You are on page 1of 1

Reference: /RS/LPS/40 Zouk Mosbeh, 07/11/2017

Project: Qobbeh 1406-Block B

Concerned Mission: L+S+PS

Sent by mail to: mohamad.edlby@ade-group.com Addressee: Mr. Mohamad Edlby

Dear Sir,

After examination of the here below specified documents, please find by the present the observations that we can formulate within the scope of
the mission referenced here above.

Best regards,

The Engineer: R. Sebaaly The Manager: N. MOUSSA

Documents or Drawings Designation: Observations

Preliminary comments:
 B3 Floor Framing
 B2 Floor Framing 1. The soil investigation report shall be submitted including the
 B1 Floor Framing following:
 Ground Floor Framing
 1st Floor Framing  Soil classification for seismic study
 Typical Floor Framing  Soil density, internal friction angle and cohesion
 Roof Floor Framing
 Allowable soil pressure
 Top Of Roof Framing
 Subgrade reaction
 Columns & Shear Walls
 Raft Bottom and Top reinforcement.  Predictable settlements
 Water table level

2. Concrete Compressive strength value is not mentioned in any


drawing; to be clarified.

3. Posttesnion slabs shall be submitted and the following 2


comments are to be respected on the PT design:

 Peripheral chords (Chaînages Horizontaux périphériques)


shall be added to each slab, respecting the following:
- Minimum reinforcement is 3cm2 (4Φ10).
- Minimum shear reinforcement spacing shall be equal to
min (beam height and 25 cm).

 Horizontal chords (Chaînages Horizontaux transversaux)


shall be added at the common area between slab and
bracing system, respecting the following:

- Minimum reinforcement is 1.5 cm2 (2Φ10).


- Minimum peripheral beam shear reinforcement spacing
shall be equal to min (beam height and 25 cm).