춘 흙


시 막

약 이

주 구

복 조



축 산

사 서

2
0
2
2
.
12








제 1장 설계개요
1.1 공사개요 ······································································································································· 2
1.2 검토 목적 ······································································································································· 2
1.3 검토 과정 ······································································································································· 3
1.4 과업 위치 및 현황 ······················································································································· 4
1.4.1 과업위치 ··································································································································· 4
1.4.2 인근현황분석 ··························································································································· 4

제 2장 공사계획
2.1 굴착공법 선정 ······························································································································· 6
2.1.1 굴착공법 선정시 검토 사항 ································································································· 6
2.1.2 굴착공법 선정시 고려 사항. ································································································ 7
2.1.3 벽체공법 선정 ························································································································· 8
2.1.4 지지공법 선정 ························································································································· 9
2.1.5 차수공법 선정 ························································································································· 9
2.2 예상 발생문제점 및 대책수립 ································································································· 10
2.2.1 굴착에 따른 인접지반의 침하 ·························································································· 10
2.2.2 침하영향평가 개요 ·············································································································· 12
2.2.3 침하영향평가 ························································································································ 13
2.2.4 흙막이벽체 수평변위 검토 ································································································ 15
2.2.5 굴착공사에 관한 규제사항 ································································································ 16
2.3 암반굴착 공법 선정 ··················································································································· 20
2.3.1 암반굴착방법 ························································································································ 20
2.3.2 설계 발파진동 추정식 ········································································································ 23
2.3.3 발파패턴에 따른 분류기준 ································································································ 24
2.3.4 시험발파 및 시공 ················································································································ 27
2.3.5 발파 전 사전 조사 ·············································································································· 27
2.3.6 시험발파 ································································································································ 27
2.3.7 시공 및 계측 관리 ·············································································································· 32
2.3.8 자료 수집 ······························································································································ 32

제 3장 가시설 구조계산서
3.1 설계기준 ······································································································································· 34
3.1.1 검토방향 ································································································································ 34
3.1.2 부재 설계법 ·························································································································· 34
3.1.3 하 중 ······································································································································ 34
3.1.4 적용 안전율 ·························································································································· 35
3.1.5 재료의 허용응력 ·················································································································· 36
3.2 지반의 토질정수 산정 ··············································································································· 38
3.2.1 기본방향 ································································································································ 38
3.2.2 지반정수 산정시 참고자료 ································································································ 39
3.2.3 지반정수 산정 근거 ············································································································ 60
3.2.4 지반정수 산정 결과 ············································································································ 60
3.3 설계하중 ······································································································································· 61
3.3.1 활하중 ···································································································································· 61
3.3.2 건축물하중 ···························································································································· 61
3.4 계획도면 및 해석방법 ··············································································································· 62
3.4.1 계획평면도 ···························································································································· 62
3.4.2 계획단면도 ···························································································································· 63
3.4.3 흙막이 프로그램을 이용한 해석방법 ·············································································· 64
3.5 각 단면별 검토결과 ··················································································································· 67

제 4장 계측계획서
4.1 개 요 ········································································································································· 73
4.2 계측관리 계획 ····························································································································· 73
4.3 계측항목 ······································································································································· 74
4.4 계측 위치 선정 ··························································································································· 80
4.5 계측 빈도 ····································································································································· 82
4.6 계측관리기준 ······························································································································· 83
4.6.1 절대치 관리 방법 ················································································································ 83
4.6.2 예측 관리 방법 ···················································································································· 83
4.7 당 현장의 계측관리기준 ··········································································································· 85
4.7.1 자동화 계측시스템 ············································································································ 86
4.7.2 사고 및 계측관리기준 초과시 대응방안 ········································································ 88

부 록
1. 가시설 단면검토
2. 기초 검토
3. 현장타설말뚝 검토
4. 슬래브지지공법 검토
춘천시 약사동 주상복합 신축공사

흙 막 이 구 조 계 산 서

2022. 12.

주식
회사 다솔엔지니어링
제 출 문

귀 사(청)에서 의뢰한 “춘천시 약사동 주상복합 신축공사”중 흙막


이 공사에 대한 과업을 수행 완료하고, 그 결과를 분석․검토하여
이에 보고서를 다음과 같이 제출합니다.

2022년 12월

경기도 광주시 중앙로 351, 2층(송정동)


TEL.02-536-3145, FAX.02-555-2908
( 주) 다 솔 엔 지 니 어 링
토질및기초기술사
이 송
(91135010065)
1
설계개요
4

1.1 공사개요
1.2 검토목적
1.3 검토과정
1.4 과업 위치 및 현황
제 1 장 설 계 개 요

1.1 공사개요

공 사 명 춘천시 약사동 주상복합 신축공사

공 사 규 모 굴토면적 2,753.38 m2 굴착심도 Hmax = 32.79 m

대 지 위 치 강원도 춘천시 약사동 150-10번지

굴 착 공 법 - C.I.P+S.M.I Grouting으로 구성된 토류벽체를 형성한 후 건축 SLAB로 지지하면서 굴착.

굴 착 깊 이 EL(+) 40.89m (H=32.79m)

사 용 자 재
(강 재재질 : 엄지말뚝 H - 300 X 300 X 10 X 15 (C.T.C 1.20m)
S S 2 7 5 )

건축철골 및 SLAB 건축철골 LIST 참조

ø600, C.T.C600mm(근입장까지 근입)

기 타 자 재 C.I.P fck=40 MPa

철근항복강도 fy=400MPa(주철근), fy=400MPa(전단철근)

S.M.I Grouting ø800, C.T.C600mm(근입장까지 근입)

1.2 검토 목적

강원도 춘천시 약사동 150-10번지에 건립될 “춘천시 약사동 주상복합 신축공사”에 따른 터파기 공사시 평형상

태를 유지하고 있는 지반은 응력의 불균형과 힘의 재평형에 의해 토립자의 재배치가 이루어진다. 따라서 굴

착에 따른 지반거동은 굴착배면의 변형을 유발시키고 인접 지반이 침하하는 등 붕괴 사고를 일으킬 수 있다.

이러한 측면에서 본 검토는 지반 굴착시 지반 거동을 최소화 할 수 있는 최적의 흙막이 시스템을 검토하여

설계에 반영함으로서 당 현장의 터파기 공사가 합리적이고 안전한 시공이 되도록 하는데 그 목적이 있다.

-2-
제1 장 설 계 개 요

1.3 검토 과정

본 검토는 굴착에 의해 작용되는 횡 토압과 기타 작용하중에 대해 저항 할 수 있도록 적절한 흙막이

벽체 및 버팀 시스템을 계획하고 이에 따른 흙막이 벽체의 변위 및 흙막이 부재의 응력 검토를 통해 안

정성 확인하는 관점에서 그림 1.1과 같은 흐름도에 의해 범위를 설정하여 수행하였다.

-3-
1.4 과업 위치 및 현황
1.4.1 과업위치

1.4.2 인근현황분석

동 측 - 춘천시 약사동 150-22외(소공원부지 )

서 측 - 춘천시 약사동 151-7외(근린생활시설외 )

남 측 - 약사천(하천)

북 측 - 춘천시 약사동 77(주거단지 -모아엘가센텀뷰 )

-4-
2
공사계획
4

2.1 굴착공법 선정
2.2 예상 발생문제점 및 대책수립
2.3 암반굴착 공법 선정
제 2 장 공 사 계 획

2.1 굴착공법 선정

본 사업부지는 지하층 시공을 위한 터파기가 EL(+) 40.89m (H=32.79m)까지 계획되어 있으며, 흙막이공법

의 선정은 부지 및 지반 조건 등을 충분히 고려하여, 경제적이며 안정성이 확보된 공법으로 채택하여

야 한다. 따라서 지반 굴착시 흙막이공법 선정에 있어서는 우선 다음과 같은 각 항목에 대해서 조사 검토를
하고, 그 결과를 분석하여 흙막이 형식을 선정하는 것이 필요하다.

2.1.1 굴착공법 선정시 검토 사항


굴착공사로 인하여 발생되는 주변지반의 침하와 그 밖의 피해를 최소화하고 소음, 진동 등의 공해 문제를 계

획, 설계단계에서 충분히 고려하여 현장의 모든 여건에 부합될 수 있는 최적의 공법을 채택하여야 한다.

흙막이 공사의 설계 및 시공시 공법 선정을 위한 기본원칙은 다음의 3가지로 요약할 수 있다.

∙ 안전성 : 붕괴, 파손, 과대한 변형 등의 방지(현장장해의 방지)

∙ 경제성 : 공사비의 저렴화, 공기의 단축

∙ 환경보호 : 무소음, 무진동, 주변의 침하 및 지하수위저하 등의 방지(공사공해의 방지)

또한, 흙막이공법의 선정시 고려해야 될 사항은 일반적으로 다음과 같다.

∙ 굴착심도 및 형상

∙ 지층상태와 지하수위의 상황

∙ 주변 구조물 및 매설물 상태

∙ 인근 주민과 소음, 진동 등 공해 평가

∙ 시공시 배수 및 굴착방법

∙ 공사기간과 경제성

∙ 가설 및 영구 지하구조물 시공, 철거시 안전관리

∙ 주변의 유사조건에서 실시된 시공실적과 문제점 조사 결과

-6-
제 2 장 공 사 계 획

2.1.2 굴착공법 선정시 고려 사항.

검토항목 고 려 사 항

∙ 굴착지반이 연약한 점성토 또는 느슨한 사질토일 경우 굴착에 따른 흙막이벽체 변위가 크게


되므로 주변지반의 침하량과 침하영향범위를 고려해야함.

지 층 조 건

<양호한 지반> <불량한지반>

∙ 벽체 강성이 클수록 변위가 작게 되며 벽체강성은 다음 순서와 같다.


( H-Pile + 토류판 < Sheet Pile < S.C.W < C.I.P < 지중연속벽 )
∙ 자갈층인 경우 Sheet Pile의 타입이 곤란할 수 있고 S.C.W는 자갈이 큰 경우(10cm이상) 시공성이
결여됨.
∙ 암반층에서 C.I.P는 공사기간이 길어지고 S.C.W , Sheet Pile은 적용 불가함.

∙ 지하수위가 높으면 굴착으로 지하수 유입과 토사가 혼입되어 굴착배면토의 이완, 지하수위
저하로 지반침하가 발생되므로 적절한 차수공법 고려
지 하 수 위 ∙ H-Pile + 토류판은 별도 차수공이 필요하며 C.I.P는 공사이에 보조차수공 필요.
∙ Sheet Pile은 이음부에 문제가 있을 수 있으므로 차수도폭재 필요.
∙ S.C.W, 지중연속벽은 차수성이 큰 흙막이벽임.

∙ 흙막이벽 붕괴의 가장 큰 위험은 근입부의 붕괴에 있으며 점토지반의 Heaving, 모래지반의


Boiling, 주동과 수동토압에 의한 토압균형과 근입 안정성이 중요
근입부안정
∙ Heaving, Boiling등이 유발될 수 있는 지반에서는 흙막이벽 근입장 연장, 지반보강 등의 적절한
조치가 필요함.

∙ 주변구조물이나 지하매설물이 있는 경우 침하, 변위가 최소로 또는 허용한도 이하여야며


주변구조물 지
근접시공으로 취급, 주변구조물과의 상호작용을 고려.
하 매 설 물
∙ 이 경우 벽체강성이 크고 차수성 있는 흙막이벽체 선정이 필수적임.

∙ 소음, 진동유발시 민원의 대상이 되므로 사전 천공, 저소음, 저진동으로 해야 하며 시공시 계측을
환 경 피 해
통해 관리해야 함.

공 사 기 간
∙ 같은 조건이면 공기가 짧고 경제적인 공법을 선택함.
경 제 성

-7-
2.1.3 벽체공법 선정

구분 H-PILE + 토류판 공법 C.I.P 공법 S.C.W 공법 지하연속벽 공법

공법사진

∙현장타설 말뚝 ∙계획심도까지 주입재 ∙특수장비로 안정액을


∙H형강 삽입
∙시추기로 천공 투입 주입하며 트렌치 굴착
공법개요 ∙굴착하며 흙막이판
∙H형강 및 철근 삽입후 ∙벽체형성 및 H형강 삽 ∙철근망 삽입 후 콘크리
(목재 or 강재 등) 설치
콘크리트 타설 입으로 흙막이벽 형성 트 타설

재 질 ∙H형강, 토류판 ∙철근콘크리트 말뚝 ∙Soil Cement 벽 ∙철근콘크리트

∙벽체강성 좋음
∙벽체강성 우수
∙공사비 저렴 ∙불규칙한 형상에 적응 ∙별도차수 불필요
∙완전차수 가능
장 점 ∙소음・진동 영향 적음 성 좋음 ∙토사유실이 적음
∙건물벽체로 사용가능
∙자재재사용 가능 ∙인접구조물 영향 적음 ∙ ∙공기가 짧음
∙대심도 굴착가능
장비 소규모
∙지하수위가 높은 경우
차수 필요
∙CIP간 연결성 및 수직 도 ∙자갈 및 암반 구간 시공
∙벽체변형이 큼 ∙공사비 고가
단 점 문제로 차수공법 필요 곤란
∙토류판 배면과 지반사 ∙장비규모 큼
∙암반구간 시공성 저하 ∙벽체로 이용불가
이에 여굴 발생에 따른
지반침하 우려

∙벽체강성 우수
∙벽체 강성 보통임 ∙벽체강성 가장 우수함
∙주열식 벽체로 토사 구 ∙연속벽체로서 차수 및
∙토사구간에 적용할 경 ∙차수 효과가 우수하여
안 전 성 간 굴착공사시 배면 토 토류벽의 2중 역할을 충
우 토류판 설치시 토사 투수성이 높은 지반에
사 유입을 효과적으로 분히 할 수 있음
유출 가능성 존재함 유리함
차단

∙지하수위가 있는 지반 ∙공과 공사이의 연결부


∙각 공 10cm 중첩하여 시
조건에서는 별도의 차 에누수현상 발생 가능
차 수 성 공하므로 차수의 효과 ∙차수 효과 우수함
수 Grouting 이 실시되 성이 있어 누수 방지용
가 우수함
어야 함 보조Grout를 시행

∙원하는 위치에 대형
∙원하는 위치에 H-Pile을 ∙Guide Wall이 설치되 므
∙원하는 위치에 설계 심 Auger 에 의해 계획심
설치할 수 있으나, 투수 로 원하는 위치에 설계
정 밀 성 도의 구조체를 형성 시 도에 흙막이벽체를 정
성이 큰 지반에 적용성 심도의 구조체를 정확
킬 수 있음 확하게 형성시킬 수 있
낮음 하게 형성

선 정 ◎

-8-
제2 장 공 사 계 획

2.1.4 지지공법 선정
구 분 건축슬라브 지지공법 EARTH ANCHOR 공법 STRUT 공법

공 법
사 진

∙토류벽채 시공
∙ 지하 본 구조물용 철골기둥과 보를
∙필요한 위치에 중간말뚝(POST PILE)
굴토공사 진행에 따라 선시공하여 ∙굴착 후 지반천공 및 앵커 설치
공 법 설치
굴토공사 중 지보공으로 사용하고 ∙앵커에 선행하중을 가하여 토류벽체를
개 요 ∙단계별 굴착 후 띠장(WALE) 설치
굴토공사 완료후에는 본 구조물로 지반에 밀착 후 다음단 시공
∙JACK으로 버팀대에 PRESTRESS
사용함.
가함
적 용 ∙연약한 점토 또는 느슨한 상태의 매립,
∙보통조밀한 상태~매우 조밀한 상태 ∙보통조밀한 상태~매우 조밀한 상태
지 반 퇴적 사질토지반에 대해서는 매우
∙암반층 ∙암반층
조 건 적용성이 좋은공법
∙강성이 큰 영구 지지체로서 벽체의 ∙작업공간이 넓게 확보됨
∙버팀대의 압축강도 그 자체를
변위를 최소화 ∙타공법에 비해 안정성이 높음
이용하므로 응력상태 확인 가능
장 점 ∙지하굴착과 지상층 공사를 동시에 할 ∙앵커에 프리스트레스를 주기 때문에
∙굴착면적이 좁고 깊을 때 유리하며,
수 있어 공기단축 벽의 변위와 지반침하를 최소화 할 수
연약한 지반도 시공가능
∙가설 지지체의 해체에 대한 부담이 없음 있음
∙인접부지 침범에 따른 민원 유발 ∙주변 지반 침하 발생 우려
단 점 ∙공사비 고가 ∙주변에 지하구조물이나 매설물이 ∙버팀보가 내부의 굴착 및 구조물
있을시 시공불가 공사에 지장을 준다.
선 정 ◎

2.1.5 차수공법 선정
구분 S.M.I 공법 L.W 공법 J.S.P공법 E.G.M 공법
∙지반천공 및 지중에이중관
∙천공 후 지중에 주입관 설
주입Rod를 설치한 후, 특
치 상하로 분리된 분사노 ∙천공 후 지중에 주입관으
∙천공 후 지중에 주입관 설 수한 주입선단장치(교반
즐에서 순결재와 완결주입 로 Manjet Tube설치 주입
치 주입 시 주입관의 회전 기)를 이용하여 대상지반
공법개요 재를 동시에 분사하는 주 은 Seal 주입과 Double
인발 흙과주입재의 강제치 중에기존 S.G.R공법과 같
입장치를 이용한 비 알칼 Packer(1.5Shot)에 의한
환으로 개량체 형성 은 방법으로 저압에의해
리성 실리카졸을 사용한 L.W주입
연속으로 주입하는 저압
약액주입
침투주입공법
∙규산소다, 시멘트, SMI(실 ∙규산소다, 시멘트, 벤토나
주 재 료 ∙시멘트 혼화재, Soil ∙EF-A, 물
리카졸계) 이트
적용토질 ∙모든지층 ∙사질토 및 일반토사 ∙N<30의 점토사질 지반 ∙모든지층
차수효과 ∙보통 ∙보통 ∙지층에 따라 양호, 보통 ∙우수
∙용탈율 2%이내이며 품질
∙다공관의 특수주입장치를 ∙지반 침투성이 양호
∙연약 지반의 지반보강효과 관리 향상
사용한 저압침투주입으로 ∙주입장비, 주입재료가타공
양호 ∙분말도가 높아 침투효과
주입효과 우수 법에 비해 저렴
∙균질의 고강도 차수벽형성 탁월
장 점 ∙실리카졸 사용으로 용탈현 ∙일정범위를 균일하게보강
∙장기적 공사에 적용시외력 ∙지하수에 의한 희석환경에
상 최소화 할수 있음
에 의한 충격 및진동에 저 도 겔타임 유지
∙차수성 양호 ∙주입후 주입효과가 불량한
항력 큼 ∙배합용수 수온에 영향받지
∙장비가 소규모로 이동용이 위치에서 재주입용이
않음
∙차수 보강 영역이 좁음 ∙그라우팅공법 중에서는비
∙지층 및 공사목적에따라 ∙겔 타임 조절 곤란 교적 고가임 ∙최근 개발되어 시공실적이
주입재의 선택에유의 ∙지반 보강효과는 기대하기 ∙조밀한 자갈층 및 풍화암 적으나, 시공실적이 증가
단 점
∙실리카졸의 현장제조로 품 어려움 층에서 시공이 곤란 하는 추세(2018년 6건,
질관리에 유의 ∙실트, 모래, 사력층에재료 ∙초고압 분사로 지반의융기 2019년16건)에 있음
손실 에 따라 인접지반에 영향
선 정 ◎

-9-
2.2 예상 발생문제점 및 대책수립
2.2.1 굴착에 따른 인접지반의 침하
굴착공사로 인하여 인접지반의 침하가 발생될 수 있는 일반적인 요인으로는 다음 사항들을 열거 할 수 있다.

① 주위 매설물의 매립상태가 불완전한 경우, 말뚝관입 천공 작업시 진동으로 인한 압축 침하.

② 토류벽의 변위에 따른 배면토의 이동으로 인한 침하.


③ 지하수 배수시 토사가 함께 유출되어 발생되는 침하.

④ 배수에 의한 점성토의 압밀 침하

⑤ 굴착바닥이 연약한 지반인 경우 지반의 팽상 (Heaving), 사질지반의 경우(boiling)으로 인한 배면지반의 침


하.

⑥ 시공불량으로 인한 배면지반의 이동 및 침하

⑦ 2차적인 원인으로써 상기에 열거한 1차적인 원인에 의해 발생된 침하로 인접된 상,하수도 관거의 파손
이 야기되어 일시적으로 많은 물이 유출되어 토사가 다량 유출 되므로써 발생하는 함몰침하.

이상의 원인을 최소화하기 위하여 아래 열거되는 사항에 주의하여 지반침하에 따른 위해현상을 최소화 하여

야 한다.

1) 계측관리를 통하여 계측치가 설계치 이하가 되도록 주의

2) 시공관리를 철저히 하여 예기치 않은 사고를 미연에 방지

3) 지중장애물 조사를 사전 실시하여 침하에 의한 위험요인 제거

여러 가지 구조물의 최대허용 침하량 및 각변위의 합계

침하형태 구조물의 종류 최대침하량

배수시설 15.0 ~ 30.0cm


출입구 30.0 ~ 60.0cm
부등침하의 가능성
전 체 침 하
석적 및 벽돌구조 2.5 ~ 5.0cm
뼈대구조 5.0 ~ 10.0cm
굴뚝, 사이로, 매트 7.5 ~ 30.0cm

탑, 굴뚝 0.004 S
전 도 물품적재 0.01 S
크레인 레일 0.003 S

빌딩의 벽체벽체 0.0005 ~ 0.002 S


철근콘크리트 뼈대구조 0.003 S
부 등 침 하
강 뼈대구조 (연속) 0.002 S
강 뼈대구조 (단순) 0.005 S

S : 기둥사이의 간격 또는 임의의 두점 사이의 거리

- 10 -
제2 장 공 사 계 획

Skempton과 Macdonald(1956)의 부등침하 손상한계

각 변 위(δ/L) 1 / 300

점 토 45 mm
최 대
부 등 침 하
사 질 토 30 mm

점 토 80 mm

총 침 하 량

사 질 토 40 mm

구조적 손상 : 구조의 손상은 각변위 δ/L > 1/150일때 예상됨

(L = Span , δ=기둥간 부등침하량)

건축부재(벽체나 바닥) 손상은 δ/L > 1/300일때 예상됨

빌딩 구조물의 손상한계 (Hunt : 1984)

Bjerrum(1963)의 여러 구조물에 대한 각변위의 한계


1 1 1 1 1 1 1 1 1 1
←각변위(경사도)
100 200 300 400 500 600 700 800 900 1000

침하에 예민한 기계
기초의 작업곤란한계

사재를 가진 뼈대의 위험한계

건물에 균열이 없도록 하는 안정한계

칸막이벽에 첫 균열이 예상되는 한계

고가크레인의 작업곤란이 예상되는 한계

강성의 고층빌딩의 전도가 눈에 띄일 수 있는 한계

칸막이 벽이나 벽돌벽의 상당한 균열이 있는 한계

가요성 벽돌벽의 안전한계(L/H>4)

일반적인 건물(라아멘 타입의 건물)의 구조적 손상이 예상되는 한계

- 11 -
2.2.2 침하영향평가 개요
흙막이벽의 횡방향 변위는 버팀굴착 주위의 지반침하를 유발시키는데 이것을 일반적으로 지
반손실(Ground Loss)이라 하며, 지반손실은 인접구조물 기초 또는 지하매설물에 대하여 침하를
유발시켜 피해가 발생하므로 근접시공에 매우 중요한 문제가 된다. 흙막이 벽의 변위에 따른
주변지반의 침하는 흙막이벽 변위의 실측 또는 계산에 의하여 구하고 그 변위로 부터 주변지
반 침하를 추정하는 방법과 버팀 구조와 주변지반을 일체로 하여 해석하는 방법이 있다. 어느
경우거나 흙막이벽의 횡방향 변위를 해석하는 방법에 지배되는데 현재까지 제안된 예측방법을
살펴보면 다음과 같다.
① Caspe(1966)의 방법 : 이론적인 방법
② Peck(1969)의 방법 : 계측결과 이용
③ St. John(1975)의 방법 : 계측결과 이용
④ Goldberg et al.(1976)의 방법
⑤ Mana & Clough(1981)의 방법 : 계측결과 이용
⑥ NAVFAC(1982) DM-7.2
⑦ Fry et al(1983)의 방법 : F.E.M 해석결과 이용
⑧ Bauer(1984)의 반경험식
⑨ Clough & O' Rourke(1990)의 방법
⑩ Canada 시방규정(1992)
침하 추정방법은 전술한 바와 같이 여러가지 방법이 있는나, 본 과업에서는 국내에서 수치해
석에 의한 탄소성해석시 가장 많이 사용하고 있는 Caspe의 방법(1966)을 적용하여 침하영향
평가를 수행하였으며, Caspe 방법의 개요를 간략하게 기술하면 다음과 같다.
Caspe는 1966년에 대수나선형의 활동면을 설정하고 영향권 내의 토체를 일정한 띠요소로
나누어 흙막이벽의 수평변위와 지반의 포아송비를 사용하여 굴착에 따른 인접지반의 침하량을
산정하는 방법을 제시하였다. 현재 침하량 예측을 위하여 실무에서 많이 사용하고 있는 Caspe
방법은 1984년에 Bowles에 의하여 재정리된 것으로서 해석을 위한 입력 자료로는 깊이에 따
른 벽체의 수평변위, 굴착깊이, 굴착 폭, 내부마찰각이 요구되며, 침하량 산정을 위한 세부사항
은 다음과 같다.

1) 벽체의 수평변위를 결정한다. (예측치 또는 계측치)


2) 벽체의 수평변위를 합하여 변위 체적(   )을 구한다. 변위 체적을 구하기 위해서

averageend area, 사다리꼴 공식, 또는 Simpson의 1/2방법 등을 사용한다.


3) 침하 영향권의 수평거리   를 추정한다. 점토지반에서 침하 영향권을 적용하기 위하여
Caspe가 제안한 방법은 다음과 같다.

- 12 -
2
제 장 공 사 계 획

(1) 굴착심도(   )계산


(2) 굴착영향 거리,   를 식 (5.1)에 따라 계산
     (5.1)
여기서,      °    (    경우 )
   (    경우 )
(3) 침하영향 거리,  를 식 (5.2)에 따라 계산
    tan     (5.2)
4) 벽체에서의 지표침하량,   를 식 (5.3)에 따라 계산
 
   (5.3)

5) 벽체에서 거리( x)에 따른 침하량,   를 식 (5.4)에 따라 계산


   
  (5.4)

2.2.3 침하영향평가

허용기준치
구조물의 허용침하량은 구조적인 안전성과 사용상 기능유지로 평가되며, 구조적 안전성은
직접기초인 경우에는 건물의 침하, 전도로부터 판단되는 것이 많고 허용치로서는 과거의 균
열 상황과 침하 및 경사량의 조사 결과를 참고로 하여 중요도를 감안하여 결정한다.
Sowers(1962)의 여러 구조물에 대한 최대허용침하량

기 준 구조물의 종류 허용치 기 준 구조물의 종류 허용치

배수시설, 출입구 15~30cm 철근콘크리트


0.003S
뼈대구조
최대침하량 석적 및 조적구조 2.5~5.0cm 부등침하량
강뼈대구조
0.002S/0.005S
굴뚝, 사이로, 매트 5.0~10.0cm (연속/단순)

각변위에 대한 구조물의 허용 한계치

구조물 허용치 비고 참고문헌

∙ 침하에 예민한 기계 기초의 작업곤란 한계 1/750 -


Bjerrum
∙ 균열을 허용할 수 없는 빌딩에 대한 안전한계 1/500 -

∙ 뼈대 구조물내의 하중지지벽 또는 칸막이벽, 원형 Skepton &


1/300
강재 원유 또는 액체저장 탱크 일차 균열발생 Mcdonald
∙ 강성고층 빌딩의 전도가 눈에 뜨일 수 있는 한계 1/250 Bjerrum, Hunt

∙ 뼈대 구조물내의 하중지지벽 또는 칸막이벽, 원형 구조적 손상발생 추정 Skepton &


1/150
강재 원유 또는 액체저장 탱크 칸막이나 벽돌에 Mcdonald
∙ 일반적인 건물의 구조적 손상이 예상되는 한계 1/150 심각한 균열발생 Bjerrum, Hunt

- 13 -
안전성 평가기준

구조물 파괴 형상 인접 구조물 손상평가

구조물 손상평가 인자

WA  WB H A  H B
∙ 최대 침하량 : W A ∙ 부등 침하량 : WA  W B ∙ 각 변위 :  ∙ 수평변형률 : 
L AB L AB

적용 평가기준

기 준 도로부 침하량 관로 및 인접 구조물

허용침하량 25.0mm 25.0mm

허용각변위 - 1/500

검토조건
침하량 및 침하영향거리를 산정하는 방법은 Caspe방법을 적용하였으며, Caspe방법 적용시
흙막이벽체의 수평변위는 흙막이구조물 구조계산시 사용한 프로그램에 의해 산정된 값을 준용
하였다. 한편, 흙막이벽체의 지반고와 인접구조물의 지반고가 차이를 보이는 구간은 해석방법
상 이를 고려하지 못하므로 흙막이벽체의 지반고와 모두 동일한 것으로 가정하여 검토하였다.

- 14 -
제 2 장 공 사 계 획

2.2.4 흙막이벽체 수평변위 검토


당 현장의 흙막이벽체의 수평변위 및 인접지반에 발생하는 침하에 대한 연구사례는 표에
나타낸 바와 같으며 당현장에 적용한 흙막이벽체 변위에 대한 허용기준치는 국가건설기준(국토
교통부 시공중 지반계측 KCS 111015, 2016)에 따라 선정하였다.

굴착으로 인한 최대 수평변위량 연구사례


제안자 NAVFAC Clough & Chang
Peck 이종규 등 양구승
DM-7.2 O'Rourke Yu-Ou 등 오정환(1997)
(1969) (1993) (1996)
항목 (1982) (1990) (1993)

최대수평 0.2%H 평 균:0.2%H 0.2%H ~ 0.2%H


1.0%H 0.13%H 0.28%H 0.1%H
변 위 량 이하 상한치:0.5%H 0.5%H 이하

실트질 모래 암반을 포함한 실트질


단단한 조밀한
조밀한 단단한 점성토, 와 실트질 점 다층지반으로 모래와
점 토, 화강 사질토,
지반조건 사질토, 잔적토, 토가 번갈아 구성된 절리가
잔적토, 풍화토 JSP
빙적토(till) 모 래 가며 지반을 서울지역 발달된
모 래 지반보강
형성 4개현장 암반

굴착으로 인한 인접지반의 지표침하량 및 침하영향거리 연구사례


제안자
Peck St. John O'Rourke Clough & O'Rourke 양 구승 오정환
(1969) (1975) (1976) (1990) (1996) (1997)
항목
최대지표
0.5%H 0.3%H 0.3%H 0.15%H 0.3%H 0.28%H 0.25%H 0.42%H 0.10%H
침하량

최대침하 2.5H
3.0H 2.0H 2.0H 3.0H 2.0H 2.0H 2.2H 1.2H
영향거리 ~3.0H

단단한 점토층 조밀한


느슨한 런던의 단단~매우 실트질 실트질 모래와
이 중간 중간에 화 강 사질토,
지반조건 모래와자 단단한 모 래 견고한 점 모래와 절리가 발달된
끼여 있는 중간 풍화토 JSP지반
갈 점토 토 모래 암반
~조밀한 모래 보강

국가건설기준(국토교통부 시공중 지반계측 KDS 111015, 2016)

흙막이벽의 강성 허용변위량

0.002 H
강성 흙막이벽 (t≥60 ㎝인 콘크리트 연속벽)
(H : 굴착심도)
0.0025 H
보통 흙막이벽 (t≒40 ㎝ 정도인 콘크리트 연속벽)
(H : 굴착심도)
0.003 H
연성 흙막이벽 (H-Pile과 흙막이판 설치하는 흙막이벽)
(H : 굴착심도)

- 15 -
2.2.5 굴착공사에 관한 규제사항

국내환경 관련 법규
굴착공사와 관련된 법규는 환경정책기본법(2019. 11. 26), 환경정책기본법시행령(2020. 5. 12) 을 기본으로 하

여 굴착공사에 따른 분진문제는 대기환경보전법(2019. 11. 26), 대기환경보전법 시행령(2020. 5. 26) 및 대기

환경보존법시행규칙(2020. 5. 27)이 직접 관련되며 소음 및 진동문제는 소음 ‧ 진동관리법(2020. 5. 26), 소음

‧ 진동관리법시행령(2019. 12. 17), 소음 ‧ 진동관리법시행규칙(2019. 12. 31)에 의하여 규제된다.

진동에 관한 관리
가. 진동발생 원인

굴착공사 현장에서 주변지반이나 구조물에 전혀 진동을 가하지 않을 수는 없다. 그러므로 문제는

발생된 진동이 허용될 수 있는 범위 내에 있도록 하는 것이다. 그렇다면 공학적으로 또는 심리적으로

허용되는 범위를 알아야 하며 진동을 발생하는 공법이나 장비의 특징과 진동을 전파하는 지반상황을

조사하여야 할 것이다. 굴착현장에서 진동을 발생하는 공법과 장비에 대하여 살펴보면 다음과 같다.

① 굴착기(정격출력 19kW 이상 500kW 미만의 것으로 한정한다)

② 다짐기계

③ 로더(정격출력 19kW 이상 500kW 미만의 것으로 한정한다)

④ 발전기(정격출력 40kW 미만의 실외용으로 한정한다)

⑤ 브레이커(휴대용을 포함하며, 중량 5톤 이하로 한정한다)

⑥ 공기압축기(공기토출량이 분당 2.83세제곱미터 이상의 이동식인 것으로 한정한다)

⑦ 콘크리트 절단기

⑧ 천공기

⑨ 항타 및 항발기

- 16 -
제 2 장 공 사 계 획

나. 진동에 관한 규제 기준

국내법규에서 공장진동에 대하여는 규제기준이 설정되어 있으나 건설진동에 관하여는 규제한 것은 없


다. 진동이 주변환경에 미치는 영향은 기계진동, 교통진동, 발파진동등 진동원의 형태에 따라 다르고 대

상구조물의 종류에 따라 다르지만 이에 대한 규제기준은 대부분 지반진동의 속도로서 주어지고 있으며

현재 국내에서 가장 널리 적용되고 있는 기준은 <표-1>과 같은데 이는 서울 및 부산 지하철공사시 적


용되었던 규제기준이다.

국내에서 적용되는 발파진동허용치 단위 (cm/sec)

철근콘크리트 COMPUTER
구 분 문화재 주택, 아파트 상 가 비고
빌딩 및 공장 시설물 주변

건물 기초에서의
0.2 0.5 1.0 1.0~4.0 0.2
허용 진동치

다. 소음에 관한 관리

(1) 소음발생 원인

앞에서 언급된 진동발생공법과 장비는 대부분 소음을 동반한다. 그중에서 발생되는 진동보다는 소음이

더욱 문제시 되는 건설장비로는 Pneumatic Percussion Drill. Breaker 등이 있다. 한편 소음을 주로 크게

발생하는 장비에는 착암기, 발전기, Bull Dozer등을 들 수 있다.

(2) 소음에 관한 관리기준


소음 ‧ 진동관리법 시행규칙 제 57 조에 의한 생활소음규제기준은 <표-3>과 같다. 이 기준에 의하면 주

간(08:00 ~ 18:00)에만 굴착작업을 시행한다면 소음이 주거지역에서는 70dB 이하, 사무실지역에서는

75dB 이하가 되도록 조치하여야 한다. 만일 조석(05:00 ~ 08:00 및 18:00 ~ 22:00)까지도 작업을 연장
한다면 주간 보다 5dB 낮은 65dB 와 70dB 이하로 소음을 억제하여야 한다.

(3) 분진에 관한 관리기준

굴착공사 중 발생되는 환경에 대한 영향중에 또 하나는 주변 대기에 분진의 함유량을 증가시킬 수


있는 것인데 굴착장비 중 분진을 발생시킬 수 있는 것은 Drill, Back Hoe, Dump Truck, BullDozer 등

거의 대부분의 장비와 발파작업을 들 수 있다. 국내의 대기환경보전법시행규칙 제 9 조에 의하면 건설

공사장에서 발생되는 먼지는 120mg/Sm3 이하로 규정되어 있으므로 굴착공사 진행 중에 이러한 기준이
만족될 수 있는 조치를 취하여야 한다.

- 17 -
특정건설 작업의 소음레벨 단위 (dB)
소음레벨
작업구분 작업기계명
1m 10m 30m
디젤파일해머 105 ~ 130 92 ~ 112 88 ~ 98
바이브로 95 ~ 105 84 ~ 91 74 ~ 80
말뚝박기기계, 스팀해머, 에이해머 100 ~ 130 97 ~ 108 85 ~ 97
말뚝박기 기계 및
파일엑스트렉터 94 ~ 96 84 ~ 90
천공기를 사용하는
타설작업 어스드릴 83 ~ 97 77 ~ 84 67 ~ 77
어스오거 68 ~ 82 57 ~ 70 50 ~ 60
베노트 보링머신 85 ~ 97 79 ~ 82 66 ~ 70
콘크리트 브레이커
착암기를 사용 싱커 드릴,핸드 해머, 잭 94 ~ 119 80 ~ 90 74 ~ 80
하는 작업 해머, 크롤러 브레이커
콘크리트 카터 82 ~ 90 76 ~ 81
불도우저 타이어
83 76 64
도우저
굴착 정리 작업 파워 쇼벨, 백호 80 ~ 85 72 ~ 76 63 ~ 65
드레그 크레인, 드레그
83 77 ~ 76 72 ~ 73
스크레이퍼
크람쉘 83 78 ~ 85 65 ~ 75
공기압축기를
공기 압축기 100 ~ 110 74 ~ 92 67 ~ 87
사용 하는 작업

생활소음 규제기준의 범위 단위(dB)


조석
주간 심야
대상지역 측정위치 (05:00~08:00)
(07:00~18:00) (22:00~05:00)
(18:00~22:00)
옥외설치 60 이하 65 이하 60 이하
확성기에
주거지역,녹지지역,취락지역중 의한 소음옥내에서 옥뢰로 50 이하 55 이하 45 이하
주거지역,관광휴양지역,자연환 방사되는 경우
경 보존지역,학교.병원의 공장 및 50 이하 55 이하 45 이하
부지경계선으로부터 동일건물 45 이하 50 이하 40 이하
50m이내지역 사업장
기타 50 이하 55 이하 45 이하
공사장의 소음 60 이하 65 이하 50 이하
옥외설치 65 이하 70 이하 60 이하
확성기에
옥내에서 옥외로
의한 소음 60 이하 65 이하 55 이하
상업지역,준공업지역,일반공업 방사되는 경우
지역,취락지역중 주거지구외 공장 60 이하 65 이하 55 이하
지구 동일건물 50 이하 55 이하 45 이하
사업장
기타 60 이하 65 이하 55 이하
공사장의 소음 65 이하 70 이하 50 이하
1) 규제기준치는 생활소음의 영향이 미치는 대상 지역을 기준으로 하여 적용한다.
2) 공사장 소음의 규제기준은 주간의 경우 소음발생 시간이 1일 3시간 미만일때는 +10dB, 3시간 초과 6시간 이하일때는
+ 5dB를 보정한 값으로 함.

- 18 -
2
제 장 공 사 계 획

비산먼지 발생억제 시설에 관한 기준

배출 공 정 시설에 관한 기준

가. 이동식 국소배기장치(진공흡인시설)등을 설치할 것.


나. 작업장 주위에 고정식 또는 이동식 살수시설 (반경 5m 이상 수압 3kg 이상)을
2. 상적 및 하화 설치 운영하여 작업 중 재비산이 없도록 할 것.
다. 풍속이 평균 초속 8m 이상일 경우에는 작업을 중지할 것.
라. 위의 각호와 동등하거나 그 이상의 효과를 가지는 시설을 설치할 것.

가. 적재물이 흘림, 비산되지 않도록 덮개 등을 설치할 것.


나. 적재함 상단의 수평 5cm 이하까지만 적재할 것.
다. 도로가 비포장 사설도로인 경우
(1) 비산분진 발생원으로부터 비포장시설도로 연장이 1km 미만일 때는 포장할 것.
(2) 비포장도로 연장이 1km이상의 경우 비포장도로 반경 500m이내에 10가구 이상의
주거시설이 있을 경우 해당 부락으로부터 반경 1km이상을 포장할 것.
3. 수 송 라. 다음규격의 세륜 및 세차시설을 설치할 것.
(토사운송업의 - 수조의 넓이 : 수송차량의 1.5배 이상
경우에는 가,나 - 수조의 깊이 : 20cm 이상
및 바에 한한다.) - 청정수 순환을 위한 침전조 및 배관을 설치할 것.
마. 다음규격의 측면 살수시설을 설치할 것.
- 살수 높이 : 수송차량의 바퀴부터 적재함
- 살수 길이 : 수송차량 전장의 1.5배 이상
- 살 수 압 : 3kg/cm 이상
바. 수송차량은 세륜 및 세차 후 운행하도록 할 것.
사. 위의 각호와 동등하거나 그 이상의 효과를 가지는 시설을 설치할 것.

가. 살수시설(수압 1kg/cm이상)을 설치하여 정기적인 청소를 실시할 것.


나. 발파 시 발파공에 젖은 가마니 등을 덮거나 적정 방지시 설치 후 발파를 실시할 것.
다. 작업 시 이동식 국소배기장치를 설치토록 할 것.
5. 채광 채취공정
라. 작업 후 잔여물은 재비산되지 않도록 할 것.
마. 풍속이 평균 초속 8m 이상인 경우는 작업을 중지할 것.
바. 위의 각호와 동등하거나 그 이상의 효과를 가지는 시설을 설치할 것.

- 19 -
2.3 암반굴착 공법 선정
2.3.1 암반굴착방법

기계굴착 (Breaker, Dozer)

기계굴착은 Dozer나 Breaker를 이용하여 암반을 굴착하는 방법으로 풍화암이나 발파굴착이 곤란할 경우에

적용하는 무진동 굴착공법이다.

Breaker에 의한 굴착시 연속적인 기계소음 발생이 크고, 공사 효율성 및 공사비등 문제를 가지고 있다.

미진동 발파

미진동 발파공법이란 미진동 파쇄기란 화약제품을 이용하는 발파방법을 총칭하는 것이다.

미진동 파쇄기란 폭약에 비하여 폭발반응이 느리고 파괴력이 약하다는 특성을 이용하여 발파진동과 폭음이

적게 발생되므로, 인근 주변환경 여건상 폭약의 사용이 곤란한 장소에서 암반이나 콘크리트 파쇄에 주로 사

용된다.

미진동 발파에서는 폭력이 적어 암반에 균열정도만 발생시키고 대형 Breaker를 이용하여 2차 파쇄를 실시해

야 한다.

미진동 파쇄기의 특성은 밀폐된 상태에서는 60m/sec의 폭속과 고온 및 고압이 발생하여 균열을 발생시키지

만, 일단 균열이 발생후에는 내압이 단숨에 해방되고, 가스압의 급격한 저하로 효율을 기대하기 곤란하다.

따라서 미진동 파쇄기를 장약후 공구입구를 시멘트 모르타르등으로 단단히 밀폐시켜야 하며, 균열이 많은 암

반에서는 파쇄효율이 급격히 떨어지는 특성을 지니고 있다.

일반 발파공법 (재래식)

발파설계를 위해서는 주변 상황을 파악하고 사전에 발파 영향권을 분석·예측하여 발파설계시 반영하여 설계

에 의한 계획적인 작업이 이루어져야 한다. 그러나 일반 발파공법은 발파설계 없이 현장의 몇몇 경험만을 위

주로 한 숙련공의 기량에 좌우되어 시행되고 있어, 소위 이론적이거나 학술적으로 우수한 기술자가 발파작업

에 깊이 관여하는 것이 드물어서, 발파공해에 대한 사전 예측과 분석이 불가능하기 때문에 민원 발생시 근거

자료 부족 및 대처능력이 거의 없다.

진동제어 발파공법

선진 외국에서 환경문제가 심각하게 사회 문제화되었던 1970년대초 현재의 국내 상황과 같이 도심지 발파문

제로 주민들과 건설업자들간에 분쟁이 계속되어 무진동 굴착공법을 개발하였으나, 이들 무진동 굴착공법이


대규모 굴착물량에 대해서는 한계가 있다는 사실을 인지하여 인근 주변에 피해를 주지 않고 굴착할 수 있는

발파공법을 개발하게 되었다. 이는 첨단 계측장비와 발파공법을 접합시켜 발파지역에 인접되어 있는 구조물

의 상태 및 현황을 파악하여 허용 진동치 이내로 발파하는 공법이다.


진동제어 발파공법은 매 발파마다 진동계측을 수행하여 분석과 수렴단계를 거치면서 현장 발파기술과 조합

시켜야 하므로, 이론과 경험이 풍부한 기술자가 현장관리를 해야 한다는 특성을 지니고 있으며, 주민들과의

분쟁시 발파공해에 대한 계측 결과치가 보존되어 있어 책임소재를 분명히 할 수 있는 특성을 지니고 있다.

- 20 -
제 2 장 공 사 계 획

암파쇄 공법 비교표(비발파법)

무진동 공법 미진동 공법
공법
비교
기계식 할암공법 비폭성 파쇄공법 프라즈마공법 미진동파쇄공법

유압시스템 석회계 산화칼슘 파암장비 미진동파쇄기


구성
확장장치 전력충격셀 점화구
요소
전해액 Pack

공법
팽창성 파쇄제를 물과 금속 화합물로된 충격셀을
개요 유압으로 작용하는 일반 화약이 아닌 미진동
혼합하여 천공된 홀 속에 고전압 대전류가
Element를 천공된 홀속에 제어 발파용 화약(미진동
삽입한 후 혼합물이 순간적으로 충격을 가하면
장착하여 유압의 힘으로 파쇄기)을 사용하여
팽창하여 생기는 힘으로 혼합된 금속화합물이
암반을 절개한 다음 순간적인 고열 및
암반을 절개한 다음 핵분열을 일으켜
Breaker 또는 Nipper로 가스팽창에 의한 균열
Breaker로 모암에서 팽창하면서 암반을 파쇄한
모암에서 절개된 암을 발생원리 이용하는 공법
절개된 암을 분리시키는 다음 Breaker로 모암에서
분리시키는 공법
공법 절개된 암을 분리시키는
공법

적용
연암, 보통암 연암, 보통암 연암, 보통암 연암, 보통암, 경암
암반

천공 천공 천공 천공
시공 ⇨ 할암봉삽입 ⇨ 파쇄제삽입 ⇨ 전해액삽입 ⇨ 미진동파쇄기 삽입
순서 ⇨ 암반절개 ⇨ 암반파쇄 ⇨ 암반파쇄 ⇨ 암반파쇄
⇨ 2차파쇄 ⇨ 2차파쇄 ⇨ 2차파쇄 ⇨ 2차파쇄

무진동, 무소음 (천공제외) 무진동, 무소음 (천공제외) 발파에 비하여 저진동, 공사비가 고가임
장점 민원발생소지 적음 민원발생소지 적음 저소음, 저공해 공법 Breaker / Nipper에 의한
허가가 필요없고 안전함 허가가 필요없음 허가가 필요없음 2차파쇄 필요

공사비가 고가임 2차 파쇄량 과다 고압의 전류사용으로 화약류 단속법상 화공품에


단점 Breaker / Nipper에 의한 양생문제로 인하여 우기 우천시 작업 불가 속하여 허가 필요
2차파쇄 필요 및 동절기 작업 불가 공발시 상당한 소음 발생 공발시 상당한 소음 발생

- 21 -
암파쇄 공법 비교표(발파법)

공법 일반발파 제어발파 미진동 공법


비교 노천 및 터널발파 쿠션발파 PS발파 NPS발파
구성 뇌관 뇌관 뇌관 뇌관
요소 폭약 폭약 폭약 폭약

천공홀 속에 소정의 폭약 PS발파와 발파원리는 동


주발파공을 먼저 발파한 본 발파에 선행하여 예정
을 장약하여 지발로 동시 일하나 분산장약(Deck
후에 주발파공에 비해 약 절취면 선상에 정밀 천공
에 발파하여 암반을 파쇄 Charge : 각층약포들이 각
장약된 최종열의 발파공을 한 소량의 폭약을 이용하
공법 하는 공법 기 다른 지연시차를 가지
발파하여 최종사면의 암반 여 먼저 발파하여 인위적
개요 고 폭발)으로 발파하여 인
손상을 최소화하는 발파법 인 파단면을 만들고 2차로
위적인 파단면을 형성함으
본 발파를 수행하는 공법
로써 발파진동을 감쇠 또
는 저감시키는 공법

적용 연암, 보통암, 경암, 연암, 보통암, 경암,


보통암, 경암, 극경암 보통암, 경암, 극경암
암반 극경암 극경암

천공 천공 천공 천공
⇨ 장약 ⇨ 장약 ⇨ 장약 ⇨ NPS 발파
시공
⇨ 발파공 발파 ⇨ 발파공 발파 ⇨ PS 발파 ⇨ 주발파공 발파
순서
⇨ 암반파쇄 ⇨ 암반파쇄 ⇨ 주발파공 발파 ⇨ 암반파쇄
⇨ 암반파쇄

소량의 분산장약과 전색, 소량의 분산장약과 전색, 지연시차를 가지고 폭발함


일일작업량 많음
공기에 의한 완충효과 활 공기에 의한 완충효과 활 으로 진동감소
공기단축
용 용 Deck Charge에 의한 폭발
공사비 저렴
모암의 균열 최소화 모암의 균열 최소화 압력의 순간저장효과
장점
절취면이 균일하고 미려 후방암반균열 최소화
무장약공 자유면 활용으로
진동감소 및 파쇄효과 증

공내층상장약에 의한 뇌관
발파허가필요 도심지(보안건물 인접지 PS발파공발파시 진동극심
수 증가
작업자 안전문제 역)에서 제발공수의 제한 정밀천공을 요함
일반발파에 비해 천공비증
단점 안전인원필요 으로 적용 불가 장약작업이 까다로움

진동,소음으로 민원발생 균열,절리많은 암반에서
균질한 암반에서 효과적
시공성저하

노천발파는 6개 타입으로 구분 (Type I. ~ VI.)

Type I. 미진동 굴착공법 Type IV. 진동제어발파(중규모)


Type II. 정밀진동 제어발파 Type V. 일반발파
Type III. 진동제어발파(소규모) Type VI. 대규모 발파

- 22 -
제 2 장 공 사 계 획

2.3.2 설계 발파진동 추정식


발파진동 추정식은 시험발파 등을 통하여 결정되는 것이나 설계단계에서 이러한 절차수행에는 현실적으로

적용하기에 무리가 있으므로, 효율적인 설계추진을 위하여 진동예측을 위한 설계단계에서의 발파진동 추정식

결정이 필요하다.
설계단계에서는 발파를 할 수 있는 진입로나 작업장 등이 마련되어 있지 않고 장비들도 확보되어 있지 않기

때문에 일반적으로 시험발파를 하기가 곤란하다. 따라서 보편적으로 적용할 수 있는 설계 발파진동 추정식을

B이용하여 설계를 하게 된다. 이 식은 설계자가 적절히 선택할 수도 있지만 표준화를 위하여 지침에서 직접

제시하고 있다.

설계단계에서 예비검토를 위한 설계 발파진동 추정식은 아래와 같다.


      



여기서, v : 진동속도 (cm/s)

D : 폭원으로부터 이격거리 (m)

W : 지발당 최대장약량 (kg)

이 추정식은 미광무국의 환산거리 진동 추정식 형태이며 여러 가지 추정식 중에서도 적합도가 높고 장약량

설계가 편리하여 일반적으로 사용되고 있다. 진동속도는 PPV(peak particle velocity) 성분으로서 단위는 cm/s

이다. 이격거리는 폭원과 수진점의 거리를 의미하며 지층 내의 다양한 경로를 통해 파가 전파되므로 추정식

에서는 폭원과 수진점을 잇는 최단거리를 의미한다. 지발당 최대장약량은 여러 가지 지발뇌관을 혼용하여 쓸

때 가장 많은 량의 폭약을 기폭하는 지발에서의 장약량을 의미한다. 순발 뇌관일 때는 같이 폭발되는 장약량


전체를 의미한다.

본 지침에서 제시한 상수는 국내 도로공사 현장의 실 계측자료로부터 구한 K=200, n=-1.60이다. 이 추정식

은 일반적인 환경에서 예비검토를 위한 추정식으로 사용하며 발파규모는「발파소음․진동․비석 영향권」분석에


의해 설정한다.

- 23 -
2.3.3 발파패턴에 따른 분류기준
거리~지발당 장약량 조견표 (단위: kg/delay)
진동속도
적용공법 0.1 ㎝/s 0.2 ㎝/s 0.3 ㎝/s 0.5 ㎝/s 1.0 ㎝/s 5.0 ㎝/s 적용공법
이격거리(m)
5 0.00 0.00 0.01 0.01 0.03 0.25 TYPE Ⅱ
10 0.01 0.02 0.03 0.06 0.13 0.99 TYPE Ⅲ
TYPE Ⅰ 15 0.02 0.04 0.07 0.13 0.30 2.24
TYPE Ⅳ
미진동 20 0.03 0.07 0.12 0.22 0.53 3.98
굴착공법 25 0.05 0.11 0.18 0.35 0.83 6.21 TYPE Ⅴ
30 0.07 0.16 0.27 0.50 1.20 8.95 일반발파
40 0.12 0.28 0.47 0.89 2.13 15.9
50 0.19 0.44 0.74 1.40 3.32 24.9
TYPE Ⅱ
60 0.27 0.64 1.06 2.01 4.79 35.8
정밀진동
70 0.37 0.87 1.45 2.74 6.51 48.7
제어발파
80 0.48 1.14 1.89 3.58 8.51 63.6
90 0.61 1.44 2.39 4.53 10.8 80.5
100 0.75 1.78 2.95 5.59 13.3 99.4
TYPE Ⅲ
110 0.90 2.15 3.57 6.76 16.1 120
소규모
120 1.08 2.56 4.25 8.05 19.1 143
진동제어
130 1.26 3.01 4.99 9.45 22.5 168
140 1.47 3.49 5.79 11.0 26.1 195
150 1.68 4.00 6.64 12.6 29.9 224
160 1.91 4.55 7.56 14.3 34.0 254
170 2.16 5.14 8.53 16.2 38.4 287 TYPE Ⅵ
180 2.42 5.76 9.56 18.1 43.1 322 대규모발파
TYPE Ⅳ 190 2.70 6.42 10.7 20.2 48.0 359
중규모 200 2.99 7.11 11.8 22.4 53.2 398
진동제어 210 3.30 7.84 13.0 24.7 58.6 438
220 3.62 8.61 14.3 27.1 64.4 481
230 3.96 9.41 15.6 29.6 70.3 526
240 4.31 10.2 17.0 32.2 76.6 573
250 4.67 11.1 18.4 34.9 83.1 621
260 5.05 12.0 20.0 37.8 89.9 672
270 5.45 13.0 21.5 40.8 96.9 725
TYPE Ⅴ
280 5.86 13.9 23.1 43.8 104 779
일반발파
290 6.29 15.0 24.8 47.0 112 836
300 6.73 16.0 26.6 50.3 120 895
TYPE Ⅵ 450 15.1 36.0 59.8 113 269 2013
1
0.06 미진동 굴착공법 0.25 정밀진동제어발파 1.00 소규모 진동제어발파

3.00 중규모진동제어발파 7.50 일반발파 20.0 대규모발파

【주】1. 위 발파공법별 적용거리 기준 및 지발당 장약량은 설계 발파진동 추정식   


   에 의하여 설정한
것으로, 발파 대상 현장의 암반특성 및 관리 대상 보안물건의 특성에 따라 증‧감될 수 있다.
2. 발파소음의 제어는 지반진동보다 훨씬 어려우므로 만약, 발파소음에 민감한 가축 사육시설 또는 요양원, 종교시설
등이 근접한 경우에는 별도 공법을 적용할 수 있다.
3. TYPE별 공법 설계는 상기기준에 맞게 하되 현장여건에 따라 조정할 수 있다.
4. 발파진동은 보안물건의 노후도나 상태, 암반상태, 진동주파수 등에 따라 달라지므로, 설계자 및 발파자는 보안물건
상태, 현장조건과 관련법규 등을 검토하여 발파진동 허용기준치를 설정하고 이에 대한 이격거리별 지발당장약량을
산정하여야 한다.

