Preface
The reformed TVET-System is an outcome-based system. It utilizes the needs of the labor
market and occupational requirements from the world of work as the benchmark and standard
for TVET delivery. The requirements from the world of work are analyzed and documented –
taking into account international benchmarking – as occupational standards (OS).
In the reformed TVET-System, curricula and curriculum development play an important role
with regard to quality driven comparable TVET-Delivery. The Curricula help to facilitate the
training process in a way, that trainees acquire the set of occupational competences (skills,
knowledge and attitude) required at the working place and defined in the occupational
standards (OS).
This curriculum has been developed by a group of professional experts from different
Regional TVET Bureaus, colleges, Industries, Institutes and universities based on the
occupational standard for structural construction works Level III.
The curriculum development process has been actively supported and facilitated by Ministry
of Labor and Skills.
The prime objective of this training program is to equip the Trainees with the identified
competences specified in the OS. Graduates are therefore expected to Use Computer Aided
Drafting Systems to Produce Basic Engineering Drawings, Prepare Bill of Quantities ,
Monitor Excavation, Construct masonry arches and Curved walls, Erect Stone, Memorials
and Monuments, Construct Wall Frames and Walls, Install and Decorate structural walls,
Conduct Concrete and Ingredient Testing, Erect/Install Pre-Cast Concrete Structures
Units/components, Assemble and Install Prefabricated Stairs and Furnishing Products, Install
glass block work, Construct Fireplace/Chimney with Cladding in accordance with the
performance criteria and evidence guide described in the OS.
1.3 TVET-Program Training Outcomes
The expected outputs of this program are the acquisition and implementation of the following
units of competences:
EIS SCW3 01 0322 Use Computer Aided Drafting Systems to Produce Basic Engineering
Drawings
EIS SCW3 02 0322 Prepare Bill of Quantities
EIS SCW3 03 0322 Monitor Excavation
EIS SCW3 04 0322 Construct masonry arches and Curved walls
EIS SCW3 05 0322 Erect Stone Memorials and Monuments
EIS SCW3 06 0322 Construct Fireplace/Chimney with Cladding
EIS SCW3 07 0322 Install and Decorate structural walls
EIS SCW3 08 0322 Conduct Concrete and Ingredient Testing
EIS SCW3 09 0322 Erect/Install Pre-Cast Concrete Structures Units/components
EIS SCW3 10 0322 Assemble and Install Prefabricated Stairs and Furnishing Products
EIS SCW3 11 0322 Install glass block work
EIS SCW3 02 Prepare Bill of EIS SCW3 M02 Preparing Bill of Quantities Plan and prepare for work
0322 Quantities 0322
Measure quantities of work 80
Dig excavations
Clean up
EIS SCW3 04 Construct masonry EIS SCW3 M04 Constructing masonry arches Prepare for work. 120
0322 arches and Curved 0322 and Curved walls Set out first course and curve.
walls Construct wall to arch level.
Set up arch centre.
Construct arch centre.
Cut and place masonry materials
Test ingredients
Clean up
EIS SCW3 09 Erect/Install Pre-Cast EIS SCW3 M09 Erecting/Installing Pre-Cast Prepare for work 100
0322 Concrete Structures 0322 Concrete Structures Erect pre-cast structure
Units/component Units/components Clean up
EIS SCW3 11 Install glass block EIS SCW3 M11 Installing glass block work Prepare for work.
0322 work 0322
Prepare for installation. 60
The formative assessment is incorporated in the training modules and form part of the training
process. Formative evaluation provides the trainee with feedback regarding success or failure in
attaining training outcomes. It identifies the specific training errors that need to be corrected,
and provides reinforcement for successful performance as well. For the teacher, formative
evaluation provides information for making instruction and remedial work more effective.
Summative Evaluation the other form of evaluation is given when all the modules in the
program have been accomplished. It determines the extent to which competence have been
achieved. And, the result of this assessment decision shall be expressed in the term of
institutional Assessment implementation guidelines.
Techniques or tools for obtaining information about trainees’ achievement include oral or written
test, demonstration and on-site observation.
