You are on page 1of 8

Option 1 -

Floor Req Cooling (TR ) on 100 % Load % Req TR

LG 6 100% 6
Gr 86.5 80% 69.2
1st 408 80% 326.4
2nd floor 1535.12 80% 1228.096
3rd floor 1535.12 80% 1228.096

3570.74 2857.792
6336 KW

IT Load
LG 6
Gr 102.5
1st 498
2nd floor 1918.9 1228.096
3rd floor 1918.9

4444.3
2nd 3rd
5450 5450
1548.295 1548.295
Sr. No Floors CSU Qty Total TR PAHU
1 LG 3 2 6

Sr No Floor Design Cooling (TR)

1 Lower ground floor 6


2 Ground floor 127
3 1st floor - Server Hall 1 335
4 2nd floor 1646
5 3rd floor 1645

Total Required 3759


Qty Total Tr Grand Total
0 6

Working Load % Req TR

100% 6
100% 127
100% 335
100% 1646
100% 1645

3759
Option 1 - 1800 TR x 2 Water cooled Chiller (1W+1S)
Capacity upto - July 2022

Sr No Floor Req Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 50% 63.5
3 1st floor - Server Hall 1 380 30% 114
4 2nd floor 1650 30% 495
5 3rd floor 1650 30% 495

Total Required 3813 1173.5


Installed 1800
Balance 626.5

DC5 - 1st floor 1646 38% 625.48

Option 2 - 1800 TR x 2 Water cooled working + 1800 Air cooled standby


Capacity upto - July 2022

Sr No Floor Design Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 80% 101.6
3 1st floor - Server Hall 1 380 80% 304
4 2nd floor 1650 80% 1320
5 3rd floor 1650 80% 1320

Total Required 3813 3051.6


Installed 3600
Balance 548.4

DC5 - 1st floor 1650 33% 544.5

Option 3 - 1800 TR x 3 Water cooled Chiller (2W+1S) -


Third Chiller with all Equipment PO to be released by 1st week of March
Capacity upto - July 2022

Sr No Floor Design Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 80% 101.6
3 1st floor - Server Hall 1 380 80% 304
4 2nd floor 1650 80% 1320
5 3rd floor 1650 80% 1320

Total Required 3813 3051.6


Installed 3600
Balance 548.4

DC5 - 1st floor 1650 33% 544.5

Option 4 - 1800 TR x 3 Water cooled Chiller (2W+1S) -


Third Chiller with all Equipment PO to be released by 1st week of March
Capacity upto - July 2022

Sr No Floor Design Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 70% 88.9
3 1st floor - Server Hall 1 380 70% 266
4 2nd floor 1650 70% 1155
5 3rd floor 1650 70% 1155

Total Required 3813 2670.9


Installed 3600
Balance 929.1

DC5 - 1st floor 1650 56% 924

Option 5 - 1800 TR x 3 Water cooled Chiller (2W+1S) -


Third Chiller with all Equipment PO to be released by 1st week of March
Capacity upto - July 2022
Sr No Floor Design Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 60% 76.2
3 1st floor - Server Hall 1 380 60% 228
4 2nd floor 1650 60% 990
5 3rd floor 1650 60% 990

Total Required 3813 2290.2


Installed 3600
Balance 1309.8

DC5 - 1st floor 1650 79% 1303.5

Option 6 - 1800 TR x 3 Water cooled Chiller (3W) - Air cooled Standby


Third Chiller with all Equipment PO to be released by 1st week of March
Capacity upto - July 2022

Sr No Floor Design Cooling (TR ) on 100 % Working Load % Req TR

DC 4
1 LG 6 100% 6
2 Gr 127 100% 127
3 1st floor - Server Hall 1 380 100% 380
4 2nd floor 1650 100% 1650
5 3rd floor 1650 100% 1650

Total Required 3813 3813


Installed 5400
Balance 1587

DC5 - 1st floor 1650 96% 1584