- 24 -
제2 장 공 사 계 획

표준발파공법별 분류기준
TYPE Ⅱ TYPE Ⅲ‧Ⅳ
TYPE Ⅰ TYPE Ⅴ TYPE Ⅵ
구 분 정밀진동 진동제어발파
미진동 굴착공법 일반발파 대규모 발파
제어발파 소규모 중규모
보안물건 주변에서 소량의 폭약으로 발파영향권 내에 보안물 1공당 최대 장약량 발파영향권 내에 보
TYPE Ⅱ 공법 이내 수 암반에 균열을 발 건이 존재하는 경우 “시험 이 발파 규제기준 안물건이 전혀 존재
준으로 진동을 저감 생시킨 후, 대형 발파” 결과에 의해 발파설 을 충족시킬 수 있 하지 않는 산간 오
공법개 시킬 수 있는 공법으 브레이커에 의한 계를 실시하여 규제기준 을 만큼 보안물건 지 등에서 발파효율
요 로서 대형 브레이커 2차 파쇄를 실시 을 준수할 수 있는 공법 과 이격된 영역에 만을 고려하는 공법
로 2차 파쇄를 실시 하는 공법 대해 적용하는 공
하는 공법 법

주 사용
최소단위미만폭약
폭 약 에멀젼 계열 주폭약:초유폭약
미진동파쇄기 에멀젼 계열 폭약 에멀젼 계열 폭약
또는 화 폭약 기폭약:에멀젼
공 품 미진동파쇄약 등
지발당
장약량 폭약기준 0.125 이상 0.5 이상 1.6 1.6 이상 5.0 5.0 이상
15.0 이상
범 위 0.125 미만 0.5 미만 미만 미만 15.0 미만
( k g )
천공직 ϕ51mm
ϕ51mm 이내 ϕ51mm 이내 ϕ76mm ϕ76mm ϕ76mm 이상
경 이내
천공장
공기압축기식 크롤러 드릴 또는 유압식 크롤러 드릴 선택 사용

표준패 정밀진동 진동제어발파


미진동 굴착공법 일반발파 대규모 발파
턴 제어발파 소규모 중규모
천공깊
이 (m) 1.5 2.0 2.7 3.4 5.7 8.7

최소저
항 선 0.7 0.7 1.0 1.6 2.0 2.8
(m)※
천공간
격 (m) 0.7 0.8 1.2 1.9 2.5 3.2

표준 지
발당 장
- 0.25 1.0 3.0 7.5 20.0
약 량
( k g )
파쇄 정 균열만 발생
파쇄 + 균열 파쇄 + 균열 파쇄 + 대괴 파쇄 + 대괴
도 (보통암 이하)
계측관
필수 필수 필수 선택 선택

발파보
필수 필수 필수 불필요 불필요
호 공
2차 파 대형브레이커
대형브레이커 적용 - - -
쇄 적용
※ 천공 깊이, 최소저항선, 천공간격 치수 등은 평균적으로 제시한 수치이며, 공사시행 전에는 시험발파에 따라 현장별로
검토․적용할 것.

- 25 -
표준발파공법 패턴별 특성
설계 지발당 발파제원※ 천공경 공당 파쇄량‡
Type 명칭 사용폭약
장약량 (kg) W×E×H(m) (mm) (m3/공)
폭약기준
Ⅰ 미진동 굴착공법 0.7×0.7×1.3 ϕ 51 이내 0.637
0.125 미만

에멀젼 폭약 등
Ⅱ 정밀 진동제어발파 0.25 0.7×0.8×1.8 ϕ 51 이내 1.01
(ϕ25~32mm)

소규모 〃
Ⅲ 1.0 1.0×1.2×2.4 ϕ 51 이내 2.88
진동제어발파 (ϕ32mm)

중규모 〃
Ⅳ 3.0 1.6×1.9×3.0 ϕ 76 9.12
진동제어발파 (ϕ50mm)


Ⅴ 일반발파 7.5 2.0×2.5×4.8 ϕ 76 24.0
(ϕ50mm)

주폭약 : ANFO
Ⅵ 대규모발파 20.0 2.8×3.2×7.3 ϕ 76 이상 65.4
기폭약 : 에멀젼

【주】※ W:최소저항선 E:공간간격 H:벤치고 ‡ 공당파쇄량은 평균값임.


1. 설계 지발당 장약량 기준은 설계 발파진동 추정식       에 의한 “거리~지발당 장약량” 조견표 기준임.
(진동상수 K = 200, n = -1.6, b = 1/2)
2. 발파대상 암반의 강도나 지형특성 등에 따라 설계지발당 장약량과 발파제원이 변동될 수 있음
3. 미진동파쇄기와 유압잭 및 브레이커 파쇄공법 등은 진동전파 특성에 따라 일반폭약과는 상이하므로 시험시공에
의해 지발당장약량과 천공패턴 등의 굴착방법을 설정할 것
4. 장소가 협소하거나 현장여건상 크롤러드릴의 사용이 곤란한 장소에서는 착암기를 사용한 발파공법을 적용할
수 있음.

표준발파공법 및 진동규제기준별 적용되는 이격거리(m) 단위 : cm/s

TYPE 발파공법 v=0.1 0.2 0.3 0.5 1.0 5.0

Ⅰ 미진동 굴착공법 40m까지 25m까지 20m까지 15m까지 5m까지 3m까지

Ⅱ 정밀 진동제어발파 40~80 25~50 20~40 15~30 5~20 3~7

Ⅲ 소규모 진동제어발파 80~140 50~90 40~70 30~50 20~30 7~10

Ⅳ 중규모 진동제어발파 140~260 90~170 70~130 50~90 30~60 10~25

Ⅴ 일반발파 260~450 170~290 130~220 90~160 60~110 25~40

Ⅵ 대규모발파 450m이상 290m이상 220m이상 160m이상 110m이상 40m이상

- 26 -
제2 장 공 사 계 획

2.3.4 시험발파 및 시공
시공회사는 설계도서를 검토하고 발파영향권내 보안물건 등을 조사하여 시험발파, 본 발파, 계측관리 계획을

수립하여 시행한다.

2.3.5 발파 전 사전 조사
발파영향권 검토를 위하여 발파현장에 대한 현황 조사와는 별도로 시공사에서는 민원방지를 위해 다음과 같

이 조치한다.

일반적으로 건축물이나 기타 시설물에 발생되는 균열은 지반침하, 습도의 변화 및 온도변화 등 여러 가지 요

인에 의해 자연적으로 발생되고 있다. 그러나 발파작업이 인근에서 진행될 때 추가로 발생되는 균열이 진동

으로 인한 피해인지의 여부를 판정하기에는 어려움이 있고, 많은 시간이 소요되며 민원 발생 시 공사 지연


등 막대한 피해가 예상된다.

따라서, 설명회 개최 등 주민들에 대한 홍보를 실시하고, 발파진동에 따른 피해 여부를 파악하기 위해 주민

들과 충분한 대화를 바탕으로 주민, 시설물소유자, 감독관 입회하에 사전조사를 실시한다.


발파 착수 전 주변 보안물건에 대해 건물현황과 균열상황을 파악하여 발파진동이 미칠 수 있는 현황을 조사

하고, 발파영향권 내에 있는 모든 시설물의 균열 상태를 카메라와 비디오로 촬영하여 추후 민원 발생 시 피

해여부를 판단할 수 있는 근거자료로 확보하는 것이 바람직하다.

조사 내용

가. 건물의 구조형태, 노후정도, 균열발달 상태

나. 대표적 균열상태의 정량적 측정

다. 건물의 지반상태

라. 건물의 시설물 현황 등

마. 가축의 현황 및 축종 파악

조사 방법

가. 발파영향권 내에 있는 주변 보안물건에 대해 건물현황과 균열 발달 상태 및 측정 결과치를 비디오와 카

메라로 촬영하여 차후 민원 발생 시 피해여부를 판단할 수 있는 증거자료로 활용한다.


나. 조사 시 날짜 등을 명시하기 위해 날짜가 기록된 간행물과 조사지역 현장에 시계와 달력 및 TV, 라디오

를 켜서 비디오에 삽입시킨다.

2.3.6 시험발파

시험발파는 현장조건 및 암반특성에 따라 발파횟수와 시험발파 장소를 정하여 시행한다.

시험발파의 목적

실시설계한 발파공법을 적용하여 현장의 지반조건 및 지형적 특성에 맞는 현장 발파진동 추정식을 산출하는

데 목적이 있으며, 이를 근거로 이격거리별 지발당 허용장약량을 산출하여 발파공법 적용구간 설정 및 발파


패턴을 설계하는 자료로 활용한다.

- 27 -
시험발파 세부 절차

․ 주변 환경을 고려한 허용기준 검토


시험발파계획수립
․ 설계 발파진동 추정식을 이용한 발파영향권 검토
․ 설계발파패턴 검토

․ 가급적 주변 보안물건에 근접하나, 보안물건에 피해


시험발파 및 계측
없는 안전한 곳에서 실시
․ 가능한 한 설계패턴에 가까운 천공, 장약 실시
․ 신뢰성 있는 분석을 위해 30 점 이상의 계측자료
확보

․ 도면 또는 전산프로그램을 이용하여 회귀분석 실시


자료처리
․ 현장특성에 맞는 발파진동 추정식 산출
․ 거리 및 장약량 변화에 따른 감쇠지수 파악
․ 이격거리별 지발당 허용장약량 산출

․ 주변환경을 고려한 허용기준 검토


영향평가
․ 발파영향권 검토

․ 지발당 허용장약량에 따른 발파공법 선정


발파공법 선정
․ 발파공해 허용기준 이내의 발파공법 적용성 검토

․ 선정된 발파공법에 적합한 폭약 및 지발당 장약량


발파설계
결정
․ 사용뇌관의 종류 및 기폭방법 검토
․ 이격거리별 발파공해 허용기준을 고려하여 발파패
턴 설계
․ 설계된 발파패턴의 안전성 검토 후 적용
․ 발파공사 특별시방서 작성

․ 보안물건과의 이격거리별 설계패턴 적용


공사실시
․ 설계패턴별 장약량 등 천공패턴 준수
․ 발파작업과 병행하여 발파계측 실시

시험발파 방법

시험발파는 발파공사에 대한 중요도 및 위험요인을 감안하여 엔지니어링기술진흥법에 의한 용역업체(화약류

관리) 또는 기술사법에 의한 화약류관리 기술사사무소 등 발파전문기관에 의뢰하여 실시하고, 발파진동과 발

파소음에 대한 계측결과는 화약류관리 전문기술자에 의해 검토와 검증절차를 거쳐 객관적인 자료를 유지한

다.

- 28 -
제2 장 공 사 계 획

시험발파 설계패턴이 자료와 경험에 의한 추정으로 설계되기 때문에 시험발파 위치는 가급적 보안물건과 근

접된 지점을 선택하되 위험을 피하기 위하여 각종 시설물에 피해가 미치지 않는 범위 내에서 가능한 한 실
시설계에 가까운 규모로 한다.

또한, 시험발파 시 신뢰성을 확보하기 위해 공사관계자(발주청, 시공회사, 감리단), 관할 경찰관과 발파영향권

내 시설물 소유자 또는 주민 입회하에 합동으로 실시함을 원칙으로 한다.


발파진동의 크기는 궁극적으로 발파조건에 좌우되며, 발파조건의 주요 요소로는 다음과 같다.

가. 사용 화약류의 종류 및 특성

나. 지발당 장약량

다. 기폭 방법 및 뇌관의 종류

라. 폭원과 보안물건(측점)과의 거리

마. 전색상태와 장전밀도
바. 자유면의 수

사. 전파경로와 지반상태(지형, 암질, 지하수상태)

발파진동을 예측할 수 있는 일반적인 발파진동공식은 다음과 같이 사용된다.

D n
  K  
Wb
여기서,  : 진동속도 (cm/s)

D : 폭원으로부터의 거리 (m)

W : 지발당 장약량 (kg)

K : 발파진동 상수
b : 장약지수

n : 감쇠지수

이 식에서 K, n 은 정량적으로 평가할 수 없는 인자에 의한 영향을 대표하는 값으로서 지질조건, 발파방법,

화약류의 종류에 따라 변화되므로, 시험발파에 의한 계측결과를 분석하여 그 현장에 적합한 발파진동 추정식

을 구하는 것이다.

지발당 장약량을 고정시키고 계측점을 달리하여 측정함으로써 거리에 따른 감쇠지수를 파악한다. 즉, 계측기

5대 이상을 일정한 건축물이나 시설물에 대해 일직선상으로 거리를 달리하여 설치하고, 30 측점 이상의 계

측 결과치를 얻어 분석을 실시한다.

또한, 거리를 고정시키고 지발당 장약량을 달리하여 측정함으로써 장약량 변화에 따른 발파진동상수와 장약

지수 등을 파악하도록 한다.

암발파의 경우는 발파진동 지속시간과 발파 소음의 전파성향을 파악하기 위하여, 동시발파 공수(보통 5~20

공 정도)를 달리하고 뇌관의 기폭단차도 달리하여 실시한다. 이는 지속시간에 따른 인체의 반응이 현저하게

다르게 나타나므로, 이에 따른 분석으로 각종 민원을 예방하기 위함이다.

- 29 -
진동측정 방법

가. 측정방법

측정은 원칙적으로 수직방향(V, vertical)과 상호간 직교하는 수평의 2방향 즉 진행방향(L, longitudinal)과 접

선방향(T, transverse)에 대한 3성분을 동시에 측정한다.

거리에 따른 진동감쇠를 측정하고 싶은 경우에는 넓은 범위의 환산거리를 고려하여 최상의 감쇠 관계를 구

하기 위해 적어도 5개 이상의 측정점에 대해 동시계측을 실시한다. 거리에 따른 감쇠 곡선은 대수 그래프에


작성하는 일이 많기 때문에 대수 그래프 상에서 등 간격이 되는 위치에 측정점을 선택하면 편리하지만, 때로

는 측정지형에 따라 적절하게 운용한다.

또한 최상의 감쇠 관계를 구하기 위해서는 지질상황이 일정한 지역에 측선을 설정하여 장비를 배치한다. 이

상적으로는 토층의 두께가 일정한 지역에 측선을 설정하는 것이 바람직하며, 단층과 같은 큰 구조의 지질적

불연속면을 가로지르는 것을 피한다.

구조물의 진동을 측정할 경우에는 구조물과 동시에 지반 위의 진동을 측정해두고, 지반에 대한 진동배율을

구할 수 있도록 하는 것이 바람직하다.

나. 센서의 설치

센서와 지반운동이 같이 거동할 수 있도록 지반 위나 구조물상에 센서를 견고하게 고정시킨다. 단단한 지반

에서는 센서에 부착된 스파이크(spike)를 이용하여 지반에 견고하게 설치한다.

또한 진동수준이 높지 않은 곳에서 센서의 스파이크가 지반에 삽입되지 않을 경우에는 모래주머니를 이용하

여 센서를 완전히 고르게 덮어주어 하중을 가해 줌으로써 지반과 같이 움직이도록 해준다.

센서의 설치 방향은 센서에 표시된 방향표시와 발파원의 방향이 항상 일치하도록 설치하고, 발파원의 장소가

다른 여러 발파의 경우는 센서의 방향과 일치하지 않기 때문에 그 상황을 기록해둔다.

시험발파 결과분석

가. 분석방법


측정된 결과치를 거리별, 장약량별로 정리한 후 식(1)에서 변수 b를 1/2과 1/3로 취하고,  를 SD

(환산거리, scaled distance)라 하면 다음과 같이 표현된다.

    
측정된 진동값에 대한 회귀분석(regression analysis)을 실시하기 위해 대수눈금 그래프에 나타내면, 직선

관계가 성립되어 K값과 n값이 최종적으로 결정되며, 당 현장에 적합한 발파진동 추정식을 얻게 된다.

이에 대한 결과치가 많으면 수계산이 복잡해지므로 도표를 작성하거나, 정확도를 높이기 위해 회귀분석


전산프로그램을 이용한다. 발파진동 추정식은 최대치(PPV) 자료의 95%를 추세선 아래에 위치하게 하는

95 % 수준의 발파진동 추정식을 구한다.

나. 시험발파에 대한 결과 분석내용
․발파진동 및 발파소음에 대한 회귀분석

- 30 -
제2 장 공 사 계 획

․발파진동 및 발파소음 전파 추정식 산출

․발파진동 및 발파소음 허용기준치 적합성 여부


․거리별 지발당 허용장약량 제시

․공당장약량 및 시험발파 패턴의 적합성 여부

․발파공해(발파소음, 진동 등)에 대한 저감대책


다. 발파진동 추정식의 설정을 위해서는 통계적 의미가 있는 수의 측정 자료가 필요하며, 적어도 30점 이상

의 자료를 측정하여 신뢰도를 높인다.

라. 계측결과 추정식의 상관계수가 0.70에 미치지 못하는 경우에는 시험발파를 다시 실시하여야 한다.

분석결과 검토 및 적용

가. 시험발파 결과분석에 의해 발파진동 추정식을 얻게 되면 시험발파에 따른 발파설계 패턴의 적합성을 판

단하고, 주변 건축물이나 시설물에 미치는 피해 영향 등을 검토하여 현장에 맞는 지발당 허용장약량을

구한다.

나. 지발당 허용장약량을 기준으로 장비 및 작업효율 등을 감안하여 천공장, 천공경, 천공간격, 저항선 등 발

파패턴을 설계한다.

다. 발파이론과 경험에 입각해 발파공해 저감대책 및 발파작업시 제기된 문제점을 검토하여 현장에 가장 적

합한 발파계획을 수립한다.

시험발파 보고서 수록내용

가. 개요

나. 시험발파의 목적

다. 시험발파 위치도 및 주변현황

라. 발파원 지역의 지질현황

마. 발파진동․소음 허용기준치 검토․설정

바. 시험발파 조건 및 방법
사. 발파진동․소음 측정방법 및 결과

아. 발파진동 추정식 도출

자. 지발당 허용장약량 결정

차. 발파패턴 설계

카. 발파공해 저감대책 등

시험발파 단계별 업무 분장

가. 감리단은 시공사에서 선정한 시험발파업체에 대하여 업무수행능력 등을 검토하여 적합여부를 판단한다.

- 31 -
단계별 발주청 시공 회사 감리단 시험발파자 비 고

시험발파비용 반영(공사비) ○ <설계단계>


시험발파업체 선정 ○
<시공단계>
․시험발파업체 선정자료
시험발파업체 승인 요청
○ △ ○ ․시험발파 계획서
(시공회사 → 감리단, 발주청)
․비상주 감리원 및 책임 감리원
의견서

시험발파업체 승인
○ △
(발주청 → 감리단, 시공회사)

시험발파 계약․시행 ○ ○
시 험 발 파 감 리 ○ ․발주청 입회
시험발파 결과분석
○ △ ○
및 보 고 서 작 성

시험발파 결과 승인요청 ․비상주감리원 및 책임 감리원


○ △ ○
(시공회사 → 감리단, 발주청) 의견서

시험발파결과 승인
○ △
(발주청→ 감리단 시공회사)
※○전담자, △보조자
※비상주감리원은 토질 및 기초기술사 또는 화약류관리 기술사
※시험발파업체 선정자료 :
․ 업태조서(책임기술자경력, 사업수행실적, 계측장비 등 보유현황)
․ 시험발파 수행계획서

2.3.7 시공 및 계측 관리
시공 및 계측관리는 시공회사의 책임 하에 시행하며 매 발파 시 계측을 실시하여 발파에 따른 주변 보안물

건에 대한 피해 영향을 파악하고, 계측치를 분석하여 안전한 발파 작업을 시행하여야 한다.


실제 발파작업이 진행됨에 따라 암반의 지질적 특성 및 발파조건이 현장상황에 따라 변할 수 있으므로, 시험

발파에 의해 설정된 발파진동 추정식을 계측 및 분석을 실시하여 필요한 경우 현지에 맞도록 발파방법을 변

경 시행하고, 공사비의 증감이 발생할 경우에는 사전에 발주청의 승인을 받도록 한다. 발주청은 발파 결과를
추후 정산 처리하고 계측관리에 필요한 분석비용 등을 설계에 반영한다.

발주기관의 장은 공사감독 또는 감리원이 이 지침에 따라 발파업무의 감독․감리 등 필요한 조치를 취하게

할 수 있다.

2.3.8 자료 수집
발주청은 시험발파 및 발파설계자료, 시공 시 계측 및 분석자료, 발파에 영향을 미치는 제 요인 계측자료 등

을 보관(CD-ROM, 보고서 등)하여 추후 발파진동식 정립이나 동 지침 등 개정작업에 활용토록 한다.

- 32 -
3
가시설 구조계산서
4

3.1 설계기준
3.2 지반정수의 토질정수 산정
3.3 계획도면 및 해석방법
3.4 설계하중
3.5 각 단면별 검토결과
3.6 임시비탈면 안정성 검토
제 3 장 가 시 설 구 조 계 산 서

3.1 설계기준
3.1.1 검토방향
굴착 및 흙막이 공법의 선정은 지반조건, 지하수위, 굴착규모와 깊이, 벽체의 강성, 선행 긴장력 등의 시공기

술에 따라 크게 좌우될 뿐만 아니라, 공사기간, 공사비, 시공성, 안전성 및 주변시설물의 간섭 등 모든 제반

사항을 검토하여 적정한 설계 및 시공방법을 선정․실시하여야 한다.

3.1.2 부재 설계법
가시설 구조물의 설계는 허용응력 설계법을 적용함을 원칙으로 한다.

3.1.3 하 중

토 압
설계토압은 Rankine의 주동토압을 적용한다.

Pa = (q + γ․h) tan²(45°-Φ/2) - 2․C․tan(45°-Φ/2)

Pp = (q + γ․h) tan²(45°+Φ/2) + 2․C․tan(45°+Φ/2)

상재하중
가시설 배면부가 대부분 건물 등의 밀집 지역이므로 최소 작업차량 등의 작업하중으로 등분포하중 (q =

13.0 kN/m2)을 적용하였다.

수 압
흙막이 벽체에 작용하는 수압은 삼각형 분포로 한다.

수압을 삼각형분포로 한 것은 다음 그림과 같이 흙막이 벽체 선단에 굴착측의 수압과 원지반측의 수압이 같

다는 가정에서 흙막이 벽체에 작용하는 수압 △ABC에서 △OEB를 뺀 ABD로 한다.


수압 분포도

강널말뚝
설계수위
A

굴착저면 O D
평형깊이

C
E B
굴착측 원지반측

- 34 -
제3 장 가 시 설 구 조 계 산 서

토 압
토압의 산정은 토류벽의 종류, 지반조건 등에 따라 다양한 제안식이 있으나, 점토층과 모래층이 혼재되

어 있을 경우이므로, 토압적용의 용이성 등을 고려하여 Rankine 토압을 기본적으로 사용한다.

Rankine 토압 Terzaghi-Peck의 수정토압

3.1.4 적용 안전율

조건 기준 안전율 비 고

흙막이 벽체 근입 깊이 1.2 수동 및 주동토압에 의한 모멘트 비

가설 앙카 1.5 2년 미만
지반 앵커
영구 앙카 2.5 2년 이상

가설
1.5
(단기)
사질토 대상
보일링
굴착저부의 단기는 굴착시점을 기준으로 2년 미만임
영구
안전 2.0
(장기)

히빙 1.5 점성토

∙굴착저면 안전은 최소 근입깊이의 확보여부와 히빙 및 파이핑의 발생가능성에 대하여 검토를 수행함


∙굴착저면 또는 흙막이 벽체가 근입된 지층이 풍화암 이상의 단단한 지반으로 구성되어 있는 경우에는 히빙

과 보일링에 대한 검토를 생략할 수 있음

∙벽체의 근입깊이는 안전성 검토시 안전율은 1.2 이상이 되어야 하며 히빙이나 파이핑에 대하여도 안전한 깊
이로 설치하여야 함.

- 35 -
3.1.5 재료의 허용응력

강재의 허용응력 증가계수

영구구조물의 경우
가시설 구조물의 경우
시공도중 완료후

1.50 1.25 1.00

강재의 허용응력(일반 구조용 압연강재)


당 현장 흙막이구조물에 적용한 흙막이 버팀보 부재의 강재는 SS275을 사용하였으며, SS275의 허용응력은
   에 해당되나 표 5.2와 같이 가설구조물에 대해서는 허용응력값의 1.5배를 할증 가능한 것으

로 가설흙막이 설계기준(국토교통부 KDS 213000, 2020)에 명시되어 있다.

종 류 SS275, SM275, SHP275(W) SM355, SHP355W 비고

160×1.5=240
축방향인장(순단면) 240 315
210×1.5=315
 
 ≤  일 경우  ≤  일 경우
 
240 315
 
   ≤  일 경우    ≤  일 경우
 
  l(㎝):유효좌굴장
축방향인장(총단면)            
   (㎝):단면2차반경
 
   일 경우    일 경우
 
     
  
    
   
    

     
인장면(순단면) 240 315
휨  
 ≤    ≤  
  l:플랜지의 고정점
응 압축면 간 거리
l 
(총단면)  <  ≦     ≤   :압축플랜지 폭
 
력 l

     
  
     

90×1.5 = 135
전단응력(총단면) 135 180
120×1.5 = 180

지압응력 360 465 강관과 강판

공장 모재의 100% 모재의 100%


용접강도
현장 모재의 90% 모재의 90%
주) 1) 엄지말뚝으로 H형강을 사용할 경우에는 KS F 4603(SHP)의 적합한 제품을 사용한다(참조. KCS 21 30 00).
2) 그 외 강재의 허용응력기준은 강교설계기준(허용응력설계법)을 참조한다(KDS 24 14 30, 2019).

- 36 -
제 3장 가 시 설 구 조 계 산 서

목재의 허용응력도

허용응력(MPa)
목재의 종류
휨 압축 전단
소나무,해송,낙엽송,노송나무,
9 8 0.7
솔송나무,미송
침엽수
삼나무,가문비나무,
7 6 0.5
미삼나무,전나무
참나무 13 9 1.4
활엽수 밤나무, 느티나무,
10 7 1.0
졸참나무, 너도밤나무

   : 지주길이(지주의 구속점 사이의 길이 가


목재의  ≤  인경우      
 운데 최대의 길이) (㎜)
섬유방향의
 : 지주의 최소단면 2차반지름(㎜)
허용
 
   : 허용 압축응력(MPa)
좌굴응력  > 인 경우
  
  : 허용 좌굴응력(MPa)

가설흙막이 설계기준(국토교통부 KDS 213000, 2020)

목재의 허용응력도 (단위 : MPa)

목재의 종류
침엽수 활엽수
허용응력 종류
인장응력도 섬유에 평행 16 20
휨응력도 〃 18 22
〃 16 22
지압응력도
섬유에 직각 4.0 7.0
섬유에 평행 1.6 2.4
전단응력도
섬유에 직각 2.4 3.6
 
 ≤   ≤ 
섬유에 평행  
 
         
축방향  
압축응력도  
 >  >
〃  
 
     
 

[구조물기초설계기준 해설(2018)]

- 37 -
3.2 지반의 토질정수 산정
3.2.1 기본방향
◦ 흙이 다른 구축자재, 예컨대 강철이나 콘크리트와 근본적으로 구별되는 것은 이것이 불연속체(Discrete

Material)라는 사실임. 즉, 흙 입자 그 자체는 고체이지만 강철과 같은 결정체와는 달리 이들이 강하게 부

착되어 있지 않음.
◦ 따라서 흙 입자는 쉽게 분리될 수 있으며, 외력을 받았을 때에는 입자 상호간의 변위가 쉽게 일어남. 이

러한 관점에서 보면 흙은 암반과 구별되며, 전자는 광물입자들이 자연적으로 결합되어 있으나 쉽게 분리

할 수 있는 반면, 후자는 이들이 거의 영속적인 결합력에 의하여 강하게 부착되어 있음.


◦ 그러나 실제에 있어서는 흙과 암반은 구별이 분명하지 못할 때가 많아 예를 들면 풍화과정 중에 있는 암

반은 광물입자의 결합력이 대단히 약화되어 있으며, 어떤 흙은 거의 암반에 비견할 수 있을 정도로 고결

되어 있는 경우도 있음.
◦ 흙이 불연속체라는 사실은 토질역학이 고체역학이나 유체역학과 근본적으로 차이를 보이는 중요한 특징임.

불연속체인 흙입자 사이에는 공기와 물이 있을 수 있기 때문에 흙은 본질적으로 삼상이며, 흙에 하중이 가

해졌을 때에는 이러한 물질의 상호작용 때문에 하나의 균질한 물질로 되어 있는 경우와는 달리, 힘의 전달
이나 변위가 단순하지 않다. 대단히 가는 입자를 가진 흙은 입자 상호간에 전기력이 작용하기도 함.

◦ 따라서 이러한 흙을 평가하는데는 하기와 같은 제한성이 따를 수밖에 없음.

1) 흙은 탄성을 보이지 않음.

2) 흙의 거동은 압력에 의존할 뿐만 아니라 시간과 환경(Environment)에도 의존함.

3) 흙은 본질적으로 위치마다 그 성질을 달리함.

4) 땅속에서 시료를 채취할 때, 정도의 차이는 있지만 흙은 교란(Disturbance)되며 대부분의 흙의 거동

은 이러한 교란에 민감하며, 시험실에서 얻은 흙시료의 측정값과 현장에서의 측정값은 다를 수 있음.

(정인준, 김상규 저 토질역학 참조)

건설 기술자들이 접하게 되는 지반은 토질과 암석으로 구성되어 있다고 할 수 있지만 실은 이 중간단계에서

의 구분이 명확치 않아 암반이 풍화과정에 있을 때와 토질이 경화되어 가는 도중에는 구별이 어려움. 지각에

서 암석은 풍화되어 토질로 되고 이것이 다시 경화되어 암석이 되는 윤회과정을 거치게 되므로 어떤 지질학

자는 지질학적인 관점에서 이 두 물질을 구태여 구분하지 않는 경우도 있음.


물론 건설 기술자의 입장에서 볼 때는 토질과 암반의 중간단계에 있으므로 구분은 매우 어려우며 현장 암석

을 구태여 “암반(Rock Mass)”으로 구분하여 사용하는 것은 자연상태의 암층에서는 불연속면이 많이 발달되

어 있으므로 불연속면이 전혀 없는 온전한 암석(Intact Rock)과는 구분되어야 하고 이것이 암석 역학 분야에


서 다루어야 하는 가장 중요한 요소가 됨.

- 38 -
제 3 장 가 시 설 구 조 계 산 서

3.2.2 지반정수 산정시 참고자료


1) 흙의 단위체적 중량 - 일반토성(1)

흙의 단위체적 중량

종류 단위체적중량 (kN/m3) - (지하수위 이상) 분류기호

자갈섞인 모래 다진것 20 GW,GP

쌓 입도가 좋은 것 20
모래 다진것 GW,SP
입도가 나쁜 것 19
기 사질토 다 진 것 19 SM,SC

점성토 다 진 것 18 ML,CL,MH,CH

치밀한 것 또는 입도가 좋은 것 20
자 갈 GW,GP
치밀하지 않은 것 또는 입도가 나쁜 것 18

치밀한 것 21
자갈섞인 모래 GW,GP
치밀하지 않은 것 19

치밀한 것 또는 입도가 나쁜 것 20
자 모 래 SW,SP
치밀하지 않은 것 또는 입도가 나쁜 것 18

연 치밀한 것 19
사질토 SM,SC
치밀하지 않은 것 17

굳은것(손가락으로 강하게 눌러 조금 들어감) 18

반 점성토 약간 무른것(손가락 중간정도의 힘으로 들어감) 17 ML,CL

무른것(손가락이 쉽게 들어감) 16

굳은것(손가락으로 강하게 눌러 조금 들어감) 17

점토 및 실트 약간 무른것(손가락 중간정도의 힘으로 들어감) 16 CH,MH,ML

무른것(손가락이 쉽게 들어감) 14
1) 지하수위 이하에 있는 흙의 단위체적중량은 각각의 표의 값에서 1.0을 뺀 값으로 함.
2) 쇄석은 자갈과 같은 값으로 함.
비 3) Tunnel 버럭이나 암괴 등은 입경이나 간극에 비해 다르기 때문에 과거의 실적이나 현장실험에 의해서
결정함.
4) 입도가 나쁜 모래란 입경이 가지런한 모래를 말하며, 자갈의 경우도 같음.
고 5) 점성토 점토 및 Silt의 구분에서 N치의 추정은 대체로 다음의 범위임.
사질의 (N=8-15), 약간 연질의 것(N=4-8), 연질의 것(N=2-4)
6) 적요에 표시한 통일분류기호는 거의 추정한 것임.
(도로설계 요령 (신판) 제 1 집, P.28,1991.1)

- 39 -
2) 단위중량, 내부마찰각 - 일반토성(2)

단위중량, 내부마찰각

단위중량 수중단위중량 내부마찰각 수중내부마찰각


종별 상 태
(kN/㎥) (kN/㎥) ø( °) ø( °)

쇄석 - 16(1)-19 10-13 35-45° 35°

자갈 - 19-20(2) 10-12 30-40° 30°

단단한것 17-20 10 35-40° 30-35°


(3)
모래 약간 무른 것 16-19 9 30-35° 25-30°
무른것 15-18 8 25-30° 20-25°

굳은것 17-19 10 25-35° 20-30°


보통흙(4) 약간 굳은것 16-18 8-10 30-35° 15-25°
부드러운것 15(5)-17 6-9 15-25° 10-20°

굳은것 16-19 6-9 20-30° 10-20°


점 토(6) 약간 굳은 것 15-18 5-8 10-20° 0-10°
부드러운것 14-17 4-7 0-10° 0°

딱딱한 것 16-18 10 10-20° 5-15°


실 트(7)
부드러운것 14(8)-17 5-7 0° 0°

(참고문헌 : ‘도해 토목건축 가설구조물의 해석’ P.231)


[주] (1),(5)는 석회암 또는 사암계의 단위중량이 적은 것
(2)의 2.0은 깬 자갈이고 밀실한 것
(3)의 모래는 부드러운 세사, silt질 세사 등 불안정한 것 외의 것을 말함
(4)의 보통 흙에는 사질 loam, loam, 사질점토 loam을 포함함.
(5)의 1.5는 관동 loam 기타의 중량이 적은 것.
(6)의 점토에는 점토, loam, silt 질 점토를 포함함.
(7)의 silt에는 silt loam, silt를 함유함
(8)의 1.4는 silt의 진흙모양의 것

- 40 -
제 3
장 가 시 설 구 조 계 산 서

3) 일본 도로 토공지침

점성토에는 점착력과 N치의 관계에 대해 일본 도로 토공지침 가설구조물의 조항에서 다음과 같이 표시


하고 있음.

점성토의 N치와 점착력과의 관계

구분 Very soft soft Medium Stiff Very stiff Hard

N 2 이상 2-4 4-8 8-15 15-30 30 이상

C (kN/㎡) 12 이하 12-25 25-50 50-100 100-200 200 이상


(참고문헌 : N치를 이용한 기초, 토류의 설계 계산법과 실례)

4) 일반토사의 단위중량 - 일반토성-(3)

다음의 Table은 여러 가지 흙의 간극비, 간극률 및 단위중량의 대표치는 나타냄.

간극비, 간극률, 단위중량

간극률 간극비 단 위 중 량  (tf/㎥)


흙의 종류 흙의 상태
n (%) e 건 조 ( ) 전 체 ( ) 포 화 ( )

모래질 느슨 38-42 0.61-0.72 1.4-1.7 1.8-2.0 1.9-2.1


자 갈 촘촘 18-25 0.22-0.33 1.9-2.1 2.0-2.3 2.1-2.4

거친 모래 느슨 40-45 0.67-0.82 1.3-1.5 1.6-1.9 1.8-1.9


중간모래 촘촘 25-32 0.33-0.47 1.7-1.8 1.8-2.1 2.0-2.1

균등한 느슨 45-48 0.82-0.92 1.4-1.5 1.5-1.9 1.8-1.9


가는 모래 촘촘 33-36 0.49-0.56 1.7-1.8 1.8-2.1 2.0-2.1

느슨 45-55 0.82-1.22 1.3-1.5 1.5-1.9 1.8-1.9


거친 실트
촘촘 35-40 0.54-0.67 1.6-1.7 1.7-2.1 2.0-2.1

연약 45-50 0.82-1.00 1.3-1.5 1.6-2.0 1.8-2.0

실 트 중간 35-40 0.54-0.67 1.6-1.7 1.7-2.1 2.0-2.1

견고 30-35 0.43-0.49 1.8-1.9 1.8-1.9 1.8-2.2

연약 50-55 1.00-1.22 1.3-1.4 1.5-1.8 1.8-2.0


소성이
중간 35-45 0.54-0.82 1.5-1.8 1.7-2.1 1.9-2.1
작은 점토
견고 30-35 0.43-0.54 1.8-1.9 1.8-2.2 2.1-2.2

연약 60-70 1.50-2.30 0.9-1.5 1.2-1.8 1.4-1.8


소성이
중간 40-55 0.67-1.22 1.5-1.8 1.5-2.0 1.7-2.1
큰 점토
견고 30-40 0.43-0.67 1.8-2.0 1.7-2.2 1.9-2.3
(참고문헌 : ‘토질역학’ 1999. P16)

- 41 -
5) Peck-Meyerhof (1956)의 제안

상대밀도, 내부마찰각

내부마찰각 ø( °)
상대밀도 (Dr)
N- 값
Relative Density
Peck Meyerhof

0 - 4 Very Loose 0.0 - 0.2 < 28.5 < 30

4 - 10 Loose 0.2 - 0.4 28.5 - 30 30 - 35

10 - 30 Medium 0.4 - 0.6 30 - 36 35 - 40

30 - 50 Dense 0.6 - 0.8 36 - 41 40 - 45

50 < Very Dense 0.8 - 1.0 41 < 45 <

① Peck :      

② Meyerhof :       

6) Dunham (1954)의 제안

Dunham은 Terzaghi-Peck의 연구결과를 정리하여 다음과 같은 근의 식을 유도하였음.

ⓐ 입자가 둥글고 입도 분포가 균일한 모래   


   

ⓑ 입자가 둥글고 입도 분포가 좋은 모래   


   
ⓒ 입자가 모나고 입도 분포가 균일한 모래   
   

ⓓ 입자가 모나고 입도 분포가 좋은 모래   


   

7) O,saki 제안

N-값을 이용하여 내부마찰각을 산출하는 방법을 다음과 같이 제안함.

  
  

8) Peck(1956)의 제안

     

9) Meyerhof(1956)의 제안

Meyerhof는 모래 입경이 균일하면 작은 값을 취하고, 입도가 양호하면 큰 값을 취하도록 하였으며, 실


트질 점토에서는 0∼5의 작은 값을 취하도록 하였다.


        ≤  ≤  

- 42 -
제 3 장 가 시 설 구 조 계 산 서

10) 모래의 내부마찰각과 N 치와의 관계

모래의 내부마찰각과 N치와의 관계

구 분 Dunham Peck O.Saki HUKUOKA


N 
    
    
        
    Kh
1 18.46 23.46 28.46 27.30 19.47 691
2 19.90 24.90 29.90 27.60 21.32 916
3 21.00 26.00 31.00 27.90 22.75 1079
4 21.93 26.93 31.93 28.20 23.94 1213
5 22.75 27.75 32.75 28.50 25.00 1328
6 23.49 28.49 33.49 28.80 25.95 1430
7 24.17 29.17 34.17 29.10 26.83 1523
8 24.80 29.80 34.80 29.40 27.65 1607
9 25.39 30.39 35.59 29.70 28.42 1686
10 25.95 30.95 35.95 30.00 29.14 1760
11 26.49 31.49 36.49 30.30 29.83 1829
12 27.00 32.00 37.00 30.60 30.49 1895
13 27.49 32.49 37.49 30.90 31.12 1958
14 27.96 32.96 37.96 31.20 31.73 2017
15 28.42 33.42 38.42 31.50 32.32 2075
16 28.86 33.86 38.86 31.80 32.89 2130
17 29.28 34.28 39.28 32.10 33.44 2183
18 29.70 34.70 39.70 32.40 33.97 2234
19 30.10 35.10 40.10 32.70 34.49 2284
20 30.49 35.49 40.49 33.00 35.00 2332
21 30.87 35.87 40.87 33.30 35.49 2378
22 31.25 36.25 41.25 33.60 35.98 2424
23 31.61 36.61 41.61 33.90 36.45 2468
24 31.97 36.97 41.97 34.20 36.91 2511
25 32.32 37.32 42.32 34.50 37.36 2553
26 32.66 37.66 42.66 34.80 37.80 2594
27 33.00 38.00 43.00 35.10 38.24 2634
28 33.33 38.33 43.33 35.40 38.66 2673
29 33.65 38.65 43.65 35.70 39.08 2712
30 33.97 38.97 43.97 36.00 39.49 2749
31 34.29 39.29 44.29 36.30 39.90 2786
32 34.60 39.60 44.60 36.60 40.30 2822
33 34.90 39.90 44.90 36.90 40.69 2858
34 35.20 40.20 45.20 37.20 41.08 2892
35 35.49 40.49 45.49 37.50 41.46 2927
36 35.78 40.78 45.78 37.80 41.83 2960
37 36.07 41.07 46.07 38.10 42.20 2993
38 36.35 41.35 46.35 38.40 42.57 3026
39 36.63 41.63 46.63 38.70 42.93 3058
40 36.91 41.91 46.91 39.00 43.28 3090
41 37.18 42.18 47.18 39.30 43.64 3121
42 37.45 42.45 47.45 39.60 43.98 3151
43 37.72 42.72 47.72 39.90 44.33 3182
44 37.98 42.98 47.98 40.20 44.66 3212
45 38.24 43.24 48.24 40.50 45.00 3241
46 38.49 43.49 48.49 40.80 45.33 3270
47 38.75 43.75 48.75 41.10 45.66 3299
48 39.00 44.00 49.00 41.40 45.98 3327
49 39.25 44.25 49.25 41.70 46.30 3355
50 39.49 44.49 49.49 42.00 46.62 3383

- 43 -
11) Hook & Bray(Rock Slope Engineerings)

Typical Soil and Rock Properties

Unit Weight Friction


Description Cohesion
(Saturated/Dry) angle
Type Material lb/ft³ kN/㎥ Degrees lb/ft² kPa
Loose sand, uniform grain size 118/90 19/14 28-34 200 10 kPa
C Loose sand, uniform grain size 130/109 21/17 32-40 lb/ft² ≒ 1 t/㎡
Sand
o Loose sand, mixed grain size 124/99 20/16 34-40 ≒ 1 t/㎡ -
h
Dense sand, mixed grain size 135/116 21/18 38-46 - -
e
s Gravel, uniform grain size 140/130 22/20 34-37 - -
Gravel
I Sand and gravel, mixed grain size 120/110 19/17 48-45 - -
o Basalt 140/110 22/17 40-50 - -
n Chalk 80/62 13/10 30-40 - -
l Blased/ Granite 125/110 20/17 45-50 - -
e broken
s Limestone 120/100 19/16 35-40 - -
rock
s Sandstone 110/80 17/13 35-45 - -
Shale 125/100 20/16 30-35 - -
Soft Bentonite 80/30 13/6 7-3 200-400 10-20
Very soft organic clay 90/40 14/6 12-16 200-600 10-30
Soft, slightly organic clay 100/60 16/10 22-27 400-1000 20-50
Clay
C Soft glacial clay 110/76 17/12 27-32 600-1500 30-70
o
Stiff glacial clay 130/105 20/17 30-32 1500-3000 70-150
h
e Glacial till, mixed grain size 145/130 23/20 32-35 3000-5000 150-250
s Hard igneous rocks - ** 720000- 35000-
25-30 35-45
I granite, basalt, porphyry 160-190 1150000 55000
v Metamorphic rocks - 400000- 20000-
160-180 25-28 30-40
e quartzite, gneiss, slate 800000 40000
Rock
Hard sedimentary rocks - 200000- 10000-
150-180 23-28 35-45
limestone,dolomite,sandstone 600000 30000
Soft sedimentary rock - 20000- 1000-
110-150 17-23 25-35
sandstone, coal, chalk, shale 400000 20000
Higher friction angles in cohesionless materials occur at low confining or normal stresses

For intact rock, the unit weight of the material does not vary significantly between saturated and

dry states with the exception of materials such as porous sandstones.

1 MPa = 1 MN/㎡ = 10.2 kg/㎠ = 145 lb/in² "Rock Slope Engineering (1981)"

1 kN/㎥ = 102 kg/㎥ = 6.37 lb/in³

(REF : E.Hook and J.W. Bray 'Rock Slope Engineering' (1981))

- 44 -
제 3 장 가 시 설 구 조 계 산 서

12) BOWELS의 제안

표준관입수를 바탕으로 한 점성토의 연경도와  의 경험치

연경도 대단히 연약 연약 중간의 단단한 대단히 단단한 강한

 , ksf 0 0.5 1.0 2.0 4.0 8.0

(kPa) ( 25 ) ( 50 ) ( 100 ) ( 200 ) ( 400 )


표준관입
0 2 4 8 16 32
저항 N치
  ,pcf 100 ~ 200 110 ~ 130 120 ~ 140

(kN/㎥) ( 16 ~ 19 ) ( 17 ~ 20 ) ( 19 ~ 22 )

각 토층에 대한 내부마찰각(∅)의 대표치

TYPE OF TEST

Soil Unconsolidated- Consolidated- Consolidated-


Undrained Undrained Drained
(UU) (CU) (CD)

Gravel - - -

Medium Size 40-55° - 40-55°

Sandy 35-50° - 35-50°

Sand - - -

Loose Dry 28-34° -

Loose Saturated 28-34° -

Dense Dry 35-46° - 43-50°


1-2°Less than
Dense Saturated - 43-50°
Dense sand
Silt or Silty sand - - -

Loose 20-22° - 27-30°

Dense 25-30° - 30-35°

Clay 0°If Saturated 3-20° 20-42°

* See a laboratory manual on soil testing for a complete description of these.


E.G, BOWLES (1986B)
(REF : J.E BOWLES, 'Foundation Analysis and Design', 4th ed., 1988. P84)

- 45 -
13) 통일분류법에 의한 사질토의 지반특성치

Common Properties of Cohesionless Soils

Dr 
구분 Material Compactness N* e ø( °)
(%) (gf/㎤)

Dense 75 90 2.21 0.22 40


well-graded
GW gravels, gravels- Medium dense 50 55 2.08 0.28 36
sand mixtures
Loose 25 <28 1.97 0.36 32

Dense 75 70 2.04 0.33 38


poorly graded
GP gravels, gravel- Medium dense 50 50 1.92 0.39 35
sand mixtures
Loose 25 <20 1.83 0.47 32

Dense 75 65 1.89 0.43 37


well-graded
SW sands, gravelly- Medium dense 50 35 1.79 0.49 34
sands
Loose 25 <15 1.70 0.57 30

Dense 75 50 1.76 0.52 36


poorly sands
SP sands, gravelly- Medium dense 50 30 1.67 0.60 33
sands
Loose 25 <10 1.59 0.65 29

Dense 75 45 1.65 0.62 35

SM silty sands Medium dense 50 25 1.55 0.74 32

Loose 25 <8 1.49 0.80 29

Dense 75 35 1.49 0.80 33

inorganic silts,
ML Medium dense 50 20 1.41 0.90 31
very fine sands

Loose 25 <4 1.35 1.00 27

* N is blows per foot of penetraion in the SPT. Adjustments for gradation are after Burmister(1962)
Density given is for G s = 2.65 (quartz grains)
* Friction angle ψ depends on mineral type, normal stress, and grain anfularity as well as Dr and
gradation
Roy.E.Hunt : Geotechniacl Engineering Analysis and Evaluation
(Mc.Graw-Hill, 1986, P80)

- 46 -
제3 장 가 시 설 구 조 계 산 서

14) RMR 분류법에 의한 암반 정수의 추정 - Z.T. Bieniawski (1972∼1973)

RMR분류법에 의한 암반 정수의 추정

분 류기 준 값의 범 위
점하중 이 범위는 일축
신선암 >10 4-10 2-4 1-2
강도지수 압축시험 사용
강 도
1 (MPa) 일축압축
>250 100-250 50-100 25-50 5-25 1-5 <1
강 도
점 수 15 12 7 4 2 1 0
RQD(%) 90-100 75-90 50-75 25-50 < 25
2
점 수 20 17 13 8 3
불연속면의 간격 >2m 0.6-2m 200-600mm 60-200mm <60mm
3
점 수 20 15 10 8 5

∙매우 거친 표면
∙약간 거친 표면 ∙약간 거친 표면 ∙ 평활면 혹은
불연속이다. ∙연한 충전물 >
간극<1mm 간극 <1mm 충전물 <5mm
불연속면의 상태 ∙분리가 없음 5mm 두께 혹은
4 약간 풍화된 심하게 풍화된 두께 혹은 간극
풍화되지 않은 간극 > 5mm 연속적
표면 표면 1-5mm 연속적
모암

점 수 30 25 20 10 0
10m터널길이
없음 <10 10-20 25-125 >125
지 유입(l/분)
하 절리수압/
0 <0.1 0.1-0.2 0.2-0.5 >0.5
5 수 최대주응력
일반적 상태 완전 건조 약간 습함 젖음 물이 떨어짐 물이 흐름

점 수 15 10 7 4 0

절리형태에 의한 보정

주향과 경사 매우 유리 유리 보통 불리 매우 불리

터널과 광산 0 -2 -5 -10 -12



기 초 0 -2 -7 -15 -25

비 탈 면 0 -5 -25 -50 -60

절리의 주향과 경사의 영향

터널 굴진 방향 불연속면의 경사 상 태
경 사 a 45∼90˚ A 매우 유리
방 향 b 20∼45˚ B 유 리
주향과 직교
역경사 b 45∼90˚ A 보 통
방 향 a 20∼45˚ B 불 리
20∼45˚ D 보 통
주행과 평행
45∼90˚ C 매우 불리
주향과 무관 0∼20˚ 보 통

- 47 -
RMR 분류에 의한 암반의 등급

점 수 100∼81 80∼61 60∼41 40∼21 <20

등 급 Ⅰ Ⅱ Ⅲ Ⅳ Ⅴ

구 분 매우 양호 양호 보통 불량 매우 불량

암반등급의 공학적 의미

등 급 Ⅰ Ⅱ Ⅲ Ⅳ Ⅴ

평 균 15m 폭 10m 폭 5m 폭 2.5m 폭 1m 폭

자립시간 10년 6개월 1주일 10시간 30분

암반의 점착력(kPa) > 400 300∼400 200∼300 100∼200 <100

암반의 내부마찰각 > 45° 35∼45° 25∼35° 15∼25° 15°

각 요소들의 측정치가 각 등급의 경계선에 있을 때나 각 범주사이에 배점의 변화폭이 너무 커서 이를

완화시키기 위해서 각 인자의 연속적인 값을 위해서는 그림이나 아래 표를 이용한다.

불연속면 상태의 분류기준

요 소 점 수

불연속면의 길이
<1m 1∼3m 3∼10m 10∼20m >20m
(연속성)

불연속면의 간격
6 4 2 1 0
(틈새)

매우 거침 거침 약간 거침 평활 slickensided
거칠기
6 5 3 1 0

단단한 충전물 연한 충전물


충전물 없음 <5mm >5mm <5mm >5mm
6 4 2 2 0

풍화 안됨 약간 풍화 풍화 심한 풍화 분해
풍화정도
6 5 3 1 0

- 48 -
3
제 장 가 시 설 구 조 계 산 서

15) 암층분류표 (서울지하철공사)

서울지하철공사 암층분류표

암반
경 암 보 통 암 연 암 풍 화 암 잔 류 토
구분

4.5 4.0-4.5 3.5-4.0 3.5 2.0


탄성파 속도
km/sec 이상 km/sec km/sec km/sec 이상 km/sec 이하

물리 화학적 교대
작용으로 파쇄대가
풍화작용으로 매우 발달되어
경도가 아주 좋고 균열 및 절리가 완전풍화되고
암상에 층리 및 있는 상태로
균열이 적으며 다소 발달되어 암의 조직이
암질상태 절리가 발달되어 다소의 단층이
풍화 변질이 안된 있으며 풍화가 보존되어 있으나
있는 암체로서 포함 되어
상태 안된 상태 토사화 됨
파쇄질 점토질이 많이
발달되어 있는
암상

망치가 튕겨나옴, 강하게 치면 망치로 쉽게


망치로 쉽게
관찰에 의한 강하게 균열면이나 부서지며 망치가 손으로 문지르면
갈라지며 쉽게
판 정 치면신선한 결리면을 따라 아니더라도 쉽게 쉽게 부서짐
균열면으로 갈라짐
면으로 갈라짐 크게 갈라짐 부서짐

채취율 90 % 이상 70 % 이상 40 - 70 % 40 % 이하 -

코아
균열 세편을 이루고
주상코아 다소의 세편 포함 다량의 세편 포함 -
상태 있음
상태

암괴 20 cm 이상 5 cm 이상 5 cm 이하,세편 - -

점 착 력
(2.5 - 200) (2 - 50)
(tf/m2) (10 - 500) (5 - 300) (0.5 - 20)
5.0 0.0
설 계 치

내부마찰각( °) (25 - 50) (20 - 45)


(35 - 50) (35 - 50) (20 - 45)
설 계 치 40 37

단 위중량
(2.6 - 2.7) (2.6) (2.5 - 2.56) (2.0 - 2.4) (1.8 - 2.2)
(tf/m3)

- 49 -
16) 수평지반반력계수 산정방법

일반적으로 수평지반반력계산은 Hukuoka법과 Solatanche법으로 많이 산정되며 산정방법은 다음과 같다.


① Hukuoka법

Kh = 0.691 × N0.406

② Bowles의 Kh 추정
Bowles의 Kh의 추정 (1982)

흙의 종류       

조밀한 사질자갈 1400 ~ 2500 220 ~ 400

중간밀도의 조립모래 1000 ~ 2000 157 ~ 300

중간밀도의 모래 700 ~ 1800 110 ~ 280

세립 혹은 실트질, 세립모래 500 ~ 1200 80 ~ 200

견고한 점토(습윤) 350 ~ 1400 60 ~ 220

견고한 점토(포화) 250 ~ 900 39 ~ 140

중간굳기의 점토(습윤) 175 ~ 700 30 ~ 110

중간굳기의 점토(포화) 75 ~ 500 10 ~ 80

연약 점토 10 ~ 250 2 ~ 40

kcf = 0.01602 
(흙막이공학, 구미서관 pp. 147)

③ 수평지반 반력계수의 Kh 결정

지반의 횡방향 지반반력계수

모 래 지 반 점성 토 지반

N K   N K   

N≦10 0.1 ~ 0.5 N≦2 0.1 ~ 0.5

10<N≦20 0.5 ~ 1.5 2<N≦5 0.5 ~ 1.0

20<N≦30 1.5 ~ 2.5 5<N≦10 1.0 ~ 2.0

30<N≦40 2.5 ~ 3.0 10<N≦15 2.0 ~ 3.0

40<N≦50 3.0 ~ 3.5 15<N≦30 3.0 ~ 4.0

50<N≦100 3.5 ~ 5.0 30<N≦50 4.0 ~ 5.0

1  = 1,000
(지반공학에서의 수치해석의 실무, 일본 토질공학회 pp. 198)

- 50 -
3
제 장 가 시 설 구 조 계 산 서

④ 일반적인 지반의 수평반력계수

새길엔지니어링의 EXCAD Program 수평지반 반력계수 자료

토층구분 Kh (t/m3)

점 토 < 1,000
실 트 < 1,200
실트질모래(느슨) 480 ~ 1,600
실트질모래(보통) 960 ~ 3,000
실트질모래(조밀) 2,500 ~ 4,000
풍화암 3,000 ~ 6,000
연 암 4,500 ~ 8,000
보통암 6,000 ~ 9,000
경 암 8,000 ~ 12,000
⑤ Solatanche법---각 토층별 ∅, c값에 따라 아래 표에서 산정

SOLETANCHE에 의한 Kh

- 51 -
17) 토질정수의 평가

각 토층의 지반반력계수(Kh) 대표치


∙ 근사식을 사용할때 다음을 참고하여 값을 사용함.

