You are on page 1of 1

PROJECT DOSSIER INDEX

PART‐1: OPERATING AND MAINTENANCE MANUAL


PROJECT: JURASSIC PRODUCTION FACILITIES (JPF3) AT WEST RAUDHATIN, NORTH KUWAIT
KOC CONTRACT # 16052988
15
Total No.
Sl No. DRAWING NO. DESCRIPTION Rev.
of Files

1.0 OPERATING AND MAINTENANCE MANUAL‐GENERAL INDEX

1.0.1 JPF3‐01‐MN‐0101 OPERATING AND MAINTENANCE MANUAL‐GENERAL INDEX A 1

1.1 OPERATING MANUAL

O&M MANUAL PART‐I, VOL‐1 ‐ OPERATING MANUAL ‐ GENERAL


1.1.1 JPF3‐01‐MN‐0101 C 2
DESCRIPTION
O&M MANUAL PART‐I, VOL‐2‐ COMMON OPERATING
1.1.2 JPF3‐01‐MN‐0101 B 1
PROCEDURE & GUIDELINES
O&M MANUAL PART‐I, VOL‐3 ‐ CRUDE OIL AND OFF SPEC CRUDE
1.1.3 JPF3‐01‐MN‐0101 B 2
OIL SYSTEM
O&M MANUAL PART‐I, VOL‐4 ‐ SOUR GAS COMPRESSION,
1.1.4 JPF3‐01‐MN‐0101 C 15
TREATING & EXPORT AND VAPOUR RECOVERY SYSTEM

1.1.5 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐5 ‐ SULPHUR RECOVERY UNIT C 30

O&M MANUAL PART‐I, VOL‐6 ‐ FUEL GAS, HP FLARE, LP FLARE,


1.1.6 JPF3‐01‐MN‐0101 D 18
AGI, CLOSED DRAIN AND OPEN DRAIN SYSTEM

1.1.7 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐7 ‐ EWTP SYSTEM A 90

O&M MANUAL PART‐I, VOL‐8 ‐ INSTRUMENT AIR, PLANT AIR AND


1.1.8 JPF3‐01‐MN‐0101 D 2
NITROGEN SYSTEM

1.1.9 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐9 ‐ WATER SYSTEM D 11

1.1.10 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐10 ‐ STEAM SYSTEM D 2

O&M MANUAL PART‐I, VOL‐11 ‐ POWER GENERATION (GTG),


1.1.11 JPF3‐01‐MN‐0101 A 1
DIESEL STORAGE, EMERGENCY POWER GENERATION SYSTEM

1.1.12 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐12 ‐ FIRE WATER SYSTEM C 11

1.1.13 JPF3‐01‐MN‐0101 O&M MANUAL PART‐I, VOL‐13 ‐ CHEMICAL INJECTION SYSTEM D 4

O&M MANUAL PART‐I, VOL‐14 ‐ INSTRUMENTATION AND


1.1.14 JPF3‐01‐MN‐0101 B 20
CONTROL

1.2 MAINTENANCE MANUAL

1.2.1 JPF3‐01‐MN‐0101 PART ‐ II‐ MAINTENANCE MANUAL C

1 of 1

You might also like