INSPECTION TEST PLAN Document No.

FOR Revision:
Shirpur Power Pvt.Ltd
EXCAVATON & BACKFILL Date :

Project: 2 x 150MW Thermal Power Plant Client: SPPL Job Number:


REFERENCE ACCEPTANCE INSPECTION
Sr. No. QUALITY ACTIVITY TEST RECORDS REMARKS
DOCUMENTS CRITERIA Contractor Simplex SPPL
1 Excavation and site clearance

Site clearance with trail pits for soil Approved Drawings &
1.1 IS 1892 / 10042 ----------- HP HP S
classification Specification

Survey / Marking center line of


1.2 ----------DO---------- Approved drawing HP HP WP
building
Approved Drawings
1.3 Excavation ----------DO---------- As per Drawing HP WP S
& SPEC
Final excavated level / strata check Approved Drawings
1.4 ----------DO---------- HP HP S
prior to PCC/ Blinding & SPEC
2 Backfilling
2.1 Approval of source of material Third Party Test HP HP S
As per MORTH and
2.2 Raw material approval ( Soil testing ) ----------DO---------- Third Party Test HP HP RD
IS 1498, IS 2720
Banking of layers of max. loose
2.3 ----------DO---------- Approved Drawings HP WP S
thickness 300mm

2.4 Field Compaction Control ----------DO---------- Approved Drawings Detailed Procedure HP HP RD


Legend :
HP - HOLD POINT, WP - WITNESS POINT,
RD - REVIEW DOCUMENT S - SURVEILLANCE

Prepared By : Reviewed BY : Approved By : Reviewed By SPPL


NAME : NAME : NAME : NAME :

SIGN : DATE : SIGN : DATE: SIGN : DATE : SIGN : DATE: