SITE TEST REPORT Date :


sibilities
Legend Contractor’s name: Customer:
Hadi Haider Company NG-EOA
CSD Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 1 of 5
VOLTAGE TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
Have all relevant safety instructions been followed?
VOLTAGE TRANSFORMER TEST

..\WorkInstructions\24.pdf

For Mechanical Check/Visual Inspection and Electrical Tests Use C.L. of W.I.24

GENERAL DATA AND INFORMATIONS .


Circuit Ref: Rated voltage
Panel No: Sr.No:-R
Make Sr.No:-Y
Type Sr.No:-B

DESCRIPTION WINDING -1 WINDING -2


Primary Volts
Secondary Volts
Class
Burden
VT Ratio
Voltage factor (Vf)

1. INSULATION RESISTANCE TEST:

Instrument :

Make :
Model No. / Sl. No. :

Applied Voltage : Primary to Ground 5 KV DC for one minute.


Primary to Secondary 2.5 KV DC for one minute.
Secondary to Ground and Core to core 1 KV DC for one minute.
Criteria : More than 1000 M Ohms for Primary – Secondary / Earth.
More than 10 M Ohms for Secondary – Earth and Between Secondary’s

Applied Between IR Value in Mega Ohms


Remarks
Phase A Phase B Phase C
Primary - Earth

Primary-Secondary-1
Primary – Secondary 2
Secondary1 – Earth
Secondary 2 – Earth
Secondary 1 – Secondary 2

DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 2 of 5
VOLTAGE TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:

2. Winding Resistance (Secondary side)

Instrument :

Make :

Model No. / Sl. No. :

Criteria : Within ± 5% of Factory Test Report


o
Amb.Temp : C

Measured Value in Ohms Factory


Core at Value Ohms
% Variation
Phase o
at Remarks
C 75o C 75o C
Full Wdg
1
Mid Tap
A Full Wdg
2
Mid Tap
Full Wdg
1
Mid Tap
B Full Wdg
2
Mid Tap
Full Wdg
1
Mid Tap
C Full Wdg
2
Mid Tap

Formula to convert winding resistance to reference temperature at 75  C for copper winding.

NOTE: 1.
Rc = Calculated value at 75  C
Rm = Measurement value which contained a measurement cable.

NOTE: 2
Calculated 75  C Rc = (Rm-Rx) x (234.5+75)
(234.5+Ta)

Rx = Resistance value of the measurement cable.


Ta = Ambient Temperature  C

NOTE: 3

Resistance value of measurement cable Rx = _______ Ω

DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 3 of 5
VOLTAGE TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:

3. Ratio Test

INSTRUMENTS: Make: Model: Sr.No:

Voltage Applied to Primary: Volt (Full Tap) & Volt (Mid Tap)

Measured
Theoretical Ratio
Phase Tap Secondary Measured Ratio % Error
Voltage
Core-1 Core-2 Core-1 Core-2 Core-1 Core-2 Core-1 Core-2

Full Tap
A
Mid Tap

Full Tap
B
Mid Tap

Full Tap
C
Mid Tap

4. POLARITY TEST :

Instrument :
 Tick here if found okay

Polarity checked
Phase Core
& found okay
A 1
2
B 1
2
C 1
2

DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 4 of 5
VOLTAGE TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
5. FUSE CHECK:

6.PHASE TEST:

7. Burden Test :

INSTRUMENT :

Multimeter :

Make :

Model / Sl. No. :

Test Results:

Voltage Current Burden


Phase Core VT Sec. Rated Design
Applied Measured VxI Remarks
Ref. Ref. Terminal no. Burden (VA)
(V) (mA) (VA)
1
A
2

1
B
2

1
C
2

DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 5 of 5
VOLTAGE TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
8. BACK ENERZISATION VOLTAGE AT RATED VOLTAGE: (15 MINUTES)

Note: This test has not been included in TCS-P-105 Rev01


INSTRUMENTS:

Make :

Model / Sl. No. :

Procedure

a) Remove the connections in primary side of voltage transformers in all the three
phases to ensure that the primary induced voltage is not fed to the switchgear bus or the other equipments.

b) Apply the voltage to secondary terminals of one of the core of the PT.
Gradually increase the voltage up to 1 volt and check the corresponding
Voltage developed in the same secondary terminal of the core.

Applied Voltage in volts Measured Voltage in volts


Core-1 Core-2
A Ph B Ph C Ph A Ph B Ph C Ph
1a1-1n 2a1-2n

1a2-1n 2a2-2n

DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________