Professional Documents
Culture Documents
Document Title:
GYUA-MD-QQMAT-00-0002-001
4103 M ODEC Document No.
1 of 27
4103-MI20-12S1-0002-001
Confidential
Project Green
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
RECORD OF AMENDMENT
REVISION SECTION PARAGRAPH DESCRIPTION OF CHANGE
A Interdisciplinary Check (IDC)
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
B Issue for Review (IFR)
B1 Issue for Review (IFR)
UNCONTROLLED WHEN PRINTED
Page 2 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY ................................................................................................. 5
2.0 BACKGROUND .............................................................................................................. 5
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
3.0 BASIS ............................................................................................................................. 5
3.1 REFERENCES .................................................................................................... 5
3.1.1 Company.............................................................................................. 6
3.1.2 Client.................................................................................................... 6
UNCONTROLLED WHEN PRINTED
3.2.2 Abbreviations........................................................................................ 7
Page 3 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
APPENDIX D – PMI MATERIALS EXAMINATION & REPORTING REQUIREMENTS ............ 21
ATTACHMENT 1 – SAMPLE PMI REPORT FORMAT (MATERIAL MANUFACTURER OR
STOCKIST)................................................................................................................... 24
ATTACHMENT 2 – SAMPLE PMI REPORT (FIELD FABRICATION)...................................... 26
UNCONTROLLED WHEN PRINTED
Figures
No table of figures entries found.
Tables
Table 2-1: Process Plant Capacities ........................................................................................... 5
Page 4 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
fabricators or material suppliers and sub-suppliers. The purpose of PM I is to ensure that the
nominal composition of the Piping M aterials, W elding Consumables Corrosion Resistant Alloy
(CRA) material and fabrication welds specified has been correctly supplied and documented.
2.0 BACKGROUND
The Uaru+ Project is an offshore development located about 190km offshore Guyana in 1,400-
1,900 m water depth. The development will use a new build FPSO and SURF production
UNCONTROLLED WHEN PRINTED
system.
M ODEC International Inc. is responsible for the delivery of the FPSO for the Uaru+ project.
The FPSO will be based on the standard M 350 hull with all processing equipment on the
deck. It will be moored in a spread-moored configuration. The FPSO hull will have a minimum
off loadable oil storage capacity of 2 million barrels and will be capable of offloading 1.0
million-barrel parcels in a twenty-four (24) hour period.
The topsides facilities will consist of production separation, gas dehydration, compression and
injection, seawater treatment and injection, and power generation. The stabilized oil is stored in
the FPSO hull cargo storage tanks prior to offloading via a floating hose to tug-assisted export
tankers (direct offloading, in tandem configuration).
The topsides facilities have the nominal (annual average) processing capacities as listed in Table
2-1 below.
Parameter Capacity
Oil Rate 250 kBD
Gas Production Rate 540 MMSCFD
Produced Water Rate 300 kBD
Total Liquid Rate 350 kBD
Water Injection Rate 350 kBD
The FPSO will be expected to remain on station for 20 years without disconnection of its
moorings to dry dock for maintenance or survey.
3.0 BASIS
Proper procedures and specifications for material identification, traceability and control shall
be used to assure that materials used on the project are in accordance with design and
construction data, and of confirmed chemical and physical properties.
3.1 REFERENCES
This section lists the Company, Client, and Industry regulatory references cited within this
document. The most stringent requirement applies, unless otherwise specified in writing by the
Company. Notify the Company in case of conflict.