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
LO.2 Produce a basic drawing/ Modify existing CAD drawings Performing formwork completion.
Basic CAD drawings are created and guidance is sought as required.
Unit consistency and scales are applied before starting to draw in CAD.
Drawings are prepared in accordance with standard operating procedures.
CAD drawings are reviewed with supervisor and/or other designated staff as required to the
company’s procedures.
Existing CAD drawings are located and modified by adding, deleting or changing drawing
elements within that drawing.
Drawing files are saved in the appropriate format based on standard operating procedures.
Drawing files are printed out using plotter or equivalent devices.
LEARNING MODULE 02
TVET-PROGRAMME TITLE: Structural construction works Level III
MODULE TITLE: Preparing Bill of Quantities
MODULE CONTENTS:
LO1. Plan and prepare for work
1.1 Identifying work to be performed
1.2 Preparing time schedule of specific work.
1.3 Formatting, preparing take off sheet and bill of quantities
1.4 Sorting out materials requirement.
1.5 Supplying information regarding remarks
LO2. Measure quantities of work
2.1. Taking measurements.
2.2. Computing of take-off and bar schedule.
2.3. Computing bill of quantities.
LO3. Check and correct quantities
3.1. Checking erroneous data and Size of parameters
3.2. Making corrections and adjustment
3.3. Compiling bill of quantity
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Measurements to be quantified (on every items) are taken from the drawing
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Work instructions and operational details are obtained, confirmed and applied
Occupational Health and Safety (OHS) requirements are followed in accordance with safety plans and
policies
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked
for serviceability and any faults are rectified or reported prior to commencement
Material quantity requirements are calculated in accordance with plans and/or specifications
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located
ready for use
Environmental protection requirements are identified for the project in accordance with environmental
plans and regulatory obligations and applied
Excavation route is located, and line and depth established from site plans and instructions
Site pegs/profiles are used to identify service markers, to set out service points and the excavation limits
are marked
Safety signage, barricades and signs appropriate to the project are erected in positions as required by site
safety plan and personal protective equipment(PPE) are worn
Temporary drainage system is established to divert surface and sub-surface water from excavation
Service markers or taped areas are identified and damage or interference with underground services
avoided
Excavations safely dug with hand tools to ensure correct route, line and depth and procedures are used to
minimize risk to self and others
Machine operator is assisted with excavation to ensure quality of the excavation, correct route, line, depth
and correct procedures are used to minimize risk to self and others
Trench/excavation support is installed where specified by job specifications and/or regulations
Tamping is done where specified as per the specification and regulations
Excavation is cleaned free from loose material with hand tools and to job requirements and instructions
Work area is cleared and materials disposed off, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers'
recommendations and standard work practices.
C. Consumable materials
1 Plasticizers EBCS As required As required
12. 1:5
1 Crunch As required
13.
1 Printer laser jet 400 1pcs 1:25
19. As required
2 LCD PROJECTOR High picture Quality resolution 1:25
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Location and line of masonry unit work wall are set out on concrete footing, column, slab or
ground as per the drawings and specifications.
Span of masonry arch is determined from prepared allotted arch centre plus 4mm.
2 Key plan curve points are plotted from job drawings and all trammel centres are established
on footing slab for construction of the curved masonry wall.
Curve of wall is planned to specified location from trammel or plotted points and marked on
exact location (it can be on beam, slab or ground).
LO.3 Construct wall to arch level.
Masonry units are cut and chiselled according to joints and shapes.
Mortar mix is prepared and masonry units are laid to form wall to set out.
All work is carried out to specifications and standards.
Gauge of abutting walls is maintained within standard tolerance at each course level.
Plumb and alignment of vertical wall face are maintained.