흙 Kh , kcf Kh , kN/㎥

느슨한 모래 30 ∼ 100 4800 ∼ 16000


중간정도 다져진 모래 60 ∼ 500 9600 ∼ 80000
다져진 모래 400 ∼ 800 64000 ∼ 128000
점토질 중간정도 다져진 모래 200 ∼ 500 32000 ∼ 80000
실트질 중간정도 다져진 모래 150 ∼ 300 24000 ∼ 480000
점성토 - -
qu ≤ 200kPa (4ksf) 75 ∼ 150 12000 ∼ 24000
200 < qu ≤ 400kPa 150 ∼ 300 24000 ∼ 48000
qu > 800kPa 〉300 〉48000
(Ref. : J.E. Bowles, 기초구조물의 설계와 해석 도서출판 엔지니어스 P.313)

여러 시험방법에 의한 응력-변형계수 Es에 대한 공식

∙ Es는 SPT에 대하여 kPa 단위이며, CPT에 대하여 qc의 단위임. ksf로 하기 위해서는 kPa를 50으로 나

눔.

구 분 SPT CPT

모 래 Es = 500(N+15) Es* = 2 to 4qc


Es‡ = 18000 + 750N Es†= 2(1 + Dr²)qc
Es = (15200 to 22000) ln N -
점성모래 Es = 320(N + 15) Es = 3 to 6qc
실트질 모래 Es = 300(N + 6) Es = 1 to 2qc
자갈 섞인 모래 Es = 1200(N + 6) -
연약 점토 - Es = 6 to 8qc
비배수 전단시험 Ip > 30 또는 유기질 Es = 100 to 500Su
Su 단위 Ip < 30 또는 굳음 Es = 500 to 1500Su
점토 I < OCR < 2 Es = 800 to 1200Su
OCR > 2 Es = 1500 to 2000Su
* Schmertmann(1970) 2qc를 사용 1974년에는 2.5에서 3.5qc

[Mitchell and Gardner(1975)]


† Vesic(1970)

‡ D'Appolonia등(1970)에 의함

(Ref : J.E. Bowles, 기초 구조물의 설계와 해석 도서출판 엔지니어즈 P.188)

- 52 -
3
제 장 가 시 설 구 조 계 산 서

18) Rock Slope Engineering (1981)

대표적인 흙과 암반의 성질
단위중량
설 명 점 착 력
(포화상태/건조상태) 마찰각
ø( °)
종 류 재 료 1b/ft3 kN/m3 1b / ft2 kPa

느슨한 모래, 고른 입자크기 118/90 19/14 28-34*


200
모 조밀한 모래, 고른 입자크기 130/109 21/17 32-40* 10kPa
ℓb/ft2
래 느슨한 모래, 혼합된 입자크기 124/99 20/16 34-40* ≒1t/m2
≒ 1t/m2
점 조밀한 모래, 혼합된 입자크기 135/116 21/18 38-46*


자 자갈, 고른 입자크기 140/130 22/20 34/37*
이 - -
갈 모래와 자갈, 혼합된 입자크기 120/110 19/17 48/45*


는 발
현 무 암 140/110 22/17 40-50*

물 백 악 80/62 13/10 30-40*
/
질 화 강 암 125/110 20/17 45-50*
파 - -
석 회 암 120/100 19/16 35-40*

사 암 110/80 17/13 35-45*

셰 일 125/100 20/16 30-35*

연한 벤토나이트 80/30 13/6 7-3* 200-400 10-20


점 아주 연한 유기질 점토 90/40 14/6 12-16* 200-600 10-30
연한, 약간의 유기성 점토 100/60 16/10 22-27* 400-1000 20-50
연한 빙하 점토 110/76 17/12 27-32* 600-1500 30-70
토 굳은 빙하 점토 130/105 20/17 30-32* 1500-3000 70-150
빙하 점토, 혼합된 입자크기 145/130 23/20 32-35* 3000-5000 150-250





견고한 화성암․․․ 720000- 35000-
있 암 160to190 25 to 30 35-45 1150000 55000
화강암, 현무암, 반암

변성함․․․
물 규암, 편마암, 점판암 400000- 20000-
질 160to180 25 to 28 30-40 800000 40000
견고한 퇴적암․․․
석회암, 백운석, 사암 200000- 10000-
150to180 23 to 28 35-45 600000 30000

연약한 퇴적암․․․
사암, 석탄, 백악, 셰일
110to150 17 to 23 25-35 20000- 1000-
400000 20000

- 53 -
19) 건설 교통부 도로 설계 편람

지반 및 지보재 특성치 적용 사례 (1998)

구미․현풍
구 분 육십령 수리,수암 둔내 용평 대관령 죽령 평 균
(퇴적암)
γ (kN/m3) 27 26 26.2 27 27 26.8 27 26.6
E(MPa) 15,000 20,000 20,000 8,000 14,500 20,000 20,000 18,000


υ 0.2 0.25 0.17 0.2 0.13 0.2 0.2 0.2
ø 50 50 47 50 50 45 45 50

c(kPa) 5000 5000 1800 2000 2900 2000 450 3000
0.5-2.0 0.58-0.67
Ko 0.8 1.0 2.0 1.0 0.5-1.5 1.0
(1.0) (0.62)

γ (kN/m3) 27 - 26.2 27 27 26.8 26 26.5


E(MPa) 10,000 - 3,000 3,000 8,580 10,000 7,500 7,500

υ 0.2 - 0.17 0.2 0.22 0.2 0.2 0.22
통 ø 45 - 40 50 50 45 40 45
암 c(kPa) 3000 - 1360 2000 1800 1000 350 1500
0.5-2.0 0.75-0.88
Ko 0.8 - 2.0 1.0 0.5-1.5 1.0
(1.0) (0.82)

γ (kN/m3) 26 24 25 25 25 26.8 25 25
E(MPa) 5,000 800 790 1,000 3,000 5,000 2,000 3,000
연 υ 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
ø 40 40 40 45 40 40 35 40

c(kPa) 1000 1000 500 1000 500 500 250 700
0.5-2.0
Ko 0.5 0.333 2.0 0.77 1.0 0.5-2.5 0.86
(1.0)

γ (kN/m3) 25 22 22 23 22 23 23 22.6

풍 E(MPa) 400 40 350 300 365 1000 1000 500


υ 0.3 0.3 0.34 0.3 0.3 0.3 0.3 0.3

ø 35 35 36 40 36 35 30 35
암 c(kPa) 500 300 100 300 100 300 150 250
Ko 0.5 0.43 0.52 0.5 0.43 0.5 0.5-1.5 0.5
γ (kN/m ) 3 20 19 19 19 19 18 19 18.9

풍 E(MPa) 40 20 20 20 20 30 30 20
υ 0.35 0.3 0.35 0.33 0.35 0.35 0.35 0.35

ø 30 30 30 35 30 30 30 30
토 c(kPa) 30 10 - 50 - 50 50 30
Ko 0.43 0.43 0.54 0.5 0.54 0.5 0.5-1.5 0.5
Soft
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
E(MPa)
S/C
Hard
10,000 10,000 10,000 15,000 15,000 15,000 15,000 15,000
E(MPa)
R/E E(MPa) 210,000 210,000 210,000 210,000 210,000 210,000 210,000 210,000

- 54 -
제 3 장 가 시 설 구 조 계 산 서

20) 지역 지하철 설계시 암반물성치 적용례

(UNIT : C = t/㎡ , ∅ = deg , E = 103t/㎡)


지역 지하철 설계시 암반물성치

풍 화 암 연 암 경암 (보통암)
구 분
C ø E C ø E C ø E

5호선
30 40 30 100 45 100 500 50 300
(기본설계)

3,4호선
Standard 30-100 40-45 10-40 100-200 45-50 40-100 200-400 50-55 100-1000
Design

3,4호선
30 40 15 100 45 55 100 45 55
(323공구)

3,4호선
30 40 40 100 45 75 200 50 90
(416공구)

7호선
25 37 25 98 43 65 600 48 278
(7-23공구)

9호선
5 37 47 300 40 200 - - -
(903공구:유신)

9호선
6 35 20 20 35 50 - - -
(907공구:서영)

9호선
5 30 40 20 35 400 40 42 850
(910공구:도화)

과천선
30 35 10 70 40 15 1200 45 300
(금정-사당)

반월선
30 40 40 100 45 80 300 45 500
(반월)

범 위 5-100 30-45 10-47 20-300 35-50 15-400 40-1200 42-55 55-1000

평 균 23.3 38.0 29.4 92.3 42.3 86.9 250.0 47.0 336.3

주) 평균 값은 최고값과 최저값을 제외한 평균값 임.

- 55 -
21) 도로설계실무편람 (한국도로공사, 1996)

흙의 종류에 따른 단위중량, 점착력, 내부마찰각

단위 내부
점착력 분류기호
종 류 재료의 상태 중량 마찰각
c(tf/m2) (통일분류)
(kN/m2) ø( °)

자갈 및
다진것 20 40 0 GW, GP
자갈섞인 모래

입도가 좋은 것 20 35 0
모 래 다진것 SW, SP
쌓 입도가 나쁜 것 19 30 0

사질토 다진것 18 25 3 이하 SW, SC



ML, CL
점성토 다진것 18 15 5 이하
MH, CH

밀실한 것, 입도가 좋은 것 20 40 0
자 갈 GW, GP
밀실치 않은 것, 입도가 나쁜 것 18 35 0

밀실한 것 21 40 0
자갈섞인 모래 GW, GP
밀실치 않은 것 19 35 0

밀실한 것, 입도가 좋은 것 20 35 0
모 래 SW, SP
밀실치 않은 것, 입도가 나쁜 것 18 30 0

밀실한 것 19 30 3 이하
사질토 SM, SC
연 밀실치 않은 것 17 25 0

굳은 것(손가락으로 강하게 눌러 조금
18 25 5 이하
지 들어감. N=8∼15)

약간, 무른 것(손가락 중간정도의


점성토 17 20 3 이하 ML, CL
반 힘으로 들어감, N=4∼8)

무른 것(손가락으로 쉽게 들어감.
17 20 1.5이하
N=2∼4)

굳은 것(손가락으로 강하게 눌러 조금
17 20 5 이하
들어감. N=8∼15)

약간 무른 것(손가락 중간정도의
점토 및 실트 16 15 3 이하 CH, MH, ML
힘으로 들어감. N=4∼8)

무른 것(손가락으로 쉽게 들어감.
14 10 1.5 이하
N=2∼4)

- 56 -
3
제 장 가 시 설 구 조 계 산 서

22) 흙의 내부 마찰각 : 가설 구조물의 해설

단위중량 수중단위 중량 내부마찰각 수중 내부마찰각


종 별 상 태
(kN/m3) (kN/m3) (deg) (deg)

쇄 석 - 16~19 10~13 34°~ 45° 35°

자 갈 - 16~20 10~12 30°~ 40° 30°

단단한 것 17~20 9~10 35°~ 40° 30°~ 35°

모 래 약간무른 것 16~19 8~9 30°~ 35° 25°~ 30°

무른 것 15~18 7~8 25°~ 30° 20°~ 25°

굳은 것 17~19 9~10 25°~ 35° 20°~ 30°

보통흙 약간 굳은 것 16~18 8~10 30°~ 35° 15°~ 25°

부드러운 것 15~17 6~9 15°~ 25° 10°~ 20°

굳은 것 16~19 6~9 20°~ 30° 10°~ 20°

점 토 약간 굳은 것 15~18 5~8 10°~ 20° 0°~ 10°

부드러운 것 14~17 4~7 0°~ 10° 0°

딱딱한 것 16~18 10 10°~ 20° 5°~ 15°


실 트
부드러운 것 14~17 5~7 0° 0°

23) 서울시 도로설계 실무 편람의 지반정수

단위중량 점착력 C 탄성계수(×104)


지층명 내부마찰각(°) 포와송비
(kN/㎥) (kPa) (MPa)

풍화토 17~20 0~10 25~30 2~10 0.35

풍화암 20~22 10~30 30~35 10~20 0.30~0.35

연암 23~25 30~60 30~40 20~40 0.25~0.30

보통암 24~26 60~150 35~40 40~100 0.25

경암 25~27 150~200 35~45 100~400 0.20

극경암 26~27 200~500 40~45 400~800 0.20

- 57 -
24) 흙의 종류 및 조성상태에 따른 토질정수 (M.J. Tomlinson, 1994)

구분 Soil type, compactness & consistency  (kN/m3) sub(kN/m3) C (kN/m2)

연약한 소성점토 16 ~ 19 6 ~ 9 20 ~ 40

단단한 소성점토 17.5 ~ 20 7.5 ~ 11 40 ~ 75

견고한 소성점토 18 ~ 21 08 ~ 11 75 ~ 150

연약하고 소성이 적은 점토 17 ~ 20 7 ~ 100 20 ~ 40


점성토
및 단단하고 소성이 적은 점토 18 ~ 21 8 ~ 11 40 ~ 75
유기질 흙
견고하고 소성이 적은 점토 21 ~ 22 11 ~ 12 75 ~ 150

견고 또는 매우견고한 점토 20 ~ 23 10 ~ 13 150 ~ 300

유기질 점토 14 ~ 17 4 ~ 7 -

이 탄 10.5 ~ 14 0.5 ~ 4 -

Soil type, compactness & consistency  (kN/m3) sub(kN/m3) C (kN/m2)

모래성분이 거의 없는 느슨한 자갈 16 ~ 19 9 28 ~ 30

모래성분이 거의 없는 보통조밀한 자갈 18 ~ 20 10 30 ~ 36

모래성분이 거의 없는 조밀내지 매우조밀한 자갈 19 ~ 21 11 36 ~ 45

느슨하며 입도가 양호한 모래질 자갈 18 ~ 20 10 28 ~ 30

보통조밀하고 입도가 양호한 모래질 자갈 19 ~ 21 11 30 ~ 36

조밀하고 입도가 양호한 모래질 자갈 20 ~ 22 12 36 ~ 45

느슨하고 점토가 함유된 모래질 자갈 18 ~ 20 10 28 ~ 30


모래
와 보통조밀하고 점토가 함유된 모래질 자갈 19 ~ 21 11 30 ~ 35
자갈
조밀내지 매우조밀하고 점토가 함유된 모래질 자갈 21 ~ 22 12 35 ~ 40

느슨한 조립내지 세립 모래 17 ~ 20 10 28 ~ 30

보통조밀한 조립내지 세립 모래 20 ~ 21 11 30 ~ 38

조밀내지 매우 조밀한 조립내지 세립 모래 21 ~ 22 12 35 ~ 40

느슨하고 세립질 모래와 실트질모래 15 ~ 17 7 28 ~ 30

보통조밀한 세립질 모래와 실트질모래 17 ~ 19 9 30 ~ 35

조밀내지 매우조밀한 세립질 모래와 실트질모래 19 ~ 21 11 35 ~ 40

- 58 -
3
제 장 가 시 설 구 조 계 산 서

25) 지반별 마찰 저항력 산정

구조물 기초 설계기준 해설

지반종류 마찰저항력(MPa)

경 암 1 ~ 2.5

암반 연 암 0.6 ~ 1.5

풍화암 0.4 ~ 1.0

10 0.1 ~ 0.2

20 0.17 ~ 0.25

자 갈 N치 30 0.25 ~ 0.35

40 0.35 ~ 0.45

50 0.45 ~ 0.70

10 0.10 ~ 0.14

20 0.18 ~ 0.22

자 갈 N치 30 0.23 ~ 0.27

40 0.29 ~ 0.35

50 030 ~ 0.40

점성토 - 0.10C

- 59 -
3.2.3 지반정수 산정 근거

∙ 지층구성은 상부로부터 매립층, 풍화토, 풍화암, 연암, 경암 순으로 구성되어 있는 것을 고려하여 각 지층별

설계지반정수를 산정하였다.

∙ 금회 과업구간에서 지층확인을 위하여 12공의 시추조사와 수리특성 분석을 위한 지층별 현장투수시험,지하

수위측정 및 변형특성 분석을 위한 공내재하시험, 공내전단시험과 토사층 및 기반암의 물리적 특성분석을 위


한 실내토질시험 등을 수행하였다.

∙ 금회 현장에서 수행된 현장시험값을 우선으로 하며 기존 문헌자료와의 적정성을 검토하여 설계지반정수


산정 시 반영하였다.

3.2.4 지반정수 산정 결과
∙각 지층별 검토에 적용된 설계 지반정수를 문헌값, 경험식, 현장시험 및 인근설계자료 등을 종합하

여안전측 판단을 위한 현장시험값과 인근설계자료를 최대한 적용하여 산정한 결과 다음과 같다.

∙구조검토 및 인접지반의 영향을 검토하기 위해 적용될 지반 물성치는 지반조사 시 실시한 시험값과

기존문헌, 경험식, 인근자료를 비교∙분석한 후 보수적인 값을 적용하여 안정하며 합리적인 설계가

되도록 하였다.

적용 물성치

수평지반
단위중량 점착력 내부마찰각
구 분 반력계수
(γt, kN/㎥) (c, kPa) (Ø, ゚)
(kN/m³)

매립층 18.0 0.0 24.0 14,300

점토질실트 17.0 20.0 10.0 10,000


퇴적층
자갈섞인
18.0 0.0 25.0 25,500
모래

풍화토 19.0 17.0 28.0 33,800

풍화암 20.0 27.0 30.0 38,000

연암 23.0 40.0 33.0 48,000

- 60 -
제3 장 가 시 설 구 조 계 산 서

3.3 설계하중

∙흙막이 벽체에 작용하는 외력에는 토압, 수압, 장비하중 등의 하중과 검토범위 내에 있는 인접건물 하중과

인접도로를 통행하는 교통하중 등이 있으며, 지반안전성 검토시 하중을 적용하여 안전성 검토를 수행함

3.3.1 활하중
∙활하중(교통하중) : 자동차 활하중은 표준트럭하중(DB하중) 또는 차로하중(DL하중), 보도 등의 등분
포하중 및 궤도의 차량하중을 적용하며, 이때 현장여건 및 장비하중 등을 고려하여 안전측으로 1등

교 교량의 DL기준인 13.0(≒12.7)kN/m2을 적용함

3.3.2 건축물하중
∙인접건축물에 대한 하중은 구조종별 구분없이 층별 하중을 계산하여 적용

건물 하중(kN/m2)
용도
주택 사무실

최 상 층 14.0 16.0

일 반 층 13.0 14.0

1 층 16.0 15.0

지 하 층 33.0 30.0

- 61 -
3.4 계획도면 및 해석방법
3.4.1 계획평면도

- 62 -
3
제 장 가 시 설 구 조 계 산 서

3.4.2 계획단면도

A-A

B-B

- 63 -
3.4.3 흙막이 프로그램을 이용한 해석방법
본 Program 은 탄・소성 Beam・Spring Model 로서 단계별 굴착과 지보공에 따른 흙막이 벽의 변위, 전단

력, 휨모멘트 및 지보공의 축방향력을 계산한다.

배면측 주동 측압(Pa)
STRUT
초기 측압(Pi)
STRUT Spring(Kt)

STRUT
배면측 수동 측압(Pp)
굴착면

굴착측 수동 측압(Pp)
지반Spring(Ksy)

토류벽

< 기 본 구 조 Model >

본 Model 에서 하중과 변형에 대한 기본 식은 다음과 같이 표시된다.

   ⋅′
 ⋅    ⋅      ⋅
 

여기서 E : 흙막이 벽체의 탄성계수

I : 흙막이 벽체의 단면 2차 Moment

A : 지보공의 단면적

E' : 지보공의 탄성계수

L : 지보공의 길이

Pi : 초기토압 (주로 정지토압이 사용됨)

Ks : 지반의 수평방향 지반반력계수

x : 깊이 y 지점에서의 벽체의 x 방향변위이다.

(수압 및 기타하중에 의한 변위 포함)

- 64 -
제3 장 가 시 설 구 조 계 산 서

굴착심도 이상부분 및 굴착심도 이하 부분에서의 변위와 탄소성 관계는 각각 다음 그림과 같다.

< 굴착면 이상 부분의 지반 Spring 거동 >

y
소성변위

Pp

Ksa
1

Pi

Ksa : 지반반력계수 (배면측)


Pi : 초기측압 (배면지반)
Pa
소성변위 Pp : 수동측압 (배면지반)
Pa : 주동측압 (배면지반)
δ : 토류벽의 변위
x
0

굴착측으로의 변위 δ 배면측으로의 변위

< 굴착면 이하 부분의 지반 Spring 거동 >


y
소성변위

Pp

Ksa
배면측지반의 거동

Pi

Pa

0
x
(굴착측으로의 변위) δ (배면측으로의 변위)

Pa'

Pi'
굴착측지반의 거동
Ksa : 지반반력계수 (배면측)
Pi : 초기토압 (배면측)
Pp : 수동토압 (배면측)
Ksp Pa : 주동토압 (배면측)
Ksp : 지반반력계수 (굴착측)
Pp'
Pi' : 초기토압 (굴착측)
Pp' : 수동토압 (굴착측)
소성변위 Pa' : 주동토압 (굴착측)

식의 좌변에서 보이는 바와 같이 계산초기에 작용시킨 토압 Pi 는 벽체의 변위에 1 차적으로 비례하여 증감

된다. 그러나 이 토압은 “변위 - 탄소성관계” 그림에서 보는바와 같이 주동토압과 수동토압의 범위 (최소 및
최대한계치) 이내에 있어야 하며, 그 범위를 벗어나는 변위가 발생 할 때는 토압은 한계토압으로 되고 지반

반력계수를 0 으로 한 후 반복계산이 계속된다. 그전 반복계산시의 토압과 현재 계산시의 토압의 차이가 미

리 정해둔 오차 이내 일 때 계산을 종료한다.

- 65 -
탄소성 해석에서의 기본 원칙과 가정은 다음과 같다.

① 지보공 설치지점의 수직벽에는 지보공의 수평간격, 단면적, 길이, 설치각도 및 재료의 탄성계수로 구해지
는 탄성 Spring 지점이 부가된다.

A・E
Ksupport =  × cos(θ)
L・Space

② 위의 지보공에 대한 탄성지점은 그 지보공이 설치될 때 이미 발생되었던 변위량에 해당하는 선행변위를

가지는 것으로 고려된다.

③ 각 굴착단계에서 작용토압은 계산초기에 정지토압을 작용시키고 토류벽체의 변위에 1 차 비례하여 수정

된다. 그러나 다음과 같은 한계를 넘지 않는다.

초기토압 : Pi
수정토압 : Pi ± Ksoil × Displacement

한계토압 : 주동토압 ≤ 토압 ≤ 수동토압

위의 범위를 벗어나는 조건이 될 때 토압은 한계토압으로 되며 지반의 Spring 상수는 → 0 으로 된다.


< 탄・소성법에서의 변위와 토압 >

기설치된 STRUT

지중선행 변위

다음설치 STRUT

금회굴착저면
소성역
탄성역

탄성반력

굴착면측의
굴착저면의 정지측압에 유효주동
유효수동측압 정지토압 해당하는측면 측 압
수동측압 주동측압

- 66 -
3
제 장 가 시 설 구 조 계 산 서

3.5 각 단면별 검토결과


3.5.1 단면 A-A 검토결과

좌측검토결과

- 67 -
우측검토결과

- 68 -
3
제 장 가 시 설 구 조 계 산 서

3.5.2 단면 B-B 검토결과


좌측검토결과

- 69 -
우측검토결과

- 70 -
4
계측 계획서
4
4.1 개요
4.2 계측관리 계획
4.3 계측항목
4.4 계측위치 선정
4.5 계측빈도
4.6 계측 관리기준

- 72 -
제4 장 계 측 계 획 서

제 4장 계 측 계 획 서

4.1 개 요

현장 굴착에 따른 지반의 정확한 거동예측은 현장계측을 실시함으로써 가능하다.

그러므로 건물 인접 시 굴착공사의 안전관리를 위하여 가능한 완벽한 계측계획이 필수적이다.

효과적인 계측계획을 달성하기위하여 가장 중요한 점은 아래와 같다.

(1) 계측기를 설치할 위치 및 대표단면의 선정

(2) 계측자료의 수집, 정리, 분석방법

(3) 계측결과에 대한 정확한 설계와 시공에의 적용

(4) 계측기들의 설치, 유지, 관리방법 (계측관리 계획도면 참조)

계측계획에 대한 검토사항
항 목 내 용

계 측 빈 도 ‧ 계측 항목별로 시공 진행도 및 변화 속도 등을 검토 후 결정

계 측 방 법 ‧ 수동, 반자동, 자동 등의 방법 검토

처 리 S y s t e m ‧ 측정기, Computer종류, 용량, 통신방법 등 환경정비 상태검토

계 측 체 제 ‧ 전임자, 담당자 선정, System구축, 조직에 대한 장기적인 체제 확립

4.2 계측관리 계획

계측계획시 신축현장에 대한 공사개요 및 규모, 흙막이 종류 및 형태와 지질상태를 사전에 파악하고 이를

토대로 합리적인 시공과 안전관리를 위한 정보를 신속정확하게 수집하기 위해서는 체계적인 계측계획이 수
립되어야 하며, 계측계획의 3가지 기본조건은

(1) 계측의 목적과 계측에 필요로 하는 토질역학의 문제를 정확히 파악하며,

(2) 계측기 측정은 능력있는 요원이 실시하여 계측값의 신뢰도 여부를 현장에서 직접 파악하도록 계획되어야

한다.

(3) 계측기간 동안 수집되는 자료는 편리하고 간편한 양식으로 정리하여야 하며, 능력있는 기술자에 의해서

분석되고 결과가 긍정적이건, 부정적이건 지체없이 담당자에게 전달되어야 한다.

대표적인 계측관리계획은 측량에 의한 흙막이벽의 변위조사, 경사계에 의한 지반의 수평변위 측정, 지하수

위 측정계에 의한 지반의 지하수위의 측정, 하중계를 이용한 가설 Strut 및 Anchor의 축력 및 변형측정이다.

- 73 -
4.3 계측항목

가시설 계측항목의 선정과 관련한 검토내용은 다음과 같다.

계측기 항목 설정기준

항 목 내 용

‧ 주변 도로망 파악
인 접 구 조 물 특 성 ‧ 인접 건물의 배치 및 노후상태파악
‧ 인접 건물의 토질 특성파악

‧ 본 구조물 및 인접 주요구조물의 특성파악


구 조 물 특 성 ‧ 지반 지지 주체의 특성
‧ 자연적, 인위적 현상의 상호관계

‧ 광역적 지형, 지질의 특성


지 질 및 토 질 특 성 ‧ 해당 지역의 지지 기반층 생성과 발달과정 파악
‧ 지질 및 토질의 공학적 특성

‧ 하중분포 및 하중전달 역학관계의 이해


‧ 지반공학적 상수의 평가
‧ 재료역학적 상수의 평가
설 계 특 성
‧ 수치해석 모델의 이해
‧ 수치해석 결과의 평가
‧ Safety Factor(안전율)의 적용

‧ 가설구조 및 기타부재의 거동특성


지 지 부 재 및 시 공 ‧ 시공순서 및 시공단계별 시간개념
특 성 ‧ 지층변화 및 지하수 유동예측
‧ 시공상 취약요소의 파악

‧ 작동원리 및 설치기법
‧ 측정범위 및 측정오차
계 측 기 기 특 성
‧ 측정방법 및 경제성
‧ 내구성 및 계기간의 상호 호환성

- 74 -
4
제 장 계 측 계 획 서

주요계측 항목 사용기기 및 측정항목

측정위치 계 측 항 목 사용계기 육안 관 찰 측 정 항 목

측 1.측압의 실측치와 설계와의 비교검토


토 압 토압계 *벽체의 휨 2.주변수위 간극수압 벽면수압의
수 압 수압계 CRACK
압 관련성 파악
*토류벽 연결부의
연속성 확인
TRANSIT *누수
변 *주변지반의
두부 변위 INVERTED 1.변형이 허용치이내에 있는가의 여부
토류벽 수평 변위 PENDULUM CRACK 2.토압. 수압과 벽체변형과의 관계 파악

INCLINOMETER

1.벽체응력분포를 구해 설계측압에서
변형계 계산된 벽체응력과의 비교
벽체내의 응력 -
철근계 2.실측된 응력과 허용응력과의 비교에
의한 벽의 안정성 확인

STRUT 하중계 1.STRUT 또는 E/ANCHOR의 토압분담


또는 축력, 신축량, 신축계 *STRUT의 평탄성 역할을 분명히 한다.
EARTH 온도 상대변위계 *볼트의 조임 상태 2.허용축력과의 비교에 의한 안정성
ANCHOR 온도계 확인

굴착저면의 변위 및
지중고정
어떤 깊이의 변위, *내부지반의 용수 1.응력개방에 의한 굴착측지반의 변형
굴착지반 ROD,간극수압계,
간극수압, 지중 *BOILING 및 주변지반의 거동을 안다.
INCLINOMETER
수평변위 2.배면지반의 변위 토류벽의 변위 및
굴착저면 변위와의 관계 파악
*배면지반의 3.허용변위량과 실측변위량과의
지표연직변위, 변위말뚝, 비교에 의한 안정성의 확인 계산된
CRACK
지중연직변위, 지중고정 벽체응력과의 비교
주변지반 *도로의 연석,
간극수압, ROD,간극수압계, 4.굴착 및 배수에 따른 주변지반 의
BLOCK등의
지중수평변위 INCLINOMETER 침하량 및 침하범위의 파악
벌어짐 확인

1.벽체응력분포를 구해 설계측 측압서


인 접 연통관식 침하계, *구조물의 계산된 벽체응력과의 비교
연직변위, 경사량
구조물 고정식 경사계 CRACK 2.실측된 응력과 허용응력과의 비교에
의한 벽의 안정성 확인

1.굴착 및 배수에 수반하는 가시설


탄산 GAS.
유독 GAS GAS 검지기 구조물의 변위량 파악
메탄 GAS. -
수질오염 우물의 수질시험 2.지반개량 등에 의한 주변지역에
수질오면
수질오염 확인

- 75 -
본 과업 구간의 각 계측 항목별 목적은 다음과 같다.

1) 경사계

․ 경사계관의 공내 삽입시에는 관내에 맑은물을 채워서 부력에 의한 경사계관의 떠오름을 방지해


야 한다.

․ 경사계관은 직교하는 2방향의 변위를 측정할 수 있는 것으로써 경사계 롤러용 홈(Key Way)이
연속적인 이음에 의하여 뒤틀리지 않고 단일 평면내에 있도록 정확하게 연결되어야 한다.

․ 경사계관의 여굴 채움재는 경사계관 설치지반의 강도를 고려하여 선정되어야 한다.

․ 여굴에 대한 그라우팅 재주입후 경사계관 내부는 맑은 물을 이용하여 청소하여야 한다.

․ 그라우팅 완료후 측정관 상부에는 뚜껑(Cap)을 설치하여 흙이나 돌부스르기 등 이물질이 투입되
지 않도록 보호한다.

․ 경사계관은 공사용 장비나 사람에 의하여 훼손되지 않도록 적절한 보호장치에 의하여 보호되어
야 한다.

․ 경사계의 측정을 시작하기전에 맑은 물이 들어있는 경사계관내에 충분히 담구어 두어서 온도에


대한 오차를 최소화 하여야 한다.

․ 측정은 경사계관이 설치된 방향으로 직교하는 2방향에 대하여 측정하여야 하며 굴착면과 경사


계관의 축이 일치하지 않을때는 보정하여 보고되어야 한다.

․ 측정심도는 50cm 간격을 원칙으로 하되 측정된 경사각과 변위량은 공별, 심도별로 정리하여 보
고하여야 한다.

․ 알루미늄관을 사용할 경우 관의 부식으로 인한 막힘을 방지하기 위하여 정기적으로 한달에 1회


정도 맑은물로 청소를 하여야 한다.

․ 경사계 설치공의 천공직경은 경사계관 삽입 후 그라우팅이 가능한 정도 이상의 직경이어야 한


다.

․ 경사계관과 별도로 그라우팅 파이프를 삽입할 경우는 경사계관과 그라우팅 파이프의 삽입이 가
능한 직경이어야 한다.

․ 경사계관을 이용하여 그라우팅을 실시하고 별도의 그라우팅 파이프를 삽입할 필요가 없는 경우


에는 경사계관 외부의 공간을 그라우팅용 채움 재료가 용이하게 통과하기에 충분한 직경이어야
한다.

․ 천공시 공벽의 붕괴가 우려되는 지층에서는 붕괴를 방지하기 위한 케이싱을 사용하여 공벽을 보
호 하여야 한다.

․ 천공심도는 수평변위측정시 기준이 될 수 있도록 지반의 변위가 없다고 판단되는 견고한 지층내
부 1.5m 이상이어야 한다.

․ 경사계관의 하부에는 슬라임 및 그라우팅 채움재의 관내부로의 유입을 차단하기에 적합한 뚜껑


을 설치하고 실리콘과 테이프를 이용하여 밀봉하여야 한다.

- 76 -
제4 장 계 측 계 획 서

․ 경사계관의 이음부는 그라우팅 채움재를 차단하기 위하여 실리콘 테이프등으로 밀봉하여야 한


다.

2) 수위계

․ 용도에 적합한 종류의 계기(공기식, 전기저항식, V.W형, 개방식등)를 선정하여 설치하여야 한다.

․ Casagrande형 Open Stand Pipe일 경우는 경사계관 설치시와 같은 방법으로 천공을 하여야한
다.

․ 채움용 모래는 표준체로서 #8과 #50사이에 전체 모래중 95%가 존재하는 깨끗한 모래 #200체
통과량이 2%이상이어서는 안되며, #4체에 남는 것이 있어서는 안된다.

․ Tip 관입전에 깨끗한 모래로 약 30cm를 채운후 설치하여야 한다.

․ 지하수위의 거동을 측정하기 위하여 설치되는 간극 수압계일 경우 여굴은 깨끗한 모래로 다짐하
여 채우고 상부에서 지표수가 유입되지 않도록 적절한 조치를 하여야 한다.

․ 설치후 보호 Cap을 씌우고 지표면으로 돌출된 Pipe를 보호할 적당한 보호장치를 하여야 한다.

3) 지표침하계

․ 굴착면 주변의 영향권에 지표침하 측정판을 등간격 또는 부등간격으로 매설된다.

․ 수준 측량으로 측정하며 지질, 지하수위 시공법 등에 따라 침하량이 변한다.

․ 침하 영향권의 지역의 시준 가능한 지점에 Bench mark롤 선정하고 상단에 스태프를

세워서 레벨측정을 실시한다.

4) 변형 측정계(Strain Gauge)

․ 용도에 적합한 종류의 계기(매설형 및 표면 부착용등)를 선정하여야 한다.

․ Strut에 설치할 경우, 잭키의 잭킹전에 설치를 하여 부재에 작용되는 축력이 정확히 전달되게 하
여야 한다.

․ V.W Type의 변형 측정계인 경우 충격과 과전류에 민감하게 반응하므로 설치시나 관리시 각별한
주의를 요하여야 한다.

․ 설치시점에서 측정지점까지 케이블이 연장되어야 하는 경우 정확한 접합, 방수 및 연결부위의파


손을 방지하기 위하여 완전접합을 하여야 한다.

․ 설치는 접착재를 사용하여 부착하며 그위에 방수 Bond를 도포하여 밀폐시킨다.

5) 하중계

․ Load Cell에 Cable을 연결 후의 영점값을 읽고 Readout Sheet에 기록한다.

․ E/Anchor 스트랜드를 Center Hole 내부로 접어 넣어 Lower Plate를 거치시킨다.

․ Load Cell을 거치시킨다.

․ Upper Plate를 거치시킨 후 지압판을 거치하고 유압잭을 이용하여 E/Anchor를 인장시킨다.

․ E/Anchor를 인장시킨 후 지시계를 이용하여 초기치를 읽는다.

- 77 -
6) 축력계

․ 용도에 적합한 종류의 계기(매설형 및 표면 부착용 등)를 선정하여야 한다.

․ ROCK BOLT에 설치할 경우, 매설전에 설치를 하여 부재에 작용되는 축력이 정확히 전달되게 하
여야 한다.

7) 구조물경사계

․ 구조물경사계는 Inclinometer와 마찬가지로 평행력 가속도계를 내장한 계측기기이므로 측정시


진동에 의한 영향을 크게 받으므로 주의가 필요하다. Breaker나 발파작업이 진행되는 현장에서
계측된 결과를 보면 일자별로 측정치의 기복이 심한 경우가 많은데 이는 측정시 진동 영향이
sensor에 전달된 현상으로 판단된다. 따라서 구조물경사계 측정은 작업진동이 없는 상태에서 실
시하도록 해야 할 것이다.

․ 설치지점을 고르게 정리한 후 이물질을 제거한다.

․ 그라우트재나 Epoxy bond 등을 사용하여 plate 면적만큼 설치지점에 포설한다.

․ Plate의 1-3축이 현장 방향으로 향하게 부착한다.

․ 2~3일 경과 후 부착정도를 확인하여 완전히 부착되었으면 보호관을 씌운다.

8) Crack Gauge(균열 측정계)

․ 구조물의 표면 균열이나 팽창 지점의 거동변위를 계측하여 구조물의 안전 여부를 판단하는 것으


로 설치 방법은 포텐쇼미터가 내장된 Sensor를 Anchor Plate와 Template를 균열 예상 지점에
고정하고, 이 양끝은 Rod로 연결되어 있으며 이는 균열이나 팽창에 따라 움직이는 값을 측정한
다.

9) 진동소음측정기

․ 인접 지반과 구조물에 설치하여 소음과 진동의 크기를 측정하여 안정관리 자료로 활용함.

․ 측정할 지점에 진동소음장비를 설치 후 측정한다.

10) 내공변위계

․ 지하철 구조물 단면 형상을 따라 종방향 또는 횡방향으로 설치하여 인접 굴착시 지하철 구조물


의 콘크리트 변위량을 측정하여 허용변위량과 비교, 구조물의 안정성을 판단하고자 설치한다.

․ 설치 후 자동화 시스템을 구축하여 관리한다.

11) 진동측정계 (지하철)

․ 상부 굴착 시 진동영향을 측정하여 지하터널의 안전도를 판단한다.

(1) 측정하고자 하는 지점을 표시한 뒤 부착면을 정리한다.

(2) Mounting Block을 에폭시나 앵커 볼트 등으로 고정 시킨다. 이때 Mounting Block을방향을


맞추어 평평하게 설치한다.

(3) 볼트를 사용하여 가속도계를 Mounting Block에 설치한다.

- 78 -
제4 장 계 측 계 획 서

(4) 드라이버나 스패너로 영점조정을 한다.

(5) Cable은 보호관을 씌워 측정 장비 위치까지 포설한다.

12) 균열측정계 (지하철)

․ 균열측정계는 굴토공사로 인한 주요 지하철 균열 변화량을 측정하여 해당 구조물의 안정성 여부


를 판단하기 위하여 설치한다.

(1) Bore Hole의 지름의 직경을 약 10mm로 소정 깊이(Anchor bolt의 길이 이상)까지 시공한다.

(2) 천공 후 양생 재를 삽입한다.

(3) Anchor Bolt의 Male 부분을 삽입한다.

(4) 양생 재가 초기 양생이 되면 균열 측정기의 Body 부분을 Bolt Male 부분의 맞추어 끼우고
Female 부분을 체결한다.

(5) 양생재가 완전히 굳으면 초기치를 설정하고, 계획 계측 빈도에 따라 계측을 실시한다.

- 79 -
4.4 계측 위치 선정

설치위치는 다음과 같은 사항을 고려하여 선정한다.


• 원위치시험 등에 의해 지반조건이 충분히 파악된 곳
• 공사구간 중 지반거동을 대표할 수 있는 곳
• 흙막이 구조물과 지반에 특수한 조건이 있어 공사에 영향을 미칠 것으로 예상되는 곳
• 계측기 설치, 유지관리가 용이하고, 공사도중 훼손 가능성이 적은 곳

계측기기 배치에 대한 검토사항

항 목 내 용

계측 목적과의 부합성 ‧ 계측목적 및 해석상 합치한 장소선정과 배치간격 수량 및 심도검토


‧ 선행부분, 가장 취약하다고 판단되는 부분 검토
시 공 사 항 ‧ 시공 과정에 대한 합리성 검토
‧ 자연조건 및 주변 여건 고려
‧ 한계기가 부담할 수 있는 영역검토
전체관리 및 집중관리
‧ 주 계측단면, 보조계측 단면의 산정
‧ 가설물, 중기 등에 대한 장해
계 기 보 수
‧ 장기간 계측하는 경우의 설비

계측관리 항목 및 수량

계측항목 계측기 명칭 설치목적 수량

지반굴착시 일정간격으로 수평변위량을 측정하여 흙막이 벽체의 연


수평변위 지중 경사계 속적인 횡방향 변위와 변화속도를 측정하여 현재의 안전판단 및 향후 8 개소
지반거동을 사전에 예측할 목적으로 실시함.
굴착에 따른 배면지반의 수위변동을 측정하여 설계시 적용된 수위와
지하수위 지하 수위계 비교 검토함으로써 하중증가요인 및 인접지반에 미치는 영향 상태를 8 개소
검토함.
굴착으로 인해 발생된 인접지반의 지표침하를 측정하여 변위 영역을
지표침하 지표 침하계 추정하고 인접지반의 안전도를 검토하며 지하매설물 및 인접건물에 57 개소
미치는 영향을 검토함.

버팀보, 띠장 및 엄지말뚝 등과 같은 강재구조물의 변형정도를 측정


변형률계 15 개소
하여 굴착에 따른 강재 구조물의 안전도를 검토함.
응력계
철골 Slab 및 기둥 같은 구조물의 철근의 인장응력을 측정하여 구조물의
51 개소
응력계 안전도를 검토하기 위하여 실시함.

구조물 지하 흙막이 공사시 인접 기존 건물이 있는 경우 구조물의 경사변화


건물 경사계 28 개소
기울기 를 측정하기 위하여 실시함.

구조물 표면 균열이나 팽창지점의 거동 변위를 계측하여 구조물의


균열측정 균열 측정계 28 개소
안정 여부 판단.

- 80 -
4
제 장 계 측 계 획 서

- 81 -
4.5 계측 빈도
굴착지반의 거동은 일일 굴토량과 작업기계, 기상(우천)등에 영향을 받으므로 데이터의 변화속도와 안정성
여부의 관련성을 충분히 고려하여 적정한 측정 빈도를 설정해야 한다. 굴착 현장의 일반적인 계측 빈도는

아래와 같으며, 당 현장은 다음과 같은 상황에 따라 증감될 수 있다.

가. 데이터의 변화속도

데이터가 변화하는 속도가 빠른 계측항목은 빈도를 높여야 하며, 반대로 장시간에 걸쳐 서서히 변화하

는 항목은 낮은 빈도로 충분하다. 데이터의 변화속도는 계측시기, 계측항목, 측정위치 등에 따라 다르다.

나. 안전과의 관련도
안전과의 관련이 직접적인 계측항목과 간접적인 계측항목으로 분류되는데(예를 들면 전자는 응력, 후자

는 하중) 직접적인 것 일수록 빈도를 높일 필요가 있다.

다. 계측빈도의 통일
각 계측항목은 상호관련의 비교검토가 필요하므로 관련 항목은 동일시기에 계측을 실시하도록하고 그

중 빈도가 높은 것은 별도로 계측한다.

계측항목별 측정 빈도 (이상징후 발생시 수시측정)

계측항목 설치 시점 측정시기 측정빈도 비 고

그라우팅완료후 4일 1회/일(3일간) 초기치 선정


지중경사계 굴착전 굴착시 2회/주
지하골조 완공후 1회/주(1개월까지 ) 1~6개월 (월 1회)

설치 후 1회/일 초기치 선정
지하수위계 굴착전 굴착시 1회/일
지하골조 완공후 1회/월(1년간) 1회/분기 (이상징후 발생시 )

설치후 1일 경과후 1회/일(3일간) 초기치 선정


지표침하계 굴착전 굴착시 2회/주
지하골조 완공후 1회/주(1개월까지 ) 1~6개월 (월 1회)
수동
계측
지보 설치후 3회/일(1일간) 초기치 선정
지보 거치후
철골응력계 굴착시 2회/주 다음단 설치시 추가측정
jacking 이전
지하골조 완공후 1회/주(1개월까지 ) 1~6개월 (월 1회)

설치후 1일 경과 3회/일(1일간) 초기치 선정


구조물
굴착전 굴착시 2회/주
경사계
지하골조 완공후 1회/주(1개월까지 ) 1~6개월 (월 1회)

설치후 1일 경과 3회/일(1일간) 초기치 선정


균열측정계 굴착전 굴착시 2회/주
지하골조 완공후 1회/주(1개월까지 ) 1~6개월 (월 1회)

- 82 -
4
제 장 계 측 계 획 서

4.6 계측관리기준
계측에 의한 변위 및 응력의 관리 기준은 지질 조건 및 단면의 크기 및 형상, 굴착 공법, 주변 구조물의 환경
조건 등에 따라 각각 달라지므로 일정한 기준을 설정하는 것은 설계, 형식, 결과라든지 유사 지질 및 단
면에서의 계측 결과를 토대로 계측 전문 기술자에 의해 관리 기준(허용량 및 허용 속도 등)을 정해야 한
다. 최근 들어, 현장에서 안전하고 경제적인 시공을 위해 사용되고 있는 계측Data 관리 방법으로 절대치
관리 방법과 예측 관리 방법 등 크게 두 가지로 나눌 수 있다.

4.6.1 절대치 관리 방법
- 절대치 관리 방법은 시공에 앞서 설정한 관리 기준치를 실제 측정한 실측치와 비교 검토하여 그 시점에서
의 공사의 안전성을 확인하는 방법이다.
- 절대치 관리 방법을 도입했을 경우 가장 문제가 되는 것은 설계치에 대한 관리 기준치의 결정방법과 계측
결과치가 관리 기준치를 초과했을 때의 대처방안이다. 그러나 굴착공사에서 관리 기준치를 결정하는 것은
매우 어려운 사항이다.
- 절대 관리치를 설정한 후 측정을 계속하여 측정 관리치가 절대 관리치에 접근하면 공사의 안전 시공을 위
해 공사의 진행 속도를 감안한다던가 계측 빈도를 높이는 등의 유기적인 체제를 강화하고, 측정치가 절대
관리치를 초과하였을 때에는 그 발생 원인을 찾아 대책을 강구해야 한다.
- 이 방법은 계측 결과로 나타난 가설 구조물의 거동 및 이상 징후를 조기에 발견할 수 있으며, 즉시 시공에
반영할 수 있다는 점에서 일반적으로 일상의 안전관리 방법으로 쓰이고 있다.
4.6.2 예측 관리 방법
- 예측 관리 방법은 현 시점에서 다음 단계 이후의 예측과 시공에 앞서 결정한 관리 기준치를 비교 검토
하여 사전에 공사의 안전성을 확인하거나 현재 시공하고 있는 시공법을 검토하여 관리하는 방법이다.
- 따라서 예측 관리방법은 현재 단계까지의 굴착 중에 나타난 변형의 실측치를 바탕으로 Simulation하여, 해
석 결과로 얻어진 토질 정수, 벽체 및 지보공의 특성치를 구해서 다음 단계 굴착 이후의 흙막이 벽체 또
는 구조물 및 지보공의 거동을 수치해석 기법을 통하여 예측, 추정한다. 이 결과 안전하다고 판단되면 굴
착공사를 진행하고 문제가 있으면 대책을 강구하며 그 대책에 대해서 다시 앞에서와 같이 수치해석을 행
하여 안전을 확인하고 공사를 진행하는 방법이다.
계측항목별 측정빈도
INPUT (통상해석) OUTPUT

하 중 응 력
경계조건 변 형
지반정수 변 위

OUTPUT (역 해 석) INPUT
- 이와 같이 계측 자료와 예측 자료를 비교하는 과정에서 계측 자료가 충분히 허용 범위 내에 유지되어야
하지만 그렇지 못한 경우에는 설계된 단면을 재 가정하여 안전측에 도달되도록 반복 설계를 실시하여야
한다. 이와 같은 반복 설계의 절차는 다음과 같다.
∙ 흙막이 벽체의 횡방향 변위, 지표침하, 지보재에 작용하는 하중 등의 설계 허용치 지정
∙ 충분한 안전성과 경제성을 감안한 수치예측 자료 계산

- 83 -
∙ 계측치와 수치 예측치의 비교
∙ 계측치와 예측치가 차이가 있을 경우, 오차의 가능성을 확인한 후 필요에 따라 물성치 등의 입력자료
를 현장 조건에 맞도록 재결정하여 역해석(Back Analysis)을 실시한다.
∙ 계측치가 허용 범위 내에 들지 못하면 설계 조건을 재 가정하여 허용 범위를 만족할 때까지 위의 과
정을 반복 실시한다. 여기에서 설계 조건의 재 가정에서는 벽체의 강성변화, 지보공의 설치간격 변경,
시공법의 변경, 굴착 깊이의 감소, 인접 구조물과의 벽체 거리 변경 등의 대안을 고려할 수 있다.
∙ 이상과 같은 방법을 통하여도 개선의 여지가 없을 경우에는 주변 구조물에 새로운 보강공법을 적용하
거나 인접 구조물에 대한 처리 또는 현장 위치를 변경하는 등의 기타 방안을 강구한다.
- 이 방법은 현장의 제반 조건에 대한 이상 징후 또는 거동을 조기에 추정할 수 있으며 대응책을 검토할 수
있는 시간적인 여유가 충분히 있다는 장점이 있으나 지반공학적 경험이 풍부하며 전산해석이 가능한 숙
련된 기술자가 업무에 투입되어야 한다.
측정항목과 관리 기준치의 예(2)

측 정 안전, 위험의 판 정 법
항 목 판정기준치 지 표 (관리기준) 위 험 주 의 안 전

설계시에 이용
측압 한 토압분포
설계시이용한토압
(토압, (지표면에서 F   F1 < 0.8 0.8 < F1 < 1.2 F1 > 1.2
실측에의한측압 예측 
수압) 각단계
근입깊이)

벽체 설계시의 설계시의추정치
F   F2 < 0.8 0.8 < F2 < 1.2 F2 > 1.2
변형 추정치 실측의변형량 예측 

철근의 허용 철근의허용인장응력
F   F3 < 0.8 0.8 < F3 < 1.2 F3 > 1.2
토류 인장응력 실측의인장응력 예측 
벽내
응력 토류벽의 허용 허용휨모멘트
F   F4 < 0.8 0.8 < F4 < 1.2 F4 > 1.2
휨 모멘트 실측의휨모멘트

Strut 부재의 부재의허용응력


F   F5 < 0.7 0.7 < F5 < 1.2 F5 > 1.2
축력 허용축력 실측 예측 의축력

실측결과가 실측결과가
굴착 실측결과가 주의
위험영역에 안전영역에
저면의 T.W.Lambe에 의한 Heaving량 영역에 Plot되는
Plot되는 Plot되는
Heaving량 경우
경우 경우

각 현장마다 각 현장 상황에 맞는 허용침하량을 지정하고,


침하량
허용치를 결정 그 허용 침하량을 넘으면, 위험 또는 주의 신호로 판단한다.

부 등 건물의 허용 기둥 간격에 대한 1/300


1/300이상 1/500이하
침하량 부등 침하량 부등침하량의 비 ~1/500 이상

- 84 -
제 4 장 계 측 계 획 서

4.7 당 현장의 계측관리기준


당 현장의 계측관리기준치는 7.4절의 계측관리기법에 소개된 예와 굴착으로 인하여 발생하는 흙막이벽체의

변위 및 인접지반의 침하에 관한 기존의 연구결과와 문헌 등을 종합하여 다음과 같이 선정하였다.

계측관리 기준은 정량적으로 설정되어 현장 적용에 적합하게 설정하며, 3차관리기준(허용치)를 중심으로 1차

2차 관리 기준을 설정함

현장의 계측관리 기준

판 정표
내 용 비고
1차 관리치(안전) 2차 관리치(주의) 3차 관리치(위험)

토사 σ ≤ 2mm (7일간) σ ≤ 4mm (7일간) σ ≤ 10mm (7일간)


일간
변위량
지중 암반 σ ≤ 1mm (1일간) δ ≤ 2㎜ (1일간) σ ≤ 4mm (1일간)
경사계
0.002H
최대변위랑 3차관리기준× 0.6 3차관리기준× 0.8
(H= 최대굴착깊이)

일일
△H ≤ 0.5m △H ≤ 0.75 △H > 1.0m
수위변화량
지하
수위계
누적 4.0
6.0m 8.0m
수위변화량 (3차관리기준 ×0.5)

지표 3차 관리기준 × 0.6 3차 관리기준 × 0.8


최대변위량 25mm(허용치)
침하계 15mm 20mm 지하안전
영향평가
메뉴얼
응력계 최대변위량 3차 관리기준 × 0.6 3차 관리기준 × 0.8 허용치 (2020.06)

구조물
각변위 1/1,000 1/850 1/500
경사계

균열
최대변위량 0.2mm 0.38mm 0.5mm
측정계

유적, 문화재, 컴퓨터


가축류등 : 0.1cm/s : 0.2cm/s
시설물

진동
재래주택
측정계 : 0.3cm/s 주택, 아파트(R.C조) : 0.5cm/s
(조적식,목재)

상업용 건축물 : 1.0cm/s 철골콘크리트 건물 및 공장 : 5.0cm/s

- 85 -
4.7.1 자동화 계측시스템
1) 자동화 계측시스템의 구축 목적

구조물의 안전성 확인과 최적의 유지관리가 되도록 체계적인 연속자료를 제공하여 효율적이고

경제적인 구조물 유지관리를 목적으로 실시한다.


2) 자동화계측시스템 구축시 구비조건

- 열악한 현장 환경에 견딜 수 있도록 내구성이 우수해야 한다.