Page 5 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
3.1.1 Company
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
4103-M380-12P1-0001-001
for Supplier Equipment / Materials
4103-MI20-12S1-0001-001 Quality Requirements for Subcontracts
4103-MI20-00S1-0070-001 Addendum to 2500-M380-00S1-0070-001, Fabrication of Piping Specification
4103-MI20-00S1-0090-001 Valve Specification
4103-MI20-00S1-0110-001 Piping Material Specification
UNCONTROLLED WHEN PRINTED
3.1.2 Client
Page 6 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
3.2.1 Definitions
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
The following definitions apply within this document:
Term Definition
Client MODEC client and / or it assigns
Company MODEC International, Inc. and/or its assigns
Facility Supplier or Subcontractor shop and/or any property owned by a Supplier or Subcontractor
UNCONTROLLED WHEN PRINTED
3.2.2 Abbreviations
Term Definition
AV Alloy Verified
CRA Corrosion Resistant Alloy
MRB Manufacturer’s Record Book
MTR Manufacturer’s Test Records
PMI Positive Material Identification
OES Optical Emission Spectroscopy
XRF X-ray Fluorescence
Page 7 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
This specification covers the procedures and methodology to be adopted to assure the chemical
composition of alloy steel material is consistent with the material specification.
The requirements for conducting PM I tests on CRA materials and fabrication welds shall be in
accordance with requirements of this specification, unless superseded by more stringent local
regulations.
vendors etc.
The nominal composition required by the applicable code and/or specification shall be used to
assess the acceptability of the material tested.
In case any defective material being found at fabrication site or vendor shop, the fabricator or
vendor shall be responsible to effect replacement of such defective material without any delay
to the satisfaction of Company.
5.0 REQUIREMENTS
Page 8 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
A button of bare wire is not necessary if the PM I instrument can examine wire. Button size shall
be a minimum 25 mm (1 in.) diameter with a minimum 9.5 mm (0.375 in.) thickness of
deposited weld metal.
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
The remainder of the inspection lot shall be compared to the sample to ensure that color-coding
and/or identification of the consumables is correct.
After successful PM I qualification, all welding consumables used for fabrication shall be
segregated and uniquely identified from all other welding materials in Fabricator's shop.
A list of acceptable material heat, lot, and batch numbers shall be developed and clearly
identified on the documentation accompanying each vessel in Fabricator's shop.
UNCONTROLLED WHEN PRINTED
Alloy equipment or assemblies that have been alloy verified in a shop need not be re-verified in
the field. However, construction contractor shall maintain manufacturer's report of alloy
verification (material certifications are not acceptable substitutes) and shall ensure full
traceability through to installation.
PM I examination shall be reperformed whenever modifications occur after the final assembly
of items.
If there is no associated shop fabrication, then PM I shall be performed in the field. In such cases,
warehouse-based PM I (e.g., upon material receipt) shall not be a replacement for in-field PM I
during construction or maintenance.
Page 9 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Use of portable Optical Emission Spectrometers (OES) analyzers per API RP578, provided the
instruments do not employ an electric arc. Fixed laboratory OES analyzers may also be used
where “cut off” samples are demonstrably traceable to the original heat and batch.
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
PM I examination shall not be carried out with chemical spot testing or methods that use eddy
current, triboelectric testing, electromagnetic, or thermoelectric tests.
The surface to be examined shall be prepared by light grinding or abrasive paper or solvent
cleaner.
The chosen method of PM I shall not damage or leave un-repairable damage to the material
being tested.
UNCONTROLLED WHEN PRINTED
5.4 CALIBRATION
The calibration shall be performed using certified master standards. The verification shall be
documented. Certified master sample shall be traceable to a National Standard Laboratory.
Prior to conducting PM I examination, calibration blocks of the similar material of the product
to undergo PM I examination shall be used to validate calibrations. Calibrations of PM I
equipment shall be conducted as recommended by the manufacturer.
5.5 OPERATORS
Supplier shall submit training / qualification certificates of PM I operators demonstrating ability
and experience with the PM I equipment and testing procedure.
Deposited weld metal or undiluted weld metal deposits shall be with +/- 5% the ranges specified
by ASM E Section II Part C for each element.
Deposited weld metal or undiluted weld metal deposits shall be within the ranges specified by
ASM E Section II Part C for each element.
Page 10 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
If a weld fails PM I, remaining welds in the piece of equipment or piping shall undergo PM I
examination. Additionally, other equipment or components being fabricated by that same
Supplier / Subcontractor using the same welding procedure qualification in the same shop or
field location shall be reviewed for need of additional PM I. The required actions shall be
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
approved by Company.
5.7.1 Sampling
If representative sampling is allowed, the following requirements shall apply:
a) If any piece from the representative sample is unacceptable, then each piece of the lot shall
be examined.
UNCONTROLLED WHEN PRINTED
b) W hen a lot is found to contain unacceptable pieces, 100% of the next two lots from the
same manufacturer shall be examined. W hen two successive lots are deemed acceptable,
the original sampling procedure may be resumed.
c) W hen a shipment (lot) of filler metal is found to contain unacceptable items during
verification of weld metal PM I, then weld metal of same filler metal lot shall be subjected
to 100% PM I. Company materials or welding engineers shall be consulted as soon as
practical following all cases where the use of an incorrect filler metal is discovered, or
suspected.
d) For welding consumables, if the alloy sample is incorrect then the entire heat or lot shall be
rejected.
If the prior PM I marking is difficult to read during receiving inspection, then PM I testing shall
be repeated, and new marks shall be made.
All PM I results ("Accept" or "Reject") shall be recorded in PM I verification reports for each
weld and component subjected to PMI and captured within the Supplier’s Manufacturing
Record Book (M RB).
A permanent dye or paint may be used to mark bolts, tubing, and other small items approved
for paint/dye marking by Company. Bolts and studs shall be marked on one end and nuts on
one flat.
W eld overlay and back-cladding material may have PM I noted on signed, as-built drawings in
lieu of equipment marking.
If the material may be damaged or cannot otherwise be stamped, then vibro-etching or color-
coding shall be applied and noted on the PM I verification reports.
Page 11 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
a) Pipe: Two marks, 180 degrees apart, 75 mm (3 in.) from each end of each length, and on
the outer surface of the pipe
f) Tubes for Heat Transfer Service: Stenciled, not stamped, 300 mm (11.8 in.) from each
end as follows:
- The marking shall be made with a water-insoluble material that contains no harmful
metals (e.g., Al, Pb, and Zn).
- The chloride and sulfur content of water-insoluble materials shall be limited to 1 wt%
per ASTM D 808 and ASTM D 129, respectively.
- Adjacent to welder's mark on the weld or at weld button (stop/start locations). W elds
on tubes in heat transfer service shall not be stamped but shall be marked by either
stenciling or vibro-etching.
Name of Supplier/Vendor
Item number and name or description of the fabricated equipment and piping
PM I method/instrument used
Date of examination
Page 12 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
The PM I reports shall be keyed to each tested item through the use of report numbers
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Attachment 1.
Name of Subcontractor
UNCONTROLLED WHEN PRINTED
PM I method/instrument used
Acceptance criteria
Date of examination
The PM I reports should be keyed to each tested item through the use of report numbers
Page 13 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
APPENDIX A – PMI REQUIREMENTS FOR PIPING
COMPONENTS
UNCONTROLLED WHEN PRINTED
Page 14 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Chrome-Moly Alloy, Nickel Aluminum
Equipment Austenitic SS, Duplex SS, Bronze, Copper Nickel,
Nickel Alloy Bronze, Titanium
Pipe, Fittings, Flanges 100% 10%
Clamp Connectors (e.g., Grayloc) including Hub, Seal 100% 10%
Ring, and Clamp
Gaskets – RTJ 100% Random Inspection
UNCONTROLLED WHEN PRINTED
(Notes 5 & 6)
Gaskets - Spiral Wound Random Inspection Random Inspection
(Notes 5 & 6) (Notes 5 & 6)
Alloy Bolting (Note 4) Random Inspection Random Inspection
(Notes 5 & 6) (Notes 5 & 6)
Circumferential, Branch and Fillet Welds 100% 10%
Closure Welds 100% 10%
Weld Overlay 100% 10%
Valves: Pressure-Containing Parts (Notes 3 & 5) 100% for > NPS 2 and 10%
random for ≤ NPS 2
Valves: Pressure-Controlling Parts (Note 9) 10% 10%
Specialty Items: Pressure-Containing Parts 100% 10%
Specialty Items: Pressure-Controlling Parts 10% 10%
Welding consumables The inspection lot shall include each diameter and heat
(Note 10)
NOTES:
1. The material Supplier shall provide M TRs for equipment which contains materials that are subject to
PM I examination.
