You are on page 1of 14

INDUSTRIAL PARK DEVELOPMENT CORPORATION

ADAMA INDUSTRIAL PARK


Engineering And Maintenance departement
Daily inspection check list for Shed #1(8-12/1/2024
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
1 Transformer
Phase A 39.5 40.8
Winding TEMP °C Phase B 41.3 43.8
Phase C OP OP
Fan(run manually for a while) R R
Abnormal sounds And smells R R
2 RMU
SF6 gas pressure gauge R R
power indicator lamp R R
Abnormal sounds And smells R R
3 MV Room
Axial fan R R
Cleanliness R R
4 LV Room
Main ACB R R
Capacitor bank R R
Measuring device and LED R R
Cleanliness R R
L1-2 383.4 385.7
voltage L2-3 382.3 385
in Volt L1-3 382 384.5
Meter
I1 0 0
reading
Current I2 3 2
in A I3 2 3
Power Factor 1 1
5 Lighting systems
Working area R R
Offices R R
Toilet R R
MV Room R R
LV Room R R
6 Air Conditioner R R
7 Server room R R
8 Mic and speaker there is no MIC and Speaker
9 UPS there is no UPS
Battery voltage
Ventilation
10 Shutter doors R R

The company was completely closed from Monday to Wednesday for christmass holiday.
Remark

Note:- R in good status T in bad status


Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:- Date:-

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Shed #7(8-12/1/2024)
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
1 Transformer
Phase A 38.3 36.1 36.5 35.5
Winding TEMP °C Phase B 39 38.3 37 36.8
Phase C 40.2 41.2 39.5 38.3
Fan(run manually for a while) R R R R
Abnormal sounds And smells R R R R
2 RMU
SF6 gas pressure gauge R R R R
power indicator lamp R R R R
Abnormal sounds And smells R R R R
3 MV Room
Axial fan R R R R
Cleanliness R R R R
4 LV Room
Main ACB R R R R
Capacitor bank R R R R
Measuring device and LED R R R R
Axial fan R R R R
Cleanliness R R R R
L1-2 383.4 383 382.1 384.5
voltage L2-3 383 382.7 381.7 384
in Volt L1-3 382.5 380.4 379.5 383.7
Meter
I1 68 69 75 58
reading
Current I2 58 70 69 60
in A I3 55 76 57 65
Power Factor 0.96 0.97 0.96 0.96
5 Lighting systems
Working area R R R R
Offices R R R R
Toilet R R R R
MV Room R R R R
LV Room R R R R
6 Air Conditioner R R R R
7 Server room R R R R
8 Mic and speaker R R R R
9 UPS
Battery voltage R R R R
Ventilation R R R R
10 Shutter doors R R R R
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:- Date:-

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Shed #8(8-12/2023)
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
Transformer 4
Phase A 48.5 48 48.5 48.1
Winding TEMP in
Phase B 54 54.2 54.6 54.4
1 °C
Phase C 53.7 53.3 54.4 53.8
Fan(run manually for a while) R R R R
Abnormal sounds And smells R R R R
2 RMU
SF6 gas pressure gauge R R R R
power indicator lamp R R R R
Abnormal sounds And smells R R R R
3 MV Room
Axial fan R R R R
Cleanliness R R R R
4 LV Room
Main ACB R R R R
Capacitor bank R R R R
Measuring device and LED R R R R
Axial fan R R R R
Cleanliness R R R R
L1-2 382.3 382.8 381.5 382.6
voltage
in Volt
Meter
reading
voltage L2-3 382.1 382 381 381.7
in Volt L1-3 381 381.5 379.4 381.2
Meter
I1 185 178 188 228
reading
Current I2 167 187 177 202
in A I3 200 210 207 225
Power Factor 0.96 0.98 0.99 0.98
5 Lighting systems
Working area R R R R
Offices R R R R
Toilet R R R R
MV Room R R R R
LV Room R R R R
6 Air Conditioner R R R R
7 Server room R R R R
8 Mic and speaker R R R R
9 UPS UPS is working in bypass mode
Battery voltage
Ventilation R R R R
10 Shutter doors R R R R

Remark
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:- Date:-

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Waste water treatment plant (ZLD) (8-12/2023)
Day
Descriptions Remark
S.N Mo Tue Wed Thur Fir
1 Transformer
Winding temprature in °C 55 55
Oil tempratrure in °C 55 55
Oil leakage R R
Tap position 11 11

Oil level Bteween Bteween


1/2 & 3/4 1/2 & 3/4
Cleanliness of silica gel R R
Abnormal sounds And smells R R
2 RMU
SF6 gas pressure gauge R R
Power indicator R R
Abnormal sounds And smells R R
3 MV Room
exhaust fan R R
Cleanliness R R
L1-2 31.6 31.7
Voltage L2-3 31.81 31.89
Meter in kv L1-3 31.86 31.87
reading
Avg 31.75 31.82
Power Factor 1 1
4 LV Room
Main ACB R R
Capacitor bank
Cleanliness R R
L1-2 393.07 392.39
voltage
L2-3 396.46 395.76
in Volt
L1-3 394.25 393.62
Meter
L1 435.71 273.88
reading Current
L2 430.53 283.61
in A
L3 427.13 281.64
Power Factor
5 Lighting systems
MV Room R R
PCC Room R R

1.SF6 gas level for porcess incoming compartement,TR 1 & TR 4 compartment is in


Remark
normal range,but for TR2 &TR3 sf6 gas level is lower (not ready service).
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:- Date:-
Shed#1 Shed#1
Last Day temprature controller reading Last day LV meter reading

Phase A
Current

Phase B
voltage
Phase C

RMU last day picture compens


ator bank

SF6 gas
Ameter/
volt
meter
reading
potential
indicator

Relay
Shed#7 Shed#7
Last Day temprature controller reading Last day LV meter reading

Phase A

Current
Phase B

Phase C
Voltage
RMU last day picture

Compens
ator bank
SF6 gas
Ameter/
volt
meter
reading
potential
indicator
UPS Last picture

UPS

Relay
Shed#8
Shed#8 Last day LV meter reading
Last Day temprature controller reading

Phase A
Current

Phase B

Phase C
Voltage
RMU last day picture

SF6 gas
compens
ator bank
Ameter/
volt
meter
reading

Relay

potential
indicator

UPS
Waste water treatment plant (ZLD) Last day LV meter reading
Winding temperature and oil temprature for TR 3
Current
WT
indicator

Voltage
OT
indicator
Last day MV meter reading

TR oil
Voltage
level

Tapining
position
Last Day RMU picture

SF6 gas
TR 3
reading

r reading

You might also like