- 측정 정밀도와 정확도가 높아야 하고, 장시간 사용시에도 계측값의 안정성이 확보되어야 한
다. 계측기기는 여러 업체에서 가장 많이 사용하는 방식을 선정하여 상호 호환성과 다양한 통신
수단을 이용할 수 있어야 한다.
- 계측기기는 사용 온도범위가 넓고 온도에 따른 계측값의 변화가 없어야 한다. 또한 습도의
영향을 받지 않도록 방습 기능을 보유하여야 한다.
- 계측 속도와 저장용량은 센서수량, 측정빈도, 측정기간 등을 고려하여 적정한 기기를 선정하
여야 한다.
- 아날로그 값을 출력하는 센서와 계측기기 사이의 연결 케이블 길이는 최소화하여 센서 신호
가 왜곡되는 것을 방지하여야 한다.
- 계측기기는 고전압 및 유도장애, 누설전류, 온도변화, 진동, 습도나 주위환경에 관계없이 정
상작동이 되어야 한다.
- 전원의 공급방법이 다양하여야 하며, 전력소모가 적어야 한다.
- 현장에 설치되는 계측기기 측정 정밀도는 높고 단순한 구조로 견고해야 한다.
- 통합운영 프로그램을 구축하여 중앙 집중형 자동계측 운영이 가능해야 한다.
- 운영 프로그램에 의하여 관리치를 설정할 수 있어야 한다. 필요시 임계치를 설정하여 계측
및 데이터릉 저장 개시를 알리는 트리거링 시스템을 갖추어 불필요한 데이터 로깅을 줄일 수 있
다.
- 통합운영 프로그램은 사용자가 쉽게 운영할 수 있어야 한다.
- 자동계측시스템은 구축공사를 시점을 기준으로 6개월 이전에 생산된 제품을 설치하여 계측
장비에 대한 신뢰도를 향상시켜야 한다.
3) 자동화계측시스템 주요 장비 사양

- 자동화계측시스템의 주요 장비에 대한 사양은 다음을 참고하고 계측기기 및 장비의 진보와


IT 기술력의 발달을 고려하여 신뢰성이 확보된 장비를 선정하여야 하며, 현장여건에 따라 감독자
와 협의 후 변경하여 설치할 수 있다.
- 데이터 로거
① 센서를 직접 연결하거나 멀티플렉서와 연결하여 다수의 센서를 측정하여 데이터를 저장 및
전송하는 장치.
② 사 양
㉠ 채널수 : 8ch 또는 16ch
㉡ 내장메모리 : 4Mb (확장 가능)

- 86 -
제 4 장 계 측 계 획 서

㉢ 정확도 : ±0.12% of reading + offset


㉣ 측정가능방식 : 전기저항식, 진동현식 4-wire gauge & -6wire gauge(full bridge), 2-wire,
3-wire, 4-wire half bridge
㉤ 통신방식 : RS-232, CS I/O, SDI-12, PERIPHERAL, Protocol(Pakbus, AES-128, Modbus,
FTP, HTTP 외)
㉥ 공급전원 : 9.6 ~ 16 Vdc
㉦ 품질보증기간 : 최소 3년 이상
- 광데이터로거
① 광센서를 직접 연결하거나 멀티플렉서와 연결하여 다수의 센서를 측정하여 데이터를 저장
및 전송하는 장치
② 사 양
㉠ 채널수 : 4ch, 8ch, 16ch
㉡ 측정속도 : 1Hz 이상
㉢ 측정범위 : 1510nm ~ 1590nm
㉣ 통신방식 : Ethernet 또는 RS 통신
- 멀티플렉서
① 다수의 센서를 1개의 데이터로거에 연결하기 위한 채널 확장 모듈
② 사 양
㉠ 채널 확장수 : 16ch (최대 32ch)
㉡ 최대측정속도 : 20ms
㉢ 공급전원 : 9.6 ~ 16 Vdc
- 운영 PC
① 운영 PC는 데이터 로거부터 측정된 데이터의 저장을 기본적으로 수행하게 되므로 데이터
저장 용량을 고려한 하드디스크 용량 선정, CPU 사양 등을 고려하여 선정한다.
② 현장 적용시점을 기준으로 일반적인 산업용 PC의 사양을 적용하도록 한다.
4) 통합계측시스템 구축시 고려사항

- 유지관리계측기의 운영 및 관리시 통합관리가 용이하도록 가능한 공구별로 상이하지 않도록


모니터링 프로그램을 일괄적은 통합시스템(통합프로그램)으로 구축하는 것이 바람직하다.
- 공구별 시공사 및 계측전문회사가 상이하여 동일한 프로그램의 설치 및 관리는 불가능하므
로 통합계측시스템(통합 모니터링 시스템)은 별도의 전문업체에서 개발 및 구축하는 것이 바람
직하며 다음과 같이 운영하도록 한다.
① 유지관리계측 통합계측시스템의 구축과 관련하여 전체 공구 통합시스템 운영관리를 위한
유지관리업체 선정(주체 : 발주처 또는 유지관리기관)
② 선정된 업체에서는 시공 중에 설치된 유지관리계측기를 통합계측시스템과 연계하는 업무
수행
③ 하자보수기간내에 발생된 하자에 대해서는 각 공종별 과업수행업체(계측기 설치 및 자동화
구축 업체, 통합계측시스템 구축 업체 등)에서 하자보수 실시

- 87 -
4.7.2 사고 및 계측관리기준 초과시 대응방안
1) 평상시(안전)

인허가 승인기관

필요시 ↑ → 지하개발 사업자

책임감리원 전직원
검토·열람
→ 열람

보고서 제출(주간,월간) ↑
현장대리인 전직원
검토·열람
→ 열람

보고서 제출(주간,월간) ↑ ← 자문

계측회사
책임기술자
측정결과 검토분석
보고서 작성

↑ 측정결과 제출

감리단 담당자 계측회사 담당자 시공사 담당자


입회·확인
↔ 측정 및 Data정리
↔ 입회·확인

- 88 -
4
제 장 계 측 계 획 서

2) 1차 관리기준치(주의)

인허가 승인기관

필요시 ↑ → 지하개발 사업자

책임감리원 전직원
검토·열람 → 열람
계측결과 제출 ↑ ↓ 의견통보
현장대리인 전직원
검토·열람 → 열람

계측결과 제출 ↑
계측회사
책임기술자
측정결과 검토분석
보고서 작성

↑ 측정결과 제출

감리단 담당자 계측회사 담당자 시공사 담당자

주변지반 및 ↔ 측정 및 계측기 점검 ↔ 주변지반 및


시설물 점검 주변지반 및 시설물점검 시설물 점검

SMS 메시지 송신(현장소장, 감리단장, 발주처)

구 분 조치요령
∙ 측정기기 점검 및 재측정(센서, 케이블 점검) → 필요시 추가설치
계측회사 ∙ 주변 지반 및 시설물 일체 점검(육안점검)
∙ 책임기술자 현장정밀조사 → 원인조사 →보고서 작성
∙ 시설물 점검, 지반 정밀 관찰
시공사
∙ 본사 기술진 현장조사 및 시설물 이상 유무 확인 →의견서 작성
∙ 시설물 점검, 지반 정밀관찰, 작업주의 지시
감리단 ∙ 비상주 감리원 현장정밀조사 → 설계도서 검토 → 원인분석 → 필요시 보완공법 검토
∙ 이상징후 발견 시 : 지원업무수행자 즉시 보고

지하개발 사업자 ∙ 현장 상황 조사

- 89 -
3) 2차 관리기준치(특별관리)

인허가 승인기관

보완공법 검토

필요시보고 ↑ → 지하개발 사업자

비상주감리
책임감리원
→ 원
현장점검 강화 기술지원
열람
계측체계 강화

보고서 제출 ↑↓ 의견통보

현장대리인
즉시보고
현장점검 강화
계측체계 강화

계측결과 제출 ↑↓
의견
← 자문
통보 필요시

계측회사
책임기술자
요인분석
계측체계 강화

자료제출 ↑ ↓ 주의관찰 지시
감리단 담당자 계측회사 담당자 시공사 담당자
시설물 점검 시설물 점검
지반/막장조사
↔ 측정빈도 증가 ↔ 지반/막장조사
현장조사
변위진행여부 확인 변위진행여부 확인
SMS 메시지 송신(현장소장, 감리단장, 발주처)

- 90 -
제4 장 계 측 계 획 서

구 분 조치요령

∙ 측정기 추가설치, 측정빈도 증가(매 시간마다 측정), 주변지반 및 시설물점검


계측회사 ∙ 책임기술자 현장정밀조사 → 관리기준치 검토 → 원인분석 → 계측체제 강화 → 보고서작성
∙ 상황전파 → 현장소장, 감리단장, 발주처

∙ 시설물 점검, 지반 정밀관찰


∙ 변위진행 상황 기록
∙ 계측체제 강화 및 공사중단 여부검토
시공사
∙ 본사 기술진 현장조사 및 시설물 이상유무 확인
∙ 필요시 외부전문기관 용역시행
∙ 보완공법 시공방안작성 보완방법 보고

∙ 시설물 점검, 지반 정밀관찰, 변위진행 상황확인


∙ 비상주감리원 현장정밀조사 → 계측등 원인분석 → 보완공법 제시
감리단 ∙ 현장상황 점검, 계측체제 강화
∙ 공사 중단여부 검토, 필요시 응급보강 지시
∙ 보완공법 결정 및 시행계획 보고

∙ 현장상황 조사
지하개발 사업자
∙ 보완공법 검토 승인

- 91 -
4) 3차 관리기준치(위험)

인허가 승인기관

현장상황조사
재설계 대체공법 검토

보완공법 선정보고 ↑ ↓ 결정승인 → 지하개발 사업자

책임감리원 비상주감리원
설계검토 → 공법 적정성검토
재설계추가계획 검토 기술지원 재설계 내용검토
(필요시)
대책공법 시행 계획검토 요인분석

보완방법 보고 ↑ ↓ 보완방법 결정 지시
현장대리인
시공방법 및 보강대책 검토 즉시보
또는 수행 고
응급보강실시(필요시)
필요시 외부전문기관
용역시행

보고서 제출 ↑ ↓ 지시
시행
← 자문
필요시

계측회사
책임기술자
계측빈도 증가
계측기 추가배치
현장조사요인분석

↑ ↓ 측정결과 제출
감리단 담당자 계측회사 담당자 시공사 담당자
측정기 추가 설치 시공방법 및 보강대책 수행
인접시설물 점검 ↔ 측정빈도 증가 ↔ 응급보강 실시(필요시)
변위진행상황 확인
현장조사 인접시설물 점검
SMS 메시지 송신(현장소장, 감리단장, 발주처)

- 92 -
4
제 장 계 측 계 획 서

구 분 조치요령

측정기 추가설치 및 측정빈도 증가 대책 수립


∙ 주변지반 및 시설물 일체 점검
계측회사
∙ 책임기술자 현장정밀조사 → 관리기준치 검토 → 원인분석 → 계측체제 강화 → 보고서작성
∙ 상황전파 → 현장소장, 감리단장, 발주처

공사중지(안전시공 대책 수립시까지)
∙ 시공방법의 변경
∙ 지반조사 및 응급보강 조치
시공사 ∙ 외부기관 안전진단(점검) 실시
∙ 지하매설물 재조사 실시
∙ 대체공법 강구 재설계추진계획 등 시행방안 보고
∙ 계측시스템 개선

공사중지 및 현장점검
∙ 비상주감리원 보강공사 실시결과 검토, 대책공법 및 재설계
감리단 ∙ 검토, 원인분석
-재설계 추가계획 및 대체공법 시행계획 검토
-대체공법 및 재설계추진계획 시행방안 승인요청

∙ 현장상황 조사 → PM 보고
∙ 대체공법 검토
지하개발 사업자
∙ 계측기 시스템 변경 승인
∙ 재설계 보강공법 검토 승인

- 93 -
부 록
4

1. 가시설 단면검토
2. 기초검토
3. 현장타설말뚝 검토
4. 슬래브지지공법 검토
1. 가시설 단면검토
1.A-A(L)
1.설계요약
1.1 C.I.P
단면검토 비고
부재 적용
구분 발생응력(MPa) 허용응력(MPa) 판정 (설계안전율)
40 Mpa 압축응력 12.712 19.200 O.K 66.21%
흙막이벽 HD32×8 인장응력 173.363 270.000 O.K 64.21%
D13@200 전단응력 0.992 1.329 O.K 74.63%

1.2 안전성 검토
1) 측면파일 근입장
근입장 안전율 : 1.77 > 1.20 ---> O.K

2) 수평변위 검토
허용 수평변위 : 16.33mm < 61.94mm ---> O.K
허용수평변위 = 30.97 m x 0.20 % = 0.0619 m ( 61.94mm)
수 평 변 위 (mm)
시공단계 부재 굴착깊이 판 정 비고
최대발생변위 허용변위
STEP-1 CIP 1.000 2.40 61.94 O.K 3.87%
STEP-2 CIP 5.085 3.80 61.94 O.K 6.13%
STEP-3 CIP 8.485 5.80 61.94 O.K 9.36%
STEP-4 CIP 11.885 8.10 61.94 O.K 13.08%
STEP-5 CIP 15.285 9.10 61.94 O.K 14.69%
STEP-6 CIP 18.685 8.70 61.94 O.K 14.05%
STEP-7 CIP 22.135 8.70 61.94 O.K 14.05%
STEP-8 CIP 25.585 8.70 61.94 O.K 14.05%
STEP-9 CIP 27.300 10.60 61.94 O.K 17.11%
STEP-10 CIP 30.970 10.70 61.94 O.K 17.27%
STEP-11 CIP 30.970 16.00 61.94 O.K 25.83%
STEP-12 CIP 30.970 16.30 61.94 O.K 26.32%
STEP-13 CIP 30.970 16.30 61.94 O.K 26.32%
STEP-14 CIP 30.970 16.30 61.94 O.K 26.32%

3) 침하량 검토
허용 침하량 : 13.12 < 25.00 ---> O.K
2.결과 정리
구 분 해석결과 (단위) 비고

외측파일 모멘트 358.47 kN·m


CIP
외측파일 최대 전단력 387.30 kN

최대 수평 변위 16.33 mm

주동토압 모멘트 (Ma) 10469.89 kN·m


근입장검토
수동토압 모멘트 (Mp) 18483.28 kN·m
3.C.I.P 설계
3.1 흙막이벽
가. 설계 제원
C.I.P 직경(D, mm) 600.0
C.I.P 설치간격
600.0 전단철근 주철근
(C.T.C, mm)
H-pile 제원 H-300x300x10x15

600.0
직경
H-pile 설치간격
1200.0
(C.T.C, mm)
콘크리트 설계기준강도 CIP 간격
40.0
(fck, MPa)
600.0
주철근 항복강도(fy, MPa) 400.0
전단철근 항복강도(fy, MPa) 400.0
콘크리트 설계기준강도
0.8
저감계수
허용응력보정계수 1.5
탄성계수비(n) 8
피복두께(mm) 80.0

나. 단면력 산정
(1) 최대 휨모멘트 ( Mmax )
Mmax = 358.470 kN·m/m
= 358.470 (kN·m/m) × 0.60 m (C.I.P 설치간격) = 215.082 kN·m
(2) 최대 전단력 ( Smax )
Smax = 387.300 kN/m
= 387.300 (kN/m) × 0.60 m (C.I.P 설치간격) = 232.380 kN

다. C.I.P의 허용 응력
(1) 콘크리트 허용압축강도 ( fca )
fck' = 0.8 × 40.0 = 32.000 MPa
fca = 보정계수 × ( 0.4 × fck' ) = 1.5 × ( 0.4 × 32.000 )
= 19.200 MPa
(2) 콘크리트 허용전단강도 ( τa )
τca = 보정계수 × ( 0.08 × fck' ) = 1.5 × ( 0.08 × 32.000 )
= 0.679 MPa
(3) 주철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa
(4) 전단철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa

라. 철근량 검토
(1) 환산단면
4 3 4 4
π × D B × B π × 600 B
= → = → B = 525.6 mm
64 12 64 12

(2) 환산 단면적 : B × H = 526 × 526


b = 526 mm , d = 526 - 80.0 = 445.6 mm
n × fca 8 × 19.200
k0 = = = 0.363 (평형철근비)
n × fca + fsa 8 × 19.200 + 270.00
k0 0.363
j0 = 1 - = 1 - = 0.879
3 3

(3) 휨에 대한 검토
Mmax 215.082 × 1000000
소요철근량 = = = 2,033 mm2
fsa × j × d 270.0 × 0.88 × 445.6

사용철근량 (As) : 4 ea HD 32 = 3,175.3 mm2

소요철근량 < 사용철근량 ---> O.K

스트럿에 의한 축력의 작용방향과 토압의 작용방향은 서로 반대이므로 양측에 모두 배근해야 하므로


※ 철근 : 8 ea HD 32 사용 ( As = 6350.6 mm2 )

(4) 전단에 대한 검토
Smax 232.380 x 1000
τ = = = 0.992 MPa
bxd 525.6 × 445.6
∴ τ > τca = 0.679 MPa ---> N.G 최소전단철근 배치
τ' = τ - τca
= 0.992 - 0.679
= 0.313 MPa

∴ 사용철근량 (Av) : 2 ea D 13 = 253.2 mm2


∴ s = 200 mm 간격으로 배치

τ'ㆍsㆍb 0.313 × 200.0 × 525.6


Av req = = = 122.0 mm2
fsa 270.000

사용철근량(Av) > 필요철근량(Av req) → O.K

Avㆍfsa 253.225 × 270.0


τsa = = = 0.650 MPa
sㆍb 200.000 × 525.6
τa = τca + τsa = 0.679 + 0.650 = 1.329 MPa
∴ τa > τ = 0.992 MPa ---> O.K

마. 응력 검토
(1) 압축응력 검토
ρ = 3175.3 / ( 445.6 × 525.6 ) = 0.0136
2
k = (n·ρ) + 2·n·ρ - n·ρ
= ( 8 × 0.0136 )2 + 2 × 8 × 0.0136 - 8 × 0.0136 = 0.370
j = 1 - (k/3) = 1 - ( 0.370 / 3 ) = 0.877
2ㆍMmax 2 × 215.082 × 1000000
fc = = = 12.712 MPa
2 2
kㆍjㆍbㆍd 0.370 × 0.877 × 525.6 × 445.6
∴ fc < fca = 19.200 MPa ---> O.K

(2) 인장응력 검토
Mmax Mmax 215.082 × 1000000
fs = = = = 173.363 MPa
pㆍjㆍbㆍd2 Asㆍjㆍd 3175.294 × 0.877 × 445.6
∴ fs < fsa = 270.000 MPa ---> O.K
4.침하량 (GROUND SETTLMENT CHECK) 검토
SUNEX PROGRAM OUT DATA Caspe(1966) 방법에 따른 지표면 침하 계산

Excavation Depth (HW) = 31.00 m


Average Phi to ex. Depth = 27.81 deg
Width of Excavation (B) = 60.00 m
Hp = (0.5 B tan(45+PHI/2 = 49.74 m
Ht = (Hw+Hp) = 80.74 m
Distance of Influnce (D=Ht*tan(45-PHI/2)) = 48.70 m

Volume of deflection (Vs) = 0.31942 ㎥


Settlement at wall (Sw) = 2 Vs/D = 0.01312 m = -13.12 mm

Distance 0.0×D 0.1×D 0.2×D 0.3×D 0.5×D 1.0×D


(m) 0.0 4.9 9.7 14.6 24.4 48.7

Settlement(mm) -13.12 -10.63 -8.40 -6.43 -3.28 0.00

- SUNEX에의한 침하예상량은 다음과 같다. -


절점범호 DISTANCE (m) SETTLEMENT (mm)
1 0.0 -13.12
2 4.9 -10.63
3 9.7 -8.40
4 14.6 -6.43
5 24.4 -3.28
6 48.7 0.00

-5
SETTLEMENT (mm)

-10

-15

-20

-25
0 10 20 30 40 50 60
DISTANCE (m)

※ 침하 및 각변위 허용치
허용침하량은 국도설계실무요령(2018)이 제안한 25mm로 적용하였으며, 허용 각변위는 Bjerrum(1981)이 제안한
건물에 균열이 없도록 하는 안정한계 1/500을 적용 하였다.
- 인접부지의 예상 피해 판단

* 가장 인접하여있는 150번지 는 13.64 m 거리에 위치하고,

인접한 150번지 폭을 11.67 m로 가정 할 때

13.64 m 지점의 침하량 = 6.801 mm < 25.0 ∴ O.K

25.31 m 지점의 침하량 = 3.027 mm

→ 부등침하량 = 3.774 mm < 25.0 ∴ O.K

3.774 1 1
→ 각변위 (δ/L) = = < ∴ O.K
11670 3093 500

* 통신관
29.23 m 지점의 침하량 = 2.098 mm < 25.0 ∴ O.K
* 가스관
30.35 m 지점의 침하량 = 1.863 mm < 25.0 ∴ O.K
* 상수관
31.76 m 지점의 침하량 = 1.588 mm < 25.0 ∴ O.K

최대침하량 허용침하
해석방법 각변위 허용각변위 판정
(mm) (mm)
1 1
Caspe 13.12 25.00 O.K
3712 500
5.흙막이 벽체의 근입장 검토
근입장에 대한 검토는 최하단 지보공 위치를 중심으로 하는 주동토압 (Pa)에 의한
회전 모멘트 (Ma = Pa X La)와 최하단 지보공 위치를 중심으로 하는 수동토압 (Pp)에 의한
회전 모멘트 (Ma = Pp X Lp)를 비교하여 판별한다.
또한 엄지말뚝에 작용하는 수동토압의 작용폭은 다음 표와 같으며 주동토압의 작용폭은 굴착저면
이상은 말뚝의 간격, 굴착면 이하는 플랜지 폭만을 적용한다.
[ 엄지말뚝의 토압작용폭 (근입부) ]
사 질 토 N > 30 30 ≥ N > 10 N ≤ 10
지반의 상태
점 성 토 N > 8 8 ≥ N > 4 N ≤ 4
토압의 작용폭 플랜지폭의 3배 플랜지폭의 2배 플랜지폭의 1배
(흙막이 가시설 세부설계기준 , 한국도로공사, 2005)

최하단 지보공 H-PILE

La
Lp Pa

Pp

Mp Pp X Lp
Fs = = ≥ 1.2 이어야 한다.
Ma Pa X La

1) 토압에 의한 근입장 검토
전산해석 결과 : Ma = 10469.89 KN.m
Mp = 18483.28 KN.m

18483.28
∴ Fs (안전율) = = 1.77 > 1.2 - O.K -
10469.89
6. 전산INPUT
6.1 INPUT DATA
PROJECT 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1)

UNIT kN

SOIL 1 매립층(자갈 및 실트섞인 모래)


18 9 0 24 14300 0 0 0
2 퇴적층(점토질실트)
17 8 20 10 10000 0 0 0
3 퇴적층(자갈섞인 모래)
18 9 0 25 25500 0 0 0
4 풍화토
19 10 17 28 33800 0 0 0
5 풍화암
20 11 27 30 38000 0 0 0
6 연암
23 14 40 33 48000 0 0 0

PROFILE 1 1.06 1 1
2 3.76 2 2
3 7.76 3 3
4 9.26 4 4
5 50.00 5 5

VWALL 1 37.97 0.055116 0.0012304 2.05E+08 1 1 1 0 0

STRUT 1 2.80 0.01348 5 3 0 0 0 0 0


2 26.80 0.01348 5 3 0 0 0 0 0

SLAB 1 0.000 0.25 5 0


2 4.085 0.15 5 0
3 7.485 0.15 5 0
4 10.885 0.15 5 0
5 14.285 0.15 5 0
6 17.685 0.15 5 0
7 21.135 0.15 5 0
8 24.585 0.15 5 0
9 29.440 3.06 5 0

WALL 1 27.910 30.970 1.0 0


2 17.610 27.900 1.0 0
3 10.810 17.610 0.6 0
4 4.010 10.810 0.5 0
5 0.000 4.010 0.4 0

Division 0.2
Solution 0
Output 0
NoteMode 0
MINKS 0
ECHO

STEP 1 굴착 1단계
RANKINE 1.0 0.0 50
LOAD 0.0 0.7 13 13.442 13 1
LOAD 4.9 13.638 89 25.308 89 1
LOAD 5.2 34.429 31 52.874 31 1
WATERPRESSURE 0.54 0.0 9.26 87.2 30.97 0.0
EXCAVATION 1.000

STEP 2 1F 슬래브 설치 및 2단계 굴착


CONST SLAB 1
EXCAVATION 3.300

STEP 3 1단 가설지보재 설치 및 3단계 굴착


CONST STRUT 1
EXCAVATION 5.085
STEP 4 B1 슬래브 설치 및 4단계 굴착
CONST SLAB 2
EXCAVATION 8.485

STEP 5 B2 슬래브 설치 및 5단계 굴착


CONST SLAB 3
EXCAVATION 11.885

STEP 6 B3 슬래브 설치 및 6단계 굴착


CONST SLAB 4
EXCAVATION 15.285

STEP 7 B4 슬래브 설치 및 7단계 굴착


CONST SLAB 5
EXCAVATION 18.685

STEP 8 B5 슬래브 설치 및 8단계 굴착


CONST SLAB 6
EXCAVATION 22.135

STEP 9 B6 슬래브 설치 및 9단계 굴착


CONST SLAB 7
EXCAVATION 25.585

STEP 10 B7 슬래브 설치 및 10단계 굴착


CONST SLAB 8
EXCAVATION 27.300

STEP 11 2단 가설지보재 설치 및 11단계 굴착


CONST STRUT 2
EXCAVATION 30.970
DEPTH_CHECK
GROUND_SETTLEMENT 60
DISPLACEMENT 0.2

STEP 12 슬래브, 벽체설치 및 가설지보재해체


CONST SLAB 9
CONST WALL 1
REMOVE STRUT 2

STEP 13 벽체설치 및 가설지보재해체


CONST WALL 2
CONST WALL 3
CONST WALL 4
REMOVE STRUT 1

STEP 14 벽체설치
CONST WALL 5

END
6.2 TOT DATA

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 99 << Pile, Strut, Anchor and Slab Force for each Step >>

>> 흙막이 벽의 최소 최대값 (Min and Max of Pile Force) <<

Step 굴착 ---- 전 단 력(kN/m) ---- --- 휨 모멘트 (kNm/m) ---


No 깊이 최대 깊이 최소 깊이 최대 깊이 최소 깊이.

1 1.00 9.08 5.80 -14.87 7.70 19.51 6.80 -10.43 10.80


2 3.30 36.28 0.00 -29.06 5.50 75.25 3.10 -27.05 9.90
3 5.10 112.82 2.80 -92.92 7.70 155.73 5.30 -66.69 10.10
4 8.50 189.79 4.10 -143.70 9.10 239.68 6.80 -110.23 11.10
5 11.90 212.30 7.50 -153.39 11.90 207.52 9.90 -129.62 14.20
6 15.30 209.01 10.90 -170.81 10.90 164.35 13.40 -126.38 17.30
7 18.70 206.64 14.30 -160.27 10.90 148.89 16.90 -115.56 14.30
8 22.10 224.51 17.70 -161.00 10.90 172.18 20.50 -145.65 17.70
9 25.60 294.69 21.10 -172.76 21.10 254.45 24.10 -195.98 21.10
10 27.30 236.06 21.10 -164.97 21.10 190.08 26.20 -171.31 21.10
11 31.00 387.30 26.80 -198.67 26.80 358.47 29.80 -219.28 26.80
12 31.00 315.71 24.80 -211.35 24.50 250.43 30.40 -257.33 24.60
13 31.00 316.05 24.80 -210.13 24.50 253.11 30.40 -255.21 24.60
14 31.00 316.05 24.80 -210.13 24.50 253.11 30.40 -255.21 24.60

Max/Min 387.30 26.80 -211.35 24.50 358.47 29.80 -257.33 24.60

Note : (파일 간격이 고려되지 않았으므로 파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)

>> Strut Force <<

------- S T R U T N o. a n d D E P T H --------
Step Exca 1 2
No Depth 2.8 26.8

1 1.0 0.0 0.0


2 3.3 0.0 0.0
3 5.1 409.2 0.0
4 8.5 273.6 0.0
5 11.9 286.3 0.0
6 15.3 287.3 0.0
7 18.7 287.0 0.0
8 22.1 287.0 0.0
9 25.6 287.0 0.0
10 27.3 287.0 0.0
11 31.0 287.0 1757.9
12 31.0 287.0 0.0
13 31.0 0.0 0.0
14 31.0 0.0 0.0

(스트럿 1개당의 축력임, 경사가 고려되어 증가된 값임, 1/cosθ)

>> 슬래브 축력 (Slab Force) <<

-------- 슬 래 브 번 호 깊 이, 축 력 --------
Step Exca 1 2 3 4 5 6 7 8
No Depth 0.0 4.1 7.5 10.9 14.3 17.7 21.1 24.6

1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


2 3.3 36.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 5.1 6.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 8.5 -17.6 189.1 0.0 0.0 0.0 0.0 0.0 0.0
5 11.9 -9.9 87.0 363.1 0.0 0.0 0.0 0.0 0.0
6 15.3 -10.6 98.7 263.0 379.8 0.0 0.0 0.0 0.0
7 18.7 -10.6 98.1 274.2 286.5 361.2 0.0 0.0 0.0
8 22.1 -10.6 98.1 273.5 298.7 260.7 379.9 0.0 0.0
9 25.6 -10.6 98.1 273.4 297.7 277.4 246.2 467.4 0.0
10 27.3 -10.6 98.1 273.4 297.7 276.9 254.5 401.0 290.3
11 31.0 -10.6 98.1 273.4 297.7 275.7 265.9 344.6 222.9
12 31.0 -10.6 98.1 273.4 297.7 275.3 273.6 277.8 560.5
13 31.0 11.5 177.5 267.2 298.1 275.3 273.6 278.1 559.7
14 31.0 11.6 176.3 267.2 298.1 275.3 273.6 278.1 559.7

-------- 슬 래 브 번 호 깊 이, 축 력 --------
Step Exca 9
No Depth 29.4

1 1.0 0.0
2 3.3 0.0
3 5.1 0.0
4 8.5 0.0
5 11.9 0.0
6 15.3 0.0
7 18.7 0.0
8 22.1 0.0
9 25.6 0.0
10 27.3 0.0
11 31.0 0.0
12 31.0 256.2
13 31.0 239.8
14 31.0 239.8

Note : (단위폭당의 축력임)

>> 흙막이 벽의 전단력, 휨모멘트의 최대치 최소치, 변위, 토압의 최대치 (선택된 절점) <<

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

1 0.00 36.28( 2) -17.57( 4) 0.00( 1) 0.00( 0) 1.62( 2) 0.00( 0)


4 0.50 35.41( 2) -18.44( 4) 18.03( 2) -8.92( 4) 2.11(13) 3.54( 1)
7 1.00 31.86( 2) -21.99( 4) 35.03( 2) -18.87( 4) 2.63(13) 10.66( 1)
8 1.10 31.03( 2) -22.82( 4) 38.12( 2) -21.12( 4) 2.73(13) 5.95( 2)
17 2.80 112.82( 3) -47.24( 4) 74.31( 2) -76.48( 4) 4.40(13) 22.79( 2)
20 3.30 100.19( 3) -31.12(14) 74.59( 2) -57.53( 4) 4.87(13) 27.75( 2)
23 3.80 84.35( 3) -47.15(14) 89.68( 3) -45.68( 4) 5.35(13) 47.27(14)
24 4.00 74.63( 3) -55.26(13) 105.59( 3) -43.53( 4) 5.54(13) 49.92( 3)
25 4.10 189.79( 4) -9.13( 2) 112.83( 3) -43.21( 4) 5.66( 4) 51.24( 3)
30 5.10 131.95( 4) -27.08( 2) 154.65( 3) 0.00( 0) 7.03( 4) 64.44( 3)
34 5.80 83.61( 4) -28.82( 3) 195.00( 4) 0.00( 0) 7.75( 4) 73.66( 4)
43 7.50 212.30( 5) -150.84( 5) 220.09( 4) -50.34( 5) 8.40( 5) 96.02( 4)
45 7.80 184.02( 5) -88.89( 4) 197.44( 4) -10.52( 2) 8.58( 5) 77.66(14)
49 8.50 126.45( 5) -139.39( 4) 118.48( 5) -34.13( 3) 8.98( 5) 86.82( 4)
53 9.30 53.81( 5) -136.08( 4) 190.82( 5) -60.08( 3) 9.15( 5) 87.20( 5)
61 10.80 12.25( 3) -162.42( 6) 174.91( 5) -107.51( 4) 8.63( 6) 83.90( 5)
62 10.90 209.01( 6) -170.81( 6) 167.55( 5) -109.01( 4) 8.64( 6) 83.82( 5)
67 11.90 125.56( 6) -153.39( 5) 69.10( 6) -102.71( 4) 8.74( 6) 83.09( 5)
71 12.60 67.57( 6) -113.48( 5) 136.67( 6) -86.16( 4) 8.69( 6) 82.59(14)
80 14.30 206.64( 7) -154.60( 7) 132.75( 6) -129.18( 5) 7.98( 7) 81.42( 6)
85 15.30 125.56( 7) -140.85( 6) 50.88( 7) -107.50( 5) 8.07( 7) 80.74(14)
97 17.60 26.37( 5) -147.46( 8) 127.09( 7) -130.51( 8) 7.57( 8) 79.19(14)
98 17.70 224.51( 8) -155.38( 8) 121.25( 7) -145.65( 8) 7.59( 8) 79.12( 7)
103 18.70 145.72( 8) -132.99( 7) 39.80( 8) -92.37( 6) 7.99( 8) 78.44( 7)
115 21.10 294.69( 9) -172.76( 9) 155.41( 8) -195.98( 9) 8.42( 9) 90.49(14)
120 22.10 201.25( 9) -136.16( 8) 54.75( 8) -76.78( 7) 9.50( 9) 96.39(14)
124 22.90 122.25( 9) -101.07( 8) 182.20( 9) -46.65( 7) 10.28( 9) 101.11( 9)
133 24.60 173.50(10) -162.97(11) 239.17( 9) -257.33(12) 11.13(12) 111.11(14)
138 25.60 224.00(12) -160.12( 9) 175.64(10) -83.09( 8) 13.05(12) 116.97( 9)
144 26.80 387.30(11) -198.67(11) 207.72(12) -219.28(11) 15.20(12) 124.00(10)
147 27.30 324.57(11) -135.79(10) 231.83(12) -102.77( 9) 15.80(12) 126.92(14)
150 27.90 247.37(11) -130.72(10) 218.82(12) -136.01( 9) 16.22(12) 130.42(14)
158 29.40 54.27(13) -36.85(10) 351.59(11) -121.65(10) 15.97(12) 139.17(14)
166 31.00 38.07(10) -172.88(11) 242.13(11) -111.96(10) 14.28(11) 148.48(11)
169 31.50 51.54(10) -180.65(11) 152.74(11) -91.93(10) 13.17(11) 0.00( 0)
172 32.00 50.25(10) -176.16(11) 62.99(11) -69.81(10) 11.90(11) 0.00( 0)
175 32.50 44.92(10) -159.38(11) 3.18( 8) -49.40(10) 10.57(11) 0.00( 0)
178 33.00 37.74(10) -130.33(11) 2.51( 8) -108.63(12) 9.26(11) 0.00( 0)
181 33.50 30.21(10) -89.00(11) 5.04( 9) -156.97(12) 8.04(11) 0.00( 0)
184 34.00 23.26(10) -28.98(11) 6.66( 9) -182.34(12) 6.97(11) 0.00( 0)
187 34.50 26.17(12) 0.00( 0) 6.98( 9) -186.14(11) 6.07(11) 0.00( 0)
190 35.00 54.96(14) 0.00( 0) 6.50( 9) -170.38(11) 5.36(11) 0.00( 0)
193 35.50 77.45(12) 0.00( 0) 5.60( 9) -140.99(11) 4.81(11) 0.00( 0)
196 36.00 86.68(11) 0.00( 0) 4.81(10) -104.44(11) 4.41(11) 0.00( 0)

Max/Min 387.30 -211.35 358.47 -257.33 16.33 148.48

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

최대변위/최대굴착깊이 = 16.33mm/31.00m = 0.05%

Note : (전단력과 모멘트는 파일 간격이 고려되지 않았으므로


파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)
() 내는 최대치/최소치가 발생한 스텝 번호임
모든 절점에 대한 상세한 결과를 얻으려면 WALLOUT 명령어를 사용해야 함
최대 변위는 지표에서 흙막이 벽체 바닥까지의 변위중 최대치임

>> 공사단계별 흙막이 벽의 최대변위 및 허용변위와 비교 <<


(흙막이 벽의 허용변위 = 굴착깊이 x 0.20 % )
단계별 최대 변위는 지표에서 흙막이 벽체 바닥 사이의 최대 변위임
최대허용변위율 = 0.20 % 는 DISPLACEMENT 명령문에서 바꿀 수 있음
허용변위량 산정기준 : 최종굴착깊이

스텝 스텝명칭 굴착깊이 최대변위 허용변위 최대/허용 안전여부


번호 m mm mm %
1 굴착 1단계 1.0 2.4 62.0 3.9 O.K
2 1F 슬래브 설치 및 2단계 굴착 3.3 3.8 62.0 6.1 O.K
3 1단 가설지보재 설치 및 3단계 굴착 5.1 5.8 62.0 9.3 O.K
4 B1 슬래브 설치 및 4단계 굴착 8.5 8.1 62.0 13.1 O.K
5 B2 슬래브 설치 및 5단계 굴착 11.9 9.1 62.0 14.8 O.K
6 B3 슬래브 설치 및 6단계 굴착 15.3 8.7 62.0 14.1 O.K
7 B4 슬래브 설치 및 7단계 굴착 18.7 8.7 62.0 14.1 O.K
8 B5 슬래브 설치 및 8단계 굴착 22.1 8.7 62.0 14.1 O.K
9 B6 슬래브 설치 및 9단계 굴착 25.6 10.6 62.0 17.1 O.K
10 B7 슬래브 설치 및 10단계 굴착 27.3 10.7 62.0 17.3 O.K
11 2단 가설지보재 설치 및 11단계 굴착 31.0 16.0 62.0 25.7 O.K
12 슬래브, 벽체설치 및 가설지보재해체 31.0 16.3 62.0 26.3 O.K
13 벽체설치 및 가설지보재해체 31.0 16.3 62.0 26.3 O.K
14 벽체설치 31.0 16.3 62.0 26.3 O.K
6.3 OUTPUT DATA
S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 1 << 굴착 1단계 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 1.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.582 -0.003 0.00 0.00


4 0.50 3.54 -1.608 -0.003 -0.87 -0.14
7 1.00 10.66 -1.635 -0.003 -4.42 -1.30
8 1.10 -11.12 -1.641 -0.003 -4.39 -1.79
17 2.80 2.62 -1.746 -0.004 4.33 1.86
20 3.30 7.19 -1.777 -0.003 1.87 3.54
23 3.80 -11.75 -1.805 -0.003 -0.54 3.34
24 4.00 -10.40 -1.815 -0.003 -0.64 3.23
25 4.10 -9.72 -1.820 -0.003 2.69 3.35
30 5.10 -2.72 -1.859 -0.002 7.78 8.63
34 5.80 2.63 -1.868 0.000 9.03 14.36
43 7.50 18.88 -1.762 0.007 -8.57 16.80
45 7.80 -11.62 -1.722 0.008 -12.72 12.91
49 8.50 -2.49 -1.613 0.009 -9.20 5.16
53 9.30 -5.82 -1.477 0.010 -10.13 -2.50
61 10.80 -4.06 -1.251 0.007 -0.15 -10.35
62 10.90 -3.52 -1.239 0.007 2.59 -10.35
67 11.90 0.26 -1.139 0.005 1.63 -8.62
71 12.60 1.31 -1.090 0.003 3.08 -8.07
80 14.30 -0.92 -1.035 0.000 1.73 -7.93
85 15.30 -1.82 -1.045 -0.001 1.97 -6.79
97 17.60 0.89 -1.154 -0.004 1.76 -1.79
98 17.70 0.89 -1.160 -0.004 3.87 -1.62
103 18.70 0.70 -1.226 -0.004 0.85 0.07
115 21.10 0.11 -1.384 -0.004 -0.05 0.74
120 22.10 0.00 -1.448 -0.004 -0.09 0.66
124 22.90 -0.03 -1.498 -0.004 -0.08 0.59
133 24.60 -0.03 -1.603 -0.004 3.02 0.50
138 25.60 -0.02 -1.664 -0.004 0.00 0.49
144 26.80 0.00 -1.737 -0.003 0.01 0.50
147 27.30 0.00 -1.768 -0.003 0.01 0.51
150 27.90 0.00 -1.804 -0.003 0.02 0.52
158 29.40 0.00 -1.895 -0.003 3.62 0.54
166 31.00 0.00 -1.992 -0.003 0.02 0.57
169 31.50 0.00 -2.022 -0.003 3.86 0.58
172 32.00 -0.01 -2.052 -0.003 3.92 0.60
175 32.50 -0.01 -2.082 -0.003 3.98 0.61
178 33.00 -0.02 -2.112 -0.003 4.05 0.63
181 33.50 -0.03 -2.142 -0.003 4.12 0.66
184 34.00 -0.04 -2.172 -0.003 4.20 0.69
187 34.50 -0.05 -2.202 -0.003 4.28 0.73
190 35.00 -0.06 -2.232 -0.003 4.36 0.79
193 35.50 -0.05 -2.261 -0.003 4.44 0.85
196 36.00 -0.04 -2.291 -0.003 4.52 0.94
206 38.00 0.31 -2.40 -0.003 -9.14 1.22

노트 1) 최종횡력은 주동측 및 수동측 양측의 토압, 수압 기타 압력을 모두 고려한 합력이다


굴착측으로 작용할때 (+) 이다
2) 지보공의 반력은 배면측으로 밀때 (+) 이다
3) 압력, 전단력 및 모멘트는 벽체폭 1m 당이다
4) 지보공의 축력은 1개당의 값이며, 경사로 인하여 증가된 값이 포함 되어있다
5) 건물 벽체와 슬래브가 토압에 대하여 안전한지 별도의 검토가 필요하다
6) 본 리스트는 지정된 절점들에 대한 출력이며, 최대값은 본 리스트에 없는 절점에서
발생할 수 있다. 따라서 최대치는 xxx.tot 파일에 있는 값을 참조.

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 3.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.616 -0.049 36.28 0.00 36.28(SL1)


4 0.50 3.54 -2.040 -0.048 35.41 18.03
7 1.00 10.66 -2.446 -0.045 31.86 35.03
8 1.10 5.95 -2.524 -0.044 31.03 38.12
17 2.80 22.79 -3.524 -0.021 6.61 74.31
20 3.30 27.75 -3.671 -0.013 -2.36 74.59
23 3.80 32.80 -3.743 -0.004 -0.12 74.51
24 4.00 29.09 -3.751 -0.001 -6.31 73.85
25 4.10 27.24 -3.751 0.001 -9.13 73.05
30 5.10 8.67 -3.600 0.016 -27.08 53.29
34 5.80 -4.35 -3.364 0.022 -28.60 33.20
43 7.50 8.42 -2.588 0.027 -18.25 -4.11
45 7.80 -26.33 -2.446 0.027 -19.23 -10.52
49 8.50 -10.20 -2.130 0.024 -8.57 -19.94
53 9.30 -9.52 -1.816 0.020 -5.65 -25.27
61 10.80 -5.41 -1.404 0.011 5.33 -24.92
62 10.90 -5.31 -1.385 0.011 7.19 -24.35
67 11.90 1.60 -1.242 0.006 7.27 -16.93
71 12.60 3.31 -1.185 0.004 7.68 -12.87
80 14.30 0.44 -1.139 0.000 3.26 -8.01
85 15.30 -1.12 -1.156 -0.002 2.28 -6.06
97 17.60 0.86 -1.275 -0.004 1.50 -1.37
98 17.70 0.85 -1.282 -0.004 3.85 -1.23
103 18.70 0.62 -1.348 -0.004 0.67 0.29
115 21.10 0.07 -1.506 -0.004 -0.07 0.74
120 22.10 -0.01 -1.569 -0.004 -0.09 0.65
124 22.90 -0.03 -1.619 -0.004 -0.07 0.59
133 24.60 -0.02 -1.724 -0.004 3.26 0.52
138 25.60 -0.01 -1.785 -0.004 0.00 0.52
144 26.80 0.00 -1.858 -0.003 0.01 0.53
147 27.30 0.00 -1.889 -0.003 0.02 0.54
150 27.90 0.00 -1.925 -0.003 0.02 0.55
158 29.40 0.00 -2.016 -0.003 3.85 0.58
166 31.00 0.00 -2.113 -0.003 0.02 0.60
169 31.50 0.00 -2.143 -0.003 4.09 0.62
172 32.00 -0.01 -2.173 -0.003 4.15 0.63
175 32.50 -0.01 -2.203 -0.003 4.22 0.65
178 33.00 -0.02 -2.233 -0.003 4.28 0.67
181 33.50 -0.03 -2.263 -0.003 4.35 0.69
184 34.00 -0.04 -2.293 -0.003 4.43 0.72
187 34.50 -0.05 -2.323 -0.003 4.51 0.77
190 35.00 -0.06 -2.353 -0.003 4.60 0.83
193 35.50 -0.06 -2.382 -0.003 4.68 0.90
196 36.00 -0.04 -2.412 -0.003 4.76 0.98
206 38.00 0.32 -2.53 -0.003 -9.60 1.28

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 5.10
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.587 -0.055 6.08 0.00 6.08(SL1)


4 0.50 3.54 -2.070 -0.055 5.22 2.93
7 1.00 10.66 -2.549 -0.055 1.67 4.83
8 1.10 5.95 -2.645 -0.055 0.84 4.90
17 2.80 22.79 -4.247 -0.054 112.82 -10.24 0.00 409.23(ST1)
20 3.30 27.75 -4.717 -0.052 100.19 43.16
23 3.80 47.27 -5.145 -0.045 84.35 89.68
24 4.00 49.92 -5.294 -0.040 74.63 105.59
25 4.10 51.24 -5.363 -0.038 69.57 112.83
30 5.10 64.44 -5.764 -0.007 11.73 154.65
34 5.80 51.42 -5.694 0.018 -28.82 148.05
43 7.50 19.78 -4.475 0.057 -89.33 39.78
45 7.80 -76.20 -4.169 0.059 -86.39 12.41
49 8.50 -46.52 -3.452 0.057 -47.01 -34.13
53 9.30 -35.71 -2.713 0.048 -20.50 -60.08
61 10.80 -10.41 -1.744 0.026 12.25 -61.61
62 10.90 -9.36 -1.699 0.025 14.85 -60.33
67 11.90 -0.93 -1.380 0.013 18.71 -43.42
71 12.60 5.29 -1.263 0.007 19.29 -31.17
80 14.30 4.15 -1.194 -0.001 8.78 -11.59
85 15.30 1.37 -1.228 -0.003 4.57 -5.86
97 17.60 1.10 -1.376 -0.004 1.06 -0.10
98 17.70 1.04 -1.383 -0.004 3.58 0.54
103 18.70 0.51 -1.453 -0.004 0.18 1.05
115 21.10 -0.05 -1.611 -0.004 -0.19 0.78
120 22.10 -0.07 -1.674 -0.004 -0.12 0.62
124 22.90 -0.06 -1.723 -0.004 -0.06 0.55
133 24.60 -0.02 -1.828 -0.004 3.48 0.52
138 25.60 -0.01 -1.889 -0.004 0.02 0.53
144 26.80 0.00 -1.962 -0.003 0.02 0.56
147 27.30 0.00 -1.993 -0.003 0.02 0.57
150 27.90 0.00 -2.029 -0.003 0.02 0.58
158 29.40 0.00 -2.120 -0.003 4.04 0.61
166 31.00 -0.01 -2.217 -0.003 0.02 0.63
169 31.50 0.00 -2.247 -0.003 4.29 0.65
172 32.00 -0.01 -2.277 -0.003 4.35 0.66
175 32.50 -0.01 -2.307 -0.003 4.41 0.68
178 33.00 -0.02 -2.337 -0.003 4.48 0.70
181 33.50 -0.03 -2.367 -0.003 4.55 0.72
184 34.00 -0.05 -2.397 -0.003 4.63 0.75
187 34.50 -0.06 -2.427 -0.003 4.71 0.80
190 35.00 -0.06 -2.457 -0.003 4.80 0.86
193 35.50 -0.06 -2.486 -0.003 4.88 0.93
196 36.00 -0.04 -2.516 -0.003 4.97 1.02
206 38.00 0.33 -2.63 -0.003 -9.99 1.33

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 8.50
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.565 -0.044 -17.57 0.00 -17.57(SL1)


4 0.50 3.54 -1.949 -0.044 -18.44 -8.92
7 1.00 10.66 -2.342 -0.046 -21.99 -18.87
8 1.10 5.95 -2.423 -0.046 -22.82 -21.12
17 2.80 22.79 -4.007 -0.064 -47.24 -76.48 0.00 273.58(ST1)
20 3.30 27.75 -4.600 -0.071 31.32 -57.53
23 3.80 47.27 -5.250 -0.077 15.48 -45.68
24 4.00 49.92 -5.523 -0.079 5.76 -43.53
25 4.10 51.24 -5.663 -0.080 189.79 -43.21 189.09(SL2)
30 5.10 64.44 -7.034 -0.071 131.95 119.11
34 5.80 73.66 -7.754 -0.045 83.61 195.00
43 7.50 96.02 -7.821 0.043 -60.61 220.09
45 7.80 77.66 -7.560 0.057 -88.89 197.44
49 8.50 86.82 -6.699 0.082 -139.39 115.68
53 9.30 -74.38 -5.454 0.093 -136.08 1.40
61 10.80 -52.01 -3.251 0.069 -17.66 -107.51
62 10.90 -48.11 -3.132 0.067 -9.68 -109.01
67 11.90 -18.16 -2.180 0.042 19.17 -102.71
71 12.60 -6.45 -1.758 0.027 29.07 -86.16
80 14.30 8.07 -1.349 0.003 26.87 -38.46
85 15.30 7.75 -1.350 -0.003 16.76 -17.44
97 17.60 3.58 -1.550 -0.005 2.38 1.89
98 17.70 3.34 -1.560 -0.005 4.99 2.72
103 18.70 1.34 -1.649 -0.005 -0.24 3.43
115 21.10 -0.32 -1.821 -0.004 -0.77 1.44
120 22.10 -0.31 -1.884 -0.004 -0.44 0.84
124 22.90 -0.23 -1.932 -0.003 -0.22 0.59
133 24.60 -0.06 -2.035 -0.003 3.89 0.47
138 25.60 -0.01 -2.096 -0.003 0.05 0.51
144 26.80 0.01 -2.169 -0.003 0.05 0.58
147 27.30 0.02 -2.199 -0.003 0.04 0.60
150 27.90 0.01 -2.236 -0.003 0.03 0.62
158 29.40 0.01 -2.326 -0.003 4.44 0.66
166 31.00 0.00 -2.423 -0.003 0.02 0.69
169 31.50 0.00 -2.453 -0.003 4.68 0.70
172 32.00 -0.01 -2.483 -0.003 4.74 0.72
175 32.50 -0.02 -2.513 -0.003 4.81 0.73
178 33.00 -0.03 -2.543 -0.003 4.87 0.75
181 33.50 -0.04 -2.573 -0.003 4.95 0.78
184 34.00 -0.05 -2.603 -0.003 5.03 0.82
187 34.50 -0.06 -2.633 -0.003 5.11 0.86
190 35.00 -0.07 -2.663 -0.003 5.20 0.93
193 35.50 -0.06 -2.693 -0.003 5.29 1.01
196 36.00 -0.05 -2.722 -0.003 5.37 1.10
206 38.00 0.36 -2.84 -0.003 -10.78 1.44

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.


