Professional Documents
Culture Documents
1
PRAGATI CONSULTANTS
Creep Strain
Creep strain of concrete = f x sc/Ec
where f = creep coefficient (calculated as per IRC-112)
sc = constant Compressive stress applied to the concrete at time t
Ec = Modulus of Elasticity of concrete
From Table 6.5 of IRC 112
Modulus of Elasticity of Concrete for M40 grade concrete = 33000 N/mm2
2
PRAGATI CONSULTANTS
3
PRAGATI CONSULTANTS
fcm = 50
a3 = SQRT(43.75/fcm) = 0.935
Grade of concrete = M40
bH = 846.4
From IRC:112-2011,table 6.9
f (inf,to) = 2.48
b (t,to) = for 14 days = 0.000
14 to 40 days = 0.349
14 to 60 days = 0.411
14 to 25550 days = 0.990