Reference no.

: BNPP-TIR-122
Date: 14-Jul-2023

Technical Incident Report (TIR)

Section 1: Incident Details


Incident Number BNPP-TIR-121
Incident Date 24-JUL-2023 Incident Type Fire alarm activated
Date of IIR 24-JUL-2023 Report Prepared by Mohammed Zubair
Contract ENEC-EFS Incident Location ADB Building Elevator Machine Room
Section 2: Incident Investigation Team
Name Company Designation
Mohammed Zubair EFS Facilities Services Facility Engineer
Ghulam Asi Kamal Juma Al Majid Fire technician
Sunil EFS Facilities Services Technician
Section 3: Brief Description of the Incident (Detail the facts of the incident)

Smoke detector activated in ADB Building Roof Machine Room

Section 4: Sequence of Events

On 24th JULY 2023, 22:51:39 Fire alarm activated in ADB Building Elevator Machine Room. EFS
team reported immediately to the BNPP Emergency team about the fire alarm.

Fire Fighting Emergency team arrived at site and observed Smoke detector P4-C5-SD3 in the
ADB Building Elevator Machine Room. Fire team checked the Location and found the smoke
detector was activated due to humidity.

Fire Team reset the panel and is under 24 Hours observation. Reason for Alarm is Due to humidity.

Fire alarm panel activated – 22:51:39


Fire alarm panel has been silenced – 23:04:09
Fire alarm panel has been reset – 23:04:16

Section 5: Persons Involved (Details of persons involved in the incident)


Name Company Designation Contact Number Age
Ghulam Asi Kanal Juma Al Majid Fire technician N/A N/A
Ram Mohan Reddy EFS Facilities Services HVAC Technician N/A N/A

For Official Use Only (FOUO)


Reference no.: BNPP-TIR-122
Date: 14-Jul-2023

Technical Incident Report (TIR)

Section 6: Incident Cause Analysis


Fire alarm activated in ADB Building Elevator Machine Room
Immediate Cause
Underlying Cause Smoke detector False Activation
Root Cause Alarm due to Humidity
Section 7: Action(s) Taken (What action was taken immediately following the incident)
See Section 4: Sequence of Events.

 Reported to Emergency Team.


 Inspected the location.
 Identified Smoke detector and Cleaned
 Reset the panel.

Section 8: Corrective Actions to Prevent Recurrence:


Corrective Actions Person Responsible Target Date

 Reset the panel and keep the EFS


Smoke detector under observation 25-JUL-2023

Section 9: HSE Communication


Does this incident fall under the HSE incident reporting category. □ Yes □ No □ NA
□ Yes □ No
If Yes, was it reported to the QHSE Dept.

Section 10: Prepared By


Name Mohammed Zubair Date 24-JUL-2023

Signature

Section 11: Reviewed By


Name Date
Signature

Comments
Section 12: Approved By
Name Date
Signature

Comments

Images associated with this report:

For Official Use Only (FOUO)


Reference no.: BNPP-TIR-122
Date: 14-Jul-2023

Technical Incident Report (TIR)

For Official Use Only (FOUO)