Input Data File = 1.A-A(L).dat Date : 2022-12-07
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 11.90
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -9.94 0.00 -9.94(SL1)


4 0.50 3.54 -1.978 -0.047 -10.80 -5.11
7 1.00 10.66 -2.390 -0.048 -14.35 -11.24
8 1.10 5.95 -2.473 -0.048 -15.18 -12.72
17 2.80 22.79 -4.030 -0.060 55.84 -55.10 0.00 286.35(ST1)
20 3.30 27.75 -4.574 -0.065 43.21 -30.20
23 3.80 47.27 -5.149 -0.067 27.37 -12.40
24 4.00 49.92 -5.383 -0.067 17.65 -7.88
25 4.10 51.24 -5.501 -0.067 99.56 -6.36 86.97(SL2)
30 5.10 64.44 -6.634 -0.060 41.72 65.73
34 5.80 73.66 -7.294 -0.048 -6.61 78.45
43 7.50 96.02 -8.397 -0.035 212.30 -50.34 363.14(SL3)
45 7.80 77.66 -8.584 -0.036 184.02 9.38
49 8.50 86.82 -8.977 -0.025 126.45 118.48
53 9.30 87.20 -9.146 0.003 53.81 190.82
61 10.80 83.90 -8.160 0.071 -73.62 174.91
62 10.90 83.82 -8.032 0.075 -82.00 167.55
67 11.90 83.09 -6.462 0.100 -153.39 44.07
71 12.60 -76.49 -5.225 0.099 -113.48 -51.53
80 14.30 -38.93 -2.820 0.058 8.95 -129.18
85 15.30 -16.06 -2.055 0.031 32.31 -107.50
97 17.60 13.60 -1.661 -0.003 26.37 -25.68
98 17.70 13.58 -1.667 -0.004 28.18 -23.11
103 18.70 10.70 -1.768 -0.007 12.57 -3.88
115 21.10 1.60 -2.038 -0.005 -1.00 5.47
120 22.10 0.03 -2.121 -0.004 -1.71 3.97
124 22.90 -0.48 -2.177 -0.004 -1.50 2.66
133 24.60 -0.47 -2.282 -0.003 3.76 0.90
138 25.60 -0.29 -2.341 -0.003 -0.19 0.54
144 26.80 -0.10 -2.412 -0.003 0.03 0.47
147 27.30 -0.05 -2.442 -0.003 0.07 0.50
150 27.90 -0.01 -2.478 -0.003 0.08 0.54
158 29.40 0.02 -2.568 -0.003 4.95 0.67
166 31.00 0.01 -2.665 -0.003 0.04 0.75
169 31.50 0.01 -2.695 -0.003 5.16 0.77
172 32.00 0.00 -2.725 -0.003 5.21 0.79
175 32.50 -0.01 -2.755 -0.003 5.27 0.81
178 33.00 -0.02 -2.785 -0.003 5.34 0.83
181 33.50 -0.04 -2.815 -0.003 5.41 0.86
184 34.00 -0.05 -2.846 -0.003 5.49 0.89
187 34.50 -0.07 -2.876 -0.003 5.58 0.95
190 35.00 -0.07 -2.905 -0.003 5.67 1.01
193 35.50 -0.07 -2.935 -0.003 5.76 1.10
196 36.00 -0.05 -2.965 -0.003 5.85 1.20
206 38.00 0.39 -3.08 -0.003 -11.69 1.56

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 15.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.61 0.00 -10.61(SL1)


4 0.50 3.54 -1.976 -0.047 -11.47 -5.44
7 1.00 10.66 -2.387 -0.048 -15.02 -11.91
8 1.10 5.95 -2.470 -0.048 -15.85 -13.46
17 2.80 22.79 -4.032 -0.060 55.48 -56.98 0.00 287.29(ST1)
20 3.30 27.75 -4.580 -0.065 42.85 -32.26
23 3.80 47.27 -5.162 -0.068 27.01 -14.64
24 4.00 49.92 -5.400 -0.068 17.29 -10.19
25 4.10 51.24 -5.519 -0.069 110.92 -8.71 98.68(SL2)
30 5.10 64.44 -6.669 -0.060 53.07 74.73
34 5.80 73.66 -7.321 -0.046 4.74 95.41
43 7.50 96.02 -8.238 -0.023 -139.48 -14.08 262.98(SL3)
45 7.80 77.66 -8.357 -0.022 95.22 18.99
49 8.50 86.82 -8.595 -0.015 37.65 65.93
53 9.30 87.20 -8.719 -0.002 -34.99 67.23
61 10.80 83.90 -8.634 0.000 -162.42 -81.88
62 10.90 83.82 -8.635 -0.002 209.01 -98.54 379.82(SL4)
67 11.90 83.09 -8.735 -0.003 125.56 69.10
71 12.60 82.59 -8.686 0.013 67.57 136.67
80 14.30 81.42 -7.405 0.073 -71.83 132.75
85 15.30 80.74 -5.934 0.092 -140.85 20.64
97 17.60 -43.24 -2.889 0.048 11.09 -125.41
98 17.70 -40.79 -2.808 0.045 17.96 -124.08
103 18.70 -7.78 -2.257 0.020 41.18 -92.37
115 21.10 13.12 -2.133 -0.006 18.83 -11.30
120 22.10 8.68 -2.253 -0.007 7.83 1.63
124 22.90 5.08 -2.350 -0.007 2.37 5.50
133 24.60 0.48 -2.516 -0.005 3.06 4.91
138 25.60 -0.44 -2.589 -0.004 -1.66 3.14
144 26.80 -0.60 -2.665 -0.003 -0.97 1.54
147 27.30 -0.53 -2.694 -0.003 -0.69 1.12
150 27.90 -0.42 -2.729 -0.003 -0.40 0.80
158 29.40 -0.14 -2.817 -0.003 5.35 0.55
166 31.00 -0.01 -2.911 -0.003 0.10 0.67
169 31.50 0.01 -2.941 -0.003 5.69 0.72
172 32.00 0.02 -2.971 -0.003 5.74 0.77
175 32.50 0.01 -3.001 -0.003 5.79 0.82
178 33.00 0.00 -3.031 -0.003 5.84 0.86
181 33.50 -0.02 -3.061 -0.003 5.91 0.91
184 34.00 -0.04 -3.091 -0.003 5.98 0.96
187 34.50 -0.06 -3.121 -0.003 6.06 1.02
190 35.00 -0.07 -3.151 -0.003 6.15 1.10
193 35.50 -0.07 -3.181 -0.003 6.24 1.19
196 36.00 -0.05 -3.211 -0.003 6.33 1.30
206 38.00 0.42 -3.32 -0.003 -12.63 1.68

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>
계산결과 토압, 변위, 회전, 전단력 및 모멘트
굴착깊이 = 18.70
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.60 0.00 -10.60(SL1)


4 0.50 3.54 -1.976 -0.047 -11.46 -5.44
7 1.00 10.66 -2.387 -0.048 -15.01 -11.90
8 1.10 5.95 -2.470 -0.048 -15.84 -13.45
17 2.80 22.79 -4.031 -0.060 55.39 -56.95 0.00 286.98(ST1)
20 3.30 27.75 -4.580 -0.065 42.76 -32.28
23 3.80 47.27 -5.161 -0.068 26.92 -14.71
24 4.00 49.92 -5.399 -0.068 17.20 -10.27
25 4.10 51.24 -5.518 -0.069 110.26 -8.81 98.12(SL2)
30 5.10 64.44 -6.668 -0.060 52.42 73.99
34 5.80 73.66 -7.322 -0.046 4.09 94.20
43 7.50 96.02 -8.256 -0.024 -140.14 -16.39 274.17(SL3)
45 7.80 77.66 -8.380 -0.023 105.76 19.84
49 8.50 86.82 -8.627 -0.016 48.19 74.16
53 9.30 87.20 -8.740 0.000 -24.46 83.89
61 10.80 83.90 -8.505 0.011 -151.88 -49.42
62 10.90 83.82 -8.487 0.009 -160.27 -65.03 286.51(SL4)
67 11.90 83.09 -8.381 0.006 42.79 19.84
71 12.60 82.59 -8.285 0.010 -15.20 29.47
80 14.30 81.42 -7.979 0.001 206.64 -115.56 361.25(SL5)
85 15.30 80.74 -8.066 -0.005 125.56 50.88
97 17.60 79.19 -7.093 0.060 -58.36 127.09
98 17.70 79.12 -6.986 0.063 -66.27 121.25
103 18.70 78.44 -5.708 0.080 -132.99 15.85
115 21.10 -38.55 -3.059 0.036 20.97 -110.29
120 22.10 -1.79 -2.637 0.014 38.84 -76.78
124 22.90 10.31 -2.528 0.003 34.68 -46.65
133 24.60 10.97 -2.624 -0.007 18.76 -6.48
138 25.60 6.64 -2.742 -0.007 4.94 3.54
144 26.80 2.40 -2.871 -0.006 -0.29 5.79
147 27.30 1.24 -2.917 -0.005 -1.19 5.39
150 27.90 0.29 -2.966 -0.004 -1.63 4.51
158 29.40 -0.56 -3.068 -0.004 4.60 2.21
166 31.00 -0.41 -3.163 -0.003 -0.39 0.95
169 31.50 -0.31 -3.191 -0.003 5.85 0.80
172 32.00 -0.23 -3.220 -0.003 6.04 0.73
175 32.50 -0.16 -3.249 -0.003 6.19 0.72
178 33.00 -0.11 -3.279 -0.003 6.31 0.75
181 33.50 -0.08 -3.308 -0.003 6.42 0.81
184 34.00 -0.07 -3.338 -0.003 6.51 0.88
187 34.50 -0.06 -3.368 -0.003 6.60 0.98
190 35.00 -0.06 -3.397 -0.003 6.69 1.09
193 35.50 -0.05 -3.427 -0.003 6.78 1.22
196 36.00 -0.03 -3.457 -0.003 6.86 1.36
206 38.00 0.46 -3.57 -0.003 -13.56 1.81

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 22.10
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.59 0.00 -10.59(SL1)


4 0.50 3.54 -1.976 -0.047 -11.46 -5.43
7 1.00 10.66 -2.387 -0.048 -15.01 -11.89
8 1.10 5.95 -2.470 -0.048 -15.84 -13.44
17 2.80 22.79 -4.031 -0.060 55.41 -56.93 0.00 287.02(ST1)
20 3.30 27.75 -4.580 -0.065 42.78 -32.25
23 3.80 47.27 -5.161 -0.068 26.94 -14.67
24 4.00 49.92 -5.399 -0.068 17.22 -10.23
25 4.10 51.24 -5.518 -0.069 110.22 -8.75 98.06(SL2)
30 5.10 64.44 -6.668 -0.060 52.38 74.00
34 5.80 73.66 -7.322 -0.046 4.05 94.19
43 7.50 96.02 -8.255 -0.024 -140.17 -16.47 273.48(SL3)
45 7.80 77.66 -8.379 -0.023 105.02 19.55
49 8.50 86.82 -8.626 -0.016 47.46 73.35
53 9.30 87.20 -8.742 -0.001 -25.19 82.49
61 10.80 83.90 -8.522 0.010 -152.61 -51.91
62 10.90 83.82 -8.506 0.008 -161.00 -67.59 298.72(SL4)
67 11.90 83.09 -8.416 0.006 54.26 28.75
71 12.60 82.59 -8.311 0.012 -3.73 46.41
80 14.30 81.42 -7.819 0.013 -143.13 -79.12 260.67(SL5)
85 15.30 80.74 -7.682 0.005 36.46 -1.77
97 17.60 79.19 -7.567 -0.011 -147.46 -130.51
98 17.70 79.12 -7.589 -0.014 224.51 -145.65 379.88(SL6)
103 18.70 78.44 -7.987 -0.025 145.72 39.80
115 21.10 90.49 -7.676 0.050 -54.79 155.41
120 22.10 96.39 -6.546 0.076 -136.16 54.75
124 22.90 -63.46 -5.465 0.076 -101.07 -42.84
133 24.60 -42.22 -3.673 0.040 14.82 -110.84
138 25.60 -7.64 -3.176 0.018 36.60 -83.09
144 26.80 11.16 -3.002 0.001 31.89 -39.65
147 27.30 12.73 -3.012 -0.003 25.83 -25.18
150 27.90 12.07 -3.057 -0.005 18.30 -11.96
158 29.40 6.17 -3.226 -0.007 10.50 3.87
166 31.00 1.26 -3.387 -0.005 -1.10 5.41
169 31.50 0.44 -3.428 -0.004 5.00 4.74
172 32.00 -0.09 -3.465 -0.004 4.99 3.95
175 32.50 -0.41 -3.499 -0.004 5.19 3.18
178 33.00 -0.57 -3.531 -0.004 5.50 2.51
181 33.50 -0.61 -3.561 -0.003 5.86 1.98
184 34.00 -0.59 -3.591 -0.003 6.22 1.60
187 34.50 -0.53 -3.620 -0.003 6.55 1.38
190 35.00 -0.44 -3.648 -0.003 6.85 1.28
193 35.50 -0.34 -3.677 -0.003 7.10 1.29
196 36.00 -0.23 -3.705 -0.003 7.30 1.39
206 38.00 0.63 -3.81 -0.003 -14.49 1.93

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 25.60
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)
1 0.00 0.00 -1.572 -0.046 -10.59 0.00 -10.59(SL1)
4 0.50 3.54 -1.976 -0.047 -11.46 -5.43
7 1.00 10.66 -2.387 -0.048 -15.01 -11.89
8 1.10 5.95 -2.470 -0.048 -15.84 -13.44
17 2.80 22.79 -4.031 -0.060 55.41 -56.94 0.00 287.02(ST1)
20 3.30 27.75 -4.580 -0.065 42.78 -32.25
23 3.80 47.27 -5.161 -0.068 26.94 -14.68
24 4.00 49.92 -5.399 -0.068 17.22 -10.24
25 4.10 51.24 -5.518 -0.069 110.25 -8.76 98.09(SL2)
30 5.10 64.44 -6.668 -0.060 52.40 74.01
34 5.80 73.66 -7.322 -0.046 4.07 94.22
43 7.50 96.02 -8.254 -0.024 -140.15 -16.40 273.41(SL3)
45 7.80 77.66 -8.379 -0.023 104.98 19.60
49 8.50 86.82 -8.626 -0.016 47.42 73.37
53 9.30 87.20 -8.741 -0.001 -25.23 82.49
61 10.80 83.90 -8.521 0.010 -152.65 -51.98
62 10.90 83.82 -8.505 0.008 -161.04 -67.67 297.70(SL4)
67 11.90 83.09 -8.415 0.005 53.20 27.62
71 12.60 82.59 -8.313 0.012 -4.79 44.54
80 14.30 81.42 -7.846 0.012 -144.19 -82.79 277.43(SL5)
85 15.30 80.74 -7.731 0.005 52.16 10.26
97 17.60 79.19 -7.382 0.004 -131.76 -82.36
98 17.70 79.12 -7.377 0.002 -139.67 -95.93 246.21(SL6)
103 18.70 78.44 -7.469 -0.010 27.75 -28.46
115 21.10 90.49 -8.418 -0.050 294.69 -195.98 467.44(SL7)
120 22.10 96.39 -9.501 -0.065 201.25 52.52
124 22.90 101.11 -10.277 -0.043 122.25 182.20
133 24.60 111.11 -10.245 0.048 -58.14 239.17
138 25.60 116.97 -8.984 0.092 -160.12 124.85
144 26.80 -62.54 -6.885 0.101 -120.39 -51.25
147 27.30 -87.07 -6.041 0.092 -82.99 -102.77
150 27.90 -78.38 -5.162 0.075 -29.30 -136.01
158 29.40 -19.06 -3.811 0.029 49.81 -116.60
166 31.00 15.01 -3.459 0.000 37.77 -43.67
169 31.50 16.08 -3.475 -0.004 36.51 -28.11
172 32.00 15.02 -3.519 -0.006 28.76 -15.16
175 32.50 12.81 -3.578 -0.007 21.89 -5.93
178 33.00 10.15 -3.643 -0.008 16.27 1.54
181 33.50 7.51 -3.708 -0.007 11.98 5.04
184 34.00 5.15 -3.769 -0.007 8.94 6.66
187 34.50 3.19 -3.824 -0.006 6.98 6.98
190 35.00 1.67 -3.874 -0.005 5.88 6.50
193 35.50 0.54 -3.919 -0.005 5.42 5.60
196 36.00 -0.25 -3.959 -0.004 5.43 4.55
206 38.00 -1.47 -4.09 -0.004 -15.56 2.06

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 10 << B7 슬래브 설치 및 10단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 27.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.59 0.00 -10.59(SL1)


4 0.50 3.54 -1.976 -0.047 -11.46 -5.43
7 1.00 10.66 -2.387 -0.048 -15.01 -11.89
8 1.10 5.95 -2.470 -0.048 -15.84 -13.44
17 2.80 22.79 -4.031 -0.060 55.41 -56.94 0.00 287.02(ST1)
20 3.30 27.75 -4.580 -0.065 42.78 -32.25
23 3.80 47.27 -5.161 -0.068 26.94 -14.67
24 4.00 49.92 -5.399 -0.068 17.22 -10.24
25 4.10 51.24 -5.518 -0.069 110.25 -8.76 98.08(SL2)
30 5.10 64.44 -6.668 -0.060 52.40 74.01
34 5.80 73.66 -7.322 -0.046 4.07 94.21
43 7.50 96.02 -8.255 -0.024 -140.15 -16.41 273.43(SL3)
45 7.80 77.66 -8.379 -0.023 104.99 19.60
49 8.50 86.82 -8.626 -0.016 47.43 73.38
53 9.30 87.20 -8.741 -0.001 -25.22 82.50
61 10.80 83.90 -8.521 0.010 -152.64 -51.95
62 10.90 83.82 -8.505 0.008 -161.03 -67.63 297.67(SL4)
67 11.90 83.09 -8.414 0.005 53.18 27.63
71 12.60 82.59 -8.313 0.012 -4.81 44.54
80 14.30 81.42 -7.845 0.012 -144.21 -82.83 276.93(SL5)
85 15.30 80.74 -7.730 0.005 51.64 9.70
97 17.60 79.19 -7.394 0.004 -132.28 -84.13
98 17.70 79.12 -7.390 0.002 -140.20 -97.75 254.52(SL6)
103 18.70 78.44 -7.493 -0.011 35.54 -22.48
115 21.10 90.49 -8.312 -0.042 236.06 -171.31 401.03(SL7)
120 22.10 96.39 -9.244 -0.058 142.62 18.57
124 22.90 101.11 -9.984 -0.046 63.62 101.34
133 24.60 111.11 -10.705 -0.005 173.50 58.64 290.26(SL8)
138 25.60 116.97 -10.589 0.023 59.46 175.64
144 26.80 124.00 -9.577 0.073 -85.13 161.13
147 27.30 126.92 -8.871 0.088 -135.79 103.28
150 27.90 -23.17 -7.895 0.096 -130.72 21.96
158 29.40 -82.55 -5.531 0.076 -36.85 -121.65
166 31.00 -21.82 -4.067 0.030 38.07 -111.96
169 31.50 -3.84 -3.860 0.018 51.54 -91.93
172 32.00 7.25 -3.744 0.009 50.25 -69.81
175 32.50 13.09 -3.697 0.002 44.92 -49.40
178 33.00 15.21 -3.699 -0.002 37.74 -32.20
181 33.50 14.90 -3.733 -0.005 30.21 -18.76
184 34.00 13.17 -3.786 -0.007 23.26 -9.02
187 34.50 10.77 -3.848 -0.007 17.38 -2.55
190 35.00 8.17 -3.911 -0.007 12.77 2.75
193 35.50 5.68 -3.974 -0.007 9.43 4.49
196 36.00 3.43 -4.033 -0.007 7.27 4.81
206 38.00 -3.36 -4.24 -0.006 -16.12 2.12

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:49
--------------------------------------------------------------------------------
Step No. 11 << 2단 가설지보재 설치 및 11단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 31.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.59 0.00 -10.59(SL1)


4 0.50 3.54 -1.976 -0.047 -11.46 -5.43
7 1.00 10.66 -2.387 -0.048 -15.01 -11.89
8 1.10 5.95 -2.470 -0.048 -15.84 -13.44
17 2.80 22.79 -4.031 -0.060 55.41 -56.94 0.00 287.02(ST1)
20 3.30 27.75 -4.580 -0.065 42.78 -32.25
23 3.80 47.27 -5.161 -0.068 26.94 -14.67
24 4.00 49.92 -5.399 -0.068 17.22 -10.23
25 4.10 51.24 -5.518 -0.069 110.24 -8.76 98.08(SL2)
30 5.10 64.44 -6.668 -0.060 52.40 74.01
34 5.80 73.66 -7.322 -0.046 4.07 94.21
43 7.50 96.02 -8.255 -0.024 -140.15 -16.41 273.44(SL3)
45 7.80 77.66 -8.379 -0.023 105.00 19.59
49 8.50 86.82 -8.626 -0.016 47.43 73.38
53 9.30 87.20 -8.741 -0.001 -25.21 82.51
61 10.80 83.90 -8.521 0.010 -152.64 -51.93
62 10.90 83.82 -8.505 0.008 -161.02 -67.61 297.71(SL4)
67 11.90 83.09 -8.414 0.005 53.23 27.70
71 12.60 82.59 -8.312 0.012 -4.76 44.64
80 14.30 81.42 -7.843 0.012 -144.16 -82.63 275.75(SL5)
85 15.30 80.74 -7.727 0.005 50.51 8.76
97 17.60 79.19 -7.410 0.003 -133.41 -87.66
98 17.70 79.12 -7.408 0.000 -141.33 -101.40 265.87(SL6)
103 18.70 78.44 -7.533 -0.012 45.76 -15.91
115 21.10 90.49 -8.223 -0.033 189.86 -140.21 344.60(SL7)
120 22.10 96.39 -8.960 -0.046 96.42 3.46
124 22.90 101.11 -9.579 -0.041 17.42 49.28
133 24.60 111.11 -10.599 -0.036 -162.97 -72.52 222.92(SL8)
138 25.60 116.97 -11.343 -0.050 -54.09 -68.51
144 26.80 124.00 -12.682 -0.085 387.30 -219.28 0.00 1757.91(ST2)
147 27.30 126.92 -13.503 -0.100 324.57 -41.23
150 27.90 130.42 -14.534 -0.093 247.37 130.48
158 29.40 139.17 -15.955 -0.003 45.17 351.59
166 31.00 148.48 -14.283 0.116 -172.88 242.13
169 31.50 3.28 -13.166 0.138 -180.65 152.74
172 32.00 -21.27 -11.899 0.151 -176.16 62.99
175 32.50 -45.82 -10.568 0.153 -159.38 -21.71
178 33.00 -70.38 -9.258 0.146 -130.33 -94.81
181 33.50 -94.93 -8.039 0.132 -89.00 -150.32
184 34.00 -115.38 -6.967 0.113 -28.98 -181.65
187 34.50 -81.23 -6.072 0.092 19.07 -186.14
190 35.00 -54.01 -5.360 0.072 51.96 -170.38
193 35.50 -33.16 -4.815 0.054 73.02 -140.99
196 36.00 -4.76 -4.409 0.040 86.68 -104.44
206 38.00 76.00 -3.46 0.023 -13.17 2.26

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 11 << 2단 가설지보재 설치 및 11단계 굴착 >>

Caspe(1966) 방법에 따른 지표면 침하 계산


(FOUNDATION ANALYSIS AND DESIGN 5th ed., Bowles, p804)

굴착깊이 (HW) = 31.00 m


평균 내부마찰각 = 27.81 Deg (흙막이 벽 하단까지)
굴착폭 (B) = 60.00 m
Hp = (0.5 B tan(45+PHI/2) = 49.74 m
Ht = (Hw+Hp) = 80.74 m
영향거리 D=Ht*tan(45-PHI/2)) = 48.70 m
영향거리/굴착깊이(D/Hw) 의 최대비율 = 10.00
Settlement at x from the wall, Sx = Sw x (1 - x/D) ^2
수정된 영향거리 = 48.70 m

횡방향 변위의 체적 (Vs) = 0.31942 m3


벽체에서의 침하 (Sw) = 2 Vs/D = 0.01312 m = -13.12 mm
벽체에서 x만큼 떨어진 지점의 침하Sx = Sw x (1 - x/D) ^2, (^2는 제곱임)

벽체에서의 거리 0.0*D 0.1*D 0.2*D 0.3*D 0.5*D 1.0*D


( m ) 0.0 4.9 9.7 14.6 24.3 48.7

침하 (mm) -13.12 -10.63 -8.40 -6.43 -3.28 0.00


(- 값은 침하이며 + 값은 융기를 나타냄)

For X1 = 1.0 m S1 = -12.59 mm


For X2 = 6.0 m S2 = -10.09 mm
Slope = 1000 x (6.0 - 1.0) / (12.59 - 10.09) = 1/2,000

Note. 결과는 Caspe가 제안한 방법에 의한 개략치임

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 11 << 2단 가설지보재 설치 및 11단계 굴착 >>

근입장 체크 (WALL DEPTH CHECK)


최하단 지보공의 깊이 = 26.80, 절점번호 = 144

Node Depth 주동 기타 합계 주동 수동 기타 수동 안전율


No. GL 토압 횡력 횡력 모멘트 토압 횡력 모멘트
(kN/m2) (kN/m2) (kNm) (kN/m2) (kN/m2) (kNm)
144 26.80 126.03 16.88 142.91 0.00
145 27.00 127.49 16.07 143.56 4.31
146 27.10 128.21 15.67 143.89 6.47
147 27.30 129.67 14.87 144.54 14.45
148 27.50 131.12 14.06 145.19 20.33
149 27.70 132.57 13.26 145.83 26.25
150 27.90 134.02 12.46 146.48 32.23
151 28.10 135.48 11.65 147.13 38.25
152 28.30 136.93 10.85 147.78 44.33
153 28.50 138.38 10.05 148.42 50.46
154 28.70 139.83 9.24 149.07 56.65
155 28.90 141.28 8.44 149.72 62.88
156 29.10 142.73 7.64 150.36 69.17
157 29.30 144.18 6.83 151.01 56.63
158 29.40 144.90 6.43 151.33 59.02
159 29.60 146.35 5.63 151.98 85.11
160 29.80 147.80 4.82 152.62 91.57
161 30.00 149.25 4.02 153.27 98.09
162 30.20 150.70 3.21 153.91 104.66
163 30.40 152.14 2.41 154.56 111.28
164 30.60 153.59 1.61 155.20 117.95
165 30.80 155.04 0.80 155.84 124.67
166 31.00 156.48 0.00 156.48 131.45 -120.65 0.00 -101.34 0.07
167 31.20 157.13 0.00 157.13 138.27 -131.63 0.00 -115.83 0.14
168 31.40 157.77 0.00 157.77 108.86 -142.61 0.00 -98.40 0.19
169 31.50 158.09 0.00 158.09 111.45 -148.10 0.00 -104.41 0.24
170 31.70 158.73 0.00 158.73 155.56 -159.08 0.00 -155.90 0.30
171 31.90 159.37 0.00 159.37 121.92 -170.06 0.00 -130.10 0.35
172 32.00 159.70 0.00 159.70 124.56 -175.55 0.00 -136.93 0.39
173 32.20 160.34 0.00 160.34 173.16 -186.53 0.00 -201.46 0.45
174 32.40 160.98 0.00 160.98 135.22 -197.51 0.00 -165.91 0.49
175 32.50 161.30 0.00 161.30 137.91 -203.01 0.00 -173.57 0.53
176 32.70 161.94 0.00 161.94 191.09 -213.99 0.00 -252.50 0.58
177 32.90 162.58 0.00 162.58 148.76 -224.97 0.00 -205.85 0.62
178 33.00 162.90 0.00 162.90 151.50 -230.46 0.00 -214.33 0.66
179 33.20 163.54 0.00 163.54 209.33 -241.44 0.00 -309.04 0.71
180 33.40 164.18 0.00 164.18 162.54 -252.42 0.00 -249.90 0.75
181 33.50 164.50 0.00 164.50 165.32 -257.91 0.00 -259.20 0.79
182 33.70 165.14 0.00 165.14 227.89 -268.89 0.00 -371.07 0.84
183 33.90 165.78 0.00 165.78 176.55 -279.87 0.00 -298.07 0.88
184 34.00 166.10 0.00 166.10 179.38 -285.36 0.00 -308.19 0.91
185 34.20 166.73 0.00 166.73 246.77 -296.35 0.00 -438.59 0.96
186 34.40 167.37 0.00 167.37 190.81 -307.33 0.00 -350.35 1.00
187 34.50 167.69 0.00 167.69 193.68 -312.82 0.00 -361.30 1.03
188 34.70 168.33 0.00 168.33 265.96 -323.80 0.00 -511.61 1.08
189 34.90 168.97 0.00 168.97 205.30 -334.78 0.00 -406.76 1.11
190 35.00 169.29 0.00 169.29 208.22 -340.27 0.00 -418.53 1.15
191 35.20 169.93 0.00 169.93 285.48 -351.25 0.00 -590.11 1.19
192 35.40 170.56 0.00 170.56 220.03 -362.23 0.00 -467.28 1.22
193 35.50 170.88 0.00 170.88 223.00 -367.72 0.00 -479.88 1.26
194 35.70 171.52 0.00 171.52 305.30 -378.71 0.00 -674.10 1.30
195 35.90 172.16 0.00 172.16 234.99 -389.69 0.00 -531.92 1.33
196 36.00 172.47 0.00 172.47 238.01 -395.18 0.00 -545.34 1.37
197 36.20 173.11 0.00 173.11 325.45 -406.16 0.00 -763.58 1.41
198 36.40 173.75 0.00 173.75 333.59 -417.14 0.00 -800.91 1.45
199 36.60 174.38 0.00 174.38 341.79 -428.12 0.00 -839.11 1.50
200 36.80 175.02 0.00 175.02 350.04 -439.10 0.00 -878.21 1.54
201 37.00 175.66 0.00 175.66 358.34 -450.08 0.00 -918.18 1.58
202 37.20 176.29 0.00 176.29 366.69 -461.07 0.00 -959.02 1.62
203 37.40 176.93 0.00 176.93 375.08 -472.05 0.00 -1000.74 1.66
204 37.60 177.56 0.00 177.56 383.53 -483.03 0.00 -1043.34 1.70
205 37.80 178.20 0.00 178.20 392.04 -494.01 0.00 -1086.83 1.74
206 38.00 178.83 0.00 178.83 200.29 -504.99 0.00 -565.59 1.77

9949.86 196.90 10469.89-12605.92 0.00-18483.28

합계 주동 모멘트 (Ma) = 10469.89


합계 수동 모멘트 (Mp) = -18483.28
안전율 (Mp/Ma) = 1.77

최소 안전율 = 1.2 이상이어야 함

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 31.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.572 -0.046 -10.59 0.00 -10.59(SL1)


4 0.50 3.54 -1.976 -0.047 -11.46 -5.43
7 1.00 10.66 -2.387 -0.048 -15.01 -11.89
8 1.10 5.95 -2.470 -0.048 -15.84 -13.44
17 2.80 22.79 -4.031 -0.060 55.41 -56.93 0.00 287.02(ST1)
20 3.30 27.75 -4.580 -0.065 42.78 -32.25
23 3.80 47.27 -5.161 -0.068 26.94 -14.67
24 4.00 49.92 -5.399 -0.068 17.22 -10.23
25 4.10 51.24 -5.518 -0.069 61.20 -8.76 98.08(SL2)
30 5.10 64.44 -6.668 -0.060 52.40 74.01
34 5.80 73.66 -7.322 -0.046 4.07 94.21
43 7.50 96.02 -8.255 -0.024 -3.43 -16.42 273.45(SL3)
45 7.80 77.66 -8.379 -0.023 105.01 19.59
49 8.50 86.82 -8.626 -0.016 47.45 73.39
53 9.30 87.20 -8.741 -0.001 -25.20 82.52
61 10.80 83.90 -8.521 0.010 -152.62 -51.90
62 10.90 83.82 -8.505 0.009 -12.18 -67.58 297.67(SL4)
67 11.90 83.09 -8.414 0.005 53.20 27.70
71 12.60 82.59 -8.312 0.012 -4.79 44.63
80 14.30 81.42 -7.842 0.012 -6.51 -82.70 275.35(SL5)
85 15.30 80.74 -7.727 0.005 50.08 8.27
97 17.60 79.19 -7.422 0.002 -133.84 -89.14
98 17.70 79.12 -7.420 0.000 -4.95 -102.92 273.60(SL6)
103 18.70 78.44 -7.555 -0.012 53.07 -10.13
115 21.10 90.49 -8.117 -0.025 -8.52 -116.89 277.83(SL7)
120 22.10 96.39 -8.711 -0.040 36.95 -32.69
124 22.90 101.11 -9.308 -0.045 -42.05 -34.44
133 24.60 111.11 -11.134 -0.092 57.80 -257.33 560.48(SL8)
138 25.60 116.97 -13.046 -0.116 224.00 24.78
144 26.80 124.00 -15.200 -0.081 79.42 207.72
147 27.30 126.92 -15.799 -0.056 16.69 231.83
150 27.90 130.42 -16.219 -0.025 -43.66 218.82
158 29.40 139.17 -15.975 0.040 50.84 159.17 256.18(SL9)
166 31.00 148.48 -13.751 0.122 -147.90 199.63
169 31.50 3.28 -12.604 0.140 -166.31 117.41
172 32.00 -21.27 -11.340 0.148 -161.82 34.83
175 32.50 -45.82 -10.041 0.148 -145.04 -42.70
178 33.00 -70.38 -8.784 0.139 -115.99 -108.63
181 33.50 -94.93 -7.632 0.124 -74.66 -156.97
184 34.00 -102.69 -6.633 0.104 -16.32 -182.34
187 34.50 -71.35 -5.812 0.084 26.17 -182.00
190 35.00 -46.81 -5.170 0.064 54.86 -163.70
193 35.50 -28.31 -4.689 0.047 77.45 -133.71
196 36.00 0.54 -4.339 0.034 83.41 -96.90
206 38.00 68.19 -3.57 0.018 -13.56 2.26

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 13 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 31.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.593 -0.060 11.52 0.00 11.52(SL1)


4 0.50 3.54 -2.114 -0.060 10.66 5.65
7 1.00 10.66 -2.631 -0.059 7.11 10.27
8 1.10 5.95 -2.733 -0.058 6.28 10.89
17 2.80 22.79 -4.396 -0.054 -18.15 5.00
20 3.30 27.75 -4.867 -0.054 -30.78 -7.11
23 3.80 47.27 -5.346 -0.056 -46.62 -26.31
24 4.00 49.92 -5.543 -0.057 -55.26 -36.59
25 4.10 51.24 -5.644 -0.058 29.50 -42.25 177.45(SL2)
30 5.10 64.44 -6.675 -0.056 66.21 51.60
34 5.80 73.66 -7.301 -0.045 16.47 81.27
43 7.50 96.02 -8.245 -0.024 -0.44 -14.27 267.24(SL3)
45 7.80 77.66 -8.372 -0.024 104.58 21.68
49 8.50 86.82 -8.625 -0.016 46.56 74.98
53 9.30 87.20 -8.742 -0.001 -26.04 83.40
61 10.80 83.90 -8.522 0.010 -153.08 -51.98
62 10.90 83.82 -8.505 0.009 -12.40 -67.70 298.12(SL4)
67 11.90 83.09 -8.414 0.005 53.25 27.60
71 12.60 82.59 -8.312 0.012 -4.74 44.56
80 14.30 81.42 -7.842 0.012 -6.50 -82.70 275.32(SL5)
85 15.30 80.74 -7.727 0.005 50.08 8.27
97 17.60 79.19 -7.422 0.002 -133.83 -89.12
98 17.70 79.12 -7.420 0.000 -4.96 -102.90 273.57(SL6)
103 18.70 78.44 -7.554 -0.012 53.02 -10.14
115 21.10 90.49 -8.117 -0.025 -8.49 -117.10 278.07(SL7)
120 22.10 96.39 -8.713 -0.040 37.28 -32.68
124 22.90 101.11 -9.310 -0.045 -41.40 -34.06
133 24.60 111.11 -11.133 -0.092 58.62 -255.21 559.67(SL8)
138 25.60 116.97 -13.033 -0.115 223.17 26.91
144 26.80 124.00 -15.164 -0.080 72.85 206.00
147 27.30 126.92 -15.755 -0.055 6.09 225.86
150 27.90 130.42 -16.173 -0.025 -42.91 204.85
158 29.40 139.17 -15.973 0.039 54.27 166.01 239.81(SL9)
166 31.00 148.48 -13.771 0.121 -148.73 201.14
169 31.50 3.28 -12.625 0.140 -166.75 118.70
172 32.00 -21.27 -11.362 0.148 -162.25 35.90
175 32.50 -45.82 -10.062 0.148 -145.48 -41.85
178 33.00 -70.38 -8.803 0.139 -116.43 -108.00
181 33.50 -94.93 -7.649 0.124 -75.10 -156.56
184 34.00 -103.22 -6.647 0.105 -16.63 -182.14
187 34.50 -71.78 -5.824 0.084 26.09 -181.90
190 35.00 -47.12 -5.178 0.064 54.96 -163.60
193 35.50 -28.57 -4.694 0.047 73.22 -133.40
196 36.00 0.38 -4.341 0.034 83.77 -97.46
206 38.00 68.65 -3.56 0.018 -13.53 2.26

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 1.A-A(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(BH-1) Time : 14:51:50
--------------------------------------------------------------------------------
Step No. 14 << 벽체설치 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 31.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -1.593 -0.060 11.59 0.00 11.59(SL1)


4 0.50 3.54 -2.114 -0.060 10.72 5.68
7 1.00 10.66 -2.630 -0.059 7.16 10.33
8 1.10 5.95 -2.732 -0.058 6.32 10.95
17 2.80 22.79 -4.395 -0.054 -18.34 4.99
20 3.30 27.75 -4.865 -0.054 -31.12 -7.25
23 3.80 47.27 -5.344 -0.056 -47.15 -26.66
24 4.00 49.92 -5.541 -0.057 -54.75 -37.04
25 4.10 51.24 -5.642 -0.058 30.47 -42.56 176.28(SL2)
30 5.10 64.44 -6.674 -0.056 66.39 51.60
34 5.80 73.66 -7.301 -0.045 16.52 81.35
43 7.50 96.02 -8.245 -0.024 -0.47 -14.22 267.24(SL3)
45 7.80 77.66 -8.372 -0.024 104.55 21.72
49 8.50 86.82 -8.625 -0.016 46.53 75.00
53 9.30 87.20 -8.742 -0.001 -26.05 83.40
61 10.80 83.90 -8.522 0.010 -153.08 -51.98
62 10.90 83.82 -8.505 0.009 -12.40 -67.71 298.12(SL4)
67 11.90 83.09 -8.414 0.005 53.25 27.60
71 12.60 82.59 -8.312 0.012 -4.73 44.56
80 14.30 81.42 -7.842 0.012 -6.50 -82.70 275.32(SL5)
85 15.30 80.74 -7.727 0.005 50.08 8.27
97 17.60 79.19 -7.422 0.002 -133.83 -89.12
98 17.70 79.12 -7.420 0.000 -4.96 -102.90 273.57(SL6)
103 18.70 78.44 -7.554 -0.012 53.02 -10.14
115 21.10 90.49 -8.117 -0.025 -8.49 -117.10 278.07(SL7)
120 22.10 96.39 -8.713 -0.040 37.28 -32.68
124 22.90 101.11 -9.310 -0.045 -41.40 -34.06
133 24.60 111.11 -11.133 -0.092 58.62 -255.21 559.67(SL8)
138 25.60 116.97 -13.033 -0.115 223.17 26.91
144 26.80 124.00 -15.164 -0.080 72.85 206.00
147 27.30 126.92 -15.755 -0.055 6.09 225.86
150 27.90 130.42 -16.173 -0.025 -42.91 204.85
158 29.40 139.17 -15.973 0.039 54.27 166.01 239.81(SL9)
166 31.00 148.48 -13.771 0.121 -148.73 201.14
169 31.50 3.28 -12.625 0.140 -166.75 118.70
172 32.00 -21.27 -11.362 0.148 -162.25 35.90
175 32.50 -45.82 -10.062 0.148 -145.48 -41.85
178 33.00 -70.38 -8.803 0.139 -116.43 -108.00
181 33.50 -94.93 -7.649 0.124 -75.10 -156.56
184 34.00 -103.22 -6.647 0.105 -16.63 -182.14
187 34.50 -71.78 -5.824 0.084 26.09 -181.90
190 35.00 -47.12 -5.178 0.064 54.96 -163.60
193 35.50 -28.57 -4.694 0.047 73.22 -133.40
196 36.00 0.38 -4.341 0.034 83.77 -97.46
206 38.00 68.65 -3.56 0.018 -13.53 2.26
S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:15:17

Step No. 1 << 굴착 1단계 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -1.58 0.00 0.00


4 0.50 3.54 7.8 -1.61 -0.87 -0.11
7
8 1.00
1.10 10.66
-11.12 -1.64 -4.42
-4.39 -1.30
-1.79

17 2.80 2.62 -1.75 4.33 1.86


20 3.30 7.19 -1.78 1.87 3.54
23
24 3.80
4.00 -11.75
-10.40 -1.80
-1.81 -0.54
-0.64 3.34
3.06
25 4.10 -9.72 -1.82 2.69 3.35
30 5.10 -2.72 -1.86 7.78 8.63
34 5.80 2.63 -1.87 9.03 14.36
19.5
43 7.50 18.88 -1.76 -8.57
14.8 16.80
45 7.80 -11.62 -1.72 -12.72 12.91
49 8.50 -2.49 -1.61 -9.20 5.16
53 9.30 -5.82 -1.48 -10.13 -2.50

61
62 10.80
10.90 -4.06
-3.52 -1.25
-1.24 -0.15
2.59 -10.35
-9.90
67 11.90 0.26 -1.14 1.63 -8.62
71 12.60 1.31 -1.09 3.08 -7.65

80 14.30 -0.92 -1.04 1.73 -7.54


85 15.30 -1.82 -1.04 1.97 -6.79

97
98 17.60
17.70 0.89
0.89 -1.15
-1.16 1.76
3.87 -1.79
-1.17
103 18.70 0.70 -1.23 0.85 0.07

115 21.10 0.11 -1.38 -0.05 0.74


120 22.10 0.00 -1.45 -0.09 0.66
124 22.90 -0.03 -1.50 -0.08 0.59

133 24.60 -0.03 -1.60 3.02 0.50


138 25.60 -0.02 -1.66 0.00 0.49

144 26.80 0.00 -1.74 0.01 0.50


147 27.30 0.00 -1.77 0.01 0.51
150 27.90 0.00 -1.80 0.02 0.52

158 29.40 0.00 -1.89 3.62 0.54

166 31.00 0.00 -1.99 0.02 0.57


169 31.50 0.00 -2.02 3.86 0.58
172 32.00 -0.01 -2.05 3.92 0.60
175 32.50 -0.01 -2.08 3.98 0.61
178 33.00 -0.02 -2.11 4.05 0.63
181 33.50 -0.03 -2.14 4.12 0.66
184 34.00 -0.04 -2.17 4.20 0.69
187 34.50 -0.05 -2.20 4.28 0.73
190 35.00 -0.06 -2.23 4.36 0.79
193 35.50 -0.05 -2.26 4.44 0.85
196 36.00 -0.04 -2.29 4.52 0.94

206 38.00 0.31 -2.40


-2.4 -9.14 0.00
S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:23:33

Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

36.3 36.3
1 0.00 0.00 -1.62 0.00
36.28 0.00
4 0.50 3.54 -2.04 35.41 18.03
7
8 1.00
1.10 10.66
5.95 -2.45
-2.52 31.86
31.03 34.98
38.12

17 2.80 22.79 25.8 -3.52 6.61 74.31 75.2


20 3.30 27.75 -3.67 -2.36 74.59
23
24 3.80
4.00 32.80
29.09 -3.74
-3.75
-3.8 -0.12
-6.31 74.51
73.70
25 4.10 27.24 -3.75 -9.13 73.05
30 5.10 8.67 -3.60 -27.08 53.27
34 5.80 -4.35 -3.36 -28.60 33.17

43 7.50 8.42 -2.59 -18.25 -3.73


45 7.80 -26.33 -2.45 -19.23 -10.24
49 8.50 -10.20 -2.13 -8.57 -19.94
53 9.30 -9.52 -1.82 -5.65 -25.27

61
62 10.80
10.90 -5.41
-5.31 -1.40
-1.38 5.33
7.19 -24.92
-23.98
67 11.90 1.60 -1.24 7.27 -16.93
71 12.60 3.31 -1.18 7.68 -12.40

80 14.30 0.44 -1.14 3.26 -7.58


85 15.30 -1.12 -1.16 2.28 -6.06

97
98 17.60
17.70 0.86
0.85 -1.28
-1.28 1.50
3.85 -1.37
-0.73
103 18.70 0.62 -1.35 0.67 0.29

115 21.10 0.07 -1.51 -0.07 0.74


120 22.10 -0.01 -1.57 -0.09 0.65
124 22.90 -0.03 -1.62 -0.07 0.59

133 24.60 -0.02 -1.72 3.26 0.52


138 25.60 -0.01 -1.79 0.00 0.52

144 26.80 0.00 -1.86 0.01 0.53


147 27.30 0.00 -1.89 0.02 0.54
150 27.90 0.00 -1.93 0.02 0.55

158 29.40 0.00 -2.02 3.85 0.58

166 31.00 0.00 -2.11 0.02 0.60


169 31.50 0.00 -2.14 4.09 0.62
172 32.00 -0.01 -2.17 4.15 0.63
175 32.50 -0.01 -2.20 4.22 0.65
178 33.00 -0.02 -2.23 4.28 0.67
181 33.50 -0.03 -2.26 4.35 0.69
184 34.00 -0.04 -2.29 4.43 0.72
187 34.50 -0.05 -2.32 4.51 0.77
190 35.00 -0.06 -2.35 4.60 0.83
193 35.50 -0.06 -2.38 4.68 0.90
196 36.00 -0.04 -2.41 4.76 0.98

206 38.00 0.32 -2.53 -9.60 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:23:39

Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

6.1
1 0.00 0.00 -1.59 0.00
6.08 0.00
4 0.50 3.54 -2.07 5.22 2.93
7
8 1.00
1.10 10.66
5.95 -2.55
-2.64 1.67
0.84 4.78
4.90

409.2 112.8
17 2.80 22.79 -4.25 -23.59
112.82 -10.23
20 3.30 27.75 -4.72 100.19 43.16
23
24 3.80
4.00 47.27
49.92 -5.15
-5.29 84.35
74.63 89.68
105.35
25 4.10 51.24 -5.36 69.57 112.83
61.8 155.7
30 5.10 64.44 -5.76 -5.8 11.73 154.65
34 5.80 51.42 -5.69 -28.82 148.05

43 7.50 19.78 -4.47 -89.33 39.78


45 7.80 -76.20 -4.17 -86.39 12.41
49 8.50 -46.52 -3.45 -47.01 -34.12
53 9.30 -35.71 -2.71 -20.50 -60.08

61
62 10.80
10.90 -10.41
-9.36 -1.74
-1.70 12.25
14.85 -61.61
-60.06
67 11.90 -0.93 -1.38 18.71 -43.42
71 12.60 5.29 -1.26 19.29 -30.67

80 14.30 4.15 -1.19 8.78 -11.12


85 15.30 1.37 -1.23 4.57 -5.85

97
98 17.60
17.70 1.10
1.04 -1.38
-1.38 1.06
3.58 -0.10
0.54
103 18.70 0.51 -1.45 0.18 1.05

115 21.10 -0.05 -1.61 -0.19 0.78


120 22.10 -0.07 -1.67 -0.12 0.62
124 22.90 -0.06 -1.72 -0.06 0.55

133 24.60 -0.02 -1.83 3.48 0.52


138 25.60 -0.01 -1.89 0.02 0.53

144 26.80 0.00 -1.96 0.02 0.56


147 27.30 0.00 -1.99 0.02 0.57
150 27.90 0.00 -2.03 0.02 0.58

158 29.40 0.00 -2.12 4.04 0.61

166 31.00 -0.01 -2.22 0.02 0.63


169 31.50 0.00 -2.25 4.29 0.65
172 32.00 -0.01 -2.28 4.35 0.66
175 32.50 -0.01 -2.31 4.41 0.68
178 33.00 -0.02 -2.34 4.48 0.70
181 33.50 -0.03 -2.37 4.55 0.72
184 34.00 -0.05 -2.40 4.63 0.75
187 34.50 -0.06 -2.43 4.71 0.80
190 35.00 -0.06 -2.46 4.80 0.86
193 35.50 -0.06 -2.49 4.88 0.93
196 36.00 -0.04 -2.52 4.97 1.02

206 38.00 0.33 -2.63 -9.99 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:23:45

Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.56 0.00
-17.57 0.00
4 0.50 3.54 -1.95 -18.44 -8.90
7
8 1.00
1.10 10.66
5.95 -2.34
-2.42 -21.99
-22.82 -18.87
-21.12

273.6
17 2.80 22.79 -4.01 -47.24
43.95 -76.47
20 3.30 27.75 -4.60 31.32 -57.52
23 3.80 47.27 -5.25 15.48 189.1 189.8 -45.42
24
25 4.00
4.10 49.92
51.24 -5.52
-5.66 0.70
5.76
189.79 -43.53
-42.94
30 5.10 64.44 -7.03 131.95 119.11
34 5.80 73.66 -7.75 83.61 195.00
-8.1 239.7
43 7.50 96.02 98.7 -7.82 -60.61 220.09
45 7.80 77.66 -7.56 -88.89 197.44
49 8.50 86.82 -6.70 -139.39 115.48
53 9.30 -74.38 -5.45 -136.08 1.17

61
62 10.80
10.90 -52.01
-48.11 -3.25
-3.13 -17.66
-9.68 -107.51
-108.66
67 11.90 -18.16 -2.18 19.17 -102.71
71 12.60 -6.45 -1.76 29.07 -85.86

80 14.30 8.07 -1.35 26.87 -37.91


85 15.30 7.75 -1.35 16.76 -17.44

97
98 17.60
17.70 3.58
3.34 -1.55
-1.56 2.38
4.99 1.89
2.72
103 18.70 1.34 -1.65 -0.24 3.43

115 21.10 -0.32 -1.82 -0.77 1.44


120 22.10 -0.31 -1.88 -0.44 0.84
124 22.90 -0.23 -1.93 -0.22 0.59

133 24.60 -0.06 -2.03 3.89 0.47


138 25.60 -0.01 -2.10 0.05 0.51

144 26.80 0.01 -2.17 0.05 0.58


147 27.30 0.02 -2.20 0.04 0.60
150 27.90 0.01 -2.24 0.03 0.62

158 29.40 0.01 -2.33 4.44 0.66

166 31.00 0.00 -2.42 0.02 0.69


169 31.50 0.00 -2.45 4.68 0.70
172 32.00 -0.01 -2.48 4.74 0.72
175 32.50 -0.02 -2.51 4.81 0.73
178 33.00 -0.03 -2.54 4.87 0.75
181 33.50 -0.04 -2.57 4.95 0.78
184 34.00 -0.05 -2.60 5.03 0.82
187 34.50 -0.06 -2.63 5.11 0.86
190 35.00 -0.07 -2.66 5.20 0.93
193 35.50 -0.06 -2.69 5.29 1.01
196 36.00 -0.05 -2.72 5.37 1.10

206 38.00 0.36 -2.84 -10.78 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:23:51

Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-9.94 0.00
4 0.50 3.54 -1.98 -10.80 -5.08
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -14.35
-15.18 -11.24
-12.72

286.4
17 2.80 22.79 -4.03 -39.61
55.84 -55.09
20 3.30 27.75 -4.57 43.21 -30.19
23 3.80 47.27 -5.15 27.37 87.0 -12.15
24
25 4.00
4.10 49.92
51.24 -5.38
-5.50 12.59
17.65
99.56 -7.88
-6.10
30 5.10 64.44 -6.63 41.72 65.73
34 5.80 73.66 -7.29 -6.61 78.45

363.1 212.3
43 7.50 96.02 98.7 -8.40 -150.84
212.30 -49.85
45 7.80 77.66 -8.58 184.02 9.38
49 8.50 86.82 -8.98 126.45 118.48
-9.1
53 9.30 87.20 -9.15 53.81 190.80 207.5
61
62 10.80
10.90 83.90
83.82 -8.16
-8.03 -73.62
-82.00 174.91
167.55
67 11.90 83.09 -6.46 -153.39 43.72
71 12.60 -76.49 -5.23 -113.48 -51.53

80 14.30 -38.93 -2.82 8.95 -128.84


85 15.30 -16.06 -2.06 32.31 -107.50

97
98 17.60
17.70 13.60
13.58 -1.66
-1.67 26.37
28.18 -25.68
-22.40
103 18.70 10.70 -1.77 12.57 -3.88

115 21.10 1.60 -2.04 -1.00 5.47


120 22.10 0.03 -2.12 -1.71 3.97
124 22.90 -0.48 -2.18 -1.50 2.66

133 24.60 -0.47 -2.28 3.76 0.90


138 25.60 -0.29 -2.34 -0.19 0.54

144 26.80 -0.10 -2.41 0.03 0.47


147 27.30 -0.05 -2.44 0.07 0.50
150 27.90 -0.01 -2.48 0.08 0.54

158 29.40 0.02 -2.57 4.95 0.67

166 31.00 0.01 -2.67 0.04 0.75


169 31.50 0.01 -2.70 5.16 0.77
172 32.00 0.00 -2.73 5.21 0.79
175 32.50 -0.01 -2.76 5.27 0.81
178 33.00 -0.02 -2.79 5.34 0.83
181 33.50 -0.04 -2.82 5.41 0.86
184 34.00 -0.05 -2.85 5.49 0.89
187 34.50 -0.07 -2.88 5.58 0.95
190 35.00 -0.07 -2.91 5.67 1.01
193 35.50 -0.07 -2.94 5.76 1.10
196 36.00 -0.05 -2.96 5.85 1.20

206 38.00 0.39 -3.08 -11.69 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:23:57

Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.61 0.00
4 0.50 3.54 -1.98 -11.47 -5.42
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.02
-15.85 -11.91
-13.46

287.3
17 2.80 22.79 -4.03 -40.28
55.48 -56.97
20 3.30 27.75 -4.58 42.85 -32.25
23 3.80 47.27 -5.16 27.01 98.7 -14.39
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.23
17.29
110.92 -10.19
-8.45
30 5.10 64.44 -6.67 53.07 74.73
34 5.80 73.66 -7.32 4.74 95.41

263.0
43 7.50 96.02 98.7 -8.24 -139.48
123.50 -13.59
45 7.80 77.66 -8.36 95.22 18.99
49 8.50 86.82 -8.60 37.65 65.93
53 9.30 87.20 -8.72 -34.99 67.21
379.8 209.0
61
62 10.80
10.90 83.90
83.82 -8.63
-8.64 -162.42
-170.81
209.01 -81.88
-98.13
67 11.90 83.09 -8.74 -8.7 125.56 69.10
71 12.60 82.59 -8.69 67.57 136.67
164.4
80 14.30 81.42 -7.41 -71.83 132.75
85 15.30 80.74 -5.93 -140.85 20.29

97
98 17.60
17.70 -43.24
-40.79 -2.89
-2.81 11.09
17.96 -125.41
-123.76
103 18.70 -7.78 -2.26 41.18 -92.36

115 21.10 13.12 -2.13 18.83 -11.29


120 22.10 8.68 -2.25 7.83 1.63
124 22.90 5.08 -2.35 2.37 5.50

133 24.60 0.48 -2.52 3.06 4.91


138 25.60 -0.44 -2.59 -1.66 3.14

144 26.80 -0.60 -2.66 -0.97 1.54


147 27.30 -0.53 -2.69 -0.69 1.12
150 27.90 -0.42 -2.73 -0.40 0.80

158 29.40 -0.14 -2.82 5.35 0.55

166 31.00 -0.01 -2.91 0.10 0.67


169 31.50 0.01 -2.94 5.69 0.72
172 32.00 0.02 -2.97 5.74 0.77
175 32.50 0.01 -3.00 5.79 0.82
178 33.00 0.00 -3.03 5.84 0.86
181 33.50 -0.02 -3.06 5.91 0.91
184 34.00 -0.04 -3.09 5.98 0.96
187 34.50 -0.06 -3.12 6.06 1.02
190 35.00 -0.07 -3.15 6.15 1.10
193 35.50 -0.07 -3.18 6.24 1.19
196 36.00 -0.05 -3.21 6.33 1.30

206 38.00 0.42 -3.32 -12.63 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:04

Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.60 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.90
-13.45

287.0
17 2.80 22.79 -4.03 -40.27
55.39 -56.94
20 3.30 27.75 -4.58 42.76 -32.27
23 3.80 47.27 -5.16 26.92 98.1 -14.46
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.14
17.20
110.26 -10.27
-8.54
30 5.10 64.44 -6.67 52.42 73.99
34 5.80 73.66 -7.32 4.09 94.20

274.2
43 7.50 96.02 98.7 -8.26 -140.14
134.04 -15.91
45 7.80 77.66 -8.38 105.76 19.84
49 8.50 86.82 -8.63 48.19 74.16
53 9.30 87.20 -8.74
-8.7 -24.46 83.86
286.5
61
62 10.80
10.90 83.90
83.82 -8.50
-8.49 -151.88
-160.27
126.24 -49.42
-64.61
67 11.90 83.09 -8.38 42.79 19.84
71 12.60 82.59 -8.28 -15.20 29.47

361.2 206.6
80 14.30 81.42 -7.98 -154.60
206.64 -115.16
85 15.30 80.74 -8.07 125.56 50.88
148.9
97
98 17.60
17.70 79.19
79.12 -7.09
-6.99 -58.36
-66.27 127.09
121.25
103 18.70 78.44 -5.71 -132.99 15.50

115 21.10 -38.55 -3.06 20.97 -109.98


120 22.10 -1.79 -2.64 38.84 -76.78
124 22.90 10.31 -2.53 34.68 -46.65

133 24.60 10.97 -2.62 18.76 -5.43


138 25.60 6.64 -2.74 4.94 3.54

144 26.80 2.40 -2.87 -0.29 5.79


147 27.30 1.24 -2.92 -1.19 5.39
150 27.90 0.29 -2.97 -1.63 4.51

158 29.40 -0.56 -3.07 4.60 2.21

166 31.00 -0.41 -3.16 -0.39 0.95


169 31.50 -0.31 -3.19 5.85 0.80
172 32.00 -0.23 -3.22 6.04 0.73
175 32.50 -0.16 -3.25 6.19 0.72
178 33.00 -0.11 -3.28 6.31 0.75
181 33.50 -0.08 -3.31 6.42 0.81
184 34.00 -0.07 -3.34 6.51 0.88
187 34.50 -0.06 -3.37 6.60 0.98
190 35.00 -0.06 -3.40 6.69 1.09
193 35.50 -0.05 -3.43 6.78 1.22
196 36.00 -0.03 -3.46 6.86 1.36

206 38.00 0.46 -3.57 -13.56 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:10

Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.59 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.89
-13.44

287.0
17 2.80 22.79 -4.03 -40.26
55.41 -56.92
20 3.30 27.75 -4.58 42.78 -32.24
23 3.80 47.27 -5.16 26.94 98.1 -14.41
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.16
17.22
110.22 -10.23
-8.49
30 5.10 64.44 -6.67 52.38 74.00
34 5.80 73.66 -7.32 4.05 94.19

273.5
43 7.50 96.02 98.7 -8.25 -140.17
133.31 -15.98
45 7.80 77.66 -8.38 105.02 19.55
49 8.50 86.82 -8.63 47.46 73.35
53 9.30 87.20 -8.74
-8.7 -25.19 82.47
298.7
61
62 10.80
10.90 83.90
83.82 -8.52
-8.51 -152.61
-161.00
137.72 -51.91
-67.18
67 11.90 83.09 -8.42 54.26 28.75
71 12.60 82.59 -8.31 -3.73 46.41

260.7
80 14.30 81.42 -7.82 -143.13
117.54 -78.71
85 15.30 80.74 -7.68 36.46 -1.77

379.9 224.5
97
98 17.60
17.70 79.19
79.12 -7.57
-7.59 -147.46
-155.38
224.51 -130.51
-145.26
103 18.70 78.44 -7.99 145.72 39.80

172.2
115 21.10 90.49 -7.68 -54.79 155.41
120 22.10 96.39 -6.55 -136.16 54.41
124 22.90 -63.46 -5.47 -101.07 -42.84

133 24.60 -42.22 -3.67 14.82 -110.35


138 25.60 -7.64 -3.18 36.60 -83.09

144 26.80 11.16 -3.00 31.89 -39.65


147 27.30 12.73 -3.01 25.83 -25.17
150 27.90 12.07 -3.06 18.30 -11.96

158 29.40 6.17 -3.23 10.50 3.87

166 31.00 1.26 -3.39 -1.10 5.41


169 31.50 0.44 -3.43 5.00 4.74
172 32.00 -0.09 -3.46 4.99 3.95
175 32.50 -0.41 -3.50 5.19 3.18
178 33.00 -0.57 -3.53 5.50 2.51
181 33.50 -0.61 -3.56 5.86 1.98
184 34.00 -0.59 -3.59 6.22 1.60
187 34.50 -0.53 -3.62 6.55 1.38
190 35.00 -0.44 -3.65 6.85 1.28
193 35.50 -0.34 -3.68 7.10 1.29
196 36.00 -0.23 -3.71 7.30 1.39