2. Bolsters Steel
25 1:1
LEARNING MODULE 05
TVET-PROGRAMME TITLE: Structural construction works Level III
MODULE TITLE Erecting Stone Memorials and Monuments
MODULE CODE: EIS SCW3 M05 0322
NOMINAL DURATION: 60 Hours
MODULE DESCRIPTION: This unit deals with the right understanding and skills of erecting
monuments and memorials
LEARNING OUTCOMES
At the end of the module the trainee will be able to:
LO1. Plan and prepare work
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Bricks and/or blocks are identified, selected and checked for conformity with
specifications and comply with standards.
Work platform is erected in accordance with regulatory and workplace requirements.
Location and structural details of brickwork/ block work are identified from plans
and job specifications.
Base brickwork below floor construction is set out to location, dimensions and
specifications in compliance with standards.
Brickwork/ block work is set out to location and dimensions from drawings and
specifications.
Mortar mix is prepared and checked for conformity and bricks/blocks laid to set out
to specifications and standards.
Brickwork/ block work gauge is determined and set out rod is prepared.
Base brickwork/ block work is constructed for cladding installation to requirements
Structural frame is checked to ensure it is ready for brick/ block cladding maintaining
minimum cavity.
Damp proof courses are installed to specifications and in accordance with standards.
Ventilation for veneer construction is built to specifications and requirements of
standards.
Wall ties are positioned and correctly fixed to framework to standards.
Openings are constructed and flashings installed to job specifications
Cavities are kept clear of mortar droppings and bridging
Lintels are installed to job specifications.
Top brickwork/ block work is constructed to eaves/gable level in accordance with
standards
Veneer gable is constructed as required by plans and specifications.
Walls are built to gauge straight and true in plumb, line and level within standards
tolerance.
Control joints are formed in accordance with locations on job drawings and
specifications and standards.
Weep holes, brick/block reinforcing, vermin proofing and wall flashing are located
and built in to job specifications.
Sill bricks are cut where required and laid to line in accordance with job
specifications.
Joints of laid brickwork/ block work are raked or ruled to correct depth and profile in
accordance with job specifications.
Brickwork/ block work is brushed down prior to drying to remove unwanted mortar
and face cleaned.
Excess mortar is removed from brick/block work surfaces and cavities are cleaned
free of mortar and debris in accordance with manufacturer’s recommendations, job
specification and standards.
Work area is cleared and materials are disposed of, reused or recycled in accordance
with legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance
with manufacturers’ recommendations and standard work practices
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Work instructions, including plans, specifications, quality requirements and operational details
are obtained, confirmed and applied.
Safety requirements are followed in accordance with safety plans and policies.
Plant, tools and equipment are selected to carry out tasks that are consistent with the
requirements of the job, checked for serviceability and any faults are rectified or reported prior
to commencement.
Material quantity requirements are calculated in accordance with plans and/or specifications.
Materials appropriate to the work application are identified, obtained, prepared, safely handled
and located ready for use.
Environmental protection requirements are identified for the project in accordance with
environmental plans and regulatory obligations and applied
Location and structural feature details of walls are determined from drawings and specifications.
Wall is set out to location to dimensions from drawings and specifications.
Mortar is mixed to specifications.
LO.3 Lay wall to form corbels and protrusions
Plinth bricks are laid to level and alignment to form protruding plinth in accordance with
specifications.
Plinth bricks/squints are laid to sill locations to form feature finish to level and alignment in
accordance with specifications.
LO.6 Install decorative capping
Bricks are cut and laid on edge miter coping to 90° corner.
Bricks are cut and laid on edge miter coping to 135° corner
LO.7 Construct decorative panel
Set out area is located, checked for plumb and level, cleaned and dried in accordance with
manufacturers’ specifications. Panel is set out to plan and specifications.
Whole bricks are laid to conform to the set out.
Starting edges and feather edges are cut and laid to conform to set out.
LO.8 Carry out stencil finishes, Finish joints and stamp finishes
Brickwork joints in laid brickwork are raked or ruled to correct depth in accordance with job
specification.
Brickwork is brushed down prior to drying using appropriate brushing tool in accordance with
job specifications.
Stencil for pattern finish is prepared so that any lapping will maintain alignment and bond
Stencil is laid carefully onto screened surface to specifications ensuring alignment, bond and
flat.
Surface is finished with wood or steel float to a consistent texture in accordance with
specifications.
Control joints are inserted during placement and/or cut into applied finish after setting, to
specifications.
Method of applying pattern is determined in accordance with designed finish and specifications.
Stamped pattern equipment is checked for cleanliness and serviceability.
LO.9 Clean Up
Work area is cleared and materials are disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with
LEARNING MODULE 08
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Work instructions, including plans, specifications, quality requirements and operational details
are obtained, confirmed and applied.
Safety requirements are followed in accordance with safety plans and policies.
Tools and equipment are selected to carry out tasks consistently with the requirements of the job,
are checked for serviceability and any faults are rectified or reported prior to commencement.
Environmental protection requirements are identified and applied for the project in accordance
with environmental plans and regulatory obligations
LO2. Visual check ingredients.
Visual characteristics of materials are identified and recorded
Sand, clay and aggregate are inspected for conformity with the approved lab test report.
Compatibility between materials and their performance are identified and documented.
LO3. Test concrete
Methods of sampling fresh concrete are described in terms of the workability test used
Fresh concrete is tested and analyzed to determine proportions of a concrete mix
Methods of testing hardened concrete are described in terms of testing for saturated density,
compressive strength and tensile splitting strength and flexural strength
Hardened concrete is tested to determine density, strength and flexibility
Fresh concrete is tested to determine air content and yield.
LO4. Test ingredients
Methods of sampling aggregates in concrete are described in terms of determining aggregates
properties
Non-destructive test for hardened concrete are described in terms of methods and purposes
Core testing is described in terms of procedures for drilling, preparing and compression testing of
cores
Methodology for specified test is selected and carried out in accordance with standard and
workplace procedures.
Methodology results are recorded and reported in accordance with workplace procedures
Work area is cleared and materials are disposed-off, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification
Tools and equipment are cleaned, checked, maintained and stored in accordance with
manufacturers’ recommendations and standard work practices
Work completion procedures are applied and relevant personnel notified that work is finished
All operations are carried out with hazard control procedures in accordance with site safety plan
and legal requirements
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
Work area is cleared and waste materials are safely disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers’
recommendations and standard work practices.
LEARNING MODULE 10
LEARNING OUTCOMES
At the end of the module the trainee will be able to:
LO1. Plan and prepare
LO2. Assemble and erect stairs
LO3. Fit handrails, balustrade and finish
LO4. Clean up
MODULE CONTENTS:
LO1. Plan and prepare
1.1. Obtaining ,conforming work instruction
1.2. Following safety
1.3. Identifying and implementing Sign/barricade
1.4. Selecting tools and equipment
1.5. Calculating material quantity
1.6. Identifying, obtaining and preparing Materials handling
1.7. Identifying environmental protection
LO2. Assemble and erect stairs
2.1. Determining exit and ground finish levels
2.2. Calculating rise and going of stairs
2.3. Setting out and placing newel posts
2.4. Selecting and setting out materials for stringers
2.5. Housing stringers and fixing risers or metal brackets
2.6. Cutting housing stringers
2.7. Selecting material treads and riser
LO3. Fit handrails, balustrade and finish.
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Work instructions, including plans, specifications, quality requirements and operational details
are obtained and confirmed.
Safety requirements are followed in accordance with safety plans and policies.
Sign/barricade requirements are identified and implemented.
Tools and equipment are selected to the need of particular job; in the case of problems report to
the concerned body before the next work is started.
Material quantity requirements are calculated in accordance with plans and/ or specifications.
Materials appropriate to the work application are identified, obtained, prepared, safely handled
and located ready for use.
Environmental protection requirements are identified for the project in accordance with
environmental plans and regulatory obligations and applied
Exit and ground finish levels are determined from job drawings and site location.
Rise and going of stairs are calculated from job drawings, site location and regulations.
Newel posts and footings are set out and placed to layout of designed stairs, job drawings and
specifications.
Materials for stringers are selected and set out to the pitch of stairs with treads and risers
according to regulations.
