Professional Documents
Culture Documents
Safety Inspection Report 14.02.2024 Hexatech
Safety Inspection Report 14.02.2024 Hexatech
LPS-01 PROJECT
Area
LPS-01 Date 14.02.2024 Time 08.00 PM
Location
Completed by Mark Signature
Items to be checked
1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear
2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x
Immediate
GF zone B electrical room. closed properly.
2 Days
4 Days
1
√
FHR access obstruction at B- Always ensure that FHR
x Immediate
2 Days
4 Days
2 1. access is free of obstruction.
Observations Closeouts
Inadequate edge protection at GF zone B Ensure edge protections are closed properly.
electrical room.
FHR access obstruction at B-1. Always ensure that FHR access is free of
obstruction.