NOTES & KEY

NOTES:
1. DNO Route to be confirmed.
Scale: 1:75 Assumed that feeder pillar
location shown on site plan to be
new connection position.
2. Final circuit to be fully ducted.
3. Position of EV Charger base to
be central between two bays as
shown.
4. Clear walkway distance based on
site measurements and EV
Charging base design. Minimum
clear walkway not less than 1200
mm in construction.
5. Drawing Adapted from Conway
Drawing Number:
CSHCRO1164-SK-000-001

Rolec Dual
Outlet 7 kW

Feeder Pillar
GRP (VR6)

Trench Route
to EV Charger
WESTON CLOSE

99
Rev Description By Date

Quotation

Client:

Site Name:
Tollers Lane - Weston Close

Drawing Title:
Site Plan
Scale @ A1: Drawn By: Checked By: Date:
1:75 AG SG 19.06.23

Project Number: Drawing Number: Revision:


0111 SRG-CROY-DRW-SP-003 A