206 38.00 0.63 -3.81 -14.49 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:17

Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.59 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.89
-13.44

287.0
17 2.80 22.79 -4.03 -40.26
55.41 -56.93
20 3.30 27.75 -4.58 42.78 -32.24
23 3.80 47.27 -5.16 26.94 98.1 -14.42
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.16
17.22
110.25 -10.24
-8.50
30 5.10 64.44 -6.67 52.40 74.01
34 5.80 73.66 -7.32 4.07 94.22

273.4
43 7.50 96.02 -8.25 -140.15
133.27 -15.92
45 7.80 77.66 -8.38 104.98 19.60
49 8.50 86.82 -8.63 47.42 73.37
53 9.30 87.20 -8.74 -25.23 82.46
297.7
61
62 10.80
10.90 83.90
83.82 -8.52
-8.50 -152.65
-161.04
136.66 -51.98
-67.25
67 11.90 83.09 -8.41 53.20 27.62
71 12.60 82.59 -8.31 -4.79 44.54

277.4
80 14.30 81.42 -7.85 -144.19
133.24 -82.38
85 15.30 80.74 -7.73 52.16 10.26

246.2
97
98 17.60
17.70 79.19
79.12 -7.38
-7.38 -131.76
-139.67
106.53 -82.36
-95.54
103 18.70 78.44 -7.47 27.75 -28.46

467.4 294.7
115 21.10 90.49 -8.42 -172.76
294.69 -195.97
120 22.10 96.39 -9.50 201.25 52.52
124 22.90 101.11 -10.28 122.25 182.20
-10.6 254.5
133 24.60 111.11 -10.24 -58.14 239.17
115.8
138 25.60 116.97 -8.98 -160.12 124.51

144 26.80 -62.54 -6.88 -120.39 -51.25


147 27.30 -87.07 -6.04 -82.99 -102.77
150 27.90 -78.38 -5.16 -29.30 -136.01

158 29.40 -19.06 -3.81 49.81 -115.25

166 31.00 15.01 -3.46 37.77 -43.66


169 31.50 16.08 -3.48 36.51 -26.71
172 32.00 15.02 -3.52 28.76 -13.74
175 32.50 12.81 -3.58 21.89 -4.50
178 33.00 10.15 -3.64 16.27 1.54
181 33.50 7.51 -3.71 11.98 5.04
184 34.00 5.15 -3.77 8.94 6.66
187 34.50 3.19 -3.82 6.98 6.98
190 35.00 1.67 -3.87 5.88 6.50
193 35.50 0.54 -3.92 5.42 5.60
196 36.00 -0.25 -3.96 5.43 4.55

206 38.00 -1.47 -4.09 -15.56 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:23

Step No. 10 << B7 슬래브 설치 및 10단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.59 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.89
-13.44

287.0
17 2.80 22.79 -4.03 -40.26
55.41 -56.93
20 3.30 27.75 -4.58 42.78 -32.24
23 3.80 47.27 -5.16 26.94 98.1 -14.42
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.16
17.22
110.25 -10.24
-8.50
30 5.10 64.44 -6.67 52.40 74.01
34 5.80 73.66 -7.32 4.07 94.21

273.4
43 7.50 96.02 -8.25 -140.15
133.28 -15.92
45 7.80 77.66 -8.38 104.99 19.60
49 8.50 86.82 -8.63 47.43 73.38
53 9.30 87.20 -8.74 -25.22 82.48
297.7
61
62 10.80
10.90 83.90
83.82 -8.52
-8.50 -152.64
-161.03
136.64 -51.95
-67.21
67 11.90 83.09 -8.41 53.18 27.63
71 12.60 82.59 -8.31 -4.81 44.54

276.9
80 14.30 81.42 -7.84 -144.21
132.72 -82.42
85 15.30 80.74 -7.73 51.64 9.70

254.5
97
98 17.60
17.70 79.19
79.12 -7.39
-7.39 -132.28
-140.20
114.32 -84.13
-97.35
103 18.70 78.44 -7.49 35.54 -22.48

401.0 236.1
115 21.10 90.49 -8.31 -164.97
236.06 -171.30
120 22.10 96.39 -9.24 142.62 18.57
124 22.90 101.11 -9.98 63.62 101.34

290.3
133 24.60 111.11 -10.71 -10.7 -116.77
173.50 58.64
138 25.60 116.97 -10.59 59.46 175.64 190.1
144 26.80 124.00 125.8 -9.58 -85.13 161.13
147 27.30 126.92 -8.87 -135.79 102.94
150 27.90 -23.17 -7.90 -130.72 21.91

158 29.40 -82.55 -5.53 -36.85 -121.01

166 31.00 -21.82 -4.07 38.07 -111.53


169 31.50 -3.84 -3.86 51.54 -90.48
172 32.00 7.25 -3.74 50.25 -68.34
175 32.50 13.09 -3.70 44.92 -47.93
178 33.00 15.21 -3.70 37.74 -30.71
181 33.50 14.90 -3.73 30.21 -17.26
184 34.00 13.17 -3.79 23.26 -7.51
187 34.50 10.77 -3.85 17.38 -1.03
190 35.00 8.17 -3.91 12.77 2.75
193 35.50 5.68 -3.97 9.43 4.49
196 36.00 3.43 -4.03 7.27 4.81

206 38.00 -3.36 -4.24 -16.12 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:30

Step No. 11 << 2단 가설지보재 설치 및 11단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.59 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.89
-13.44

287.0
17 2.80 22.79 -4.03 -40.26
55.41 -56.92
20 3.30 27.75 -4.58 42.78 -32.24
23 3.80 47.27 -5.16 26.94 98.1 -14.42
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 12.16
17.22
110.24 -10.23
-8.50
30 5.10 64.44 -6.67 52.40 74.01
34 5.80 73.66 -7.32 4.07 94.21

273.4
43 7.50 96.02 -8.25 -140.15
133.28 -15.93
45 7.80 77.66 -8.38 105.00 19.59
49 8.50 86.82 -8.63 47.43 73.38
53 9.30 87.20 -8.74 -25.21 82.49
297.7
61
62 10.80
10.90 83.90
83.82 -8.52
-8.50 -152.64
-161.02
136.69 -51.93
-67.20
67 11.90 83.09 -8.41 53.23 27.70
71 12.60 82.59 -8.31 -4.76 44.64

275.7
80 14.30 81.42 -7.84 -144.16
131.59 -82.23
85 15.30 80.74 -7.73 50.51 8.76

265.9
97
98 17.60
17.70 79.19
79.12 -7.41
-7.41 -133.41
-141.33
124.54 -87.66
-101.01
103 18.70 78.44 -7.53 45.76 -15.91

344.6
115 21.10 90.49 -8.22 -154.75
189.86 -140.21
120 22.10 96.39 -8.96 96.42 3.46
124 22.90 101.11 -9.58 17.42 49.28

222.9
133 24.60 111.11 -10.60 -162.97
59.95 -71.97
138 25.60 116.97 -11.34 -54.09 -68.51
1757.9 387.3
144 26.80 124.00 -12.68 -198.67
387.30 -219.27
147 27.30 126.92 -13.50 324.57 -41.23
150 27.90 130.42 -14.53 247.37 130.48

-16.0
158 29.40 139.17 -15.95 45.17 351.59 358.5
147.3
166 31.00 148.48 -14.28 -172.88 241.79
169 31.50 3.28 -13.17 -180.65 152.73
172 32.00 -21.27 -11.90 -176.16 62.85
175 32.50 -45.82 -10.57 -159.38 -21.71
178 33.00 -70.38 -9.26 -130.33 -94.81
181 33.50 -94.93 -8.04 -89.00 -150.32
184 34.00 -115.38 -6.97 -28.98 -180.73
187 34.50 -81.23 -6.07 19.07 -185.39
190 35.00 -54.01 -5.36 51.96 -169.63
193 35.50 -33.16 -4.81 73.02 -139.77
196 36.00 -4.76 -4.41 86.68 -102.79

206 38.00 76.00 -3.46 -13.17 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:37

Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

0.1
1 0.00 0.00 -1.57 0.00
-10.59 0.00
4 0.50 3.54 -1.98 -11.46 -5.41
7
8 1.00
1.10 10.66
5.95 -2.39
-2.47 -15.01
-15.84 -11.89
-13.44

287.0
17 2.80 22.79 -4.03 -40.26
55.41 -56.92
20 3.30 27.75 -4.58 42.78 -32.24
23 3.80 47.27 -5.16 26.94 98.1 -14.42
24
25 4.00
4.10 49.92
51.24 -5.40
-5.52 17.22
61.20 -10.23
-8.50
30 5.10 64.44 -6.67 52.40 74.01
34 5.80 73.66 -7.32 4.07 94.21

273.5
43 7.50 96.02 -8.25 -3.43 -15.93
45 7.80 77.66 -8.38 105.01 19.59
49 8.50 86.82 -8.63 47.45 73.39
53 9.30 87.20 -8.74 -25.20 82.50
297.7
61
62 10.80
10.90 83.90
83.82 -8.52
-8.50 -152.62
-12.18 -51.90
-67.16
67 11.90 83.09 -8.41 53.20 27.70
71 12.60 82.59 -8.31 -4.79 44.63

275.3
80 14.30 81.42 -7.84 -6.51 -82.29
85 15.30 80.74 -7.73 50.08 8.26

273.6
97
98 17.60
17.70 79.19
79.12 -7.42
-7.42 -133.84
-4.95 -89.14
-102.53
103 18.70 78.44 -7.55 53.07 -10.13

277.8
115 21.10 90.49 -8.12 -8.52 -116.88
120 22.10 96.39 -8.71 36.95 -32.68
124 22.90 101.11 -9.31 -42.05 -34.44

133 24.60 111.11 -11.13 57.80


560.5 315.7 -256.77
257.3
138 25.60 116.97 -13.05 224.00 24.78

144 26.80 124.00 -15.20 79.42 207.72


147 27.30 126.92 -15.80 16.69 231.83
150 27.90 130.42 -16.22 -43.66 218.82
-16.3
256.2
158 29.40 139.17 -15.97 50.84 159.17

147.3
166 31.00 148.48 -13.75 -147.90 199.29
169 31.50 3.28 -12.60 -166.31 117.40
172 32.00 -21.27 -11.34 -161.82 34.69
175 32.50 -45.82 -10.04 -145.04 -42.70
178 33.00 -70.38 -8.78 -115.99 -108.63
181 33.50 -94.93 -7.63 -74.66 -156.97
184 34.00 -102.69 -6.63 -16.32 -181.60
187 34.50 -71.35 -5.81 26.17 -181.26
190 35.00 -46.81 -5.17 54.86 -162.95
193 35.50 -28.31 -4.69 77.45 -131.95
196 36.00 0.54 -4.34 83.41 -95.25

206 38.00 68.19 -3.57 -13.56 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:43

Step No. 13 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

11.5
1 0.00 0.00 -1.59 0.00
11.52 0.00
4 0.50 3.54 -2.11 10.66 5.65
7
8 1.00
1.10 10.66
5.95 -2.63
-2.73 7.11
6.28 10.22
10.88

17 2.80 22.79 -4.40 -18.15 5.00


20 3.30 27.75 -4.87 -30.78 -7.10
23 3.80 47.27 -5.35 -46.62 177.5 -26.06
24
25 4.00
4.10 49.92
51.24 -5.54
-5.64 -55.26
29.50 -36.59
-41.99
30 5.10 64.44 -6.68 66.21 51.60
34 5.80 73.66 -7.30 16.47 81.27

267.2
43 7.50 96.02 -8.24 -0.44 -13.79
45 7.80 77.66 -8.37 104.58 21.68
49 8.50 86.82 -8.62 46.56 74.98
53 9.30 87.20 -8.74 -26.04 83.37
298.1
61
62 10.80
10.90 83.90
83.82 -8.52
-8.51 -153.08
-12.40 -51.98
-67.29
67 11.90 83.09 -8.41 53.25 27.60
71 12.60 82.59 -8.31 -4.74 44.56

275.3
80 14.30 81.42 -7.84 -6.50 -82.29
85 15.30 80.74 -7.73 50.08 8.27

273.6
97
98 17.60
17.70 79.19
79.12 -7.42
-7.42 -133.83
-4.96 -89.12
-102.51
103 18.70 78.44 -7.55 53.02 -10.14

278.1
115 21.10 90.49 -8.12 -8.49 -117.09
120 22.10 96.39 -8.71 37.28 -32.68
124 22.90 101.11 -9.31 -41.40 -34.05

133 24.60 111.11 -11.13 58.62


559.7 316.1 -254.65
255.2
138 25.60 116.97 -13.03 223.17 26.91

144 26.80 124.00 -15.16 72.85 206.00


147 27.30 126.92 -15.75 6.09 225.86
150 27.90 130.42 -16.17 -42.91 204.85
-16.3
239.8
158 29.40 139.17 -15.97 54.27 166.01

147.3
166 31.00 148.48 -13.77 -148.73 200.79
169 31.50 3.28 -12.62 -166.75 118.69
172 32.00 -21.27 -11.36 -162.25 35.76
175 32.50 -45.82 -10.06 -145.48 -41.85
178 33.00 -70.38 -8.80 -116.43 -108.00
181 33.50 -94.93 -7.65 -75.10 -156.56
184 34.00 -103.22 -6.65 -16.63 -181.40
187 34.50 -71.78 -5.82 26.09 -181.16
190 35.00 -47.12 -5.18 54.96 -162.85
193 35.50 -28.57 -4.69 73.22 -132.17
196 36.00 0.38 -4.34 83.77 -95.81

206 38.00 68.65 -3.56 -13.53 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 1.A-A(L).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(L)(.. Date : 2022-12-07 Time : 17:24:49

Step No. 14 << 벽체설치 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-150 -50 50 150 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -100 0 100 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

11.6
1 0.00 0.00 -1.59 0.00
11.59 0.00
4 0.50 3.54 -2.11 10.72 5.68
7
8 1.00
1.10 10.66
5.95 -2.63
-2.73 7.16
6.32 10.28
10.95

17 2.80 22.79 -4.39 -18.34 4.99


20 3.30 27.75 -4.87 -31.12 -7.24
23 3.80 47.27 -5.34 -47.15 176.3 -26.41
24
25 4.00
4.10 49.92
51.24 -5.54
-5.64 -54.75
30.47 -37.04
-42.29
30 5.10 64.44 -6.67 66.39 51.60
34 5.80 73.66 -7.30 16.52 81.35

267.2
43 7.50 96.02 -8.24 -0.47 -13.73
45 7.80 77.66 -8.37 104.55 21.72
49 8.50 86.82 -8.62 46.53 75.00
53 9.30 87.20 -8.74 -26.05 83.38
298.1
61
62 10.80
10.90 83.90
83.82 -8.52
-8.51 -153.08
-12.40 -51.98
-67.29
67 11.90 83.09 -8.41 53.25 27.60
71 12.60 82.59 -8.31 -4.73 44.56

275.3
80 14.30 81.42 -7.84 -6.50 -82.29
85 15.30 80.74 -7.73 50.08 8.27

273.6
97
98 17.60
17.70 79.19
79.12 -7.42
-7.42 -133.83
-4.96 -89.12
-102.51
103 18.70 78.44 -7.55 53.02 -10.14

278.1
115 21.10 90.49 -8.12 -8.49 -117.09
120 22.10 96.39 -8.71 37.28 -32.68
124 22.90 101.11 -9.31 -41.40 -34.05

133 24.60 111.11 -11.13 58.62


559.7 316.1 -254.65
255.2
138 25.60 116.97 -13.03 223.17 26.91

144 26.80 124.00 -15.16 72.85 206.00


147 27.30 126.92 -15.75 6.09 225.86
150 27.90 130.42 -16.17 -42.91 204.85
-16.3
239.8
158 29.40 139.17 -15.97 54.27 166.01

147.3
166 31.00 148.48 -13.77 -148.73 200.79
169 31.50 3.28 -12.62 -166.75 118.69
172 32.00 -21.27 -11.36 -162.25 35.76
175 32.50 -45.82 -10.06 -145.48 -41.85
178 33.00 -70.38 -8.80 -116.43 -108.00
181 33.50 -94.93 -7.65 -75.10 -156.56
184 34.00 -103.22 -6.65 -16.63 -181.40
187 34.50 -71.78 -5.82 26.09 -181.16
190 35.00 -47.12 -5.18 54.96 -162.85
193 35.50 -28.57 -4.69 73.22 -132.17
196 36.00 0.38 -4.34 83.77 -95.81

206 38.00 68.65 -3.56 -13.53 0.00


2.A-A(R)
1.설계요약
1.1 C.I.P
단면검토 비고
부재 적용
구분 발생응력(MPa) 허용응력(MPa) 판정 (설계안전율)
40 Mpa 압축응력 13.618 19.200 O.K 70.93%
흙막이벽 HD32×8 인장응력 185.719 270.000 O.K 68.78%
D13@200 전단응력 1.045 1.221 O.K 85.59%

1.2 안전성 검토
1) 측면파일 근입장
근입장 안전율 : 1.71 > 1.20 ---> O.K

2) 수평변위 검토
허용 수평변위 : 19.27mm < 65.58mm ---> O.K
허용수평변위 = 32.79 m x 0.20 % = 0.0656 m ( 65.58mm)
수 평 변 위 (mm)
시공단계 부재 굴착깊이 판 정 비고
최대발생변위 허용변위
STEP-1 CIP 1.355 3.70 65.58 O.K 5.64%
STEP-2 CIP 4.120 7.20 65.58 O.K 10.98%
STEP-3 CIP 5.905 9.00 65.58 O.K 13.72%
STEP-4 CIP 9.305 11.50 65.58 O.K 17.54%
STEP-5 CIP 12.705 12.10 65.58 O.K 18.45%
STEP-6 CIP 16.105 11.50 65.58 O.K 17.54%
STEP-7 CIP 19.530 11.60 65.58 O.K 17.69%
STEP-8 CIP 22.980 11.60 65.58 O.K 17.69%
STEP-9 CIP 25.905 11.60 65.58 O.K 17.69%
STEP-10 CIP 29.290 13.20 65.58 O.K 20.13%
STEP-11 CIP 32.790 18.00 65.58 O.K 27.45%
STEP-12 CIP 32.790 19.30 65.58 O.K 29.43%
STEP-13 CIP 32.790 19.10 65.58 O.K 29.12%
STEP-14 CIP 32.790 19.10 65.58 O.K 29.12%
STEP-15 CIP 32.790 19.10 65.58 O.K 29.12%

3) 침하량 검토
허용 침하량 : 16.42 < 25.00 ---> O.K
2.결과 정리
구 분 해석결과 (단위) 비고

외측파일 모멘트 384.02 kN·m


CIP
외측파일 최대 전단력 407.92 kN

최대 수평 변위 19.27 mm

주동토압 모멘트 (Ma) 10569.03 kN·m


근입장검토
수동토압 모멘트 (Mp) 18042.92 kN·m
3.C.I.P 설계
3.1 흙막이벽
가. 설계 제원
C.I.P 직경(D, mm) 600.0
C.I.P 설치간격
600.0 전단철근 주철근
(C.T.C, mm)
H-pile 제원 H-300x300x10x15

600.0
직경
H-pile 설치간격
1200.0
(C.T.C, mm)
콘크리트 설계기준강도 CIP 간격
40.0
(fck, MPa)
600.0
주철근 항복강도(fy, MPa) 400.0
전단철근 항복강도(fy, MPa) 300.0
콘크리트 설계기준강도
0.8
저감계수
허용응력보정계수 1.5
탄성계수비(n) 8
피복두께(mm) 80.0

나. 단면력 산정
(1) 최대 휨모멘트 ( Mmax )
Mmax = 384.020 kN·m/m
= 384.020 (kN·m/m) × 0.60 m (C.I.P 설치간격) = 230.412 kN·m
(2) 최대 전단력 ( Smax )
Smax = 407.920 kN/m
= 407.920 (kN/m) × 0.60 m (C.I.P 설치간격) = 244.752 kN

다. C.I.P의 허용 응력
(1) 콘크리트 허용압축강도 ( fca )
fck' = 0.8 × 40.0 = 32.000 MPa
fca = 보정계수 × ( 0.4 × fck' ) = 1.5 × ( 0.4 × 32.000 )
= 19.200 MPa
(2) 콘크리트 허용전단강도 ( τa )
τca = 보정계수 × ( 0.08 × fck' ) = 1.5 × ( 0.08 × 32.000 )
= 0.679 MPa
(3) 주철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa
(4) 전단철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 300.000 , 180 MPa )
= 225.000 MPa

라. 철근량 검토
(1) 환산단면
4 3 4 4
π × D B × B π × 600 B
= → = → B = 525.6 mm
64 12 64 12

(2) 환산 단면적 : B × H = 526 × 526


b = 526 mm , d = 526 - 80.0 = 445.6 mm
n × fca 8 × 19.200
k0 = = = 0.363 (평형철근비)
n × fca + fsa 8 × 19.200 + 270.00
k0 0.363
j0 = 1 - = 1 - = 0.879
3 3

(3) 휨에 대한 검토
Mmax 230.412 × 1000000
소요철근량 = = = 2,178 mm2
fsa × j × d 270.0 × 0.88 × 445.6

사용철근량 (As) : 4 ea HD 32 = 3,175.3 mm2

소요철근량 < 사용철근량 ---> O.K

스트럿에 의한 축력의 작용방향과 토압의 작용방향은 서로 반대이므로 양측에 모두 배근해야 하므로


※ 철근 : 8 ea HD 32 사용 ( As = 6350.6 mm2 )

(4) 전단에 대한 검토
Smax 244.752 x 1000
τ = = = 1.045 MPa
bxd 525.6 × 445.6
∴ τ > τca = 0.679 MPa ---> N.G 최소전단철근 배치
τ' = τ - τca
= 1.045 - 0.679
= 0.366 MPa

∴ 사용철근량 (Av) : 2 ea D 13 = 253.2 mm2


∴ s = 200 mm 간격으로 배치

τ'ㆍsㆍb 0.366 × 200.0 × 525.6


Av req = = = 171.0 mm2
fsa 225.000

사용철근량(Av) > 필요철근량(Av req) → O.K

Avㆍfsa 253.225 × 225.0


τsa = = = 0.542 MPa
sㆍb 200.000 × 525.6
τa = τca + τsa = 0.679 + 0.542 = 1.221 MPa
∴ τa > τ = 1.045 MPa ---> O.K

마. 응력 검토
(1) 압축응력 검토
ρ = 3175.3 / ( 445.6 × 525.6 ) = 0.0136
2
k = (n·ρ) + 2·n·ρ - n·ρ
= ( 8 × 0.0136 )2 + 2 × 8 × 0.0136 - 8 × 0.0136 = 0.370
j = 1 - (k/3) = 1 - ( 0.370 / 3 ) = 0.877
2ㆍMmax 2 × 230.412 × 1000000
fc = = = 13.618 MPa
2 2
kㆍjㆍbㆍd 0.370 × 0.877 × 525.6 × 445.6
∴ fc < fca = 19.200 MPa ---> O.K

(2) 인장응력 검토
Mmax Mmax 230.412 × 1000000
fs = = = = 185.719 MPa
pㆍjㆍbㆍd2 Asㆍjㆍd 3175.294 × 0.877 × 445.6
∴ fs < fsa = 270.000 MPa ---> O.K
4.침하량 (GROUND SETTLMENT CHECK) 검토
SUNEX PROGRAM OUT DATA Caspe(1966) 방법에 따른 지표면 침하 계산

Excavation Depth (HW) = 32.80 m


Average Phi to ex. Depth = 27.79 deg
Width of Excavation (B) = 60.00 m
Hp = (0.5 B tan(45+PHI/2 = 49.72 m
Ht = (Hw+Hp) = 82.52 m
Distance of Influnce (D=Ht*tan(45-PHI/2)) = 49.79 m

Volume of deflection (Vs) = 0.40867 ㎥


Settlement at wall (Sw) = 2 Vs/D = 0.01642 m = -16.42 mm

Distance 0.0×D 0.1×D 0.2×D 0.3×D 0.5×D 1.0×D


(m) 0.0 5.0 10.0 14.9 24.9 49.8

Settlement(mm) -16.42 -13.30 -10.51 -8.05 -4.11 0.00

- SUNEX에의한 침하예상량은 다음과 같다. -


절점범호 DISTANCE (m) SETTLEMENT (mm)
1 0.0 -16.42
2 5.0 -13.30
3 10.0 -10.51
4 14.9 -8.05
5 24.9 -4.11
6 49.8 0.00

-5
SETTLEMENT (mm)

-10

-15

-20

-25
0 10 20 30 40 50 60
DISTANCE (m)

※ 침하 및 각변위 허용치
허용침하량은 국도설계실무요령(2018)이 제안한 25mm로 적용하였으며, 허용 각변위는 Bjerrum(1981)이 제안한
건물에 균열이 없도록 하는 안정한계 1/500을 적용 하였다.
- 인접부지의 예상 피해 판단

* 가장 인접하여있는 건물 은 1.27 m 거리에 위치하고,

인접한 건물 폭을 10.38 m로 가정 할 때

1.27 m 지점의 침하량 = 15.593 mm < 25.0 ∴ O.K

11.65 m 지점의 침하량 = 9.636 mm

→ 부등침하량 = 5.957 mm < 25.0 ∴ O.K

5.957 1 1
→ 각변위 (δ/L) = = < ∴ O.K
10377 1742 500

최대침하량 허용침하
해석방법 각변위 허용각변위 판정
(mm) (mm)
1 1
Caspe 16.42 25.00 O.K
3032 500
5.흙막이 벽체의 근입장 검토
근입장에 대한 검토는 최하단 지보공 위치를 중심으로 하는 주동토압 (Pa)에 의한
회전 모멘트 (Ma = Pa X La)와 최하단 지보공 위치를 중심으로 하는 수동토압 (Pp)에 의한
회전 모멘트 (Ma = Pp X Lp)를 비교하여 판별한다.
또한 엄지말뚝에 작용하는 수동토압의 작용폭은 다음 표와 같으며 주동토압의 작용폭은 굴착저면
이상은 말뚝의 간격, 굴착면 이하는 플랜지 폭만을 적용한다.
[ 엄지말뚝의 토압작용폭 (근입부) ]
사 질 토 N > 30 30 ≥ N > 10 N ≤ 10
지반의 상태
점 성 토 N > 8 8 ≥ N > 4 N ≤ 4
토압의 작용폭 플랜지폭의 3배 플랜지폭의 2배 플랜지폭의 1배
(흙막이 가시설 세부설계기준 , 한국도로공사, 2005)

최하단 지보공 H-PILE

La
Lp Pa

Pp

Mp Pp X Lp
Fs = = ≥ 1.2 이어야 한다.
Ma Pa X La

1) 토압에 의한 근입장 검토
전산해석 결과 : Ma = 10569.03 KN.m
Mp = 18042.92 KN.m

18042.92
∴ Fs (안전율) = = 1.71 > 1.2 - O.K -
10569.03
6. 전산INPUT
6.1 INPUT DATA
PROJECT 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1)

UNIT kN

SOIL 1 매립층(자갈 및 실트섞인 모래)


18 9 0 24 14300 0 0 0
2 퇴적층(점토질실트)
17 8 20 10 10000 0 0 0
3 퇴적층(자갈섞인 모래)
18 9 0 25 25500 0 0 0
4 풍화토
19 10 17 28 33800 0 0 0
5 풍화암
20 11 27 30 38000 0 0 0
6 연암
23 14 40 33 48000 0 0 0

PROFILE 1 1.88 1 1
2 4.58 2 2
3 8.58 3 3
4 10.08 4 4
5 50.00 5 5

VWALL 1 39.79 0.055116 0.0012304 2.05E+08 1 1 1 0 0

STRUT 1 3.620 0.01749 5 3 0 0 0 0 0


2 25.405 0.01749 5 3 0 0 0 0 0
3 28.790 0.01749 5 3 0 0 0 0 0

SLAB 1 0.355 0.25 5 0


2 4.905 0.15 5 0
3 8.305 0.15 5 0
4 11.705 0.15 5 0
5 15.105 0.15 5 0
6 18.530 0.15 5 0
7 21.980 0.15 5 0
8 31.260 3.06 5 0

WALL 1 29.730 32.790 1.0 0


2 26.405 29.730 1.0 0
3 18.430 26.405 1.0 0
4 11.630 18.430 0.6 0
5 4.830 11.630 0.5 0
6 0.000 4.830 0.4 0

Division 0.2
Solution 0
Output 0
NoteMode 0
MINKS 0
ECHO

STEP 1 굴착 1단계
RANKINE 1.0 0.0 50
LOAD 0 1.27 87 11.647 87 1
WATERPRESSURE 1.36 0.0 10.08 87.2 32.79 0.0
EXCAVATION 1.355

STEP 2 1F 슬래브 설치 및 2단계 굴착


CONST SLAB 1
EXCAVATION 4.120

STEP 3 1단 가설지보재 설치 및 3단계 굴착


CONST STRUT 1
EXCAVATION 5.905

STEP 4 B1 슬래브 설치 및 4단계 굴착


CONST SLAB 2
EXCAVATION 9.305

STEP 5 B2 슬래브 설치 및 5단계 굴착


CONST SLAB 3
EXCAVATION 12.705

STEP 6 B3 슬래브 설치 및 6단계 굴착


CONST SLAB 4
EXCAVATION 16.105

STEP 7 B4 슬래브 설치 및 7단계 굴착


CONST SLAB 5
EXCAVATION 19.530

STEP 8 B5 슬래브 설치 및 8단계 굴착


CONST SLAB 6
EXCAVATION 22.980

STEP 9 B6 슬래브 설치 및 9단계 굴착


CONST SLAB 7
EXCAVATION 25.905

STEP 10 2단 가설지보재 설치 및 10단계 굴착


CONST STRUT 2
EXCAVATION 29.290

STEP 11 3단 가설지보재 설치 및 11단계 굴착


CONST STRUT 3
EXCAVATION 32.790
DEPTH_CHECK
GROUND_SETTLEMENT 60
DISPLACEMENT 0.2

STEP 12 슬래브, 벽체설치 및 가설지보재해체


CONST SLAB 8
CONST WALL 1
REMOVE STRUT 3

STEP 13 벽체설치 및 가설지보재해체


CONST WALL 2
REMOVE STRUT 2

STEP 14 벽체설치 및 가설지보재해체


CONST WALL 3
CONST WALL 4
CONST WALL 5
REMOVE STRUT 1

STEP 15 벽체설치 및 가설지보재해체


CONST WALL 6

END
6.2 TOT DATA

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 99 << Pile, Strut, Anchor and Slab Force for each Step >>

>> 흙막이 벽의 최소 최대값 (Min and Max of Pile Force) <<

Step 굴착 ---- 전 단 력(kN/m) ---- --- 휨 모멘트 (kNm/m) ---


No 깊이 최대 깊이 최소 깊이 최대 깊이 최소 깊이.

1 1.40 11.78 6.50 -14.27 8.50 13.11 7.90 -12.63 11.50


2 4.10 58.66 0.40 -59.81 7.10 136.15 3.90 -68.28 10.10
3 5.90 138.87 3.60 -135.76 8.50 211.27 5.90 -112.14 10.50
4 9.30 224.50 4.90 -176.86 9.90 292.65 7.70 -157.48 12.10
5 12.70 245.60 8.30 -184.14 8.30 237.30 10.70 -164.92 15.10
6 16.10 241.94 11.70 -195.30 11.70 188.43 14.20 -153.86 18.30
7 19.50 237.26 15.10 -182.63 11.70 172.34 17.70 -137.90 21.50
8 23.00 257.80 18.50 -183.55 11.70 199.85 21.30 -174.44 18.50
9 25.90 264.32 22.00 -183.57 11.70 219.54 24.50 -137.48 28.70
10 29.30 327.53 25.40 -198.70 25.40 284.85 28.10 -168.02 32.50
11 32.80 407.92 28.80 -232.45 28.80 384.02 31.70 -204.04 28.80
12 32.80 398.51 25.40 -263.77 25.40 292.91 28.50 -352.55 25.40
13 32.80 309.20 22.20 -224.92 21.90 255.37 32.30 -344.74 22.00
14 32.80 311.10 22.20 -224.19 21.90 255.32 32.30 -343.96 22.00
15 32.80 311.10 22.20 -224.19 21.90 255.32 32.30 -343.96 22.00

Max/Min 407.92 28.80 -263.77 25.40 384.02 31.70 -352.55 25.40

Note : (파일 간격이 고려되지 않았으므로 파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)

>> Strut Force <<

------- S T R U T N o. a n d D E P T H --------
Step Exca 1 2 3
No Depth 3.6 25.4 28.8

1 1.4 0.0 0.0 0.0


2 4.1 0.0 0.0 0.0
3 5.9 483.9 0.0 0.0
4 9.3 260.9 0.0 0.0
5 12.7 285.0 0.0 0.0
6 16.1 285.8 0.0 0.0
7 19.5 285.4 0.0 0.0
8 23.0 285.4 0.0 0.0
9 25.9 285.4 0.0 0.0
10 29.3 285.4 1578.7 0.0
11 32.8 285.4 1214.4 1921.1
12 32.8 285.4 1986.8 0.0
13 32.8 285.4 0.0 0.0
14 32.8 0.0 0.0 0.0
15 32.8 0.0 0.0 0.0

(스트럿 1개당의 축력임, 경사가 고려되어 증가된 값임, 1/cosθ)

>> 슬래브 축력 (Slab Force) <<

-------- 슬 래 브 번 호 깊 이, 축 력 --------
Step Exca 1 2 3 4 5 6 7 8
No Depth 0.4 4.9 8.3 11.7 15.1 18.5 22.0 31.3

1 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


2 4.1 59.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 5.9 24.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 9.3 1.2 245.4 0.0 0.0 0.0 0.0 0.0 0.0
5 12.7 9.0 118.6 429.7 0.0 0.0 0.0 0.0 0.0
6 16.1 8.3 132.9 309.7 437.2 0.0 0.0 0.0 0.0
7 19.5 8.3 132.2 323.2 326.8 411.8 0.0 0.0 0.0
8 23.0 8.3 132.1 322.3 341.7 291.2 435.5 0.0 0.0
9 25.9 8.3 132.2 322.3 340.7 306.3 322.6 423.3 0.0
10 29.3 8.3 132.2 322.3 340.4 308.0 320.2 327.1 0.0
11 32.8 8.3 132.2 322.3 340.5 306.9 327.0 313.3 0.0
12 32.8 8.3 132.2 322.3 340.3 307.6 327.8 254.8 307.6
13 32.8 8.3 132.2 322.3 339.4 320.8 233.5 563.6 214.3
14 32.8 27.4 215.9 315.4 339.9 320.8 233.6 564.7 216.3
15 32.8 27.4 214.7 315.4 339.9 320.8 233.6 564.7 216.3

Note : (단위폭당의 축력임)

>> 흙막이 벽의 전단력, 휨모멘트의 최대치 최소치, 변위, 토압의 최대치 (선택된 절점) <<

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

1 0.00 0.00(15) 0.00( 0) 0.00( 1) 0.00( 0) 3.69( 1) 0.00( 0)


3 0.40 58.66( 2) -0.56( 3) 0.00( 0) -0.07(14) 3.64( 2) 2.85( 1)
4 0.50 58.33( 2) -0.88( 1) 5.78( 2) -0.14( 1) 3.78( 2) 3.66(15)
9 1.40 51.15( 2) -8.06( 1) 55.75( 2) -3.48( 1) 5.04(14) 12.61(15)
12 1.90 43.52( 2) -14.48( 4) 79.36( 2) -8.92( 1) 5.72(14) 5.01( 2)
21 3.60 138.87( 3) -45.91( 4) 134.23( 2) -51.54( 4) 7.79(14) 34.11(15)
24 4.10 119.61( 3) -39.36(15) 135.82( 2) -35.43( 4) 8.32(14) 42.92( 2)
27 4.60 95.56( 3) -63.61(15) 142.88( 3) -30.47( 4) 8.84(14) 60.17(15)
28 4.80 83.25( 3) -74.21(14) 160.78( 3) -32.13( 4) 9.05( 4) 62.98( 3)
29 4.90 224.50( 4) -20.95( 4) 168.81( 3) -33.90( 4) 9.20( 4) 64.38( 3)
34 5.90 153.20( 4) -46.05( 2) 211.27( 3) -4.36( 1) 10.64( 4) 78.17( 3)
46 8.30 245.60( 5) -184.14( 5) 268.17( 4) -63.42( 5) 11.58( 5) 110.33(15)
48 8.60 213.11( 5) -133.00( 3) 241.09( 4) -46.33( 2) 11.72( 5) 90.26( 4)
52 9.30 146.72( 5) -165.01( 4) 144.49( 4) -70.42( 3) 12.00( 5) 99.42(15)
56 10.10 64.34( 5) -171.43( 4) 216.07( 5) -106.75( 3) 12.02( 5) 96.55(15)
64 11.60 25.33( 3) -185.77( 6) 203.91( 5) -151.56( 4) 11.10( 6) 95.30(15)
65 11.70 241.94( 6) -195.30( 6) 195.96( 5) -154.24( 4) 11.09( 6) 95.21( 5)
70 12.70 147.16( 6) -171.80( 5) 73.35( 6) -147.66( 4) 11.05( 6) 94.35( 5)
74 13.40 81.33( 6) -139.72( 5) 153.29( 6) -123.62( 4) 10.90( 6) 93.73(15)
83 15.10 237.26( 7) -174.52( 7) 156.84( 6) -164.92( 5) 9.88( 7) 92.21( 6)
88 16.10 145.50( 7) -156.41( 6) 55.81( 7) -140.96( 5) 9.89( 7) 91.31(15)
100 18.40 35.48( 5) -168.76( 8) 150.30( 7) -157.12( 8) 9.13( 8) 89.26( 7)
101 18.50 257.80( 8) -177.68( 8) 144.09( 7) -174.44( 8) 9.15( 8) 89.17(15)
106 19.50 169.07( 8) -147.73( 7) 39.36( 8) -120.61( 6) 9.58( 8) 88.29( 7)
110 20.30 98.62( 8) -104.10( 7) 146.44( 8) -82.53(15) 9.87( 8) 88.64( 8)
119 22.00 264.32( 9) -159.88(10) 181.51( 8) -344.74(13) 10.03(14) 98.11( 8)
124 23.00 229.93(15) -148.96( 8) 94.17( 9) -95.88( 7) 12.02(13) 103.70( 8)
128 23.70 155.07(14) -125.01( 8) 182.86( 9) -68.82(12) 13.64(13) 107.61( 9)
137 25.40 398.51(12) -263.77(12) 174.93( 9) -352.55(12) 16.76(13) 117.13(15)
140 25.90 339.25(12) -148.76( 9) 137.38(13) -167.45(12) 17.33(13) 119.93( 9)
143 26.40 278.59(12) -142.24( 9) 113.80(10) -112.03( 8) 17.76(13) 122.73(10)
147 27.10 191.30(12) -112.41( 9) 228.76(10) -81.58( 8) 18.25(13) 126.66(10)
156 28.80 407.92(11) -232.45(11) 289.38(12) -204.04(11) 19.09(13) 136.22(15)
159 29.30 339.11(11) -159.89(10) 256.17(12) -124.88( 9) 19.26(12) 139.04(15)
161 29.70 283.04(11) -163.30(10) 204.62(12) -109.82( 9) 19.24(12) 141.29(15)
163 30.10 226.07(11) -158.83(10) 209.83(11) -92.03( 9) 19.09(12) 143.55(15)
169 31.30 109.16(13) -98.13(10) 376.18(11) -114.51(10) 18.07(12) 150.32(11)
177 32.80 22.16(10) -170.00(11) 278.92(11) -163.06(10) 16.35(11) 158.79(15)
180 33.30 46.97(10) -182.91(11) 189.66(11) -147.09(10) 15.16(11) 0.00( 0)
183 33.80 61.77(10) -183.52(11) 97.47(11) -123.25(10) 13.78(11) 0.00( 0)
186 34.30 62.42(10) -171.80(11) 8.08(11) -95.70(10) 12.30(11) 0.00( 0)
189 34.80 56.94(10) -147.78(11) 6.93( 9) -100.23(12) 10.82(11) 0.00( 0)
192 35.30 48.38(10) -111.45(11) 6.52( 9) -155.13(12) 9.40(11) 0.00( 0)
195 35.80 38.87(10) -62.80(11) 5.73( 9) -188.21(12) 8.12(11) 0.00( 0)
198 36.30 29.77(10) 0.00( 0) 4.81( 9) -200.22(11) 7.02(11) 0.00( 0)
201 36.80 52.79(12) 0.00( 0) 3.94( 9) -190.78(11) 6.11(11) 0.00( 0)
204 37.30 75.80(12) 0.00( 0) 3.22( 9) -163.02(11) 5.39(11) 0.00( 0)
207 37.80 94.77(11) 0.00( 0) 3.29(10) -123.96(11) 4.83(11) 0.00( 0)

Max/Min 407.92 -263.77 384.02 -352.55 19.27 158.79

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

최대변위/최대굴착깊이 = 19.27mm/32.80m = 0.06%

Note : (전단력과 모멘트는 파일 간격이 고려되지 않았으므로


파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)
() 내는 최대치/최소치가 발생한 스텝 번호임
모든 절점에 대한 상세한 결과를 얻으려면 WALLOUT 명령어를 사용해야 함
최대 변위는 지표에서 흙막이 벽체 바닥까지의 변위중 최대치임

>> 공사단계별 흙막이 벽의 최대변위 및 허용변위와 비교 <<


(흙막이 벽의 허용변위 = 굴착깊이 x 0.20 % )
단계별 최대 변위는 지표에서 흙막이 벽체 바닥 사이의 최대 변위임
최대허용변위율 = 0.20 % 는 DISPLACEMENT 명령문에서 바꿀 수 있음
허용변위량 산정기준 : 최종굴착깊이

스텝 스텝명칭 굴착깊이 최대변위 허용변위 최대/허용 안전여부


번호 m mm mm %
1 굴착 1단계 1.4 3.7 65.6 5.6 O.K
2 1F 슬래브 설치 및 2단계 굴착 4.1 7.2 65.6 10.9 O.K
3 1단 가설지보재 설치 및 3단계 굴착 5.9 9.0 65.6 13.8 O.K
4 B1 슬래브 설치 및 4단계 굴착 9.3 11.5 65.6 17.6 O.K
5 B2 슬래브 설치 및 5단계 굴착 12.7 12.1 65.6 18.4 O.K
6 B3 슬래브 설치 및 6단계 굴착 16.1 11.5 65.6 17.6 O.K
7 B4 슬래브 설치 및 7단계 굴착 19.5 11.6 65.6 17.7 O.K
8 B5 슬래브 설치 및 8단계 굴착 23.0 11.6 65.6 17.7 O.K
9 B6 슬래브 설치 및 9단계 굴착 25.9 11.6 65.6 17.7 O.K
10 2단 가설지보재 설치 및 10단계 굴착 29.3 13.2 65.6 20.1 O.K
11 3단 가설지보재 설치 및 11단계 굴착 32.8 18.0 65.6 27.5 O.K
12 슬래브, 벽체설치 및 가설지보재해체 32.8 19.3 65.6 29.4 O.K
13 벽체설치 및 가설지보재해체 32.8 19.1 65.6 29.2 O.K
14 벽체설치 및 가설지보재해체 32.8 19.1 65.6 29.1 O.K
15 벽체설치 및 가설지보재해체 32.8 19.1 65.6 29.1 O.K
6.3 OUTPUT DATA
S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:24
--------------------------------------------------------------------------------
Step No. 1 << 굴착 1단계 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 1.40
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.693 0.015 0.00 0.00


3 0.40 2.85 -3.585 0.015 -0.56 -0.07
4 0.50 3.66 -3.558 0.015 -0.88 -0.14
9 1.40 12.61 -3.316 0.015 -8.06 -3.48
12 1.90 -26.61 -3.186 0.015 -9.54 -8.92
21 3.60 6.70 -2.814 0.011 5.86 -6.48
24 4.10 15.00 -2.723 0.010 -0.99 -5.08
27 4.60 -22.16 -2.638 0.009 -6.53 -8.08
28 4.80 -19.57 -2.606 0.009 -5.70 -9.31
29 4.90 -18.30 -2.590 0.009 -0.50 -9.62
34 5.90 -6.24 -2.454 0.007 10.03 -4.36
46 8.30 22.02 -2.118 0.011 -8.22 11.49
48 8.60 -12.37 -2.060 0.011 -11.75 7.89
52 9.30 -2.05 -1.916 0.012 -8.43 0.71
56 10.10 -8.67 -1.751 0.011 -9.68 -6.58
64 11.60 -4.83 -1.495 0.008 1.81 -12.44
65 11.70 -4.24 -1.482 0.007 5.08 -12.23
70 12.70 -0.20 -1.373 0.005 4.23 -8.09
74 13.40 1.03 -1.318 0.004 6.38 -5.70
83 15.10 1.24 -1.221 0.003 3.92 -0.97
88 16.10 0.77 -1.171 0.003 0.59 0.55
100 18.40 0.05 -1.053 0.003 -0.20 0.26
101 18.50 0.03 -1.047 0.003 1.79 0.64
106 19.50 -0.05 -0.993 0.003 -0.19 0.44
110 20.30 -0.07 -0.949 0.003 -0.14 0.31
119 22.00 -0.05 -0.855 0.003 1.59 0.16
124 23.00 -0.03 -0.800 0.003 0.00 0.15
128 23.70 -0.02 -0.762 0.003 1.47 0.16
137 25.40 0.01 -0.669 0.003 1.32 0.23
140 25.90 0.03 -0.642 0.003 0.04 0.25
143 26.40 0.05 -0.614 0.003 1.19 0.26
147 27.10 0.11 -0.575 0.003 1.06 0.25
156 28.80 0.31 -0.481 0.003 0.53 -0.24
159 29.30 0.36 -0.454 0.003 -0.55 -0.29
161 29.70 0.38 -0.432 0.003 -0.70 -0.54
163 30.10 0.37 -0.411 0.003 -0.85 -0.85
169 31.30 0.00 -0.351 0.003 -1.14 -2.09
177 32.80 -1.83 -0.296 0.002 0.00 -3.30
180 33.30 -1.00 -0.283 0.001 1.23 -3.21
183 33.80 -0.39 -0.274 0.001 1.56 -2.76
186 34.30 0.01 -0.267 0.001 1.63 -2.21
189 34.80 0.24 -0.263 0.000 1.56 -1.65
192 35.30 0.36 -0.260 0.000 1.40 -1.16
195 35.80 0.39 -0.259 0.000 1.21 -0.75
198 36.30 0.37 -0.258 0.000 1.02 -0.44
201 36.80 0.31 -0.257 0.000 0.84 -0.22
204 37.30 0.25 -0.257 0.000 0.70 0.08
207 37.80 0.18 -0.257 0.000 0.60 0.10
217 39.80 -0.05 -0.26 0.000 -0.97 0.13

노트 1) 최종횡력은 주동측 및 수동측 양측의 토압, 수압 기타 압력을 모두 고려한 합력이다


굴착측으로 작용할때 (+) 이다
2) 지보공의 반력은 배면측으로 밀때 (+) 이다
3) 압력, 전단력 및 모멘트는 벽체폭 1m 당이다
4) 지보공의 축력은 1개당의 값이며, 경사로 인하여 증가된 값이 포함 되어있다
5) 건물 벽체와 슬래브가 토압에 대하여 안전한지 별도의 검토가 필요하다
6) 본 리스트는 지정된 절점들에 대한 출력이며, 최대값은 본 리스트에 없는 절점에서
발생할 수 있다. 따라서 최대치는 xxx.tot 파일에 있는 값을 참조.

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:24
--------------------------------------------------------------------------------
Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 4.10
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.080 -0.080 0.00 0.00


3 0.40 2.85 -3.641 -0.080 58.66 -0.07 59.22(SL1)
4 0.50 3.66 -3.781 -0.080 58.33 5.78
9 1.40 12.61 -5.005 -0.074 51.15 55.75
12 1.90 5.01 -5.618 -0.066 43.52 79.36
21 3.60 34.11 -6.999 -0.023 12.09 134.23
24 4.10 42.92 -7.135 -0.008 -2.18 135.82
27 4.60 45.70 -7.136 0.008 -1.73 135.66
28 4.80 42.15 -7.099 0.014 -10.51 134.41
29 4.90 40.37 -7.073 0.017 -14.64 133.12
34 5.90 22.40 -6.534 0.044 -46.05 101.18
46 8.30 -14.30 -4.041 0.063 -47.85 -32.36
48 8.60 -56.76 -3.718 0.060 -39.36 -46.33
52 9.30 -28.26 -3.037 0.051 -12.95 -64.08
56 10.10 -22.67 -2.408 0.039 0.51 -68.28
64 11.60 -4.52 -1.681 0.018 18.30 -50.97
65 11.70 -4.01 -1.651 0.017 20.29 -49.12
70 12.70 5.37 -1.445 0.008 17.92 -29.58
74 13.40 7.62 -1.376 0.004 15.80 -19.15
83 15.10 3.24 -1.339 -0.001 5.17 -6.80
88 16.10 -0.61 -1.361 -0.002 1.91 -4.42
100 18.40 0.67 -1.468 -0.003 1.07 -1.03
101 18.50 0.66 -1.474 -0.003 3.80 -0.92
106 19.50 0.45 -1.531 -0.003 0.45 0.35
110 20.30 0.27 -1.577 -0.003 0.16 0.58
119 22.00 0.03 -1.673 -0.003 3.12 0.61
124 23.00 -0.02 -1.728 -0.003 -0.06 0.54
128 23.70 -0.03 -1.767 -0.003 3.31 0.51
137 25.40 -0.01 -1.861 -0.003 3.53 0.47
140 25.90 -0.01 -1.889 -0.003 0.00 0.47
143 26.40 0.00 -1.916 -0.003 3.65 0.48
147 27.10 0.00 -1.955 -0.003 3.72 0.49
156 28.80 0.00 -2.050 -0.003 3.91 0.51
159 29.30 0.00 -2.078 -0.003 0.01 0.52
161 29.70 0.00 -2.101 -0.003 0.01 0.52
163 30.10 0.00 -2.123 -0.003 0.01 0.52
169 31.30 -0.01 -2.191 -0.003 0.02 0.54
177 32.80 0.00 -2.275 -0.003 0.03 0.58
180 33.30 0.00 -2.304 -0.003 4.40 0.59
183 33.80 -0.01 -2.332 -0.003 4.46 0.61
186 34.30 -0.02 -2.360 -0.003 4.52 0.63
189 34.80 -0.03 -2.389 -0.003 4.58 0.65
192 35.30 -0.04 -2.418 -0.003 4.65 0.68
195 35.80 -0.05 -2.446 -0.003 4.73 0.71
198 36.30 -0.06 -2.475 -0.003 4.81 0.77
201 36.80 -0.07 -2.503 -0.003 4.90 0.83
204 37.30 -0.06 -2.532 -0.003 4.99 0.91
207 37.80 -0.05 -2.560 -0.003 5.07 1.01
217 39.80 0.37 -2.67 -0.003 -10.14 1.35

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 5.90
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.054 -0.079 0.00 0.00


3 0.40 2.85 -3.608 -0.079 24.16 -0.07 24.72(SL1)
4 0.50 3.66 -3.747 -0.079 23.84 2.33
9 1.40 12.61 -4.978 -0.077 16.65 21.25
12 1.90 5.01 -5.636 -0.074 9.02 27.61
21 3.60 34.11 -7.657 -0.062 138.87 23.84 0.00 483.85(ST1)
24 4.10 42.92 -8.179 -0.056 119.61 88.70
27 4.60 60.17 -8.614 -0.043 95.56 142.88
28 4.80 62.98 -8.751 -0.036 83.25 160.78
29 4.90 64.38 -8.811 -0.032 76.88 168.81
34 5.90 78.17 -8.998 0.012 5.58 211.27
46 8.30 34.08 -6.405 0.096 -129.32 41.34
48 8.60 -85.68 -5.899 0.097 -133.00 0.99
52 9.30 -77.40 -4.739 0.091 -70.44 -70.42
56 10.10 -59.16 -3.577 0.074 -24.48 -106.75
64 11.60 -13.34 -2.121 0.037 25.33 -97.57
65 11.70 -11.57 -2.057 0.035 28.53 -94.96
70 12.70 0.69 -1.610 0.017 31.70 -64.62
74 13.40 9.35 -1.458 0.008 30.53 -43.84
83 15.10 8.01 -1.381 -0.001 12.61 -12.16
88 16.10 2.71 -1.421 -0.003 5.17 -4.55
100 18.40 1.05 -1.567 -0.004 0.56 0.64
101 18.50 0.97 -1.574 -0.004 3.45 1.29
106 19.50 0.35 -1.636 -0.003 -0.17 1.38
110 20.30 0.06 -1.683 -0.003 -0.33 1.16
119 22.00 -0.12 -1.779 -0.003 3.16 0.66
124 23.00 -0.10 -1.833 -0.003 -0.10 0.50
128 23.70 -0.07 -1.872 -0.003 3.51 0.45
137 25.40 -0.01 -1.965 -0.003 3.76 0.45
140 25.90 0.00 -1.992 -0.003 0.03 0.47
143 26.40 0.00 -2.020 -0.003 3.87 0.49
147 27.10 0.01 -2.059 -0.003 3.94 0.51
156 28.80 0.01 -2.154 -0.003 4.11 0.54
159 29.30 0.00 -2.182 -0.003 0.01 0.55
161 29.70 0.00 -2.205 -0.003 0.01 0.55
163 30.10 0.00 -2.227 -0.003 0.01 0.55
169 31.30 -0.01 -2.295 -0.003 0.02 0.57
177 32.80 0.00 -2.379 -0.003 0.03 0.61
180 33.30 0.00 -2.408 -0.003 4.60 0.62
183 33.80 -0.01 -2.436 -0.003 4.66 0.64
186 34.30 -0.02 -2.464 -0.003 4.72 0.66
189 34.80 -0.03 -2.493 -0.003 4.78 0.68
192 35.30 -0.04 -2.522 -0.003 4.85 0.71
195 35.80 -0.05 -2.550 -0.003 4.93 0.75
198 36.30 -0.06 -2.579 -0.003 5.02 0.80
201 36.80 -0.07 -2.607 -0.003 5.10 0.87
204 37.30 -0.07 -2.636 -0.003 5.19 0.95
207 37.80 -0.05 -2.664 -0.003 5.28 1.05
217 39.80 0.38 -2.77 -0.003 -10.54 1.41

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 9.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.131 -0.065 0.00 0.00