2. These percentages denote the minimum amount of PM I required unless Company approves a change in
writing. The Inspector reserves the right to carry out his own PM I examination activity in addition to
that specified as the Fabricator’s responsibility.
3. Unless otherwise specified by Company, PM I examination requirements for valves include the body,
bonnet, metallic seals or gaskets, obturator, seat ring, stem and a minimum of one out of every four
bonnet bolts.
4. As defined in the ASM E B31.3 Piping Code and Piping M aterial Specification.
5. Unless otherwise specified in this document or in the Company-approved PM I program, the random
inspection shall be as follows:
Page 15 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
6. If PM I test fails to meet specification, 100% of the lot shall be subject to PM I testing.
7. 13% Chrome and 17-4PH valve trim components shall be subject to 10% PM I testing.
8. Use 10% for the following services: instrument air, Seal oil, lube oil, control fluid, hydraulic fluid,
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
and/or other services where alloy pipe and tubing is specifically selected for product purity and/or
cleanliness considerations only and is clearly identified as such, provided it has a design pressure
below ASM E Class 900.
9. M etallic seals or gaskets, obturator, seat ring, stem and a minimum of one out of every four bonnet
bolts.
10. W elding consumable PM I requirements as per Section 5.1.1 are applicable for the fabrication of
UNCONTROLLED WHEN PRINTED
pressure vessels, heat exchangers and of EPC packages as well as to any work done at the fabrication
yards or at subcontractors’ work locations (piping workshops for instance).
Page 16 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
APPENDIX B – PMI REQUIREMENTS FOR
INSTRUMENTATION
UNCONTROLLED WHEN PRINTED
Page 17 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Chrome-Moly Alloy, Nickel Aluminum
Equipment Austenitic SS, Duplex Bronze, Copper Nickel,
SS, Nickel Alloy Bronze, Titanium
Instrumentation Pressure-Containing Housing, including 100% 10%
Orifice Plates, Tubing, Level Gauge/Chamber, Flow Meters,
Meter Runs
Fabricated Component Welds 100% 10%
UNCONTROLLED WHEN PRINTED
NOTES:
1. The material Supplier shall provide M TRs for equipment which contains materials that are subject to
PM I examination.
2. These percentages denote the minimum amount of PM I required unless Company approves a change in
writing. The Company Inspector reserves the right to carry out his own PM I examination activity in
addition to that specified as the Fabricator’s responsibility.
3. Unless otherwise specified by Company, PM I examination requirements for valves include the body,
bonnet, metallic seals or gaskets, obturator, seat ring, stem and a minimum of one out of every four
bonnet bolts.
4. As defined in the ASM E B31.3 Piping Code and Piping M aterial Specification.
5. If PM I test fails to meet specification, 100% of the lot shall be subject to PM I testing.
6. 13% Chrome and 17-4PH valve trim components shall be subject to 10% PM I testing.
7. Use 10% for following services: instrument air, Seal oil, lube oil, control fluid, hydraulic fluid, and/or
other services where alloy pipe and tubing is specifically selected for product purity and/or cleanliness
considerations only and is clearly identified as such, provided it has a design pressure below ASM E
Class 900).
