Professional Documents
Culture Documents
PROJECT MANAGER:
A B C D E F G H I
1 1
MEDIUM WELLNESS
MEDIUM RECEPTION MEETING ROOM OFFICE OFFICE OFFICE
MEETING ROOM 133
101 127 128 129 130
109 PRELIMINARY DESIGN:
N.P.T. + 0.00 LARGE MEETING RECEPTION
ROOM 110
2 134
2
AV. INN
OVACIÓN
CORRIDOR
141
RESO
AV. PROG
CORRIDOR
103
6 6
LUNCH ROOM
ACCOUNTING
111
115
N.P.T. + 0.00
7 7
DRIVER PROJECT NORTH TRUE NORTH
TRAINING
104
N N
STAIRS OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE KEYPLAN:
STORAGE
ST1 124 123 122 120 119 118 117 116
MEDIA SCAPE 114
121
8 8 BUILDING C
BUILDING A
BUILDING E
A B C D E F G H I
BUILDING B
BUILDING D
NIVEL 1 - BLOQUE A
[01 PLANTA BAJA - BLOCK A]
1 ESCALA: 1 : 100
PROJECT:
QA-MEC-1.1
M. Arq. Samuel Moisés Arroyo Martinez
APROOVED:
Arq. Rodolfo Zapien
CLIENT:
J K L M N O P PROJECT MANAGER:
DESIGN:
1 1
PRELIMINARY DESIGN:
2 2
RECEPTION
146
MEDIUM
N.P.T. + 0.00
OFFICE OFFICE OFFICE MEETING ROOM
SPRINKLER ELECTRIC 155 156 157 158
ROOM ROOM VERIFY SHEET SIZE AND SCALES. THE BAR TO
164 163 THE RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
COFFEE POINT
154
SCALE: As indicated
3 3
OPEN OFFICE 1:
159 100
0 1 2 4 8
IT/ELEC m
162 STORAGE ADRESS:
160
RR JANITOR AMPLIACIÓN SUR DEL PARQUE INDUSTRIAL QUERÉTARO LOTE 18.
153 QUERÉTARO, QRO. MÉXICO
4 4
STAIRS LOCATION:
ST3
PANTRY
COFFEE POINT
152
147
5 R
5
100 WOMEN RR
N.P.T. + 0.47 150
RESO
AV. PROG
MEN RR
151
6 6
7 7
ELEC
149 PROJECT NORTH TRUE NORTH
RR
165
LOUD LOUNGE
148
N.P.T. + 0.00
N N
STORAGE
166 KEYPLAN:
8 8
BUILDING C
BUILDING A
BUILDING E
J K L M N O P
BUILDING B
PROJECT:
QA-MEC-1.2
M. Arq. Samuel Moisés Arroyo Martinez
APROOVED:
Arq. Rodolfo Zapien
CLIENT:
A B C D E F G H I
PROJECT MANAGER:
1 1
DESIGN:
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE LARGE MEETING
217 218 219 220 221 222 223 224 225 ROOM EXECUTIVE
LUNCHROOM
226
227
HRV-04
2 2
PRELIMINARY DESIGN:
4 4 ADRESS:
