NOTES:
1. DNO Route to be confirmed.
Scale: 1:75 Assumed that feeder pillar
location shown on site plan to be
new connection position.
2. Final circuit to be fully ducted.
3. Position of EV Charger base to
be central between two bays as
shown.
4. Clear walkway distance based on
site measurements and EV
Charging base design. Minimum
clear walkway not less than 1200
mm in construction.
5. Drawing Adapted from Conway
Drawing Number:
CSHCRO1164-SK-000-001
Rolec Dual
Outlet 7 kW
Feeder Pillar
GRP (VR6)
Trench Route
to EV Charger
WESTON CLOSE
99
Rev Description By Date
Quotation
Client:
Site Name:
Tollers Lane - Weston Close
Drawing Title:
Site Plan
Scale @ A1: Drawn By: Checked By: Date:
1:75 AG SG 19.06.23