8. M etallic seals or gaskets, obturator, seat ring, stem and a minimum of one out of every four bonnet bolts
Page 18 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
APPENDIX C – PMI REQUIREMENTS FOR MECHANICAL
EQUIPMENT & PRESSURE VESSELS
UNCONTROLLED WHEN PRINTED
Page 19 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Chrome-Moly Alloy,
Nickel Aluminum Bronze,
Martensitic SS, Ferritic SS,
Equipment Copper Nickel, Bronze,
Austenitic SS, Duplex SS,
Titanium
Nickel Alloy
Pressure Vessel & Heat Exchanger pressure 100% 10% per heat or lot
containing, Pressure controlling materials, including
plate, clad plate, strip lining, forgings, nozzles (pipe),
pad plates welded directly to vessels or exchangers,
UNCONTROLLED WHEN PRINTED
1. The material Supplier shall provide M TRs for equipment which contains materials that are subject to
PM I examination.
2. These percentages denote the minimum amount of PM I required unless Company approves a change in
writing. The Inspector reserves the right to carry out his own PM I examination activity in addition to
that specified as the Fabricator’s responsibility.
3. If PM I test fails to meet specification, 100% of the lot shall be subject to PM I testing.
4. Use 10% for the following services: instrument air, Seal oil, lube oil, control fluid, hydraulic fluid,
and/or other services where alloy pipe and tubing is specifically selected for product purity and/or
cleanliness considerations only and is clearly identified as such, provided it has a design pressure below
ASM E Class 900.
5. W elding consumable PM I requirements as per Section 5.1.1 are applicable for the fabrication of pressure
vessels, heat exchangers and of EPC packages as well as to any work done at the fabrication yards or at
subcontractors’ work locations (piping workshops for instance).
Page 20 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
APPENDIX D – PMI MATERIALS EXAMINATION &
REPORTING REQUIREMENTS
UNCONTROLLED WHEN PRINTED
Page 21 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
SS Type 304 Base Metal
SS Type 309 Base Metal
SS Type 316L Base Metal
SS Type 904L Base Metal
SS Type 6Mo Base Metal
SS /Duplex/ Super
UNCONTROLLED WHEN PRINTED
As indicated by , PM I Verification Reports shall state the % of element(s) within the material examined.
For alloys not included above, Vendor shall propose elements to be quantified via PM I Test Procedure for
Company approval
NOTES:
3. W eld M etal: For double welded joints both weld caps, inside and outside shall be PM I inspected when
accessible
Page 22 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
UNCONTROLLED WHEN PRINTED
Page 23 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
ATTACHMENT 1 – SAMPLE PMI REPORT FORMAT
(MATERIAL MANUFACTURER OR STOCKIST)
UNCONTROLLED WHEN PRINTED
Page 24 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Location of PMI Examination: PO No.:
Chemical
Mill Quantity Analysis Proper
Heat Lot Sample Accept /
Material Spec. Cert. Accept / Color
No. Size Size Reject
No. Reject Applied
Spec. Actual
Remarks:
Provide necessary attachments if required
Distribution:
Supplier /
Purchaser’s
Fabricator
Inspector:
Representative:
Date: Date:
Page 25 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
ATTACHMENT 2 – SAMPLE PMI REPORT (FIELD
FABRICATION)
UNCONTROLLED WHEN PRINTED
Page 26 / 27
Confidential POSITIVE MATERIAL IDENTIFICATION
Project Green REQUIREMENTS
GYUA-MD-QQMAT-00-0002-001
4103-MI20-12S1-0002-001, Rev. B1
Project: Inspector:
Prepared: Ben Vetuski 20-Jun-2022 Verified: Matthew Harvey 20-Jun-2022 Approved: Norihiro Kamishiro 21-Jun-2022 Acceptance Code: 1 - ACCEPTED
Contract No.:
Company: SUBCONTRACTOR DATE
Items Tested: [ ] Base [ ] Weld
Equipment: Company DATE
Plant Area:
UNCONTROLLED WHEN PRINTED
Client DATE
Page 27 / 27