You are on page 1of 2

Ambala Limited, Engineers KC

(Rev.
1) 7of 4No. Page BENCHHYDRAULIC
URBINE FRANCIS WITH
0.095
kg W3= rope Weight
of
2
0.3m measuring
tank
A= Area
of
Diameter 0.005
m of
rope Diameter
=D,
=0.05m drum brake
D, of
Water Density
of m/g=9.81
s gravity Acceleration
todue
kg/m 1000 pw
==
DATA: 8.1
GALCULATION: OBSERVATION& H.
valve. by
tank sump the Drain 7.2.3.
supply. pOwer main OFF Switch 7.2.2.
loãd. remove
the is
over,experiment the When (.2.1.
PROCEDURE: CLOSING 7.2
flow.different procedure
for I.1.11.Repeat
same the
different
load. experiment
for I.1.10.Repeat
same the
using rate flow the down NOte
stopwatch. tank
and measuring
RPM. the down NOte
pressure. inlet and weight dead weight. applied
turbine. load
on
Apply 7.1.7.
turbine the RPM
ofdesired the Set 7.1.6.
operating by
valve. control
the Swiontch 7.1.5.
rate flow the set and pump
valve. control through Swiontch 7.1.4.
supply. mains the
2
(W) E. (W) E, (m's) Q No. Sr.
TABLE:
CALCULATION 8.4
E,
(%o) x100 E,
(W) 60 =E,
2xxNxT
m)
-W,)xgx
(N R, +W, T=(W,
(m) 2
2D, xD, =Re
=p,*g*9*H
(W) E,
(m²s)
AxR
100
(m) R-R R=
water) =10.33xP
of
(m H
CALCULATIONS: 8.3
5
4
3
2
1
(kglcm) (sec) (cm) (cm) (kg) (kg) (RPM)
Wz No. Sr.
P t
R2 R1 W N
TABLE:
OBSERVATION 8.2

You might also like