You are on page 1of 32

Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KON

ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN


KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SA

BUILD UP RATE (BUILDING WORKS


DATA
Material:
Diesel RM2.15/1litre
Lubricant Oil RM27.90/1litre
Plant:
1 Excavator RM750.00/day
Labour:
1 Operator RM100.00/day
2 General Labour RM70.00/day

DESCRIPTION & CALCULATIONS


General Excavation
Initial cost
Interest on capital for 2 years 4% x RM148,000 x 2 years
Maintenance for 2 years 4% x RM148,000
Transport to site for 2 years 5% x RM148,000

Less repayment value


Cost for 2 years
Cost for 1 year RM49,960/2 years

Numbers of hours in 1 year 200 days x 8 hours = 1600 hours


Cost of excluding capital/hour

Operating cost
Operator
Diesel 6 litre x 8 hours x RM2.15
Lubricant oil (14 litre/7 days) x RM27.90
Operation cost for/day
Operation cost/hour RM259/8 hour
Total excavation cost/hour

Excavation cost/m3 RM47.99/10m3


15% Profit & overhead 15% x RM4.80
Total cost/m3
NYIAPKAN SEBUAH PUSAT KONVENSYEN TAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM

148,000
11,840
5,920
7,400
172,800
122,840
49,960
24,980

25 15.61
1600

100
103.2
55.8
259
32.38
47.99

4.8
0.72
5.52
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
A Excavate pit for pile cap max depth n.e 2.00mm
Capital cost
Excavator cost/hour RM750/8 hour

Operating cost
Operator
Diesel 6 litre x 8 hour x RM2.15
Lubricant oil (14 litre/7 days) x RM27.90
Operation cost/day
Operation cost/hour RM259/8 hour

Excavation cost/m3 RM126.13/31m3


Boards & straps,

15% Profit & overhead 15% x RM7.07


Total cost/m3

B Excavate pit for pile cap max.depth exceeding


Capital cost
Excavator cost/hour RM750/8 hour

Operating cost
Operator
Diesel 6 litre x 8 hour x RM2.15
Lubricant oil (14 litre/7 days) x RM27.90
Operation cost/day
Operation cost/hour RM259/8 hour

Excavation cost/m3 RM126.13/14m3


Board & straps, say

15% Profit & overhead 15% x RM9.01


Total cost/m3
NYIAPKAN SEBUAH PUSAT KONVENSYEN TAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM

93.75

100
103.2
55.8
259
32.38
126.13

4.07
3
7.07
1.06
8.13

93.75

100
103.2
55.8
259
32.38
126.13

9.01
3
12.01
1.35
13.36
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
C Extra over in rock excavation
Operating cost
General worker 4.5 hour x RM70/8 hour x 6
15% Profit & overhead 15% x RM236.25
Total cost for rock excaavtion/m3
Less price rate for rock excavation in soil
Total cost for extra over in rock excavation/m3
NYIAPKAN SEBUAH PUSAT KONVENSYEN TAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM

236.25
35.44
272.69
200.81
71.88
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
Material
1 Ready-mixed concrete Grade 15 RM195/m3
2 Ready-mixed concrete Grade 30 RM233/m3
3 Diesel RM2.15/litre
4 Lubricant oil RM27.9/litre

Plant/Machinery output
1 Mobile crane (10 tonnes) RM650/day
(including operator & oils)
Labour
1 Skilled labour/operator RM97/day
2 General labour RM70/day

Labour output
1 Lifting, pouring & compacting 25m3/hour

DESCRIPTION & CALCULATIONS

CONCRETE WORKS

A Blinding laid under ground slab n.e 100mm thick


Material cost
Ready-mixed concrete (Gr.15)
Wastage 5% 5% x RM195
Total material cost for 1m3

Labour cost
General labour
Lifting, pouring & compacting 5 x RM70/25m3
Mobile crane RM650/25m3
Total labour cost for 1m3

Material & labour cost


Profit & overhead 15% x RM244.75
Price for 1m3
NYIAPKAN SEBUAH PUSAT KONVENSYEN TAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM

195
9.75
204.75

14
26
40

244.75
36.71
281.46
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA

B Ready-mixed concrete (Gr.30)


Material cost
Ready-mixed concrete (Gr.30)
5% wastage 5% x RM233
Total material cost for 1m3

Labour cost
Mobile crane RM650/25m3
General labour 5 x RM70/25m3
Total labour cost for 1m3

Material & labour cost


Profit & overhead 15% x RM284.65
Price for 1m3
NYIAPKAN SEBUAH PUSAT KONVENSYEN YAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM

233
11.65
244.65

26
14
40

284.65
42.7
327.35
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
Material
1 10mm diameter mild steel bar RM
2 10mm diameter high tensile bar RM
3 16mm diameter high tensile bar RM
4 20mm diameter high tensile bar RM
5 25mm diameter high tensile bar RM
6 Tying wire RM

Labour
1 Skilled labour RM90/day
2 General labour RM70/day

Labour output
General
1 1.50 hours/tonne

Cutting & bending


1 15 hours/tonne
2 20 hours/tonne
3 30 hours/tonne

Installing
1 20 hours/tonne
2 25 hours/tonne
3 30 hours/tonne
NYIAPKAN SEBUAH PUSAT KONVENSYEN YAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
MILD STEEL REINFORCEMENT BAR
A 10mm to 12mm Diameter rod
Material cost
10mm reinforcement bar
Tying wire

Wastage
Total material cost/ton

Labour cost
Upload & arrange bar
General labour
Cutting & bending
Skilled labour
Installing bar
Skilled labour

Total cost
15% Profit & overhead
Price for 1 tonne
Price for 1kg
NYIAPKAN SEBUAH PUSAT KONVENSYEN YAMADUN
AHAN LAND DISTRICT, JALAN ENTINGAN, KAMPUS
TEKNOLOGI MARA (UITM), SARAWAK

UP RATE (BUILDING WORKS)


RM RM
Project: CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT KONVENSYE
ISLAM DIATAS LOT 3342, SAMARAHAN LAND DISTRICT, JALAN ENTINGA
KOTA SAMARAHAN, UNIVERSITI TEKNOLOGI MARA (UITM), SARAWAK

BUILD UP RATE (BUILDING WORKS)


DATA
HIGH TENSILE DEFORMED REINFORCEMENT BAR
B 10mm to 12mm diameter rod
Material cost
10mm reinforcement bar
Tying wire

Wastage
Total material cost/tonne

Labour cost
Upload & arrange bar
General labour
Cutting & bending
Skilled labour
Installing bar
Skilled labour

Total cost
15% Profit & overhead
Price for 1 tonne
Price for 1kg