LG 6 100% 6
Gr 86.5 80% 69.2
1st 408 80% 326.4
2nd floor 1535.12 80% 1228.096
3rd floor 1535.12 80% 1228.096
3570.74 2857.792
6336 KW
IT Load
LG 6
Gr 102.5
1st 498
2nd floor 1918.9 1228.096
3rd floor 1918.9
4444.3
2nd 3rd
5450 5450
1548.295 1548.295
Sr. No Floors CSU Qty Total TR PAHU
1 LG 3 2 6
100% 6
100% 127
100% 335
100% 1646
100% 1645
3759
Option 1 - 1800 TR x 2 Water cooled Chiller (1W+1S)
Capacity upto - July 2022
DC 4
1 LG 6 100% 6
2 Gr 127 50% 63.5
3 1st floor - Server Hall 1 380 30% 114
4 2nd floor 1650 30% 495
5 3rd floor 1650 30% 495
DC 4
1 LG 6 100% 6
2 Gr 127 80% 101.6
3 1st floor - Server Hall 1 380 80% 304
4 2nd floor 1650 80% 1320
5 3rd floor 1650 80% 1320
DC 4
1 LG 6 100% 6
2 Gr 127 80% 101.6
3 1st floor - Server Hall 1 380 80% 304
4 2nd floor 1650 80% 1320
5 3rd floor 1650 80% 1320
DC 4
1 LG 6 100% 6
2 Gr 127 70% 88.9
3 1st floor - Server Hall 1 380 70% 266
4 2nd floor 1650 70% 1155
5 3rd floor 1650 70% 1155
DC 4
1 LG 6 100% 6
2 Gr 127 60% 76.2
3 1st floor - Server Hall 1 380 60% 228
4 2nd floor 1650 60% 990
5 3rd floor 1650 60% 990
DC 4
1 LG 6 100% 6
2 Gr 127 100% 127
3 1st floor - Server Hall 1 380 100% 380
4 2nd floor 1650 100% 1650
5 3rd floor 1650 100% 1650