OPEN OFFICE
216 AMPLIACIÓN SUR DEL PARQUE INDUSTRIAL QUERÉTARO LOTE 18.
MEN WR WOMAN WR UNIV RR QUERÉTARO, QRO. MÉXICO
N.P.T. + 5.00 234 235 236
IT
233 LOCATION:
5 5
VESTIDOR EXECUTIVE
HRV-03
206 BAÑO RECEPTION /
205 WAITING /
COFFEE
SECURITY
AV. INN
OVACIÓN
RECAMARA 202
ROOM
207
x4 208
6 6
RESO
UE-03(S5)
AV. PROG
7 7
EXECUTIVE
MEDIUM EXECUTIVE MEETING ROOM
MEETING ROOM OFFICE
203
209 204
MEDIUM
STAIRS MEETING ROOM OFFICE OFFICE OFFICE OFFICE OFFICE
ST1 215 214 213 212 211 210
N
x4
x4
N
8 8
KEYPLAN:
BUILDING C
A B C D E F G H I
BUILDING A
BUILDING E
NIVEL 2 - BLOQUE A
[02 PLANTA ALTA - BLOCK A]
1 ESCALA: 1 : 100
BUILDING B
BUILDING D
PROJECT:
SIMBOLOGÍA [LEGEND]
TUBERÍA DE LIQUIDO INDICA DISCONTINUIDAD DE TUBERÍA Charger
L- [INDICATES PIPE DISCONTINUITY]
LIQUID PIPE
G- TUBERÍA DE GAS DIRECCIÓN DE FLUJO
GAS PIPE [FLOW DIRECTION] Querétaro Offices and Switchyard
SUMINISTRO DE AIRE R.P. D.P. SUBE/BAJA COLUMNA DE TUBERÍA
SUPPLY AIR [ PIPE DROP/RISE]
AIRE VICIADO DRAWING:
92 cm COTAS DE DETALLE EN CENTIMETROS
EXHAUST AIR
AIRE DE RETORNO [DETAIL DIMENSIONS IN CENTIMETERS]
RETURN AIR 0.92 COTAS EJES EN METROS
RENOVACIÓN DE AIRE DIMENSIONS IN METERS
RETURN AIR D.R. D.D. SUBE/BAJA DUCTO DE LÁMINA
DUCT RISE/DROP
BRANCH
BRANCH ANOTACIÓN DE EQUIPO Y
HVAC LEVEL 2 BLOCK A
NÚMERO DE SISTEMA
TERMOSTATO UE-01(S1) EQUIPMENT ANNOTATION AND
T THERMOSTAT SYSTEM NUMBER DESIGN:
Ing. Gabriel Carbajal Hernandez
Cédula: 3146642
DRAWING #:
DRAWN:
QA-MEC-1.3
M. Arq. Samuel Moisés Arroyo Martinez
APROOVED:
Arq. Rodolfo Zapien
CLIENT:
J K L M N O P
PROJECT MANAGER:
1 1
DESIGN:
2 RR RR
2
247 252
SLEEP ROOM PRELIMINARY DESIGN:
SLEEP ROOM
246 253
RR RR
SLEEP ROOM 248 251 SLEEP ROOM
3 245 254
3 VERIFY SHEET SIZE AND SCALES. THE BAR TO
THE RIGHT IS 25mm IF THIS IS A FULL SIZE DRAWING. 0 25mm
SCALE: As indicated
RR RR
249 250
SLEEP ROOM SLEEP ROOM 1:
100
244 255
0 1 2 4 8
m
4 4 ADRESS:
SLEEP ROOM STAIRS
243 ST3 AMPLIACIÓN SUR DEL PARQUE INDUSTRIAL QUERÉTARO LOTE 18.
QUERÉTARO, QRO. MÉXICO
JANITOR 256
TÍP.
242
LOCATION:
5 5
IT/ELEC
241
AV. INN
OVACIÓN
6 6
RESO
AV. PROG
7 7
QUIET LOUNGE
LAUNDRY 238
240
N.P.T. + 5.00
MECH ROOM
239
N N
8 8
KEYPLAN:
BUILDING C
J K L M N O P
BUILDING A
BUILDING E
NIVEL 2 - BLOQUE B
[02 PLANTA ALTA -BLOCK B]
1 ESCALA: 1 : 100
BUILDING B
BUILDING D
PROJECT:
SIMBOLOGÍA [LEGEND]
TUBERÍA DE LIQUIDO INDICA DISCONTINUIDAD DE TUBERÍA Charger
L- [INDICATES PIPE DISCONTINUITY]
LIQUID PIPE
G- TUBERÍA DE GAS DIRECCIÓN DE FLUJO
GAS PIPE [FLOW DIRECTION] Querétaro Offices and Switchyard
SUMINISTRO DE AIRE R.P. D.P. SUBE/BAJA COLUMNA DE TUBERÍA
SUPPLY AIR [ PIPE DROP/RISE]
AIRE VICIADO DRAWING:
92 cm COTAS DE DETALLE EN CENTIMETROS
EXHAUST AIR
AIRE DE RETORNO [DETAIL DIMENSIONS IN CENTIMETERS]
RETURN AIR 0.92 COTAS EJES EN METROS
RENOVACIÓN DE AIRE DIMENSIONS IN METERS
RETURN AIR D.R. D.D. SUBE/BAJA DUCTO DE LÁMINA
DUCT RISE/DROP
BRANCH
BRANCH ANOTACIÓN DE EQUIPO Y
HVAC LEVEL 2 BLOCK B
NÚMERO DE SISTEMA
TERMOSTATO UE-01(S1) EQUIPMENT ANNOTATION AND
T THERMOSTAT SYSTEM NUMBER DESIGN:
Ing. Gabriel Carbajal Hernandez
Cédula: 3146642
DRAWING #:
DRAWN:
QA-MEC-1.4
M. Arq. Samuel Moisés Arroyo Martinez
APROOVED:
Arq. Rodolfo Zapien