi
2 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need to connect Earthing in Both PDB & LDB M/s Shakthi Electrical O
Electrical
M/s Shakthi
3 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need to install Gland Earthing in PDB & LDB M/s Shakthi Electrical O
Electrical
M/s Shakthi
4 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need to fix cable tray covers M/s Shakthi Electrical O
Electrical
M/s Shakthi
5 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office LDB Circuit identification needs to be done M/s Shakthi Electrical O
Electrical
M/s Shakthi
6 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need to fix cable tray cover M/s Shakthi Electrical O
Electrical
M/s Shakthi
7 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need proper Cable dressing in cable tray M/s Shakthi Electrical O
Electrical
M/s Shakthi Need to fix Exhaust fans at both Male & Female
8 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office M/s Shakthi Electrical O
Electrical Restroom
M/s Shakthi Need to Fix the Exhaust Fan power sockets at Proper
9 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office M/s Shakthi Electrical O
Electrical Height level
M/s Shakthi
10 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need to fix Exhaqust Fan louvers M/s Shakthi Electrical O
Electrical
M/s Shakthi
11 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office Need Proper dressing for HVLS fan connection M/s Shakthi Electrical O
Electrical
M/s Shakthi Need to connect all cables with proper dressing to the
12 Plant Electrical CSD/CBRE 6-Jan-24 Tech office FF Tech Office M/s Shakthi Electrical O
Electrical PDB
M/s Shakthi
13 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office Tray support alignment needs to be done properly M/s Shakthi Electrical O
Electrical
M/s Shakthi
14 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office LDB SPD needs to be fixed M/s Shakthi Electrical O
Electrical
M/s Shakthi Electrical cable laid in Fire tray, kindly reroute the
15 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office M/s Shakthi Electrical O
Electrical cable in electric cable tray.
M/s Shakthi
16 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office LDB Identification sticker needs to be fixed M/s Shakthi Electrical O
Electrical
M/s Shakthi
17 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office PDB circuit identification sticker needs to be done M/s Shakthi Electrical O
Electrical
M/s Shakthi
18 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office HVLS Fan starter box tray cover needs to be fixed M/s Shakthi Electrical O
Electrical
M/s Shakthi
19 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office Vertical cable tray cover needs to be done M/s Shakthi Electrical O
Electrical
M/s Shakthi
21 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office HVLS Fan cable dressing needs to be done proeperly. M/s Shakthi Electrical O
Electrical
M/s Shakthi Power cable dressing needs to be done properly over
22 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office M/s Shakthi Electrical O
Electrical the tray
M/s Shakthi
24 Plant Electrical CSD/CBRE 31-Jan-24 Tech office FF Tech Office HVLS Fan starter box tray cover needs to be fixed M/s Shakthi Electrical O
Electrical