Vessel Clearance Procedure
Contents
1 MANAGEMENT AND CONTACT ..................................................................................................... 3
3 PROCEDURE .................................................................................................................................. 3
4 REQUIREMENTS ............................................................................................................................ 3
Annexes
Annex 1 - Vessel Clearance Flowchart
Reference Documents
ZNWF-INS-ZNP-GL-0014 Vessel Inspection Procedure
ZNWF-INS-ZNP-GL-0002 Marine Coordination Plan
Revision Control
Rev. Date Status Description/ Changes Author Reviewed Approved
Stephy Christopher Martin
0 31.01.2023 IFI All
Huang Carling Warming
Annex 1 flowchart Stephy Christopher Martin
1 08.02.2023 IFI
amended. Huang Carling Warming
1 Management
ZN Construction Team will manage vessel clearance procedure.
2 Management System
Podio will be the management system for vessel clearance procedure.
3 Procedure
Vessel Clearance Flowchart see Annex 1.
4 Requirements
▪ All vessel to work in ZN Project shall have Vessel Inspection Close-Out Report in place
before obtain Vessel Clearance Certificate. Vessel Inspection Procedure see ZNWF-
INS-ZNP-GL-0014.
▪ The Contractor shall provide SOPEP equipment list to ZN Construction Team and ZN
MCC.
▪ If a CTV is to work in ZN OCS, the Contractor shall proceed push-on test in the OCS and
provide measurement of air gap between bow fender and boat landing. See CTV and
Boat Landing in Marine Coordination Plan (ZNWF-INS-ZNP-GL-0002).
▪ Offshore personnel shall complete registration and induction on Seaplanner. Induction
link will be sent by the MC. Personnel Induction Flowchart see Annex 4 in Marine
Coordination Plan (ZNWF-INS-ZNP-GL-0002).