444479: Godrej Athena

-TOWER 1/BLOCK A-Piling Work - PRE BORING CHECKS

Company Godrej Properties Project Godrej Athena


Tower TOWER 1/BLOCK A Floor SUB STRUCTURE
Unit(s) Piling Activity Piling Work - PRE BORING
CHECKS
WIR Created By BHARATH B WIR Status Added
WIR Created Date 12/27/2023 7:53:33 AM WIR Closed Date
Contractor Sai Sri Constructions Phase Phase 1

TASKS HISTORY

SI # Location Task User Status Scheduled Date Closed Date


1 TP-161 Piling Work - PRE BORING BHARAT Added 12/27/2023
CHECKS HB 7:53:33 AM

SI # Checkpoint Client Comments Contractor Comments Last Status Photos


1 Check on pile location (peg positioning) and pile Pass
diameter As per approved drawings Max
Déviation 75mm or D/10 whichever is more .
2 Rig positioning check by center alignment with Pass
peg
3 Rig verticality -Deviation / rig height < 1.5% Pass
4 Temporary casing installation-Temporary casing Pass
to be provided for the at least 4m into non-
collapsible stratum
5 Check on joints of temporary casing and tremie Pass
pipes-All joints to be water tight and the inner
surface of the casing to be smooth and free of all
internal projections
6 Slurry pump readiness-Pressure exerted by the Pass
drilling mud is always greater than the pressures
exerted by the soils and external ground water.
7 Bentonite specific gravity to be in between 1.03 Pass
to 1.1

Page 1|1