Curtain Walls and Glazing Works Prices

Material Description Unit Price

8mm thk Reflective Tempered Glass Door sq.m. 33,600.00

12mm thk Frameless Glass Door sq.m. 33,000.00

12mm thk Reflective Tempered Glass Door sq.m. 37,000.00

12mm thk Clear Tempered Glass Wall sq.m. 6,700.00

Light Blue Light Reflective Tempered Glass Curtain Wall sq.m. 7,400.00

Aluminum Wall Cladding sq.m. 4,200.00

Aluminum Canopy sq.m. 4,400.00

Railing with 12mm thk Clear Tempered Glass x 0.8m H l.m. 1,008.50
Average glazing works prices in the Philippines.

All amount in Php. Accessories included and material price alone. To see all the material prices we have posted click here.

Painting Works

Description / Item Unit Ave. Price

Paint Tinting Color Ltr 182.00

Paint Aluminum gal 664.00

Paint Enamel gal 660.00

Paint Latex Gloss gal 640.20

Paint Latex Semi-Gloss gal 650.00

Paint Red Lead gal 581.00

Thinner Lacquer gal 511.00

Paint Metal Epoxy gal 676.00

Paint Primer Solvent gal 635.00

Brush Paint (101mm) pc 72.00

Brush Roller (152mm) pc 84.00

Brush Steel (101mm) pc 36.00

Oil Paint Ltr 158.09

Spar Varnish Ltr 145.00

Lacquer Putty Ltr 167.00

Concrete neutralizer gal 422.00

Putty Knife pc 26.00

Roller paint # 9 w/ tray pc 153.00


Paint thinner gal 286.00

Sand paper #120 Dozen 123.00


For reference, 20 sq.m normally consumes a gallon of paint. All amount in Php.

PHILIPPINE PRODUCTIVITY RATIOS

DESCRIPTION MANHOUR/UNIT UNIT

1.STRUCTURAL EXCAVATION

Common excavation

Hand 6.00 MH/M3

Machine 0.50 MH/M3

Rock excavation 8.00 MH/M3

Hauling of spoils 1.00 MH/M3

2.STRUCTURAL BACKFILL

By hand 5.00 MH/M3

By machine 2.00 MH/M3

3.TRENCHING

By hand 6.00 MH/M3

By machine 0.50 MH/M3

EXCAVATION- MANUAL

Common earth 8.00 MH/M3

Loam of sand 1.31 MH/M3

Clay or heavy soil 1.64 MH/M3

Rock 2.63 MH/M3

EXCAVATION- MECHANICAL

Common earth 6.67 MH/M3

Rock with jack hammer 16.67 MH/M3

BACKFILLING

Common manual 0.82 MH/M3

Gravel fill manual 5.00 MH/M3

TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS MANUAL FROM:

0 – 2m Depth 1.25 MH/LM

2 – 3m Depth 1.67 MH/LM

3 – 4m Depth 2.50 MH/LM


4 – 5m Depth 3.33 MH/LM

Placing binder gravel 0.11 MH/M3

Escombro backfilling 0.21 MH/M3

Spreading,tamping & grading 0.48 MH/M2

Mechanical compaction, plate compaction 0.06 MH/M3

MANUAL CLEARING & GRUBBING

Clearing under growth & trees – 12″ 0.05 MH/M2

Clearing under growth & shrubs 0.03 MH/M2

Disposal of soil 1.69 MH/M3

Hauling of soil 1.00 MH/M3

Gravel fill 2.07 MH/M3

EXCAVATION – CRANE & CLAMPSHELL

With 8 men & 2 carpenters 1.07 MH/M3

5.ROOFING AND SIDING

Roofing

Metallic 0.97 MH/m2

Non-Metallic 1.51 MH/m2

Siding

Metallic 1.29 MH/m2

Non-Metallic 1.51 MH/m2

CONCRETE WORKS

4.CONCRETE WORKS

Grade members

Formworks 2.54 MH/M2

Concreting 8.54 MH/M3

Rebar 0.07 MH/kg

Finishing 0.40 MH/M2

Suspended members

Formworks 3.28 MH/M2

Concreting 16.70 MH/M3

Rebar 0.08 MH/kg

Finishing 0.80 MH/M2


Embeded metal 0.27 MH/kg

Water proofing 1.82 MH/M2

Joint filler 0.30 MH/lLm

PLACING CONCRETE

Slab on Fill 5.00 MH/M3

Slip Form 25.00 MH/M3

Floor Finish Unhardened 1.00 MH/M3

Concrete finished hardened 1.43 MH/M3

REBAR WORKS

Ground floor installation 0.07 MH/M3

Upper floor installation 0.08 MH/M3

Fabrication 0.10 MH/M3

Mixing manual 16.00 MH/M3

Mixing machine 1.80 MH/M3

MORE THAN 1.8 M3 POUR

Chute from truck 7.00 MH/M3

Crane & bucket 14.00 MH/M3

Wheeling 27.00 MH/M3

Finishing 2.80 MH/M3

FORMWORKS & CARPENTRY WORKS

FORM WORKS INSTALLATION

Wall on ground 2.00 MH/M2

Wall above ground 2.35 MH/M2

Beams 3.08 MH/M2

Columns 2.35 MH/M2

Suspended slab

Suspended slab 0 – 18″ 1.67 MH/M2

Suspended slab 10 – 36″ up 3.33 MH/M2

Elevated & shored slab forming

Forming only 8.60 MH/M2

Forming & Shoring 11.00 MH/M2

Wood wall & Partition 0.50 MH/M2


FORM WORKS FABRICATION

Form works fabrication 1.00 MH/M2

STRIPPING OF FORMS

Wall on ground 0.25 MH/M2

Wall above 10″ 1.29 MH/M2

Beams 1.03 MH/M2

Columns 0.85 MH/M2

Suspended slab

Suspended slab 0 – 18″ 0.83 MH/M2

Suspended slab 10 – 36″ up 1.08 MH/M2

Elevated & shored slab forming – strip of forms 3.50 MH/M2

Floor slab at grade – strip of forms 2.80 MH/M2

INSTALLATION OF CARPENTRY WORKS

Plywood partition 1.00 MH/PC

T & G Flooring and Siding 0.14 MH/B.F.

Ceiling & frame work 0.36 MH/B.F.

Siding frame work 0.27 MH/B.F.

Flooring framing 0.97 MH/B.F.

Wooden post errection 0.43 MH/B.F.

Truss Fabrication 0.35 MH/B.F.

Truss Installation 0.80 MH/B.F.

Girt Installation 0.21 MH/B.F.

Plates Installation 0.13 MH/B.F.

Purlins Installation 0.27 MH/B.F.

Fascia board Installation 0.46 MH/B.F.

1/4″ or 3/4″ thk. plywood

Cutting by manual 1.00 MH/PC

Assembly 0.42 MH/M2

ARCHITECTURAL SPECIALTIES

DOORS

Wooden 2.37 MH/M2

Steel 7.64 MH/M2


Aluminum 8.07 MH/M2

Cyclone wire 7.64 MH/M2

WINDOWS

Glass 3.23 MH/M2

Louver 4.63 MH/M2

Steel 32.29 MH/M2

PARTITIONS

single wall 2.48 MH/M2

Wooden wall 3.44 MH/M2

Wooden Louver 3.44 MH/M2

cyclone Louver 5.38 MH/M2

PAINTING ( 3 coats )

Equipment 0.24 MH/f2

Pipes 0.30 MH/f2

Miscillaneous 0.24 MH/f2

STRUCTURAL STEEL WORKS

7. STRUCTURAL STEEL

Fabrication

Light 110-130 MH/MT

Heavy 60-90 MH/MT

Errection

Light 70-100 MH/MT

Heavy 40-60 MH/MT

WELDING ( one pass only )

1- Welder and 1- Helper ( 16 total mh ) 40-50 Lf/day

G.1 STRUCTURAL STEEL

Fabrication

Heavy weight 50-90 MH/MT

Light weight 100-125 MH/MT

Grating 1 1/4″ x 3/16″ 3.0 – 3.5 MH/SF

Star threat grating 4.0 – 5.0 MH/SF

Errection
Heavy Structural teel 30 – 60 MH/MT

Light Structural steel 60- 90 MH/MT

Stacks ( Inc. full welding ) 250 – 300 MH/MT

Tanks ( Inc. full welding ) 200 – 275 MH/MT

FINISHING AND MASONRY WORKS

H. CHB

4” CHB

Laying 8.0 – 10 m2/day

Tooling 11 – 14 m2/day

Plastering 8.0 – 10 m2/day

6” CHB

Laying 7.0 – 9.0 m2/day

Tooling 11 – 14 m2/day

Plastering 8.0 – 10 m2/day

8” CHB

Laying 6.0 – 8.0 m2/day

Tooling 11 – 14 m2/day

Plastering 8.0 – 10 m2/day


These are average productivity ratios of an average construction worker. Productivity ratios of manpower and equipment are used in the construction
industry to estimate how much time is needed to complete a certain work.

