Requirement: Safety & Productivity solution for large projects

COMMON QUESTIONS FOR TPL EPC SITES

Increased Productivity Health & Safety Real time Analytics

“Can we monitor safety of Lone workers “We want to ensure contractors are “How can we measure worker
with automated alerts in case anomalies” working in authorized areas only” efficiencies”

“How can we improve emergency “Can we quickly locate everyone in “Can we quantify presence in
response time” the case of an emergency” assigned work areas”

2
KEY REQUIREMENTS
Workforce Management Workforce Tracking
• Detection of unauthorized entry • Near Real time Location information
• Hazardous zone violation • Indoor & Outdoor tracking
• Workforce authentication, In/Out of defined area • Headcount & virtual Geo-fencing with alerts

Workforce Safety Workforce Digital Dashboard


• Emergency SOS signalling, Faster QRT response • Central Control (command Centre)
• Fall and Immobility detection & alert • Ensuring data safety / encrypted data / cloud
• Lone worker tracking scalability
• Zone-wise Workforce Headcount during emergency • Configure multiple sites, sheds, locations, etc.
• Customizable reports modular application.

Workforce Productivity Workforce Service Analysis


• Expose API for integration with TPL BlueColor
• Calculate Percentage productivity man hours.
Application
• Zone wise time spent.
• Enable customer for analysis of Contracted
• Productivity trends & reports
Workforce Vs Present Workers at site.
• Zone compliance/negligence, based on tracking • Assist in analyzing shortfall in fulfilment of
data
Contractor's service obligation

Statutory safety Compliance Prevent Hazards Location Tracking Work Stoppage, man hour loss Virtual Boundary

Missing person / value of life Improve Safety Audit performance Safety oriented Organization Avoid Reputational Scar

3
SAMPLE SITE LAYOUT Gate/ Premises Entry/Exit
Tracking

Zone 2
HZ HZ
Zone 3
Zone 2.1

Zone 1
TPL person

Zone 2.2
Hazard Zone/ Outdoor
Restricted zone Tracking

HZ
Building 1 /
Building / (Indoor structure )
Plant 2
HZ (Indoor structure)
HZ Indoor Tracking

HZ

4
WORKER TRACKING FOR LINEAR
10 th Floor
PROJECTS LIKE HIGHWAY, BRIDGES,
TUNNEL, METRO’S
9th Floor

TPL person

WORKER TRACKING
ON EACH FLOOR
INSIDE BUILDING
4th Floor

1st floor

Front view / Tower view

5
WORK FORCE AND SAFTEY TRACKING ON CASTING SLAB

6