AIP - Shed-Week - Two Inspection
AIP - Shed-Week - Two Inspection
The company was completely closed from Monday to Wednesday for christmass holiday.
Remark
Remark
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:- Date:-
Phase A
Current
Phase B
voltage
Phase C
SF6 gas
Ameter/
volt
meter
reading
potential
indicator
Relay
Shed#7 Shed#7
Last Day temprature controller reading Last day LV meter reading
Phase A
Current
Phase B
Phase C
Voltage
RMU last day picture
Compens
ator bank
SF6 gas
Ameter/
volt
meter
reading
potential
indicator
UPS Last picture
UPS
Relay
Shed#8
Shed#8 Last day LV meter reading
Last Day temprature controller reading
Phase A
Current
Phase B
Phase C
Voltage
RMU last day picture
SF6 gas
compens
ator bank
Ameter/
volt
meter
reading
Relay
potential
indicator
UPS
Waste water treatment plant (ZLD) Last day LV meter reading
Winding temperature and oil temprature for TR 3
Current
WT
indicator
Voltage
OT
indicator
Last day MV meter reading
TR oil
Voltage
level
Tapining
position
Last Day RMU picture
SF6 gas
TR 3
reading
r reading