Stringers are housed to accommodate treads and risers or metal brackets are fixed to support
treads.
Stringers are cut and housed into newel posts and/ or landings where specified.
Material for treads is selected and risers set out and cut to length to requirements of stair
design.
Material for handrails and balusters are marked and cut to length.
Handrails and balusters are fitted and fixed in accordance with regulations.
Non-slip strips are installed to treads, where specified
Work area is cleared and materials disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with
manufacturers’ recommendations and standard work practices.
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Environmental requirements are identified for the project in accordance with environmental
plans and statutory and regulatory authority obligations, and are applied.
MODULE CONTENTS:
LO1. Plan and prepare
1.1.Obtaining and conforming work instruction
1.2.Following safety requirements
1.3.Selecting tools and equipment
1.4.Calculating material quantity requirements
1.5.Identifying, obtaining, preparing, safely handling and locating materials
1.6.Identifying environmental protection
LO2. Construct wall frame
2.1. Identifying and selecting wall frame components
Demonstratio
Encourage trainees
Conduct close to up
follow record the time
use Sign language interpreter Illustrate in clear &
Provide
FacilitateOrientation
and
n Use verbal description Use video recorded material short method support the trainees
Provide special attention in the Ensure attention of the trainees Use Video recorded having severe
process of guidance Provide structured training material upper limbs
facilitate the support of peer trainees Show clear and short method Ensure the attention of impairment to
Safety requirements are followed in accordance with safety plans and policies including
implementation of sign/barricade requirements.
Tools and equipment are selected in accordance with the need of particular job and
identified problems reported to the concerned body before the work started.
Materials appropriate to the work application are identified, obtained, prepared, safely
handled and located ready for use
Environmental protection requirements are identified for the project in accordance with
environmental plans and regulatory obligations and applied
Wall frame components are identified and selected in accordance with regulatory criteria.
Structures preservation measures are carried-out for all in accordance with the regulations.
Damp proof course and termite shield are carried-out to protect the structures while fire
protection measures included / considered in accordance with the regulations.
Location of walls is set out on a slab or sub floor frame in accordance with dimensions,
drawings and plans/ specifications.
Common studs are regularly spaced at 600 mm intervals, center to center, to ensure support
for the internal joints between the 1200 mm wide internal wall cladding sheets.
Wall plates are marked to accommodate studs and openings and/or cladding and lining
types.
Prefabricated or cut components are distributed and stacked to suit job location and
sequence of construction.
Wall frames are erected and fixed to each other as per given by drawing.
Whole construction is fixed on the slab, strip foundation as per given by drawing to save it
against wind-force.
Materials are obtained from the store or stack to quantity and specification requirements.
Structures preservation measures are to carry out for all in accordance with the
regulations.
Fire protection measures are to include in accordance with the regulations
Location is set out and marked for partitions in accordance with job plan and specifications.
Common studs are regularly spaced at 600 mm intervals, center to center, to ensure support
for the internal joints between the 1200 mm wide internal wall cladding sheets.
One or multiple components are accurately cut to size according to plans/specifications.
Wall frames are fabricated at the workshop or at the site including lintels and bracing.
Prefabricated or cut components are distributed and stacked to suit job location and
sequence of construction.
5. Clean up
Work area is cleared and materials disposed of, reused or recycled in accordance with
legislation/regulations/codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with
manufacturers’ recommendations and standard work practices.
2 Legso Zenebe Bsc Construction Technology A.A Entoto PTC +251938946868 legsozenebe707@gmail.com
3 Derbabaw Mulaw Msc Construction Mgt Amahara Debark PTC +251967593066 derbabaw@gmail.com
5 Melsew Keba Msc Construction Mgt Benishagul Assosa PTC +251913283335 melsewkeba@gmail.com
gumuz
6 Worku Haji Bsc Construction Technology Oromia Sebeta PTC +251919486469 workuhaji2@gmail.com
7 Dawit showafera Msc Construction Mgt Dire dawa DDPTC +251986314667 dawitshowafera835@gmail.com