QC Inspection Procedure
Quality
Management
System
Department QA/QC
REVISION NO: 0
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 1 of 9
DATE: 10/02/2024
HSEQ QC Inspection Procedure
QC Inspection Procedure
APPROVAL
Rev.
No. Date Prepared Reviewed Approved
Dhaneesh Chandrasekaran
1 10-Jan-2024 Vellilapulli Balamurugan Nedal Ali Abwd
REVISION NO: 0
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 2 of 9
DATE: 10/02/2024
HSEQ QC Inspection Procedure
QC Inspection Procedure
Record of Amendments
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 3 of 9
DATE: 10/02/2024
HSEQ Understanding and
Communication of Project
STANDARD OPERATING PROCEDURES Requirements
SOP-SRC-QC-03_Rev. 0
1. Purpose
The purpose of this Quality Control Inspection and Checking Procedure is to establish a
comprehensive framework for ensuring the quality of products in shipyards and structural
fabrication yards.
2. Scope
This procedure applies to all phases of production, from incoming material inspection to
final handover to the client, encompassing welding, structural fabrication, assembly, and
integration processes.
3. Applicability
This procedure is applicable to all personnel involved in quality control, including
inspectors, welders, and management, ensuring adherence to industry standards and
client specifications.
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 4 of 9
DATE: 10/02/2024
HSEQ Understanding and
Communication of Project
STANDARD OPERATING PROCEDURES Requirements
SOP-SRC-QC-03_Rev. 0
5. Fit-Up Inspection
Verify fit-up dimensions and alignment before welding.
Ensure proper joint preparation and cleanliness.
6. Welding Inspection
Inspect welds for defects such as lack of fusion, porosity, and undercut.
Verify weld size and profile against project specifications.
9. Surface Preparation
Inspect surface preparation methods such as blasting or painting.
Ensure cleanliness and proper coating thickness.
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 6 of 9
DATE: 10/02/2024
HSEQ Understanding and
Communication of Project
STANDARD OPERATING PROCEDURES Requirements
SOP-SRC-QC-03_Rev. 0
17. Responsibilities
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 7 of 9
DATE: 10/02/2024
HSEQ Understanding and
Communication of Project
STANDARD OPERATING PROCEDURES Requirements
SOP-SRC-QC-03_Rev. 0
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 8 of 9
DATE: 10/02/2024
HSEQ Understanding and
Communication of Project
STANDARD OPERATING PROCEDURES Requirements
SOP-SRC-QC-03_Rev. 0
REVISION NO: 1
DUBAI SHIPBUILDING & ENGINEERING LLC. Page 9 of 9