NMS Identified Dec-2023

DATE
S.No.. NMS Identified Identified By Area
Identified
1 12/1/2023 WHRB#1 ESP platform area hand railing pipe required U R Reddy WHRB-1
2 12/2/2023 WHR02 ESP area platform Required Amit Verma WHRB-2
3 12/3/2023 70tph feed station platform area toe guard required U R Reddy AFBC-1
4 12/3/2023 70TPH bunker area middle rail missing Anand Vaishnow AFBC-1
5 12/4/2023 70tph APH platform area toe guard required U R Reddy AFBC-1
6 12/4/2023 Ash hendling conveying support pipe missing Abhishake Sharma Silo-1
7 12/4/2023 70TPH P A line area railing reqd Manoj Malagar AFBC-1
8 12/5/2023 70Toh Coal Feeder Area Gratting Dammage LB Meena AFBC-1
9 12/5/2023 Wh 1 2nd floor area Gratting Dammage / Missing Anand Vaishnow WHRB-1
10 12/5/2023 70TPH charging floor grating reqd Manoj Malagar AFBC-1
Pramod Kumar
11 12/6/2023 WHRB-1
Wh#1 main steam line plateform area touguard required Rawat

12 12/7/2023 70tph Boiler charging floor platform area hand U R Reddy AFBC-1
railing pipe required
13 12/8/2023 70Tph Main Steam Line Area Gratting Required LB Meena AFBC-1
14 12/8/2023 WHRB#2 ESP platform area hand railing pipe required U R Reddy WHRB-2
15 12/9/2023 Silo 2 area toe gard required Anand Vaishnow Silo-2
16 12/9/2023 70 tph Pa line floor area ralling pipe dammage Srikant Soni AFBC-1

17 12/9/2023 WHRB#1 1st floor platform area hand railing U R Reddy Silo-2
pipe required
18 12/10/2023 Silo 2 Grating found damaged Anand Vaishnow Silo-2
19 12/10/2023 Whrb -2 Esp Area Railing Pipe Required LB Meena WHRB-2
Pramod Kumar
20 12/11/2023 AFBC-1
70 Tph PA line area platform greating required Rawat

21 12/11/2023 Manoj Malagar WHRB-1


WHRB 1 sonic shoot blower no 11,12 area platform reqd
22 12/12/2023 70pth esp area railing pipe required Anand Vaishnow AFBC-1
23 12/12/2023 Silo -2 Platform Toe Guard Required LB Meena Silo-2
24 12/13/2023 70 tph charging floor area greating dammage Srikant Soni AFBC-1
25 12/13/2023 Silo 1 Opening found Amit Verma Silo-1
Pramod Kumar
26 12/13/2023 WHRB-1
wh#1 main steam line area stair case required Rawat
27 12/14/2023 70TPH boiler pa line area a big dangerus opening Anand Vaishnow AFBC-1
28 12/14/2023 70tph ESP platform area toe guard required U R Reddy AFBC-1

29 12/15/2023 Srikant Soni AFBC-1


70 tph boiler esp hopper floor area ralling pipe dammage.

30 12/16/2023 W.H.R.B.1 Eco inlet header drain floor area Railing Manoj Malagar WHRB-1
pipe welding reqd
31 12/16/2023 WHRB-2 Support ralling Missing Anand Vaishnow WHRB-2
32 12/17/2023 Silo 2 Gratting missing near convaying line Anand Vaishnow Silo-2
33 12/18/2023 Silo no 2 railing required Anand Vaishnow Silo-2

34 12/19/2023 Whrb 1 3rd floor area Railing Manoj Malagar WHRB-1


damage..maintenance work done
35 12/19/2023 100tph biker esp area railing required Anand Vaishnow AFBC-2
Pramod Kumar
36 12/20/2023 100TPH. charging floor area platform railling support AFBC-2
pipe required Rawat
37 12/20/2023 Wh2 area railing pipe damage Anand Vaishnow WHRB-2

38 12/21/2023 Nms- W.H.R.B.1 I.D.fan.n.01 discharge damper floor Srikant Soni WHRB-1
area Railing pipe dammage
39 12/22/2023 Whrb-2 ID Fan Area toe guard missing Amit Verma WHRB-2
Pramod Kumar
40 12/22/2023 WHRB-2
Nms WH#2 Drum floor area support pipe required Rawat

41 12/22/2023 Nms- 70tph boiler I.d.fan no.4 motor floor area Railing Srikant Soni AFBC-1
pipe dammage
42 12/23/2023 NMS from 70TPH P A line area Amit Verma AFBC-1
43 12/23/2023 70TPH esp area Anand Vaishnow AFBC-1
44 12/23/2023 Nms-silo#2 loading floor area greating dammage Srikant Soni Silo-2
45 12/24/2023 NMS:70tph ApH railing pipe required U R Reddy AFBC-1
46 12/24/2023 70TPH I D fan no 4 railing reqd Manoj Malagar AFBC-1
47 12/25/2023 NMS:ID fan#3 platform area toe guard required U R Reddy ID Fan-2

48 12/25/2023 Nms- W.H.R.B.2 E.S.P conveying line floor area Railing Srikant Soni WHRB-2
pipe welding work required

49 12/26/2023 NMS:WHRB#2 ESP platform area hand railing U R Reddy WHRB-2


pipe required
50 12/26/2023 NMS 70TPH Primary super heater area railing reqd Manoj Malagar AFBC-1
51 12/27/2023 WHRB 1 area grating required Anand Vaishnow WHRB-1
52 12/27/2023 NMS from 70TPH P A line area ralling missing Amit Verma AFBC-1
53 12/28/2023 Whrb -2 Esp Railing Pipe Required LB Meena WHRB-2
Pramod Kumar
54 12/29/2023 100TPH charging floor area platform railling support AFBC-2
pipe required Rawat

55 12/29/2023 Nms..W.H.R.B.1 Eco outlet floor area grating Manoj Malagar WHRB-1
welding reqd
56 12/29/2023 NMS WHRB 1 .2nd floor relling fitting work Anand Vaishnow WHRB-1
57 12/30/2023 Whrb2 esp area ralling damaged Anand Vaishnow WHRB-2

58 12/30/2023 NMS:WHRB#1 economiser I/L header platform area U R Reddy WHRB-1


hand railing pipe required
59 12/31/2023 Whrb1 area railing required Anand Vaishnow WHRB-1
Pramod Kumar
60 12/31/2023 WHRB-1
Nms wh#1 ID fan platform touguard required Rawat
Status

Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

Completed

Completed

Completed
Completed
Completed
Completed

Completed

Completed
Completed

Completed

Completed

Completed
Completed
Completed
Completed

Completed

Completed
Completed

Completed

Completed

Completed
Completed
Completed

Completed

Completed
Completed

Completed

Completed

Completed

Completed

Completed

Completed
Completed
Completed
Completed
Completed
Completed

Completed

Completed

Completed
Completed
Completed
Completed

Completed

Completed

Completed
Completed

Completed

Completed

Completed

You might also like