Costs stated herein are average prices in Php for Northern Mindanao. We hope this will also help our friends from Luzon and Visayas.

Embankment (per cubic meter)

Common Borrow 392.65

Selected Borrow 397.49

Mixed Sand & Gravel 597.211

Rock 613.76

Aggregate Subbase Course

Aggregate Subbase Course Material 828.59

Aggregate Base Course 949.92


Crushed Grading A 842.83

Uncrushed Grading A 939.38

Crushed Grading B 844.70

Uncrushed Grading B 839.81

Blended Weathered Limestone and Crush Stone 829.34

Filler Materials 410.00

Crushed Aggregate Base (per cubic meter)

Crushed Grading A 929.44

Crushed Grading B 879.83

Lime Stabilized Road Mx Base Course (per cubic meter)

Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading A 713.27

Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading B 680.65

Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading A 681.76

Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading B 634.23

Aggregate Surface Course (per cubic meter)

Crushed Grading A 882.75

Crushed Grading B 879.58

Crushed Grading C 892.91

Crushed Grading D 867.47

Uncrushed Grading A 838.32

Uncrushed Grading B 824.37

Uncrushed Grading C 819.81

Uncrushed Grading D 799.91


All amount in Php. To see all the material prices we have posted click here.
Automatic Fire Sprinkler System

BSP 25mm diameter lm 266.49

BSP 32mm diameter lm 353.43

BSP 40mm diameter lm 421.92

BSP 50mm diameter lm 531.54

BSP 65mm diameter lm 666.18

BSP 80mm diameter lm 861.48

BSP 100mm diameter lm 1,314.18

BSP 150mm diameter lm 2,153.88

BSP 200mm diameter lm 3,285.63

Valves and Accessories including necessary consumables

OS & Y Gate valve,150mm diameter pc 32,717.43

OS & Y Gate valve,200mm diameter pc 55,468.17

Gate Valve, 25mm diameter pc 2,287.26

Gate Valve, 65mm diameter pc 17,340.84

Check valve, 50mm diameter pc 9,402.57

Check valve,65mm diameter pc 12,536.82

Check valve,100mm diameter pc 23,245.29

Check valve,150mm diameter pc 42,050.43

Floor Control Valve, 100mm diameter pc 21,410.01

Flexible connector,65mm diameter pc 17,750.88

Fire Department Connection, 150x65x65mm diameter pc 24,957.45

Supervisory switch pc 4,530.87

Water flow switch pc 6,590.34

Pressure Reducing Valve, 150mm diameter pc 180,646.20

ITC Drain Valve, 25mm diameter pc 4,387.41

Roof Manifold,150x65x65mm diameter pc 38,742.12

Sight glass pc 1,233.36

Fire hose valve, 65mm diameter pc 10,157.13

Alarm check valve, 150mm diameter pc 81,396.09

Butterfly Valve, 150mm diameter pc 25,278.57

SSP 200mm diameter lm 23,636.70


SSP 250mm diameter lm 29,690.01

Gate Valve, 100mm diameter pc 21,176.55

Gate Valve, 80mm diameter pc 18,564.75

Check valve,200mm diameter pc 71,389.98

Wye Strainer 65mm diameter pc 6,355.44

Wye Strainer 200mm diameter pc 44,314.02

Flexible connector,200mm diameter pc 41,418.72

Float Valve, 100 mm diameter pc 120,301.29

Pressure relief valve, 65mm diameter pc 118,838.25

Pump Test Connection, 150x65x65mm diameter pc 24,957.45

Sprinklers to include fixing with necessary consumables

Upright sprinkler head pc 488.07

Pendent sprinkler head pc 521.10

Equipment

Fire Pump unit 114,651.54

Jockey Pump unit 30,412.80

Fire Protection Specialties

Fire Hose Cabinets, Recessed Type set 20,900.00

Portable fire extinguisher, 10 lbs pc 3,570.57

Portable fire extinguisher, 15 lbs pc 24,797.16

Portable fire extinguisher, 125 lbs Dry Chemical pc 61,957.35

Portable fire extinguisher, 11 lbs pc 16,543.53

Portable fire extinguisher, 9.46L pc 8,812.44


VAT not included.