3 0.40 2.85 -3.586 -0.065 0.66 -0.07 1.22(SL1)
4 0.50 3.66 -3.700 -0.065 0.33 -0.02
9 1.40 12.61 -4.724 -0.065 -6.85 -2.27
12 1.90 5.01 -5.296 -0.066 -14.48 -7.66
21 3.60 34.11 -7.354 -0.076 -45.91 -51.54 0.00 260.87(ST1)
24 4.10 42.92 -8.036 -0.080 21.78 -35.43
27 4.60 60.17 -8.754 -0.084 -2.27 -30.47
28 4.80 62.98 -9.050 -0.086 -14.58 -32.13
29 4.90 64.38 -9.200 -0.086 224.50 -33.90 245.44(SL2)
34 5.90 78.17 -10.636 -0.071 153.20 156.52
46 8.30 110.33 -10.897 0.069 -73.19 268.17
48 8.60 90.26 -10.489 0.086 -105.68 241.09
52 9.30 99.42 -9.228 0.118 -165.01 144.49
56 10.10 -65.03 -7.461 0.131 -171.43 5.70
64 11.60 -80.88 -4.311 0.100 -30.80 -151.56
65 11.70 -74.98 -4.139 0.097 -19.07 -154.24
70 12.70 -28.90 -2.759 0.062 27.05 -147.66
74 13.40 -9.96 -2.143 0.040 42.14 -123.62
83 15.10 12.38 -1.530 0.006 38.73 -53.60
88 16.10 11.68 -1.509 -0.003 23.63 -23.36
100 18.40 4.92 -1.723 -0.006 2.92 3.18
101 18.50 4.57 -1.733 -0.006 5.74 4.13
106 19.50 1.74 -1.824 -0.005 -0.60 4.80
110 20.30 0.40 -1.885 -0.004 -1.41 3.91
119 22.00 -0.50 -1.990 -0.003 2.73 1.61
124 23.00 -0.44 -2.045 -0.003 -0.56 0.81
128 23.70 -0.33 -2.082 -0.003 3.66 0.51
137 25.40 -0.08 -2.172 -0.003 4.17 0.46
140 25.90 -0.03 -2.199 -0.003 0.07 0.39
143 26.40 -0.01 -2.227 -0.003 4.31 0.43
147 27.10 0.02 -2.266 -0.003 4.38 0.49
156 28.80 0.02 -2.360 -0.003 4.52 0.58
159 29.30 0.02 -2.389 -0.003 0.02 0.60
161 29.70 0.01 -2.411 -0.003 0.02 0.60
163 30.10 0.00 -2.434 -0.003 0.02 0.61
169 31.30 -0.01 -2.501 -0.003 0.02 0.63
177 32.80 0.00 -2.586 -0.003 0.02 0.67
180 33.30 0.00 -2.614 -0.003 4.99 0.68
183 33.80 -0.01 -2.643 -0.003 5.05 0.70
186 34.30 -0.02 -2.671 -0.003 5.11 0.71
189 34.80 -0.03 -2.700 -0.003 5.18 0.74
192 35.30 -0.04 -2.728 -0.003 5.25 0.77
195 35.80 -0.06 -2.757 -0.003 5.33 0.81
198 36.30 -0.07 -2.785 -0.003 5.41 0.86
201 36.80 -0.08 -2.814 -0.003 5.51 0.93
204 37.30 -0.07 -2.842 -0.003 5.60 1.03
207 37.80 -0.05 -2.871 -0.003 5.68 1.13
217 39.80 0.41 -2.98 -0.003 -11.32 1.51

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 12.70
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.114 -0.069 0.00 0.00


3 0.40 2.85 -3.593 -0.069 8.48 -0.07 9.04(SL1)
4 0.50 3.66 -3.713 -0.069 8.15 0.77
9 1.40 12.61 -4.787 -0.068 0.97 5.57
12 1.90 5.01 -5.377 -0.067 -6.66 4.09
21 3.60 34.11 -7.387 -0.070 56.91 -26.52 0.00 284.99(ST1)
24 4.10 42.92 -8.006 -0.072 37.64 -2.48
27 4.60 60.17 -8.629 -0.071 13.60 10.74
28 4.80 62.98 -8.876 -0.071 1.28 12.24
29 4.90 64.38 -8.999 -0.070 113.55 12.07 118.64(SL2)
34 5.90 78.17 -10.138 -0.057 42.25 91.21
46 8.30 110.33 -11.579 -0.025 245.60 -63.42 429.74(SL3)
48 8.60 90.26 -11.719 -0.027 213.11 5.16
52 9.30 99.42 -12.004 -0.016 146.72 131.53
56 10.10 96.55 -12.017 0.017 64.34 216.07
64 11.60 95.30 -10.561 0.094 -79.56 203.91
65 11.70 95.21 -10.392 0.099 -89.08 195.96
70 12.70 94.35 -8.359 0.129 -171.80 59.73
74 13.40 -65.35 -6.759 0.130 -139.72 -51.51
83 15.10 -55.72 -3.546 0.080 5.53 -164.92
88 16.10 -21.32 -2.472 0.044 38.80 -140.96
100 18.40 16.89 -1.807 -0.002 35.48 -37.18
101 18.50 17.01 -1.811 -0.003 37.23 -33.72
106 19.50 14.16 -1.903 -0.007 17.74 -7.45
110 20.30 9.68 -2.006 -0.007 8.17 2.65
119 22.00 2.13 -2.198 -0.005 3.00 6.72
124 23.00 0.09 -2.280 -0.004 -2.15 4.88
128 23.70 -0.53 -2.326 -0.004 2.45 3.41
137 25.40 -0.62 -2.422 -0.003 3.80 1.04
140 25.90 -0.51 -2.448 -0.003 -0.52 0.71
143 26.40 -0.39 -2.474 -0.003 4.40 0.51
147 27.10 -0.23 -2.511 -0.003 4.69 0.57
156 28.80 -0.01 -2.603 -0.003 5.04 0.53
159 29.30 0.01 -2.631 -0.003 0.10 0.51
161 29.70 0.02 -2.653 -0.003 0.09 0.55
163 30.10 0.02 -2.676 -0.003 0.08 0.58
169 31.30 0.02 -2.743 -0.003 0.06 0.66
177 32.80 0.01 -2.828 -0.003 0.04 0.73
180 33.30 0.01 -2.856 -0.003 5.46 0.75
183 33.80 0.00 -2.885 -0.003 5.51 0.77
186 34.30 -0.02 -2.913 -0.003 5.57 0.79
189 34.80 -0.03 -2.942 -0.003 5.64 0.81
192 35.30 -0.05 -2.970 -0.003 5.71 0.84
195 35.80 -0.06 -2.999 -0.003 5.79 0.88
198 36.30 -0.08 -3.028 -0.003 5.88 0.94
201 36.80 -0.08 -3.056 -0.003 5.97 1.02
204 37.30 -0.08 -3.085 -0.003 6.07 1.11
207 37.80 -0.06 -3.113 -0.003 6.16 1.23
217 39.80 0.44 -3.22 -0.003 -12.24 1.63

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 16.10
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.77 -0.07 8.32(SL1)
4 0.50 3.66 -3.712 -0.068 7.44 0.69
9 1.40 12.61 -4.783 -0.068 0.26 4.86
12 1.90 5.01 -5.372 -0.067 -7.38 3.03
21 3.60 34.11 -7.388 -0.071 56.46 -28.80 0.00 285.78(ST1)
24 4.10 42.92 -8.013 -0.072 37.19 -4.98
27 4.60 60.17 -8.645 -0.072 13.15 8.01
28 4.80 62.98 -8.897 -0.072 0.83 9.42
29 4.90 64.38 -9.022 -0.072 127.35 9.21 132.89(SL2)
34 5.90 78.17 -10.180 -0.058 56.05 102.15
46 8.30 110.33 -11.389 -0.011 -170.34 -19.36 309.72(SL3)
48 8.60 90.26 -11.446 -0.011 106.89 17.35
52 9.30 99.42 -11.542 -0.003 40.50 69.38
56 10.10 96.55 -11.495 0.010 -41.88 68.94
64 11.60 95.30 -11.102 0.010 -185.77 -102.54
65 11.70 95.21 -11.086 0.008 241.94 -121.60 437.23(SL4)
70 12.70 94.35 -11.048 0.004 147.16 73.35
74 13.40 93.73 -10.900 0.023 81.33 153.29
83 15.10 92.21 -9.222 0.091 -76.71 156.84
88 16.10 91.31 -7.394 0.114 -156.41 34.49
100 18.40 -54.94 -3.462 0.065 5.54 -153.58
101 18.50 -51.38 -3.351 0.062 14.04 -152.75
106 19.50 -17.23 -2.562 0.030 46.87 -120.61
110 20.30 7.44 -2.281 0.012 49.57 -80.56
119 22.00 16.13 -2.260 -0.006 28.43 -16.90
124 23.00 10.97 -2.382 -0.008 10.42 0.85
128 23.70 7.08 -2.472 -0.007 8.82 5.76
137 25.40 0.94 -2.647 -0.005 3.11 6.12
140 25.90 0.11 -2.686 -0.004 -2.17 5.07
143 26.40 -0.39 -2.720 -0.004 3.08 4.00
147 27.10 -0.70 -2.763 -0.003 3.56 2.66
156 28.80 -0.52 -2.856 -0.003 4.88 0.82
159 29.30 -0.40 -2.882 -0.003 -0.31 0.61
161 29.70 -0.31 -2.903 -0.003 -0.17 0.51
163 30.10 -0.23 -2.925 -0.003 -0.07 0.47
169 31.30 -0.06 -2.990 -0.003 0.10 0.51
177 32.80 0.02 -3.074 -0.003 0.11 0.68
180 33.30 0.03 -3.102 -0.003 5.99 0.74
183 33.80 0.02 -3.130 -0.003 6.03 0.79
186 34.30 0.01 -3.159 -0.003 6.08 0.83
189 34.80 -0.01 -3.187 -0.003 6.13 0.87
192 35.30 -0.03 -3.216 -0.003 6.20 0.91
195 35.80 -0.05 -3.245 -0.003 6.27 0.96
198 36.30 -0.07 -3.274 -0.003 6.36 1.03
201 36.80 -0.08 -3.302 -0.003 6.45 1.11
204 37.30 -0.08 -3.331 -0.003 6.55 1.21
207 37.80 -0.06 -3.359 -0.003 6.64 1.33
217 39.80 0.46 -3.47 -0.003 -13.17 1.76

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 19.50
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.78 -0.07 8.34(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.87
12 1.90 5.01 -5.372 -0.067 -7.36 3.05
21 3.60 34.11 -7.387 -0.071 56.34 -28.75 0.00 285.37(ST1)
24 4.10 42.92 -8.013 -0.072 37.07 -4.99
27 4.60 60.17 -8.644 -0.072 13.03 7.94
28 4.80 62.98 -8.896 -0.072 0.71 9.33
29 4.90 64.38 -9.021 -0.072 126.54 9.10 132.20(SL2)
34 5.90 78.17 -10.180 -0.058 55.25 101.24
46 8.30 110.33 -11.410 -0.012 -171.15 -22.21 323.20(SL3)
48 8.60 90.26 -11.474 -0.012 119.56 18.30
52 9.30 99.42 -11.580 -0.004 53.17 79.19
56 10.10 96.55 -11.522 0.012 -29.21 88.89
64 11.60 95.30 -10.949 0.023 -173.10 -63.59
65 11.70 95.21 -10.911 0.021 -182.63 -81.37 326.75(SL4)
70 12.70 94.35 -10.626 0.015 49.35 15.76
74 13.40 93.73 -10.417 0.019 -16.48 27.23
83 15.10 92.21 -9.876 0.007 237.26 -135.95 411.79(SL5)
88 16.10 91.31 -9.887 -0.001 145.50 55.81
100 18.40 89.26 -8.587 0.074 -62.15 150.30
101 18.50 89.17 -8.455 0.077 -71.07 144.09
106 19.50 88.29 -6.888 0.098 -147.73 28.90
110 20.30 -75.93 -5.527 0.094 -104.10 -74.82
119 22.00 -44.77 -3.398 0.046 24.60 -133.82
124 23.00 -4.74 -2.835 0.020 45.99 -95.88
128 23.70 10.10 -2.679 0.007 48.56 -64.94
137 25.40 13.93 -2.722 -0.006 24.15 -11.11
140 25.90 11.54 -2.781 -0.007 12.60 -2.18
143 26.40 8.91 -2.844 -0.007 12.89 2.78
147 27.10 5.49 -2.928 -0.007 8.04 6.11
156 28.80 0.49 -3.089 -0.004 3.95 5.35
159 29.30 -0.14 -3.125 -0.004 -1.99 4.36
161 29.70 -0.44 -3.151 -0.004 -1.87 3.58
163 30.10 -0.62 -3.176 -0.003 -1.66 2.87
169 31.30 -0.63 -3.244 -0.003 -0.86 1.36
177 32.80 -0.30 -3.324 -0.003 -0.15 0.67
180 33.30 -0.20 -3.351 -0.003 6.34 0.65
183 33.80 -0.13 -3.378 -0.003 6.47 0.65
186 34.30 -0.08 -3.406 -0.003 6.58 0.68
189 34.80 -0.05 -3.434 -0.003 6.66 0.75
192 35.30 -0.04 -3.462 -0.003 6.74 0.82
195 35.80 -0.05 -3.491 -0.003 6.82 0.91
198 36.30 -0.06 -3.519 -0.003 6.90 1.02
201 36.80 -0.06 -3.548 -0.003 6.98 1.13
204 37.30 -0.06 -3.576 -0.003 7.07 1.26
207 37.80 -0.04 -3.605 -0.003 7.15 1.41
217 39.80 0.50 -3.71 -0.003 -14.11 1.88

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 23.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.79 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.47 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.37 -28.72 0.00 285.44(ST1)
24 4.10 42.92 -8.013 -0.072 37.10 -4.95
27 4.60 60.17 -8.644 -0.072 13.06 7.99
28 4.80 62.98 -8.895 -0.072 0.74 9.38
29 4.90 64.38 -9.020 -0.072 126.50 9.16 132.13(SL2)
34 5.90 78.17 -10.179 -0.058 55.21 101.26
46 8.30 110.33 -11.409 -0.012 -171.19 -22.29 322.31(SL3)
48 8.60 90.26 -11.472 -0.012 118.64 17.95
52 9.30 99.42 -11.579 -0.004 52.25 78.19
56 10.10 96.55 -11.524 0.012 -30.13 87.16
64 11.60 95.30 -10.971 0.022 -174.03 -66.71
65 11.70 95.21 -10.935 0.020 -183.55 -84.59 341.68(SL4)
70 12.70 94.35 -10.669 0.015 63.35 26.55
74 13.40 93.73 -10.451 0.021 -2.48 47.82
83 15.10 92.21 -9.684 0.021 -160.52 -91.56 291.17(SL5)
88 16.10 91.31 -9.422 0.012 38.89 -6.41
100 18.40 89.26 -9.125 -0.010 -168.76 -157.12
101 18.50 89.17 -9.146 -0.014 257.80 -174.44 435.48(SL6)
106 19.50 88.29 -9.581 -0.028 169.07 39.36
110 20.30 88.64 -9.868 -0.010 98.62 146.44
119 22.00 98.11 -9.137 0.062 -60.12 181.51
124 23.00 103.70 -7.759 0.092 -148.96 71.76
128 23.70 -51.47 -6.596 0.096 -125.01 -26.12
137 25.40 -56.51 -4.222 0.057 3.96 -134.08
140 25.90 -39.90 -3.786 0.043 23.88 -127.16
143 26.40 -19.89 -3.476 0.029 45.95 -112.03
147 27.10 2.36 -3.222 0.013 50.83 -81.58
156 28.80 14.83 -3.153 -0.005 30.42 -19.96
159 29.30 13.16 -3.203 -0.006 17.39 -8.28
161 29.70 11.29 -3.250 -0.007 12.49 -2.34
163 30.10 9.25 -3.300 -0.007 8.38 1.80
169 31.30 3.82 -3.438 -0.006 0.72 6.57
177 32.80 0.23 -3.570 -0.004 -1.88 5.00
180 33.30 -0.28 -3.605 -0.004 4.99 4.06
183 33.80 -0.56 -3.637 -0.004 5.27 3.18
186 34.30 -0.68 -3.667 -0.003 5.64 2.43
189 34.80 -0.69 -3.696 -0.003 6.04 1.86
192 35.30 -0.64 -3.723 -0.003 6.42 1.45
195 35.80 -0.55 -3.751 -0.003 6.77 1.21
198 36.30 -0.46 -3.778 -0.003 7.08 1.10
201 36.80 -0.36 -3.805 -0.003 7.34 1.10
204 37.30 -0.26 -3.832 -0.003 7.54 1.20
207 37.80 -0.16 -3.859 -0.003 7.70 1.36
217 39.80 0.68 -3.96 -0.003 -15.06 2.01

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 25.90
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.79 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.36 -28.73 0.00 285.43(ST1)
24 4.10 42.92 -8.013 -0.072 37.10 -4.96
27 4.60 60.17 -8.644 -0.072 13.05 7.98
28 4.80 62.98 -8.895 -0.072 0.74 9.37
29 4.90 64.38 -9.021 -0.072 126.52 9.15 132.15(SL2)
34 5.90 78.17 -10.179 -0.058 55.22 101.27
46 8.30 110.33 -11.408 -0.012 -171.17 -22.23 322.28(SL3)
48 8.60 90.26 -11.472 -0.012 118.62 18.00
52 9.30 99.42 -11.579 -0.004 52.23 78.23
56 10.10 96.55 -11.523 0.012 -30.15 87.18
64 11.60 95.30 -10.969 0.022 -174.05 -66.72
65 11.70 95.21 -10.933 0.020 -183.57 -84.60 340.66(SL4)
70 12.70 94.35 -10.667 0.015 62.31 25.49
74 13.40 93.73 -10.452 0.021 -3.52 46.04
83 15.10 92.21 -9.708 0.020 -161.56 -95.12 306.25(SL5)
88 16.10 91.31 -9.467 0.011 52.93 4.07
100 18.40 89.26 -8.970 0.003 -154.72 -114.34
101 18.50 89.17 -8.967 0.000 -163.64 -130.26 322.61(SL6)
106 19.50 88.29 -9.129 -0.015 70.25 -15.28
110 20.30 88.64 -9.335 -0.014 -0.21 12.74
119 22.00 98.11 -9.809 -0.026 264.32 -120.69 423.26(SL7)
124 23.00 103.70 -10.351 -0.028 163.41 94.17
128 23.70 107.61 -10.564 -0.005 89.46 182.86
137 25.40 117.13 -9.529 0.074 -101.56 174.93
140 25.90 119.93 -8.804 0.091 -148.76 109.73
143 26.40 -25.37 -7.972 0.099 -142.24 36.11
147 27.10 -59.87 -6.760 0.097 -112.41 -54.81
156 28.80 -48.98 -4.454 0.053 15.42 -136.61
159 29.30 -33.82 -4.057 0.038 31.71 -124.88
161 29.70 -16.74 -3.829 0.027 41.88 -109.82
163 30.10 -3.04 -3.671 0.018 45.71 -92.03
169 31.30 14.68 -3.505 0.000 35.94 -40.84
177 32.80 12.13 -3.624 -0.007 14.16 -3.83
180 33.30 9.55 -3.686 -0.007 15.74 1.83
183 33.80 7.00 -3.748 -0.007 11.72 5.10
186 34.30 4.75 -3.806 -0.006 8.91 6.61
189 34.80 2.90 -3.858 -0.006 7.11 6.93
192 35.30 1.48 -3.905 -0.005 6.12 6.52
195 35.80 0.47 -3.947 -0.005 5.73 5.73
198 36.30 -0.20 -3.984 -0.004 5.74 4.81
201 36.80 -0.59 -4.018 -0.004 6.01 3.94
204 37.30 -0.77 -4.049 -0.003 6.42 3.22
207 37.80 -0.79 -4.078 -0.003 6.87 2.68
217 39.80 0.15 -4.18 -0.003 -15.88 2.12

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 10 << 2단 가설지보재 설치 및 10단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 29.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.79 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.36 -28.73 0.00 285.43(ST1)
24 4.10 42.92 -8.013 -0.072 37.09 -4.96
27 4.60 60.17 -8.644 -0.072 13.05 7.98
28 4.80 62.98 -8.895 -0.072 0.74 9.37
29 4.90 64.38 -9.021 -0.072 126.52 9.15 132.15(SL2)
34 5.90 78.17 -10.179 -0.058 55.22 101.27
46 8.30 110.33 -11.409 -0.012 -171.17 -22.23 322.30(SL3)
48 8.60 90.26 -11.472 -0.012 118.64 18.00
52 9.30 99.42 -11.579 -0.004 52.25 78.25
56 10.10 96.55 -11.523 0.012 -30.13 87.21
64 11.60 95.30 -10.969 0.022 -174.02 -66.65
65 11.70 95.21 -10.933 0.020 -183.55 -84.53 340.38(SL4)
70 12.70 94.35 -10.666 0.015 62.05 25.32
74 13.40 93.73 -10.451 0.021 -3.77 45.68
83 15.10 92.21 -9.711 0.020 -161.82 -95.90 308.02(SL5)
88 16.10 91.31 -9.475 0.011 54.45 4.80
100 18.40 89.26 -8.968 0.004 -153.20 -110.13
101 18.50 89.17 -8.963 0.001 -162.12 -125.90 320.16(SL6)
106 19.50 88.29 -9.098 -0.013 69.31 -11.86
110 20.30 88.64 -9.271 -0.011 -1.14 15.42
119 22.00 98.11 -9.656 -0.023 167.17 -119.60 327.05(SL7)
124 23.00 103.70 -10.202 -0.035 66.27 -1.89
128 23.70 107.61 -10.622 -0.033 -7.69 18.81
137 25.40 117.13 -11.678 -0.049 327.53 -154.86 0.00 1578.71(ST2)
140 25.90 119.93 -12.158 -0.058 268.27 -5.25
143 26.40 122.73 -12.646 -0.052 207.60 113.80
147 27.10 126.66 -13.125 -0.024 120.32 228.76
156 28.80 136.22 -12.311 0.080 -103.14 245.73
159 29.30 139.04 -11.503 0.104 -159.89 177.35
161 29.70 -1.32 -10.728 0.117 -163.30 112.03
163 30.10 -21.02 -9.881 0.124 -158.83 47.21
169 31.30 -80.14 -7.311 0.114 -98.13 -114.51
177 32.80 -50.09 -4.990 0.061 22.16 -163.06
180 33.30 -32.77 -4.537 0.043 46.97 -147.09
183 33.80 -10.80 -4.228 0.028 61.77 -123.25
186 34.30 5.57 -4.041 0.015 62.42 -95.70
189 34.80 14.75 -3.949 0.006 56.94 -69.42
192 35.30 18.70 -3.925 0.000 48.38 -46.73
195 35.80 19.13 -3.948 -0.005 38.87 -28.65
198 36.30 17.40 -3.999 -0.007 29.77 -15.32
201 36.80 14.52 -4.065 -0.008 21.89 -6.32
204 37.30 11.16 -4.138 -0.008 15.60 0.94
207 37.80 7.74 -4.212 -0.008 11.02 3.29
217 39.80 -4.27 -4.48 -0.007 -17.04 2.24

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 11 << 3단 가설지보재 설치 및 11단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 7.79 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.36 -28.73 0.00 285.43(ST1)
24 4.10 42.92 -8.013 -0.072 37.09 -4.96
27 4.60 60.17 -8.644 -0.072 13.05 7.98
28 4.80 62.98 -8.895 -0.072 0.74 9.37
29 4.90 64.38 -9.021 -0.072 126.52 9.15 132.15(SL2)
34 5.90 78.17 -10.179 -0.058 55.22 101.27
46 8.30 110.33 -11.409 -0.012 -171.17 -22.24 322.30(SL3)
48 8.60 90.26 -11.472 -0.012 118.64 18.00
52 9.30 99.42 -11.579 -0.004 52.25 78.24
56 10.10 96.55 -11.523 0.012 -30.13 87.21
64 11.60 95.30 -10.969 0.022 -174.02 -66.66
65 11.70 95.21 -10.933 0.020 -183.55 -84.53 340.47(SL4)
70 12.70 94.35 -10.666 0.015 62.14 25.40
74 13.40 93.73 -10.451 0.021 -3.68 45.83
83 15.10 92.21 -9.709 0.020 -161.73 -95.61 306.95(SL5)
88 16.10 91.31 -9.471 0.011 53.46 4.11
100 18.40 89.26 -8.978 0.003 -154.19 -113.09
101 18.50 89.17 -8.974 0.001 163.87 -128.95 326.98(SL6)
106 19.50 88.29 -9.127 -0.014 75.15 -9.07
110 20.30 88.64 -9.309 -0.012 4.69 22.87
119 22.00 98.11 -9.634 -0.018 159.30 -102.23 313.34(SL7)
124 23.00 103.70 -10.069 -0.027 58.39 7.61
128 23.70 107.61 -10.386 -0.024 -15.56 22.78
137 25.40 117.13 -11.182 -0.041 -206.58 -164.27 0.00 1214.40(ST2)
140 25.90 119.93 -11.609 -0.055 138.96 -79.32
143 26.40 122.73 -12.118 -0.061 78.29 -25.54
147 27.10 126.66 -12.872 -0.062 -9.00 -1.12
156 28.80 136.22 -14.926 -0.089 407.92 -204.04 0.00 1921.12(ST3)
159 29.30 139.04 -15.776 -0.102 339.11 -16.52
161 29.70 141.29 -16.478 -0.098 283.04 107.96
163 30.10 143.55 -17.113 -0.083 226.07 209.83
169 31.30 150.32 -18.047 0.001 49.76 376.18
177 32.80 158.79 -16.352 0.123 -170.00 278.92
180 33.30 13.51 -15.160 0.149 -182.91 189.66
183 33.80 -11.11 -13.780 0.165 -183.52 97.47
186 34.30 -35.73 -12.302 0.171 -171.80 8.08
189 34.80 -60.36 -10.817 0.168 -147.78 -72.70
192 35.30 -84.98 -9.401 0.156 -111.45 -138.18
195 35.80 -109.60 -8.120 0.137 -62.80 -182.42
198 36.30 -107.30 -7.017 0.115 1.34 -200.22
201 36.80 -72.73 -6.110 0.093 45.22 -190.78
204 37.30 -45.28 -5.390 0.073 73.80 -163.02
207 37.80 -19.99 -4.830 0.056 94.77 -123.96
217 39.80 96.91 -3.41 0.035 -12.94 2.37

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 11 << 3단 가설지보재 설치 및 11단계 굴착 >>

Caspe(1966) 방법에 따른 지표면 침하 계산


(FOUNDATION ANALYSIS AND DESIGN 5th ed., Bowles, p804)

굴착깊이 (HW) = 32.80 m


평균 내부마찰각 = 27.79 Deg (흙막이 벽 하단까지)
굴착폭 (B) = 60.00 m
Hp = (0.5 B tan(45+PHI/2) = 49.72 m
Ht = (Hw+Hp) = 82.52 m
영향거리 D=Ht*tan(45-PHI/2)) = 49.79 m
영향거리/굴착깊이(D/Hw) 의 최대비율 = 10.00
Settlement at x from the wall, Sx = Sw x (1 - x/D) ^2
수정된 영향거리 = 49.79 m

횡방향 변위의 체적 (Vs) = 0.40867 m3


벽체에서의 침하 (Sw) = 2 Vs/D = 0.01642 m = -16.42 mm
벽체에서 x만큼 떨어진 지점의 침하Sx = Sw x (1 - x/D) ^2, (^2는 제곱임)

벽체에서의 거리 0.0*D 0.1*D 0.2*D 0.3*D 0.5*D 1.0*D


( m ) 0.0 5.0 10.0 14.9 24.9 49.8

침하 (mm) -16.42 -13.30 -10.51 -8.04 -4.10 0.00


(- 값은 침하이며 + 값은 융기를 나타냄)

For X1 = 1.0 m S1 = -15.76 mm


For X2 = 6.0 m S2 = -12.70 mm
Slope = 1000 x (6.0 - 1.0) / (15.76 - 12.70) = 1/1,631

Note. 결과는 Caspe가 제안한 방법에 의한 개략치임

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 11 << 3단 가설지보재 설치 및 11단계 굴착 >>

근입장 체크 (WALL DEPTH CHECK)


최하단 지보공의 깊이 = 28.80, 절점번호 = 156

Node Depth 주동 기타 합계 주동 수동 기타 수동 안전율


No. GL 토압 횡력 횡력 모멘트 토압 횡력 모멘트
(kN/m2) (kN/m2) (kNm) (kN/m2) (kN/m2) (kNm)
156 28.80 136.92 15.37 152.28 0.00
157 29.00 138.29 14.60 152.89 4.59
158 29.10 138.98 14.21 153.19 6.89
159 29.30 140.36 13.44 153.80 15.38
160 29.50 141.73 12.68 154.41 21.62
161 29.70 143.11 11.91 155.01 27.90
162 29.90 144.48 11.14 155.62 34.24
163 30.10 145.86 10.37 156.23 40.62
164 30.30 147.24 9.60 156.84 47.05
165 30.50 148.61 8.84 157.45 53.53
166 30.70 149.99 8.07 158.06 60.06
167 30.90 151.37 7.30 158.67 66.64
168 31.10 152.74 6.53 159.27 73.27
169 31.30 154.12 5.76 159.88 79.94
170 31.50 155.50 4.99 160.49 86.67
171 31.70 156.88 4.23 161.10 93.44
172 31.90 158.26 3.46 161.71 100.26
173 32.10 159.63 2.69 162.32 107.13
174 32.30 161.01 1.92 162.93 114.05
175 32.50 162.39 1.15 163.55 90.77
176 32.60 163.08 0.77 163.85 93.39
177 32.80 164.46 0.00 164.46 131.57 -120.65 0.00 -96.52 0.07
178 33.00 165.07 0.00 165.07 138.66 -131.63 0.00 -110.57 0.14
179 33.20 165.68 0.00 165.68 109.35 -142.61 0.00 -94.12 0.19
180 33.30 165.99 0.00 165.99 112.04 -148.10 0.00 -99.97 0.23
181 33.50 166.60 0.00 166.60 156.61 -159.08 0.00 -149.54 0.30
182 33.70 167.21 0.00 167.21 122.90 -170.06 0.00 -124.99 0.34
183 33.80 167.52 0.00 167.52 125.64 -175.55 0.00 -131.66 0.38
184 34.00 168.13 0.00 168.13 174.86 -186.53 0.00 -194.00 0.44
185 34.20 168.75 0.00 168.75 136.68 -197.51 0.00 -159.99 0.48
186 34.30 169.05 0.00 169.05 139.47 -203.01 0.00 -167.48 0.52
187 34.50 169.66 0.00 169.66 193.42 -213.99 0.00 -243.95 0.57
188 34.70 170.28 0.00 170.28 150.70 -224.97 0.00 -199.10 0.61
189 34.80 170.58 0.00 170.58 153.53 -230.46 0.00 -207.41 0.65
190 35.00 171.20 0.00 171.20 212.29 -241.44 0.00 -299.39 0.70
191 35.20 171.81 0.00 171.81 164.94 -252.42 0.00 -242.32 0.73
192 35.30 172.12 0.00 172.12 167.81 -257.91 0.00 -251.46 0.77
193 35.50 172.73 0.00 172.73 231.46 -268.89 0.00 -360.32 0.82
194 35.70 173.35 0.00 173.35 179.41 -279.87 0.00 -289.67 0.85
195 35.80 173.65 0.00 173.65 182.33 -285.36 0.00 -299.63 0.89
196 36.00 174.27 0.00 174.27 250.94 -296.35 0.00 -426.74 0.93
197 36.20 174.88 0.00 174.88 194.12 -307.33 0.00 -341.13 0.97
198 36.30 175.19 0.00 175.19 197.09 -312.82 0.00 -351.92 1.00
199 36.50 175.80 0.00 175.80 270.74 -323.80 0.00 -498.65 1.04
200 36.70 176.42 0.00 176.42 209.05 -334.78 0.00 -396.71 1.08
201 36.80 176.73 0.00 176.73 212.07 -340.27 0.00 -408.32 1.11
202 37.00 177.34 0.00 177.34 290.84 -351.25 0.00 -576.06 1.15
203 37.20 177.96 0.00 177.96 224.22 -362.23 0.00 -456.41 1.19
204 37.30 178.26 0.00 178.26 227.28 -367.72 0.00 -468.85 1.22
205 37.50 178.88 0.00 178.88 311.25 -378.71 0.00 -658.95 1.26
206 37.70 179.49 0.00 179.49 239.62 -389.69 0.00 -520.23 1.29
207 37.80 179.80 0.00 179.80 242.73 -395.18 0.00 -533.49 1.32
208 38.00 180.42 0.00 180.42 331.97 -406.16 0.00 -747.34 1.37
209 38.20 181.03 0.00 181.03 340.35 -417.14 0.00 -784.23 1.41
210 38.40 181.65 0.00 181.65 348.77 -428.12 0.00 -821.99 1.45
211 38.60 182.27 0.00 182.27 357.24 -439.10 0.00 -860.64 1.49
212 38.80 182.88 0.00 182.88 365.77 -450.08 0.00 -900.17 1.53
213 39.00 183.50 0.00 183.50 374.34 -461.07 0.00 -940.58 1.57
214 39.20 184.12 0.00 184.12 382.96 -472.05 0.00 -981.86 1.61
215 39.40 184.73 0.00 184.73 391.63 -483.03 0.00 -1024.02 1.65
216 39.60 185.35 0.00 185.35 400.35 -494.01 0.00 -1067.06 1.69
217 39.80 185.97 0.00 185.97 204.57 -504.99 0.00 -555.49 1.71

10321.34 169.02 10569.03-12605.92 0.00-18042.92

합계 주동 모멘트 (Ma) = 10569.03


합계 수동 모멘트 (Mp) = -18042.92
안전율 (Mp/Ma) = 1.71

최소 안전율 = 1.2 이상이어야 함

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 3.62 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.36 -28.73 0.00 285.43(ST1)
24 4.10 42.92 -8.013 -0.072 37.09 -4.96
27 4.60 60.17 -8.644 -0.072 13.05 7.98
28 4.80 62.98 -8.895 -0.072 0.74 9.37
29 4.90 64.38 -9.021 -0.072 60.44 9.15 132.15(SL2)
34 5.90 78.17 -10.179 -0.058 55.22 101.27
46 8.30 110.33 -11.409 -0.012 -10.01 -22.24 322.31(SL3)
48 8.60 90.26 -11.472 -0.012 118.65 18.00
52 9.30 99.42 -11.579 -0.004 52.26 78.26
56 10.10 96.55 -11.523 0.012 -30.12 87.23
64 11.60 95.30 -10.969 0.022 -174.01 -66.62
65 11.70 95.21 -10.933 0.020 -13.36 -84.49 340.35(SL4)
70 12.70 94.35 -10.666 0.015 62.03 25.32
74 13.40 93.73 -10.450 0.021 -3.80 45.67
83 15.10 92.21 -9.711 0.020 -8.04 -95.96 307.60(SL5)
88 16.10 91.31 -9.475 0.011 54.00 4.30
100 18.40 89.26 -8.979 0.004 -153.65 -111.66
101 18.50 89.17 -8.976 0.001 1.32 -127.47 327.78(SL6)
106 19.50 88.29 -9.119 -0.013 76.48 -6.26
110 20.30 88.64 -9.286 -0.010 6.02 26.75
119 22.00 98.11 -9.542 -0.015 -25.30 -96.09 254.82(SL7)
124 23.00 103.70 -9.943 -0.029 1.21 -43.44
128 23.70 107.61 -10.344 -0.037 -72.75 -68.82
137 25.40 117.13 -12.234 -0.108 398.51 -352.55 0.00 1986.84(ST2)
140 25.90 119.93 -13.322 -0.138 339.25 -167.45
143 26.40 122.73 -14.579 -0.148 278.59 -13.53
147 27.10 126.66 -16.338 -0.136 191.30 151.74
156 28.80 136.22 -19.064 -0.039 -32.15 289.38
159 29.30 139.04 -19.264 -0.008 -100.97 256.17
161 29.70 141.29 -19.242 0.013 -129.39 204.62
163 30.10 143.55 -19.089 0.030 -91.54 162.05
169 31.30 150.32 -18.071 0.065 85.15 105.07 307.62(SL8)
177 32.80 158.79 -15.535 0.135 -132.49 209.07
180 33.30 13.51 -14.268 0.154 -161.75 130.40
183 33.80 -11.11 -12.872 0.164 -162.35 48.78
186 34.30 -35.73 -11.427 0.165 -150.64 -30.23
189 34.80 -60.36 -10.012 0.158 -126.62 -100.23
192 35.30 -84.98 -8.694 0.143 -90.29 -155.13
195 35.80 -109.60 -7.527 0.124 -41.64 -188.21
198 36.30 -89.37 -6.545 0.101 16.63 -196.80
201 36.80 -59.29 -5.756 0.080 52.79 -181.57
204 37.30 -35.99 -5.145 0.061 75.80 -151.39
207 37.80 -8.86 -4.683 0.046 91.85 -113.14
217 39.80 84.09 -3.57 0.027 -13.58 2.37

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 13 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.115 -0.068 0.00 0.00


3 0.40 2.85 -3.593 -0.068 3.62 -0.07 8.35(SL1)
4 0.50 3.66 -3.712 -0.068 7.46 0.70
9 1.40 12.61 -4.783 -0.068 0.28 4.88
12 1.90 5.01 -5.372 -0.067 -7.35 3.06
21 3.60 34.11 -7.387 -0.071 56.36 -28.73 0.00 285.42(ST1)
24 4.10 42.92 -8.013 -0.072 37.09 -4.96
27 4.60 60.17 -8.644 -0.072 13.05 7.97
28 4.80 62.98 -8.895 -0.072 0.73 9.37
29 4.90 64.38 -9.021 -0.072 60.45 9.15 132.17(SL2)
34 5.90 78.17 -10.180 -0.058 55.24 101.27
46 8.30 110.33 -11.409 -0.012 -10.01 -22.20 322.29(SL3)
48 8.60 90.26 -11.472 -0.012 118.65 18.04
52 9.30 99.42 -11.579 -0.004 52.26 78.29
56 10.10 96.55 -11.523 0.012 -30.12 87.26
64 11.60 95.30 -10.967 0.022 -174.02 -66.59
65 11.70 95.21 -10.931 0.020 -13.85 -84.47 339.38(SL4)
70 12.70 94.35 -10.664 0.015 61.06 24.38
74 13.40 93.73 -10.451 0.021 -4.76 44.05
83 15.10 92.21 -9.731 0.019 -2.41 -99.23 320.80(SL5)
88 16.10 91.31 -9.515 0.010 66.23 13.27
100 18.40 89.26 -8.851 0.015 -141.41 -74.55
101 18.50 89.17 -8.826 0.013 -33.56 -89.14 233.55(SL6)
106 19.50 88.29 -8.733 -0.001 -5.52 -49.93
110 20.30 88.64 -8.819 -0.012 -75.97 -82.52
119 22.00 98.11 -10.032 -0.086 47.11 -344.74 563.64(SL7)
124 23.00 103.70 -12.020 -0.131 228.03 -65.27
128 23.70 107.61 -13.638 -0.130 154.08 68.66
137 25.40 117.13 -16.762 -0.074 -36.94 170.59
140 25.90 119.93 -17.326 -0.056 -96.20 137.38
143 26.40 122.73 -17.758 -0.044 -133.03 74.19
147 27.10 126.66 -18.247 -0.038 -0.30 16.40
156 28.80 136.22 -19.094 -0.011 36.23 133.98
159 29.30 139.04 -19.119 0.005 -39.45 134.15
161 29.70 141.29 -19.046 0.016 -54.23 104.61
163 30.10 143.55 -18.903 0.025 1.53 100.80
169 31.30 150.32 -18.063 0.057 109.16 138.39 214.30(SL8)
177 32.80 158.79 -15.634 0.133 -137.21 217.96
180 33.30 13.51 -14.376 0.153 -164.49 137.92
183 33.80 -11.11 -12.983 0.164 -165.10 54.93
186 34.30 -35.73 -11.534 0.166 -153.38 -25.45
189 34.80 -60.36 -10.110 0.159 -129.36 -96.81
192 35.30 -84.98 -8.780 0.145 -93.03 -153.09
195 35.80 -109.60 -7.599 0.125 -44.38 -187.54
198 36.30 -91.52 -6.602 0.103 14.89 -197.32
201 36.80 -60.90 -5.798 0.081 51.97 -182.73
204 37.30 -37.09 -5.174 0.062 75.65 -152.80
207 37.80 -10.16 -4.700 0.047 92.28 -114.51
217 39.80 85.67 -3.55 0.028 -13.50 2.37

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 14 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.033 -0.083 0.00 0.00


3 0.40 2.85 -3.611 -0.083 13.14 -0.07 27.39(SL1)
4 0.50 3.66 -3.755 -0.083 26.51 2.60
9 1.40 12.61 -5.038 -0.080 19.32 23.92
12 1.90 5.01 -5.722 -0.077 11.69 31.62
21 3.60 34.11 -7.792 -0.063 -19.74 32.39
24 4.10 42.92 -8.325 -0.060 -39.01 17.95
27 4.60 60.17 -8.842 -0.059 -63.05 -7.50
28 4.80 62.98 -9.049 -0.060 -74.21 -21.32
29 4.90 64.38 -9.153 -0.060 28.53 -28.94 215.93(SL2)
34 5.90 78.17 -10.184 -0.054 70.97 76.63
46 8.30 110.33 -11.398 -0.013 -6.77 -19.69 315.41(SL3)
48 8.60 90.26 -11.465 -0.013 118.09 20.46
52 9.30 99.42 -11.578 -0.004 51.21 80.10
56 10.10 96.55 -11.524 0.012 -31.09 88.24
64 11.60 95.30 -10.968 0.022 -174.53 -66.69
65 11.70 95.21 -10.932 0.020 -14.10 -84.62 339.90(SL4)
70 12.70 94.35 -10.665 0.015 61.12 24.26
74 13.40 93.73 -10.451 0.021 -4.70 43.98
83 15.10 92.21 -9.731 0.019 -2.39 -99.21 320.76(SL5)
88 16.10 91.31 -9.515 0.010 66.22 13.27
100 18.40 89.26 -8.851 0.015 -141.47 -74.64
101 18.50 89.17 -8.826 0.013 -33.59 -89.24 233.59(SL6)
106 19.50 88.29 -8.733 -0.001 -5.47 -50.02
110 20.30 88.64 -8.820 -0.012 -75.79 -82.53
119 22.00 98.11 -10.034 -0.086 48.43 -343.96 564.75(SL7)
124 23.00 103.70 -12.018 -0.131 229.93 -62.55
128 23.70 107.61 -13.627 -0.129 155.07 72.49
137 25.40 117.13 -16.701 -0.072 -47.34 169.21
140 25.90 119.93 -17.249 -0.055 -113.19 129.32
143 26.40 122.73 -17.673 -0.044 -134.76 55.64
147 27.10 126.66 -18.175 -0.040 13.95 10.91
156 28.80 136.22 -19.076 -0.012 36.09 138.10
159 29.30 139.04 -19.111 0.004 -40.79 137.87
161 29.70 141.29 -19.042 0.015 -56.06 107.67
163 30.10 143.55 -18.902 0.025 -0.44 103.10
169 31.30 150.32 -18.064 0.057 108.19 138.29 216.32(SL8)
177 32.80 158.79 -15.634 0.133 -137.20 217.93
180 33.30 13.51 -14.376 0.153 -164.48 137.89
183 33.80 -11.11 -12.982 0.164 -165.09 54.91
186 34.30 -35.73 -11.534 0.166 -153.37 -25.47
189 34.80 -60.36 -10.109 0.159 -129.35 -96.83
192 35.30 -84.98 -8.779 0.145 -93.02 -153.10
195 35.80 -109.60 -7.599 0.125 -44.37 -187.54
198 36.30 -91.52 -6.602 0.103 14.89 -197.32
201 36.80 -60.89 -5.798 0.081 51.97 -182.73
204 37.30 -37.09 -5.174 0.062 75.65 -152.80
207 37.80 -10.16 -4.700 0.047 92.28 -114.50
217 39.80 85.66 -3.55 0.028 -13.50 2.37

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 2.A-A(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 A-A(R) (BH-1) Time : 15:17:25
--------------------------------------------------------------------------------
Step No. 15 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -3.033 -0.083 0.00 0.00


3 0.40 2.85 -3.611 -0.083 13.17 -0.07 27.44(SL1)
4 0.50 3.66 -3.755 -0.083 26.56 2.61
9 1.40 12.61 -5.038 -0.080 19.38 23.98
12 1.90 5.01 -5.722 -0.077 11.73 31.70
21 3.60 34.11 -7.790 -0.063 -19.95 32.38
24 4.10 42.92 -8.323 -0.060 -39.36 17.80
27 4.60 60.17 -8.840 -0.059 -63.61 -7.87
28 4.80 62.98 -9.047 -0.060 -73.68 -21.80
29 4.90 64.38 -9.152 -0.060 29.57 -29.26 214.69(SL2)
34 5.90 78.17 -10.182 -0.054 71.17 76.63
46 8.30 110.33 -11.398 -0.013 -6.81 -19.63 315.41(SL3)
48 8.60 90.26 -11.465 -0.013 118.05 20.50
52 9.30 99.42 -11.578 -0.004 51.19 80.13
56 10.10 96.55 -11.524 0.012 -31.10 88.25
64 11.60 95.30 -10.968 0.022 -174.54 -66.70
65 11.70 95.21 -10.932 0.020 -14.10 -84.63 339.91(SL4)
70 12.70 94.35 -10.665 0.015 61.12 24.26
74 13.40 93.73 -10.451 0.021 -4.70 43.98
83 15.10 92.21 -9.731 0.019 -2.39 -99.21 320.76(SL5)
88 16.10 91.31 -9.515 0.010 66.22 13.27
100 18.40 89.26 -8.851 0.015 -141.47 -74.64
101 18.50 89.17 -8.826 0.013 -33.59 -89.24 233.59(SL6)
106 19.50 88.29 -8.733 -0.001 -5.47 -50.02
110 20.30 88.64 -8.820 -0.012 -75.79 -82.53
119 22.00 98.11 -10.034 -0.086 48.43 -343.96 564.75(SL7)
124 23.00 103.70 -12.018 -0.131 229.93 -62.55
128 23.70 107.61 -13.627 -0.129 155.07 72.49
137 25.40 117.13 -16.701 -0.072 -47.34 169.21
140 25.90 119.93 -17.249 -0.055 -113.19 129.32
143 26.40 122.73 -17.673 -0.044 -134.76 55.64
147 27.10 126.66 -18.175 -0.040 13.95 10.91
156 28.80 136.22 -19.076 -0.012 36.09 138.10
159 29.30 139.04 -19.111 0.004 -40.79 137.87
161 29.70 141.29 -19.042 0.015 -56.06 107.67
163 30.10 143.55 -18.902 0.025 -0.44 103.10
169 31.30 150.32 -18.064 0.057 108.19 138.29 216.32(SL8)
177 32.80 158.79 -15.634 0.133 -137.20 217.93
180 33.30 13.51 -14.376 0.153 -164.48 137.89
183 33.80 -11.11 -12.982 0.164 -165.09 54.91
186 34.30 -35.73 -11.534 0.166 -153.37 -25.47
189 34.80 -60.36 -10.109 0.159 -129.35 -96.83
192 35.30 -84.98 -8.779 0.145 -93.02 -153.10
195 35.80 -109.60 -7.599 0.125 -44.37 -187.54
198 36.30 -91.52 -6.602 0.103 14.89 -197.32
201 36.80 -60.89 -5.798 0.081 51.97 -182.73
204 37.30 -37.09 -5.174 0.062 75.65 -152.80
207 37.80 -10.16 -4.700 0.047 92.28 -114.50
217 39.80 85.66 -3.55 0.028 -13.50 2.37
S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:01

Step No. 1 << 굴착 1단계 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.69


-3.7 0.00 0.00
3
4 0.40
0.50 2.85
3.66 -3.58
-3.56 -0.56
-0.88 -0.07
-0.14
10.5
9 1.40 12.61 -3.32 -8.06 -3.48
12 1.90 -26.61 -3.19 -9.54 -8.70

21 3.60 6.70 -2.81 5.86 -6.16


24 4.10 15.00 -2.72 -0.99 -5.07
27
28 4.60
4.80 -22.16
-19.57 -2.64
-2.61 -6.53
-5.70 -7.87
-9.31
29 4.90 -18.30 -2.59 -0.50 -9.37
34 5.90 -6.24 -2.45 10.03 -4.35

13.1
46 8.30 22.02 -2.12 -8.22
14.2 11.49
48 8.60 -12.37 -2.06 -11.75 7.89
52 9.30 -2.05 -1.92 -8.43 0.71
56 10.10 -8.67 -1.75 -9.68 -6.58

64
65 11.60
11.70 -4.83
-4.24 -1.49
-1.48 1.81
5.08 -12.44
-11.69
70 12.70 -0.20 -1.37 4.23 -8.09
74 13.40 1.03 -1.32 6.38 -5.20

83 15.10 1.24 -1.22 3.92 -0.51


88 16.10 0.77 -1.17 0.59 0.54

100
101 18.40
18.50 0.05
0.03 -1.05 -0.20
1.79 0.26
0.64
106 19.50 -0.05 -0.99 -0.19 0.44
110 20.30 -0.07 -0.95 -0.14 0.31

119 22.00 -0.05 -0.86 1.59 0.16


124 23.00 -0.03 -0.80 0.00 0.15
128 23.70 -0.02 -0.76 1.47 0.16

137 25.40 0.01 -0.67 1.32 0.23


140 25.90 0.03 -0.64 0.04 0.25
143 26.40 0.05 -0.61 1.19 0.26
147 27.10 0.11 -0.58 1.06 0.25

156 28.80 0.31 -0.48 0.53 -0.06


159 29.30 0.36 -0.45 -0.55 -0.29
161 29.70 0.38 -0.43 -0.70 -0.54
163 30.10 0.37 -0.41 -0.85 -0.85

169 31.30 0.00 -0.35 -1.14 -2.09

177 32.80 -1.83 -0.30 0.00 -3.30


180 33.30 -1.00 -0.28 1.23 -3.10
183 33.80 -0.39 -0.27 1.56 -2.65
186 34.30 0.01 -0.27 1.63 -2.10
189 34.80 0.24 -0.26 1.56 -1.55
192 35.30 0.36 -0.26 1.40 -1.06
195 35.80 0.39 -0.26 1.21 -0.65
198 36.30 0.37 -0.26 1.02 -0.34
201 36.80 0.31 -0.26 0.84 -0.12
204 37.30 0.25 -0.26 0.70 0.02
207 37.80 0.18 -0.26 0.60 0.10

217 39.80 -0.05 -0.26 -0.97 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:22

Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.08 0.00 59.2 0.00


3
4 0.40
0.50 2.85
3.66 -3.64
-3.78 -0.56
58.33
58.66 -0.07
5.78
9 1.40 12.61 -5.01 51.15 55.75
12 1.90 5.01 -5.62 43.52 79.36

21 3.60 34.11 39.4 -7.00 12.09 134.23 136.1


24 4.10 42.92 -7.13 -7.2 -2.18 135.70
27
28 4.60
4.80 45.70
42.15 -7.14
-7.10 -1.73
-10.51 135.66
134.19
29 4.90 40.37 -7.07 -14.64 133.12
34 5.90 22.40 -6.53 -46.05 101.16
59.8

46
48 8.30
8.60 -14.30
-56.76 -4.04
-3.72 -47.85
-39.36 -32.08
-46.00
52 9.30 -28.26 -3.04 -12.95 -64.07
56 10.10 -22.67 -2.41 0.51 -68.28

64
65 11.60
11.70 -4.52
-4.01 -1.68
-1.65 18.30
20.29 -50.97
-48.66
70 12.70 5.37 -1.44 17.92 -29.58
74 13.40 7.62 -1.38 15.80 -18.59

83 15.10 3.24 -1.34 5.17 -6.27


88 16.10 -0.61 -1.36 1.91 -4.41

100
101 18.40
18.50 0.67
0.66 -1.47 1.07
3.80 -1.02
-0.36
106 19.50 0.45 -1.53 0.45 0.35
110 20.30 0.27 -1.58 0.16 0.58

119 22.00 0.03 -1.67 3.12 0.61


124 23.00 -0.02 -1.73 -0.06 0.54
128 23.70 -0.03 -1.77 3.31 0.51

137 25.40 -0.01 -1.86 3.53 0.47


140 25.90 -0.01 -1.89 0.00 0.47
143 26.40 0.00 -1.92 3.65 0.48
147 27.10 0.00 -1.96 3.72 0.49

156 28.80 0.00 -2.05 3.91 0.51


159 29.30 0.00 -2.08 0.01 0.52
161 29.70 0.00 -2.10 0.01 0.52
163 30.10 0.00 -2.12 0.01 0.52

169 31.30 -0.01 -2.19 0.02 0.54

177 32.80 0.00 -2.28 0.03 0.58


180 33.30 0.00 -2.30 4.40 0.59
183 33.80 -0.01 -2.33 4.46 0.61
186 34.30 -0.02 -2.36 4.52 0.63
189 34.80 -0.03 -2.39 4.58 0.65
192 35.30 -0.04 -2.42 4.65 0.68
195 35.80 -0.05 -2.45 4.73 0.71
198 36.30 -0.06 -2.47 4.81 0.77
201 36.80 -0.07 -2.50 4.90 0.83
204 37.30 -0.06 -2.53 4.99 0.91
207 37.80 -0.05 -2.56 5.07 1.01

217 39.80 0.37 -2.67 -10.14 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:33

Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.05 0.00 24.7 0.00


3
4 0.40
0.50 2.85
3.66 -3.61
-3.75 -0.56
23.84
24.16 -0.07
2.33
9 1.40 12.61 -4.98 16.65 21.25
12 1.90 5.01 -5.64 9.02 27.61

483.9 138.9
21 3.60 34.11 -7.66 -22.41
138.87 23.84
24 4.10 42.92 -8.18 119.61 88.70
27
28 4.60
4.80 60.17
62.98 -8.61
-8.75 95.56
83.25 142.88
160.47
29 4.90 64.38 -8.81 76.88 168.81
75.4 -9.0 211.3
34 5.90 78.17 -9.00 5.58 211.26

46
48 8.30
8.60 34.08
-85.68 -6.41
-5.90 -129.32
-133.00 41.32
0.47
52 9.30 -77.40 -4.74 -70.44 -70.42
56 10.10 -59.16 -3.58 -24.48 -106.75

64
65 11.60
11.70 -13.34
-11.57 -2.12
-2.06 25.33
28.53 -97.57
-94.64
70 12.70 0.69 -1.61 31.70 -64.46
74 13.40 9.35 -1.46 30.53 -43.24

83 15.10 8.01 -1.38 12.61 -11.59


88 16.10 2.71 -1.42 5.17 -4.55

100
101 18.40
18.50 1.05
0.97 -1.57 0.56
3.45 0.64
1.29
106 19.50 0.35 -1.64 -0.17 1.38
110 20.30 0.06 -1.68 -0.33 1.16

119 22.00 -0.12 -1.78 3.16 0.66


124 23.00 -0.10 -1.83 -0.10 0.50
128 23.70 -0.07 -1.87 3.51 0.45

137 25.40 -0.01 -1.96 3.76 0.45


140 25.90 0.00 -1.99 0.03 0.47
143 26.40 0.00 -2.02 3.87 0.49
147 27.10 0.01 -2.06 3.94 0.51

156 28.80 0.01 -2.15 4.11 0.54


159 29.30 0.00 -2.18 0.01 0.55
161 29.70 0.00 -2.20 0.01 0.55
163 30.10 0.00 -2.23 0.01 0.55

169 31.30 -0.01 -2.29 0.02 0.57

177 32.80 0.00 -2.38 0.03 0.61


180 33.30 0.00 -2.41 4.60 0.62
183 33.80 -0.01 -2.44 4.66 0.64
186 34.30 -0.02 -2.46 4.72 0.66
189 34.80 -0.03 -2.49 4.78 0.68
192 35.30 -0.04 -2.52 4.85 0.71
195 35.80 -0.05 -2.55 4.93 0.75
198 36.30 -0.06 -2.58 5.02 0.80
201 36.80 -0.07 -2.61 5.10 0.87
204 37.30 -0.07 -2.64 5.19 0.95
207 37.80 -0.05 -2.66 5.28 1.05

217 39.80 0.38 -2.77 -10.54 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:40

Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.13 0.00 1.2 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.70 -0.56
0.33
0.66 -0.07
-0.02
9 1.40 12.61 -4.72 -6.85 -2.25
12 1.90 5.01 -5.30 -14.48 -7.64

260.9
21 3.60 34.11 -7.35 -45.91
41.05 -51.36
24 4.10 42.92 -8.04 21.78 245.4 -35.41
27
28
29
4.60
4.80
4.90
60.17
62.98
64.38
-8.75
-9.05
-9.20
-2.27
-20.95
-14.58 224.5 -30.15
-32.13
-33.57
224.50
34 5.90 78.17 -10.64 153.20 156.52
-11.5
292.6
46
48 8.30
8.60 110.33
90.26
113.0 -10.90
-10.49 -73.19
-105.68 268.17
241.09
52 9.30 99.42 -9.23 -165.01 144.29
56 10.10 -65.03 -7.46 -171.43 5.47

