Daily Supervision Report on Safety &

Civilized Production
Q/HN-2-5A20.2.08.004-R05 2023/No.311

Daily Supervision Report on Safety &


Item Appendix Picture
Civilized Production

Inspection
Date 2023.12.11 Production site
location

Recorder Asif Reviewed by Huang Xuewen

Supervision result:
On December 11th, the HSE Department conducted the supervision of safety and civilization situation
at the production site. The problems founSd during the supervision will be distributed to each department
(outsourcing company), and each department (outsourcing company) is required to make comprehensive
rectification based on the problems found during the inspection. The issues discovered during the inspection
have been recorded in the EHS Platform. The form for safety supervision & rectification measures of
hidden hazard is attached below.
Rectification requirements:
(1) After rectification of issues related to civilization, feedback can be sent in the safety WeChat group
(rectification photos+notification number+problem description).
(2) The responsible department and team should promptly complete the division of the issues recorded
in EHS Platform, and assign the rectification personnel, acceptance personnel, and planned completion
time. Those who fail to assign or rectify on time will be assessed according to relevant management
regulations of the company.
(3) For behaviors such as false rectification or incomplete rectification, formality of rectification, lack
of feedback on rectification, partial rectification and without rectifying similar issues, etc. found during
inspection, assessment will be assessed according to relevant management regulations of the company.
Assessment:
Assessment Assessment Reason Assessment Assessment Assessment
Code Reference department Amount
(RMB)
Appendix:The form for safety supervision & rectification measures of hidden hazard

Serial Responsible Planned


Corrective Responsible
numb person for completi
measures department
er rectification on time
Civilization & Sanitation issue
Unit #1 turbine hall 14.5m, debris under the north side of generator Ma GuoWu 12.14
1. Clean it SEPCO-1
needs to be cleaned up. (Picture 1) (WB_43428)
Unsafe hazard and other
#1 boiler, "Do not Operate, Someone Working" sign on the cable
Take it Operation Zhang PengFei 12.16
1. bridge of low-temperature economizer B fell off. Please check and
back Department 81010639
confirm. If not in use, please take it back. (Picture 2)
#1 boiler, "Do Not Operate, Someone Working" sign near the A
Take it Operation Zhang PengFei 12.16
2. collection box for leakage monitoring has fallen off. Please check and
back Department 81010639
confirm. If not in use, please retract it. (Picture 3)
Drainage Pumping station, #2 Alkali unloading pump, cable sleeve is Ma GuoWu 12.16
3. Rectify it SEPCO-1
damaged, which needs to be rectified. (Picture 4,5,6) (WB_43428)
Mid of #2 absorption tower, south side, the black and yellow safety Zhang ZhenXing
Change 12.16
4. tape near maintenance power box is not visible, which needs to be TEPC
safety tape (WB_01435)
changed. (Picture 7,8)
Mid of #2 absorption tower, west side, a name tag near absorber tower Zhang ZhenXing
5. 2 mist remover flushing water pressure gauge manual valve is not Rectify it TEPC 12.16
(WB_01435)
properly visible, which needs to be rectified. (Picture 9,10,11)
Pictures:

Picture 1 Picture 2

Picture 3 Picture 4

Picture 5 Picture 6
Picture 7 Picture 8

Picture 9 Picture 10

Picture 11