This rate guide should help any Filipinos on how much should they rate construction laborers. Updated as of December 2019.

Philippine Labor Rates Guide – December of 2019

Description Rate/Hr (Php) Daily Rate (Php)

Foreman 94.98 759.87

Electrician 90.28 722.27

Plumber 90.28 722.27


Leadman 86.53 692.27

Heavy Equipment Operator 79.13 633.00

Highly Skilled Operator 79.13 633.00

Light Skilled Operator 72.80 582.40

Driver 67.36 538.87

Skilled Laborer 67.36 538.87

Light-skilled Laborer 63.93 511.40

Unskilled Laborer 52.65 421.20

All amount in Php. To see all the material prices we have posted click here.
Price guide to simple hardscaping works. Security, project management, temporary facility and control, and as-built preparation are not included as it
vary per location.

Product and Execution Requirements

Description QTY Unit Amount (Php)

Product Storage and Handling (Contractor’s Temporary Warehouse) 1 lot 20,000.00

Construction Layout and Surveying 1 lot 20,000.00

Local Business Permit 1 lot 20,000.00

Cleaning 1 lot 20,000.00

Description QTY Unit Material (Php) Labor (Php)

Dampproofing and Waterproofing

Cementitious and Reactive Waterproofing 1 SQ.M. 690.00 200.00

Colorless Floor Hardener 1 SQ.M. 135.00 56.25

Tiles, Stampcrete and Accessories

Supply, Delivery and Installation of Granite (150mm x 150mm) 1 SQ.M. 3,450.00 1,800.00

Supply, Delivery and Installation of Granite (300mm x 600mm) 1 SQ.M. 4,300.00 1,800.00

Supply, Delivery and Installation of #10 Crushed Granite (Washout) 1 SQ.M. 3,290.00 350.00

Supply, Delivery and Installation of Homogeneous Tiles (600mm x 600mm) 1 SQ.M. 1,515.00 350.00

Supply, Delivery and Installation of Homogeneous Tiles (300mm x 300mm) 1 SQ.M. 1,525.00 350.00

Supply, Delivery and Installation of 150mm Wide Stampcrete 1 SQ.M. 1,950.00 300.00

Supply, Delivery and Installation of Stampcrete 1 SQ.M. 1,950.00 300.00

Lighting Accessories
Supply, Delivery and Installation of Recessed Steplight (15W Die Cast Aluminum
1 pc 6,900.00 3,800.00
with Front Panels)
Performance, Surety and Guarantee Bonds are also not included.

Costs stated herein are average prices in Php for Northern Mindanao. We hope this will also help our friends from Luzon and Visayas.

Embankment (per cubic meter)

Common Borrow 392.65

Selected Borrow 397.49

Mixed Sand & Gravel 597.211

Rock 613.76

Aggregate Subbase Course

Aggregate Subbase Course Material 828.59

Aggregate Base Course 949.92

Crushed Grading A 842.83

Uncrushed Grading A 939.38

Crushed Grading B 844.70

Uncrushed Grading B 839.81

Blended Weathered Limestone and Crush Stone 829.34

Filler Materials 410.00

Crushed Aggregate Base (per cubic meter)

Crushed Grading A 929.44

Crushed Grading B 879.83

Lime Stabilized Road Mx Base Course (per cubic meter)

Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading A 713.27

Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading B 680.65
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading A 681.76

Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading B 634.23

Aggregate Surface Course (per cubic meter)

Crushed Grading A 882.75

Crushed Grading B 879.58

Crushed Grading C 892.91

Crushed Grading D 867.47

Uncrushed Grading A 838.32

Uncrushed Grading B 824.37

Uncrushed Grading C 819.81

Uncrushed Grading D 799.91

All amount in Php. To see all the material prices we have posted click here.