64
65 11.60
11.70 -80.88
-74.98 -4.31
-4.14 -30.80
-19.07 -151.56
-153.83
70 12.70 -28.90 -2.76 27.05 -147.66
74 13.40 -9.96 -2.14 42.14 -123.26

83 15.10 12.38 -1.53 38.73 -52.96


88 16.10 11.68 -1.51 23.63 -23.36

100
101 18.40
18.50 4.92
4.57 -1.72
-1.73 2.92
5.74 3.18
4.13
106 19.50 1.74 -1.82 -0.60 4.80
110 20.30 0.40 -1.89 -1.41 3.91

119 22.00 -0.50 -1.99 2.73 1.61


124 23.00 -0.44 -2.04 -0.56 0.81
128 23.70 -0.33 -2.08 3.66 0.51

137 25.40 -0.08 -2.17 4.17 0.36


140 25.90 -0.03 -2.20 0.07 0.39
143 26.40 -0.01 -2.23 4.31 0.43
147 27.10 0.02 -2.27 4.38 0.49

156 28.80 0.02 -2.36 4.52 0.58


159 29.30 0.02 -2.39 0.02 0.60
161 29.70 0.01 -2.41 0.02 0.60
163 30.10 0.00 -2.43 0.02 0.61

169 31.30 -0.01 -2.50 0.02 0.63

177 32.80 0.00 -2.59 0.02 0.67


180 33.30 0.00 -2.61 4.99 0.68
183 33.80 -0.01 -2.64 5.05 0.70
186 34.30 -0.02 -2.67 5.11 0.71
189 34.80 -0.03 -2.70 5.18 0.74
192 35.30 -0.04 -2.73 5.25 0.77
195 35.80 -0.06 -2.76 5.33 0.81
198 36.30 -0.07 -2.79 5.41 0.86
201 36.80 -0.08 -2.81 5.51 0.93
204 37.30 -0.07 -2.84 5.60 1.03
207 37.80 -0.05 -2.87 5.68 1.13

217 39.80 0.41 -2.98 -11.32 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:47

Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 9.0 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
8.15
8.48 -0.07
0.77
9 1.40 12.61 -4.79 0.97 5.57
12 1.90 5.01 -5.38 -6.66 4.09

285.0
21 3.60 34.11 -7.39 -38.09
56.91 -26.34
24 4.10 42.92 -8.01 37.64 118.6 -2.46
27
28 4.60
4.80 60.17
62.98 -8.63
-8.88 13.60
-5.09
1.28 10.74
11.93
29 4.90 64.38 -9.00 113.55 12.07
34 5.90 78.17 -10.14 42.25 91.21

429.7 245.6
46
48 8.30
8.60 110.33
90.26
113.0 -11.58
-11.72
-184.14
245.60
213.11 -63.40
5.16
52 9.30 99.42 -12.00 -12.1 146.72 131.53
56 10.10 96.55 -12.02 64.34 216.04 237.3
64
65 11.60
11.70 95.30
95.21 -10.56
-10.39 -79.56
-89.08 203.91
195.96
70 12.70 94.35 -8.36 -171.80 59.38
74 13.40 -65.35 -6.76 -139.72 -51.51

83 15.10 -55.72 -3.55 5.53 -164.53


88 16.10 -21.32 -2.47 38.80 -140.96

100
101 18.40
18.50 16.89
17.01 -1.81 35.48
37.23 -37.18
-32.94
106 19.50 14.16 -1.90 17.74 -7.45
110 20.30 9.68 -2.01 8.17 2.65

119 22.00 2.13 -2.20 3.00 6.72


124 23.00 0.09 -2.28 -2.15 4.88
128 23.70 -0.53 -2.33 2.45 3.41

137 25.40 -0.62 -2.42 3.80 1.04


140 25.90 -0.51 -2.45 -0.52 0.71
143 26.40 -0.39 -2.47 4.40 0.51
147 27.10 -0.23 -2.51 4.69 0.39

156 28.80 -0.01 -2.60 5.04 0.46


159 29.30 0.01 -2.63 0.10 0.51
161 29.70 0.02 -2.65 0.09 0.55
163 30.10 0.02 -2.68 0.08 0.58

169 31.30 0.02 -2.74 0.06 0.66

177 32.80 0.01 -2.83 0.04 0.73


180 33.30 0.01 -2.86 5.46 0.75
183 33.80 0.00 -2.88 5.51 0.77
186 34.30 -0.02 -2.91 5.57 0.79
189 34.80 -0.03 -2.94 5.64 0.81
192 35.30 -0.05 -2.97 5.71 0.84
195 35.80 -0.06 -3.00 5.79 0.88
198 36.30 -0.08 -3.03 5.88 0.94
201 36.80 -0.08 -3.06 5.97 1.02
204 37.30 -0.08 -3.08 6.07 1.11
207 37.80 -0.06 -3.11 6.16 1.23

217 39.80 0.44 -3.22 -12.24 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:29:54

Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.44
7.77 -0.07
0.69
9 1.40 12.61 -4.78 0.26 4.86
12 1.90 5.01 -5.37 -7.38 3.03

285.8
21 3.60 34.11 -7.39 -38.80
56.46 -28.62
24 4.10 42.92 -8.01 37.19 132.9 -4.96
27
28 4.60
4.80 60.17
62.98 -8.65
-8.90 13.15
-5.53
0.83 8.01
9.11
29 4.90 64.38 -9.02 127.35 9.21
34 5.90 78.17 -10.18 56.05 102.15

309.7
46
48 8.30
8.60 110.33
90.26
113.0 -11.39
-11.45
-170.34
139.38
106.89 -19.34
17.35
52 9.30 99.42 -11.54 -11.5 40.50 69.38
56 10.10 96.55 -11.50 -41.88 68.91
437.2 241.9
64
65 11.60
11.70 95.30
95.21 -11.10
-11.09 -185.77
-195.30
241.94 -102.54
-121.12
70 12.70 94.35 -11.05 147.16 73.35
74 13.40 93.73 -10.90 81.33 153.29 188.4
83 15.10 92.21 -9.22 -76.71 156.84
88 16.10 91.31 -7.39 -156.41 34.13

100
101 18.40
18.50 -54.94
-51.38 -3.46
-3.35 5.54
14.04 -153.58
-152.37
106 19.50 -17.23 -2.56 46.87 -120.61
110 20.30 7.44 -2.28 49.57 -80.56

119 22.00 16.13 -2.26 28.43 -15.96


124 23.00 10.97 -2.38 10.42 0.85
128 23.70 7.08 -2.47 8.82 5.76

137 25.40 0.94 -2.65 3.11 6.12


140 25.90 0.11 -2.69 -2.17 5.07
143 26.40 -0.39 -2.72 3.08 4.00
147 27.10 -0.70 -2.76 3.56 2.66

156 28.80 -0.52 -2.86 4.88 0.82


159 29.30 -0.40 -2.88 -0.31 0.61
161 29.70 -0.31 -2.90 -0.17 0.51
163 30.10 -0.23 -2.92 -0.07 0.47

169 31.30 -0.06 -2.99 0.10 0.51

177 32.80 0.02 -3.07 0.11 0.68


180 33.30 0.03 -3.10 5.99 0.74
183 33.80 0.02 -3.13 6.03 0.79
186 34.30 0.01 -3.16 6.08 0.83
189 34.80 -0.01 -3.19 6.13 0.87
192 35.30 -0.03 -3.22 6.20 0.91
195 35.80 -0.05 -3.24 6.27 0.96
198 36.30 -0.07 -3.27 6.36 1.03
201 36.80 -0.08 -3.30 6.45 1.11
204 37.30 -0.08 -3.33 6.55 1.21
207 37.80 -0.06 -3.36 6.64 1.33

217 39.80 0.46 -3.47 -13.17 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:02

Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.46
7.78 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.87
12 1.90 5.01 -5.37 -7.36 3.05

285.4
21 3.60 34.11 -7.39 -38.79
56.34 -28.56
24 4.10 42.92 -8.01 37.07 132.2 -4.97
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.03
-5.66
0.71 7.94
9.02
29 4.90 64.38 -9.02 126.54 9.10
34 5.90 78.17 -10.18 55.25 101.24

323.2
46
48 8.30
8.60 110.33
90.26
113.0 -11.41
-11.47
-171.15
152.05
119.56 -22.20
18.30
52 9.30 99.42 -11.58 -11.6 53.17 79.19
56 10.10 96.55 -11.52 -29.21 88.87
326.8
64
65 11.60
11.70 95.30
95.21 -10.95
-10.91 -173.10
-182.63
144.13 -63.59
-80.90
70 12.70 94.35 -10.63 49.35 15.76
74 13.40 93.73 -10.42 -16.48 27.23

411.8 237.3
83 15.10 92.21 -9.88 -174.52
237.26 -135.49
88 16.10 91.31 -9.89 145.50 55.81
172.3
100
101 18.40
18.50 89.26
89.17 -8.59
-8.46 -62.15
-71.07 150.30
144.09
106 19.50 88.29 -6.89 -147.73 28.55
110 20.30 -75.93 -5.53 -104.10 -74.82

119 22.00 -44.77 -3.40 24.60 -133.40


124 23.00 -4.74 -2.84 45.99 -95.88
128 23.70 10.10 -2.68 48.56 -63.87

137 25.40 13.93 -2.72 24.15 -10.01


140 25.90 11.54 -2.78 12.60 -2.17
143 26.40 8.91 -2.84 12.89 2.78
147 27.10 5.49 -2.93 8.04 6.11

156 28.80 0.49 -3.09 3.95 5.35


159 29.30 -0.14 -3.12 -1.99 4.36
161 29.70 -0.44 -3.15 -1.87 3.58
163 30.10 -0.62 -3.18 -1.66 2.87

169 31.30 -0.63 -3.24 -0.86 1.36

177 32.80 -0.30 -3.32 -0.15 0.67


180 33.30 -0.20 -3.35 6.34 0.63
183 33.80 -0.13 -3.38 6.47 0.64
186 34.30 -0.08 -3.41 6.58 0.68
189 34.80 -0.05 -3.43 6.66 0.75
192 35.30 -0.04 -3.46 6.74 0.82
195 35.80 -0.05 -3.49 6.82 0.91
198 36.30 -0.06 -3.52 6.90 1.02
201 36.80 -0.06 -3.55 6.98 1.13
204 37.30 -0.06 -3.58 7.07 1.26
207 37.80 -0.04 -3.60 7.15 1.41

217 39.80 0.50 -3.71 -14.11 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:09

Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.47
7.79 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.37 -28.54
24 4.10 42.92 -8.01 37.10 132.1 -4.93
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.06
-5.63
0.74 7.99
9.08
29 4.90 64.38 -9.02 126.50 9.16
34 5.90 78.17 -10.18 55.21 101.26

322.3
46
48 8.30
8.60 110.33
90.26
113.0 -11.41
-11.47
-171.19
151.13
118.64 -22.27
17.95
52 9.30 99.42 -11.58 -11.6 52.25 78.19
56 10.10 96.55 -11.52 -30.13 87.13
341.7
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.03
-183.55
158.13 -66.71
-84.11
70 12.70 94.35 -10.67 63.35 26.55
74 13.40 93.73 -10.45 -2.48 47.82

291.2
83 15.10 92.21 -9.68 -160.52
130.65 -91.10
88 16.10 91.31 -9.42 38.89 -6.41

435.5 257.8
100
101 18.40
18.50 89.26
89.17 -9.13
-9.15 -168.76
-177.68
257.80 -157.12
-174.00
106 19.50 88.29 -9.58 169.07 39.36
110 20.30 88.64 -9.87 98.62 146.44
199.8
119 22.00 98.11 -9.14 -60.12 181.51
124 23.00 103.70 -7.76 -148.96 71.41
128 23.70 -51.47 -6.60 -125.01 -26.12

137 25.40 -56.51 -4.22 3.96 -133.56


140 25.90 -39.90 -3.79 23.88 -126.79
143 26.40 -19.89 -3.48 45.95 -110.81
147 27.10 2.36 -3.22 50.83 -80.34

156 28.80 14.83 -3.15 30.42 -18.68


159 29.30 13.16 -3.20 17.39 -8.27
161 29.70 11.29 -3.25 12.49 -2.33
163 30.10 9.25 -3.30 8.38 1.80

169 31.30 3.82 -3.44 0.72 6.57

177 32.80 0.23 -3.57 -1.88 5.00


180 33.30 -0.28 -3.61 4.99 4.06
183 33.80 -0.56 -3.64 5.27 3.18
186 34.30 -0.68 -3.67 5.64 2.43
189 34.80 -0.69 -3.70 6.04 1.86
192 35.30 -0.64 -3.72 6.42 1.45
195 35.80 -0.55 -3.75 6.77 1.21
198 36.30 -0.46 -3.78 7.08 1.10
201 36.80 -0.36 -3.81 7.34 1.10
204 37.30 -0.26 -3.83 7.54 1.20
207 37.80 -0.16 -3.86 7.70 1.36

217 39.80 0.68 -3.96 -15.06 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:16

Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.46
7.79 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.36 -28.55
24 4.10 42.92 -8.01 37.10 132.2 -4.94
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.05
-5.63
0.74 7.98
9.07
29 4.90 64.38 -9.02 126.52 9.15
34 5.90 78.17 -10.18 55.22 101.27

322.3
46 8.30 110.33 -11.41 -171.17
151.11 -22.22
48 8.60 90.26 -11.47 118.62 18.00
52 9.30 99.42 -11.58 -11.6 52.23 78.23
56 10.10 96.55 -11.52 -30.15 87.15
340.7
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.05
-183.57
157.09 -66.72
-84.13
70 12.70 94.35 -10.67 62.31 25.49
74 13.40 93.73 -10.45 -3.52 46.04

306.3
83 15.10 92.21 -9.71 -161.56
144.69 -94.66
88 16.10 91.31 -9.47 52.93 4.07

322.6
100
101 18.40
18.50 89.26
89.17 -8.97 -154.72
-163.64
158.98 -114.34
-129.82
106 19.50 88.29 -9.13 70.25 -15.28
110 20.30 88.64 -9.34 -0.21 12.74

423.3 264.3
119 22.00 98.11 -9.81 -158.94
264.32 -120.20
124 23.00 103.70 -10.35 163.41 94.17
128 23.70 107.61 -10.56 89.46 182.86
219.5
137 25.40 117.13 118.8 -9.53 -101.56 174.93
140 25.90 119.93 -8.80 -148.76 109.38
143 26.40 -25.37 -7.97 -142.24 35.95
147 27.10 -59.87 -6.76 -112.41 -54.81

156 28.80 -48.98 -4.45 15.42 -136.01


159 29.30 -33.82 -4.06 31.71 -124.47
161 29.70 -16.74 -3.83 41.88 -109.82
163 30.10 -3.04 -3.67 45.71 -92.03

169 31.30 14.68 -3.51 35.94 -40.83

177 32.80 12.13 -3.62 14.16 -3.82


180 33.30 9.55 -3.69 15.74 1.83
183 33.80 7.00 -3.75 11.72 5.10
186 34.30 4.75 -3.81 8.91 6.61
189 34.80 2.90 -3.86 7.11 6.93
192 35.30 1.48 -3.91 6.12 6.52
195 35.80 0.47 -3.95 5.73 5.73
198 36.30 -0.20 -3.98 5.74 4.81
201 36.80 -0.59 -4.02 6.01 3.94
204 37.30 -0.77 -4.05 6.42 3.22
207 37.80 -0.79 -4.08 6.87 2.68

217 39.80 0.15 -4.18 -15.88 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:25

Step No. 10 << 2단 가설지보재 설치 및 10단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.46
7.79 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.36 -28.55
24 4.10 42.92 -8.01 37.09 132.2 -4.94
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.05
-5.63
0.74 7.98
9.07
29 4.90 64.38 -9.02 126.52 9.15
34 5.90 78.17 -10.18 55.22 101.27

322.3
46 8.30 110.33 -11.41 -171.17
151.13 -22.22
48 8.60 90.26 -11.47 118.64 18.00
52 9.30 99.42 -11.58 52.25 78.25
56 10.10 96.55 -11.52 -30.13 87.19
340.4
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.02
-183.55
156.83 -66.65
-84.05
70 12.70 94.35 -10.67 62.05 25.31
74 13.40 93.73 -10.45 -3.77 45.68

308.0
83 15.10 92.21 -9.71 -161.82
146.21 -95.44
88 16.10 91.31 -9.47 54.45 4.80

320.2
100
101 18.40
18.50 89.26
89.17 -8.97
-8.96 -153.20
-162.12
158.04 -110.13
-125.45
106 19.50 88.29 -9.10 69.31 -11.86
110 20.30 88.64 -9.27 -1.14 15.42

327.1
119 22.00 98.11 -9.66 -159.88
167.17 -119.11
124 23.00 103.70 -10.20 66.27 -1.88
128 23.70 107.61 -10.62 -7.69 18.81

1578.7 327.5
137 25.40 117.13 -11.68 -198.70
327.53 -154.27
140 25.90 119.93 -12.16 268.27 -5.24
143 26.40 122.73 -12.65 207.60 113.80
147 27.10 126.66 -13.13 -13.2 120.32 228.76
284.8
156 28.80 136.22 137.9 -12.31 -103.14 245.73
159 29.30 139.04 -11.50 -159.89 177.01
161 29.70 -1.32 -10.73 -163.30 111.98
163 30.10 -21.02 -9.88 -158.83 47.16

169 31.30 -80.14 -7.31 -98.13 -114.51

177 32.80 -50.09 -4.99 22.16 -163.06


180 33.30 -32.77 -4.54 46.97 -145.94
183 33.80 -10.80 -4.23 61.77 -121.70
186 34.30 5.57 -4.04 62.42 -94.14
189 34.80 14.75 -3.95 56.94 -67.84
192 35.30 18.70 -3.92 48.38 -45.14
195 35.80 19.13 -3.95 38.87 -27.05
198 36.30 17.40 -4.00 29.77 -13.71
201 36.80 14.52 -4.07 21.89 -4.70
204 37.30 11.16 -4.14 15.60 0.69
207 37.80 7.74 -4.21 11.02 3.29

217 39.80 -4.27 -4.48 -17.04 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:33

Step No. 11 << 3단 가설지보재 설치 및 11단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 -0.56
7.46
7.79 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.36 -28.55
24 4.10 42.92 -8.01 37.09 132.2 -4.94
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.05
-5.63
0.74 7.98
9.07
29 4.90 64.38 -9.02 126.52 9.15
34 5.90 78.17 -10.18 55.22 101.27

322.3
46 8.30 110.33 -11.41 -171.17
151.13 -22.22
48 8.60 90.26 -11.47 118.64 18.00
52 9.30 99.42 -11.58 52.25 78.24
56 10.10 96.55 -11.52 -30.13 87.18
340.5
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.02
-183.55
156.92 -66.66
-84.06
70 12.70 94.35 -10.67 62.14 25.40
74 13.40 93.73 -10.45 -3.68 45.83

306.9
83 15.10 92.21 -9.71 -161.73
145.22 -95.15
88 16.10 91.31 -9.47 53.46 4.11

327.0
100
101 18.40
18.50 89.26
89.17 -8.98
-8.97 -154.19
-163.11
163.87 -113.09
-128.50
106 19.50 88.29 -9.13 75.15 -9.07
110 20.30 88.64 -9.31 4.69 22.87

313.3
119 22.00 98.11 -9.63 -154.05
159.30 -101.74
124 23.00 103.70 -10.07 58.39 7.61
128 23.70 107.61 -10.39 -15.56 22.78

1214.4
137 25.40 117.13 -11.18 -206.58
198.22 -163.69
140 25.90 119.93 -11.61 138.96 -79.31
143 26.40 122.73 -12.12 78.29 -24.93
147 27.10 126.66 -12.87 -9.00 -0.49
1921.1407.9
156 28.80 136.22 -14.93 -232.45
407.92 -203.35
159 29.30 139.04 -15.78 339.11 -16.52
161 29.70 141.29 -16.48 283.04 107.96
163 30.10 143.55 -17.11 226.07 209.83
-18.0
169 31.30 150.32 -18.05 49.76 376.18 384.0
157.7
177 32.80 158.79 -16.35 -170.00 278.57
180 33.30 13.51 -15.16 -182.91 189.66
183 33.80 -11.11 -13.78 -183.52 97.38
186 34.30 -35.73 -12.30 -171.80 7.87
189 34.80 -60.36 -10.82 -147.78 -72.70
192 35.30 -84.98 -9.40 -111.45 -138.18
195 35.80 -109.60 -8.12 -62.80 -182.42
198 36.30 -107.30 -7.02 1.34 -199.43
201 36.80 -72.73 -6.11 45.22 -189.98
204 37.30 -45.28 -5.39 73.80 -162.23
207 37.80 -19.99 -4.83 94.77 -122.10

217 39.80 96.91 -3.41 -12.94 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:41

Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 3.62
7.46 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.36 -28.55
24 4.10 42.92 -8.01 37.09 132.2 -4.94
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.05
0.74 7.98
9.07
29 4.90 64.38 -9.02 60.44 9.15
34 5.90 78.17 -10.18 55.22 101.27

322.3
46
48 8.30
8.60 110.33
90.26 -11.41
-11.47 -10.01
118.65 -22.23
18.00
52 9.30 99.42 -11.58 52.26 78.26
56 10.10 96.55 -11.52 -30.12 87.20
340.3
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.01
-13.36 -66.62
-84.02
70 12.70 94.35 -10.67 62.03 25.32
74 13.40 93.73 -10.45 -3.80 45.67

307.6
83 15.10 92.21 -9.71 -8.04 -95.50
88 16.10 91.31 -9.47 54.00 4.30

327.8
100
101 18.40
18.50 89.26
89.17 -8.98 -153.65
1.32 -111.66
-127.02
106 19.50 88.29 -9.12 76.48 -6.26
110 20.30 88.64 -9.29 6.02 26.75

254.8
119 22.00 98.11 -9.54 -25.30 -95.59
124 23.00 103.70 -9.94 1.21 -43.43
128 23.70 107.61 -10.34 -72.75 -68.28

137 25.40 117.13 -12.23 -263.77


1986.8 398.5
-351.96
352.6
398.51
140 25.90 119.93 -13.32 339.25 -167.45
143 26.40 122.73 -14.58 278.59 -12.91
147 27.10 126.66 -16.34 191.30 151.74

156 28.80 136.22 -19.06 -32.15 289.38


159 29.30 139.04 -19.26 -19.3 -100.97 256.17
161 29.70 141.29 -19.24 -129.39 204.62
163 30.10 143.55 -19.09 -91.54 162.05
307.6
169 31.30 150.32 -18.07 85.15 105.07
157.7
177 32.80 158.79 -15.53 -132.49 208.72
180 33.30 13.51 -14.27 -161.75 130.40
183 33.80 -11.11 -12.87 -162.35 48.69
186 34.30 -35.73 -11.43 -150.64 -30.23
189 34.80 -60.36 -10.01 -126.62 -100.23
192 35.30 -84.98 -8.69 -90.29 -155.13
195 35.80 -109.60 -7.53 -41.64 -188.05
198 36.30 -89.37 -6.55 16.63 -196.01
201 36.80 -59.29 -5.76 52.79 -180.77
204 37.30 -35.99 -5.15 75.80 -150.59
207 37.80 -8.86 -4.68 91.85 -111.40

217 39.80 84.09 -3.57 -13.58 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:48

Step No. 13 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.11 0.00 8.3 0.00


3
4 0.40
0.50 2.85
3.66 -3.59
-3.71 3.62
7.46 -0.07
0.70
9 1.40 12.61 -4.78 0.28 4.88
12 1.90 5.01 -5.37 -7.35 3.06

285.4
21 3.60 34.11 -7.39 -38.78
56.36 -28.55
24 4.10 42.92 -8.01 37.09 132.2 -4.95
27
28 4.60
4.80 60.17
62.98 -8.64
-8.90 13.05
0.73 7.97
9.06
29 4.90 64.38 -9.02 60.45 9.15
34 5.90 78.17 -10.18 55.24 101.27

322.3
46
48 8.30
8.60 110.33
90.26 -11.41
-11.47 -10.01
118.65 -22.18
18.04
52 9.30 99.42 -11.58 52.26 78.29
56 10.10 96.55 -11.52 -30.12 87.23
339.4
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.02
-13.85 -66.59
-84.00
70 12.70 94.35 -10.66 61.06 24.37
74 13.40 93.73 -10.45 -4.76 44.05

320.8
83 15.10 92.21 -9.73 -2.41 -98.77
88 16.10 91.31 -9.52 66.23 13.27

233.5
100
101 18.40
18.50 89.26
89.17 -8.85
-8.83 -141.41
-33.56 -74.55
-88.70
106 19.50 88.29 -8.73 -5.52 -49.93
110 20.30 88.64 -8.82 -75.97 -82.52

563.6 309.2 344.7


119 22.00 98.11 -10.03 47.11 -344.25
124 23.00 103.70 -12.02 228.03 -65.26
128 23.70 107.61 -13.64 154.08 68.66

137 25.40 117.13 -16.76 -36.94 170.59


140 25.90 119.93 -17.33 -96.20 137.38
143 26.40 122.73 -17.76 -133.03 74.19
147 27.10 126.66 -18.25 -0.30 16.40

156 28.80 136.22 -19.09 -19.1 36.23 133.98


159 29.30 139.04 -19.12 -39.45 134.15
161 29.70 141.29 -19.05 -54.23 104.61
163 30.10 143.55 -18.90 1.53 100.80
214.3
169 31.30 150.32 -18.06 109.16 138.39
157.7
177 32.80 158.79 -15.63 -137.21 217.62
180 33.30 13.51 -14.38 -164.49 137.92
183 33.80 -11.11 -12.98 -165.10 54.85
186 34.30 -35.73 -11.53 -153.38 -25.45
189 34.80 -60.36 -10.11 -129.36 -96.81
192 35.30 -84.98 -8.78 -93.03 -153.09
195 35.80 -109.60 -7.60 -44.38 -187.38
198 36.30 -91.52 -6.60 14.89 -196.52
201 36.80 -60.90 -5.80 51.97 -181.94
204 37.30 -37.09 -5.17 75.65 -152.00
207 37.80 -10.16 -4.70 92.28 -112.77

217 39.80 85.67 -3.55 -13.50 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:30:56

Step No. 14 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.03 0.00 27.4 0.00


3
4 0.40
0.50 2.85
3.66 -3.61
-3.76 13.14
26.51 -0.07
2.60
9 1.40 12.61 -5.04 19.32 23.92
12 1.90 5.01 -5.72 11.69 31.62

21 3.60 34.11 -7.79 -19.74 32.39


24 4.10 42.92 -8.32 -39.01 215.9 17.95
27
28 4.60
4.80 60.17
62.98 -8.84
-9.05 -63.05
-74.21 -7.18
-21.32
29 4.90 64.38 -9.15 28.53 -28.61
34 5.90 78.17 -10.18 70.97 76.63

315.4
46
48 8.30
8.60 110.33
90.26 -11.40
-11.47 -6.77
118.09 -19.68
20.46
52 9.30 99.42 -11.58 51.21 80.10
56 10.10 96.55 -11.52 -31.09 88.21
339.9
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.53
-14.10 -66.69
-84.15
70 12.70 94.35 -10.66 61.12 24.26
74 13.40 93.73 -10.45 -4.70 43.98

320.8
83 15.10 92.21 -9.73 -2.39 -98.75
88 16.10 91.31 -9.52 66.22 13.27

233.6
100
101 18.40
18.50 89.26
89.17 -8.85
-8.83 -141.47
-33.59 -74.64
-88.79
106 19.50 88.29 -8.73 -5.47 -50.02
110 20.30 88.64 -8.82 -75.79 -82.52

564.7 311.1 344.0


119 22.00 98.11 -10.03 48.43 -343.47
124 23.00 103.70 -12.02 229.93 -62.55
128 23.70 107.61 -13.63 155.07 72.49

137 25.40 117.13 -16.70 -47.34 169.21


140 25.90 119.93 -17.25 -113.19 129.32
143 26.40 122.73 -17.67 -134.76 55.64
147 27.10 126.66 -18.18 13.95 10.91

156 28.80 136.22 -19.08 -19.1 36.09 138.10


159 29.30 139.04 -19.11 -40.79 137.87
161 29.70 141.29 -19.04 -56.06 107.67
163 30.10 143.55 -18.90 -0.44 103.10
216.3
169 31.30 150.32 -18.06 108.19 138.29
157.7
177 32.80 158.79 -15.63 -137.20 217.59
180 33.30 13.51 -14.38 -164.49 137.89
183 33.80 -11.11 -12.98 -165.09 54.82
186 34.30 -35.73 -11.53 -153.37 -25.47
189 34.80 -60.36 -10.11 -129.35 -96.83
192 35.30 -84.98 -8.78 -93.02 -153.10
195 35.80 -109.60 -7.60 -44.37 -187.38
198 36.30 -91.52 -6.60 14.89 -196.52
201 36.80 -60.89 -5.80 51.97 -181.93
204 37.30 -37.09 -5.17 75.65 -152.00
207 37.80 -10.16 -4.70 92.28 -112.77

217 39.80 85.66 -3.55 -13.50 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 2.A-A(R).dat
Project : 춘천시 약사동 주상복합 신축설계 A-A(R) .. Date : 2022-12-07 Time : 17:31:03

Step No. 15 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -3.03 0.00 27.4 0.00


3
4 0.40
0.50 2.85
3.66 -3.61
-3.76 13.17
26.56 -0.07
2.61
9 1.40 12.61 -5.04 19.38 23.98
12 1.90 5.01 -5.72 11.73 31.70

21 3.60 34.11 -7.79 -19.95 32.38


24 4.10 42.92 -8.32 -39.36 214.7 17.80
27
28 4.60
4.80 60.17
62.98 -8.84
-9.05 -63.61
-73.68 -7.55
-21.80
29 4.90 64.38 -9.15 29.57 -28.93
34 5.90 78.17 -10.18 71.17 76.63

315.4
46
48 8.30
8.60 110.33
90.26 -11.40
-11.47 -6.81
118.05 -19.62
20.50
52 9.30 99.42 -11.58 51.19 80.13
56 10.10 96.55 -11.52 -31.10 88.22
339.9
64
65 11.60
11.70 95.30
95.21 -10.97
-10.93 -174.54
-14.10 -66.70
-84.15
70 12.70 94.35 -10.66 61.12 24.25
74 13.40 93.73 -10.45 -4.70 43.98

320.8
83 15.10 92.21 -9.73 -2.39 -98.75
88 16.10 91.31 -9.52 66.22 13.27

233.6
100
101 18.40
18.50 89.26
89.17 -8.85
-8.83 -141.47
-33.59 -74.64
-88.79
106 19.50 88.29 -8.73 -5.47 -50.02
110 20.30 88.64 -8.82 -75.79 -82.52

564.7 311.1 344.0


119 22.00 98.11 -10.03 48.43 -343.47
124 23.00 103.70 -12.02 229.93 -62.55
128 23.70 107.61 -13.63 155.07 72.49

137 25.40 117.13 -16.70 -47.34 169.21


140 25.90 119.93 -17.25 -113.19 129.32
143 26.40 122.73 -17.67 -134.76 55.64
147 27.10 126.66 -18.18 13.95 10.91

156 28.80 136.22 -19.08 -19.1 36.09 138.10


159 29.30 139.04 -19.11 -40.79 137.87
161 29.70 141.29 -19.04 -56.06 107.67
163 30.10 143.55 -18.90 -0.44 103.10
216.3
169 31.30 150.32 -18.06 108.19 138.29
157.7
177 32.80 158.79 -15.63 -137.20 217.59
180 33.30 13.51 -14.38 -164.49 137.89
183 33.80 -11.11 -12.98 -165.09 54.82
186 34.30 -35.73 -11.53 -153.37 -25.47
189 34.80 -60.36 -10.11 -129.35 -96.83
192 35.30 -84.98 -8.78 -93.02 -153.10
195 35.80 -109.60 -7.60 -44.37 -187.38
198 36.30 -91.52 -6.60 14.89 -196.52
201 36.80 -60.89 -5.80 51.97 -181.93
204 37.30 -37.09 -5.17 75.65 -152.00
207 37.80 -10.16 -4.70 92.28 -112.77

217 39.80 85.66 -3.55 -13.50 0.00


3.B-B(L)
1.설계요약
1.1 C.I.P
단면검토 비고
부재 적용
구분 발생응력(MPa) 허용응력(MPa) 판정 (설계안전율)
40 Mpa 압축응력 14.112 19.200 O.K 73.50%
흙막이벽 HD32×8 인장응력 192.461 270.000 O.K 71.28%
D13@200 전단응력 0.940 1.221 O.K 77.01%

1.2 안전성 검토
1) 측면파일 근입장
근입장 안전율 : 1.51 > 1.20 ---> O.K

2) 수평변위 검토
허용 수평변위 : 18.80mm < 56.64mm ---> O.K
허용수평변위 = 28.32 m x 0.20 % = 0.0566 m ( 56.64mm)
수 평 변 위 (mm)
시공단계 부재 굴착깊이 판 정 비고
최대발생변위 허용변위
STEP-1 CIP 2.085 10.60 56.64 O.K 18.71%
STEP-2 CIP 3.850 9.00 56.64 O.K 15.89%
STEP-3 CIP 5.685 9.60 56.64 O.K 16.95%
STEP-4 CIP 9.035 12.20 56.64 O.K 21.54%
STEP-5 CIP 12.435 16.20 56.64 O.K 28.60%
STEP-6 CIP 15.835 18.80 56.64 O.K 33.19%
STEP-7 CIP 19.260 18.40 56.64 O.K 32.49%
STEP-8 CIP 22.710 18.10 56.64 O.K 31.96%
STEP-9 CIP 24.760 18.10 56.64 O.K 31.96%
STEP-10 CIP 28.320 18.10 56.64 O.K 31.96%
STEP-11 CIP 28.320 18.10 56.64 O.K 31.96%
STEP-12 CIP 28.320 18.10 56.64 O.K 31.96%
STEP-13 CIP 28.320 18.10 56.64 O.K 31.96%

3) 침하량 검토
허용 침하량 : 19.71 < 25.00 ---> O.K
2.결과 정리
구 분 해석결과 (단위) 비고

외측파일 모멘트 397.96 kN·m


CIP
외측파일 최대 전단력 367.03 kN

최대 수평 변위 18.80 mm

주동토압 모멘트 (Ma) 11913.78 kN·m


근입장검토
수동토압 모멘트 (Mp) 18042.92 kN·m
3.C.I.P 설계
3.1 흙막이벽
가. 설계 제원
C.I.P 직경(D, mm) 600.0
C.I.P 설치간격
600.0 전단철근 주철근
(C.T.C, mm)
H-pile 제원 H-300x300x10x15

600.0
직경
H-pile 설치간격
1200.0
(C.T.C, mm)
콘크리트 설계기준강도 CIP 간격
40.0
(fck, MPa)
600.0
주철근 항복강도(fy, MPa) 400.0
전단철근 항복강도(fy, MPa) 300.0
콘크리트 설계기준강도
0.8
저감계수
허용응력보정계수 1.5
탄성계수비(n) 8
피복두께(mm) 80.0

나. 단면력 산정
(1) 최대 휨모멘트 ( Mmax )
Mmax = 397.960 kN·m/m
= 397.960 (kN·m/m) × 0.60 m (C.I.P 설치간격) = 238.776 kN·m
(2) 최대 전단력 ( Smax )
Smax = 367.030 kN/m
= 367.030 (kN/m) × 0.60 m (C.I.P 설치간격) = 220.218 kN

다. C.I.P의 허용 응력
(1) 콘크리트 허용압축강도 ( fca )
fck' = 0.8 × 40.0 = 32.000 MPa
fca = 보정계수 × ( 0.4 × fck' ) = 1.5 × ( 0.4 × 32.000 )
= 19.200 MPa
(2) 콘크리트 허용전단강도 ( τa )
τca = 보정계수 × ( 0.08 × fck' ) = 1.5 × ( 0.08 × 32.000 )
= 0.679 MPa
(3) 주철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa
(4) 전단철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 300.000 , 180 MPa )
= 225.000 MPa

라. 철근량 검토
(1) 환산단면
4 3 4 4
π × D B × B π × 600 B
= → = → B = 525.6 mm
64 12 64 12

(2) 환산 단면적 : B × H = 526 × 526


b = 526 mm , d = 526 - 80.0 = 445.6 mm
n × fca 8 × 19.200
k0 = = = 0.363 (평형철근비)
n × fca + fsa 8 × 19.200 + 270.00
k0 0.363
j0 = 1 - = 1 - = 0.879
3 3

(3) 휨에 대한 검토
Mmax 238.776 × 1000000
소요철근량 = = = 2,257 mm2
fsa × j × d 270.0 × 0.88 × 445.6

사용철근량 (As) : 4 ea HD 32 = 3,175.3 mm2

소요철근량 < 사용철근량 ---> O.K

스트럿에 의한 축력의 작용방향과 토압의 작용방향은 서로 반대이므로 양측에 모두 배근해야 하므로


※ 철근 : 8 ea HD 32 사용 ( As = 6350.6 mm2 )

(4) 전단에 대한 검토
Smax 220.218 x 1000
τ = = = 0.940 MPa
bxd 525.6 × 445.6
∴ τ > τca = 0.679 MPa ---> N.G 최소전단철근 배치
τ' = τ - τca
= 0.940 - 0.679
= 0.261 MPa

∴ 사용철근량 (Av) : 2 ea D 13 = 253.2 mm2


∴ s = 200 mm 간격으로 배치

τ'ㆍsㆍb 0.261 × 200.0 × 525.6


Av req = = = 122.1 mm2
fsa 225.000

사용철근량(Av) > 필요철근량(Av req) → O.K

Avㆍfsa 253.225 × 225.0


τsa = = = 0.542 MPa
sㆍb 200.000 × 525.6
τa = τca + τsa = 0.679 + 0.542 = 1.221 MPa
∴ τa > τ = 0.940 MPa ---> O.K

마. 응력 검토
(1) 압축응력 검토
ρ = 3175.3 / ( 445.6 × 525.6 ) = 0.0136
2
k = (n·ρ) + 2·n·ρ - n·ρ
= ( 8 × 0.0136 )2 + 2 × 8 × 0.0136 - 8 × 0.0136 = 0.370
j = 1 - (k/3) = 1 - ( 0.370 / 3 ) = 0.877
2ㆍMmax 2 × 238.776 × 1000000
fc = = = 14.112 MPa
2 2
kㆍjㆍbㆍd 0.370 × 0.877 × 525.6 × 445.6
∴ fc < fca = 19.200 MPa ---> O.K

(2) 인장응력 검토
Mmax Mmax 238.776 × 1000000
fs = = = = 192.461 MPa
pㆍjㆍbㆍd2 Asㆍjㆍd 3175.294 × 0.877 × 445.6
∴ fs < fsa = 270.000 MPa ---> O.K
4.침하량 (GROUND SETTLMENT CHECK) 검토
SUNEX PROGRAM OUT DATA Caspe(1966) 방법에 따른 지표면 침하 계산

Excavation Depth (HW) = 28.30 m


Average Phi to ex. Depth = 28.47 deg
Width of Excavation (B) = 50.00 m
Hp = (0.5 B tan(45+PHI/2 = 42.00 m
Ht = (Hw+Hp) = 70.30 m
Distance of Influnce (D=Ht*tan(45-PHI/2)) = 41.85 m

Volume of deflection (Vs) = 0.41229 ㎥


Settlement at wall (Sw) = 2 Vs/D = 0.01971 m = -19.71 mm

Distance 0.0×D 0.1×D 0.2×D 0.3×D 0.5×D 1.0×D


(m) 0.0 4.2 8.4 12.6 20.9 41.9

Settlement(mm) -19.71 -15.97 -12.61 -9.66 -4.93 0.00

- SUNEX에의한 침하예상량은 다음과 같다. -


절점범호 DISTANCE (m) SETTLEMENT (mm)
1 0.0 -19.71
2 4.2 -15.97
3 8.4 -12.61
4 12.6 -9.66
5 20.9 -4.93
6 41.9 0.00

-5
SETTLEMENT (mm)

-10

-15

-20

-25
0 5 10 15 20 25 30 35 40 45
DISTANCE (m)

※ 침하 및 각변위 허용치
허용침하량은 국도설계실무요령(2018)이 제안한 25mm로 적용하였으며, 허용 각변위는 Bjerrum(1981)이 제안한
건물에 균열이 없도록 하는 안정한계 1/500을 적용 하였다.
- 인접부지의 예상 피해 판단

* 가장 인접하여있는 도로 는 0.55 m 거리에 위치하고,

인접한 도로 폭을 6.00 m로 가정 할 때

0.55 m 지점의 침하량 = 19.194 mm < 25.0 ∴ O.K

6.55 m 지점의 침하량 = 14.022 mm

→ 부등침하량 = 5.172 mm < 25.0 ∴ O.K

5.172 1 1
→ 각변위 (δ/L) = = < ∴ O.K
6000 1160 500

* 우수관
2.78 m 지점의 침하량 = 17.181 mm < 25.0 ∴ O.K
* 오수관
4.44 m 지점의 침하량 = 15.749 mm < 25.0 ∴ O.K
* 오수관
23.88 m 지점의 침하량 = 3.636 mm < 25.0 ∴ O.K
* 상수관
25.88 m 지점의 침하량 = 2.869 mm < 25.0 ∴ O.K
* 통신관
26.17 m 지점의 침하량 = 2.768 mm < 25.0 ∴ O.K
* 우수관
27.51 m 지점의 침하량 = 2.314 mm < 25.0 ∴ O.K
* 상수관
28.28 m 지점의 침하량 = 2.072 mm < 25.0 ∴ O.K

최대침하량 허용침하
해석방법 각변위 허용각변위 판정
(mm) (mm)
1 1
Caspe 19.71 25.00 O.K
2123 500
5.흙막이 벽체의 근입장 검토
근입장에 대한 검토는 최하단 지보공 위치를 중심으로 하는 주동토압 (Pa)에 의한
회전 모멘트 (Ma = Pa X La)와 최하단 지보공 위치를 중심으로 하는 수동토압 (Pp)에 의한
회전 모멘트 (Ma = Pp X Lp)를 비교하여 판별한다.
또한 엄지말뚝에 작용하는 수동토압의 작용폭은 다음 표와 같으며 주동토압의 작용폭은 굴착저면
이상은 말뚝의 간격, 굴착면 이하는 플랜지 폭만을 적용한다.
[ 엄지말뚝의 토압작용폭 (근입부) ]
사 질 토 N > 30 30 ≥ N > 10 N ≤ 10
지반의 상태
점 성 토 N > 8 8 ≥ N > 4 N ≤ 4
토압의 작용폭 플랜지폭의 3배 플랜지폭의 2배 플랜지폭의 1배
(흙막이 가시설 세부설계기준 , 한국도로공사, 2005)

최하단 지보공 H-PILE

La
Lp Pa

Pp

Mp Pp X Lp
Fs = = ≥ 1.2 이어야 한다.
Ma Pa X La

1) 토압에 의한 근입장 검토
전산해석 결과 : Ma = 11913.78 KN.m
Mp = 18042.92 KN.m

18042.92
∴ Fs (안전율) = = 1.51 > 1.2 - O.K -
11913.78
6. 전산INPUT
6.1 INPUT DATA
PROJECT 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2)

UNIT kN

SOIL 1 매립층(자갈 및 실트섞인 모래)


18 9 0 24 14300 0 0 0
2 퇴적층(점토질실트)
17 8 20 10 10000 0 0 0
3 퇴적층(자갈섞인 모래)
18 9 0 25 25500 0 0 0
4 풍화토
19 10 17 28 33800 0 0 0
5 풍화암
20 11 27 30 38000 0 0 0
6 연암
23 14 40 33 48000 0 0 0

PROFILE 1 2.34 1 1
2 8.14 3 3
3 13.94 4 4
4 50.00 5 5

VWALL 1 35.32 0.055116 0.0012304 2.05E+08 1 1 1 0 0

STRUT 1 3.35 0.01348 5 3 0 0 0 0 0


2 24.26 0.01348 5 3 0 0 0 0 0

SLAB 1 1.085 0.25 5 0


2 4.685 0.15 5 0
3 8.035 0.15 5 0
4 11.435 0.15 5 0
5 14.835 0.15 5 0
6 18.260 0.20 5 0
7 21.710 0.20 5 0
8 26.790 3.06 5 0

WALL 1 25.260 28.320 1.0 0


2 18.160 25.260 1.0 0
3 11.360 18.160 0.6 0
4 4.560 11.360 0.5 0
5 0.000 4.560 0.4 0

Division 0.2
Solution 0
Output 0
NoteMode 0
MINKS 0
ECHO

STEP 1 굴착 1단계
RANKINE 1.0 0.0 50
LOAD 0 0.5 13.0 6.5 13.0
WATERPRESSURE 1.09 0.0 13.94 128.5 28.32 0.0
EXCAVATION 2.085

STEP 2 1F 슬래브 설치 및 2단계 굴착


CONST SLAB 1
EXCAVATION 3.850

STEP 3 1단 가설지보재 설치 및 3단계 굴착


CONST STRUT 1
EXCAVATION 5.685

STEP 4 B1 슬래브 설치 및 4단계 굴착


CONST SLAB 2
EXCAVATION 9.035
STEP 5 B2 슬래브 설치 및 5단계 굴착
CONST SLAB 3
EXCAVATION 12.435

STEP 6 B3 슬래브 설치 및 6단계 굴착


CONST SLAB 4
EXCAVATION 15.835

STEP 7 B4 슬래브 설치 및 7단계 굴착


CONST SLAB 5
EXCAVATION 19.260

STEP 8 B5 슬래브 설치 및 8단계 굴착


CONST SLAB 6
EXCAVATION 22.710

STEP 9 B6 슬래브 설치 및 9단계 굴착


CONST SLAB 7
EXCAVATION 24.760

STEP 10 가설지보재 설치 및 10단계 굴착


CONST STRUT 2
EXCAVATION 28.320
DEPTH_CHECK
GROUND_SETTLEMENT 50
DISPLACEMENT 0.2

STEP 11 슬래브, 벽체설치 및 가설지보재해체


CONST SLAB 8
CONST WALL 1
REMOVE STRUT 2

STEP 12 벽체설치 및 가설지보재해체


CONST WALL 2
CONST WALL 3
CONST WALL 4
REMOVE STRUT 1

STEP 13 벽체설치
CONST WALL 5

END
6.2 TOT DATA

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 99 << Pile, Strut, Anchor and Slab Force for each Step >>

>> 흙막이 벽의 최소 최대값 (Min and Max of Pile Force) <<

Step 굴착 ---- 전 단 력(kN/m) ---- --- 휨 모멘트 (kNm/m) ---


No 깊이 최대 깊이 최소 깊이 최대 깊이 최소 깊이.

1 2.10 23.78 6.40 -33.17 3.30 28.51 13.10 -89.03 5.30


2 3.90 70.41 1.10 -63.01 6.40 113.21 3.70 -99.84 8.80
3 5.70 113.40 3.40 -123.16 8.00 150.96 5.50 -117.89 9.60
4 9.00 230.89 4.70 -111.80 9.60 240.52 7.80 -138.74 4.70
5 12.40 320.55 8.00 -198.85 13.70 358.62 11.20 -202.07 16.00
6 15.80 367.03 11.40 -223.54 16.00 397.96 14.10 -250.84 18.90
7 19.30 329.58 14.80 -259.73 14.80 306.24 17.40 -252.25 21.90
8 22.70 274.22 18.30 -242.16 18.30 198.51 20.80 -197.56 25.00
9 24.80 229.06 11.40 -239.92 14.80 158.37 13.10 -148.05 27.00
10 28.30 306.37 24.30 -240.73 14.80 229.70 27.00 -194.19 24.30
11 28.30 276.58 21.90 -229.86 21.60 164.27 24.60 -285.93 21.70
12 28.30 277.09 21.90 -229.15 21.60 160.96 24.60 -284.81 21.70
13 28.30 277.09 21.90 -229.15 21.60 160.96 24.60 -284.81 21.70

Max/Min 367.03 11.40 -259.73 14.80 397.96 14.10 -285.93 21.70

Note : (파일 간격이 고려되지 않았으므로 파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)

>> Strut Force <<

------- S T R U T N o. a n d D E P T H --------
Step Exca 1 2
No Depth 3.4 24.3

1 2.1 0.0 0.0


2 3.9 0.0 0.0
3 5.7 413.2 0.0
4 9.0 209.6 0.0
5 12.4 220.7 0.0
6 15.8 223.7 0.0
7 19.3 223.0 0.0
8 22.7 223.1 0.0
9 24.8 223.1 0.0
10 28.3 223.1 1393.6
11 28.3 223.1 0.0
12 28.3 0.0 0.0
13 28.3 0.0 0.0

(스트럿 1개당의 축력임, 경사가 고려되어 증가된 값임, 1/cosθ)

>> 슬래브 축력 (Slab Force) <<

-------- 슬 래 브 번 호 깊 이, 축 력 --------
Step Exca 1 2 3 4 5 6 7 8
No Depth 1.1 4.7 8.0 11.4 14.8 18.3 21.7 26.8

1 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


2 3.9 75.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 5.7 35.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 9.0 -14.3 297.4 0.0 0.0 0.0 0.0 0.0 0.0
5 12.4 1.3 128.3 497.8 0.0 0.0 0.0 0.0 0.0
6 15.8 -0.3 151.4 318.5 543.1 0.0 0.0 0.0 0.0
7 19.3 -0.3 150.0 341.5 363.8 589.3 0.0 0.0 0.0
8 22.7 -0.2 150.0 339.7 386.7 436.5 516.4 0.0 0.0
9 24.8 -0.2 150.0 339.7 385.3 448.8 432.6 330.7 0.0
10 28.3 -0.2 150.0 339.8 384.5 455.3 401.2 282.1 0.0
11 28.3 -0.2 150.0 339.9 383.4 464.6 337.5 535.1 233.4
12 28.3 20.7 206.5 335.5 383.7 464.5 337.6 535.0 222.4
13 28.3 20.7 205.9 335.5 383.7 464.5 337.6 535.0 222.4

Note : (단위폭당의 축력임)


>> 흙막이 벽의 전단력, 휨모멘트의 최대치 최소치, 변위, 토압의 최대치 (선택된 절점) <<

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

1 0.00 0.00(13) 0.00( 0) 0.00( 1) 0.00( 0) 10.57( 1) 0.00( 0)


4 0.50 0.00( 0) -0.90( 3) 0.00( 0) -0.14( 3) 9.77( 1) 3.71(13)
7 1.10 70.41( 2) -18.90( 4) 0.00( 0) -1.59( 3) 8.89( 2) 8.44(13)
12 2.10 54.96( 2) -34.35( 4) 62.36( 2) -26.96( 4) 9.20( 3) 22.36( 1)
13 2.30 50.27( 2) -39.04( 4) 72.91( 2) -34.28( 4) 9.26( 3) 24.56( 2)
19 3.40 113.40( 3) -74.17( 4) 110.46( 2) -95.15( 4) 9.53( 3) 39.28(13)
22 3.90 92.10( 3) -60.63(13) 112.88( 2) -102.24( 4) 9.60( 3) 45.92( 2)
26 4.60 56.71( 3) -95.35(12) 123.51( 3) -132.37( 4) 9.94( 4) 55.19(13)
27 4.70 230.89( 4) -66.56( 4) 129.19( 3) -138.74( 4) 10.03( 4) 56.51(13)
32 5.70 167.77( 4) -58.79( 2) 149.94( 3) -85.00( 1) 11.13( 4) 69.72( 3)
36 6.40 115.74( 4) -63.01( 2) 161.74( 4) -71.87( 1) 11.80( 4) 78.94(13)
44 8.00 320.55( 5) -177.26( 5) 237.02( 4) -196.84( 5) 12.80( 5) 100.01( 4)
45 8.10 311.62( 5) -120.22( 3) 233.30( 4) -165.27( 5) 12.95( 5) 78.61( 4)
50 9.00 235.56( 5) -105.34( 4) 167.80( 4) -108.30( 3) 14.47( 5) 90.41( 4)
62 11.40 367.03( 6) -176.06( 6) 357.22( 5) -106.52( 6) 16.81( 6) 121.88( 5)
67 12.40 238.59( 6) -140.55( 5) 275.18( 5) -109.23( 4) 18.17( 6) 135.00( 5)
71 13.10 140.88( 6) -178.25( 5) 330.73( 6) -103.00( 4) 18.74( 6) 144.19(13)
75 13.90 22.68( 6) -195.84( 5) 396.27( 6) -85.10( 4) 18.61( 6) 141.09( 6)
80 14.80 329.58( 7) -259.73( 7) 360.18( 6) -138.48( 5) 18.23( 7) 135.88(13)
85 15.80 196.60( 7) -222.87( 6) 191.54( 6) -201.40( 5) 18.41( 7) 130.08( 6)
89 16.60 94.39( 7) -210.99( 6) 270.41( 7) -189.82( 5) 18.18( 7) 125.45( 7)
97 18.20 47.98( 5) -230.57( 8) 264.74( 7) -231.94( 6) 16.07( 8) 116.20( 7)
98 18.30 274.22( 8) -242.16( 8) 254.26( 7) -237.84( 6) 16.00( 8) 115.62( 7)
103 19.30 161.49( 8) -211.18( 7) 87.18( 7) -242.42( 6) 15.42( 8) 109.84(13)
107 20.00 86.02( 8) -188.74( 7) 163.08( 8) -207.65( 6) 14.89( 8) 105.79(13)
116 21.70 172.44( 9) -184.10(10) 161.12( 8) -285.93(11) 12.85(11) 95.97(13)
121 22.70 200.90(11) -168.16( 8) 72.73( 9) -224.30( 7) 13.12(11) 96.31( 8)
129 24.30 306.37(10) -158.17(10) 157.19(11) -194.19(10) 13.66(11) 105.50(13)
132 24.80 252.90(10) -125.17( 9) 163.63(11) -196.43( 8) 13.57(11) 108.38(13)
135 25.30 197.99(10) -112.89( 9) 142.98(11) -194.04( 8) 13.32(11) 111.25(10)
137 25.60 164.36(10) -99.62( 9) 126.01(11) -184.42( 8) 13.11(11) 112.98(10)
143 26.80 64.97( 8) -11.20( 9) 227.17(10) -147.19( 9) 11.84(11) 119.88(10)
151 28.30 48.04( 9) -149.58(10) 126.42(10) -108.53( 9) 10.01(10) 128.51(13)
154 28.80 55.26( 9) -147.36(10) 51.28(10) -85.16( 9) 9.09(10) 0.00( 0)
157 29.30 50.46( 9) -132.86(10) 8.61( 7) -61.62( 9) 8.11(10) 0.00( 0)
160 29.80 42.94( 9) -106.07(10) 6.84( 7) -98.61(11) 7.15(10) 0.00( 0)
163 30.30 34.59( 9) -66.99(10) 7.14( 8) -132.61(11) 6.27(10) 0.00( 0)
166 30.80 26.62( 9) -16.43(10) 8.96( 8) -147.08(11) 5.51(10) 0.00( 0)
169 31.30 25.58(11) 0.00( 0) 9.16( 8) -148.09(10) 4.89(10) 0.00( 0)
172 31.80 45.01(11) 0.00( 0) 8.40( 8) -135.50(10) 4.42(10) 0.00( 0)
175 32.30 59.33(11) 0.00( 0) 7.13( 8) -114.00(10) 4.08(10) 0.00( 0)
178 32.80 63.13(10) 0.00( 0) 5.72( 8) -86.75(10) 3.86(10) 0.00( 0)
181 33.30 59.49(10) 0.00( 0) 5.36( 9) -59.36(10) 3.72(10) 0.00( 0)

Max/Min 367.03 -259.73 397.96 -285.93 18.80 152.07

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

최대변위/최대굴착깊이 = 18.80mm/28.30m = 0.07%

Note : (전단력과 모멘트는 파일 간격이 고려되지 않았으므로


파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)
() 내는 최대치/최소치가 발생한 스텝 번호임
모든 절점에 대한 상세한 결과를 얻으려면 WALLOUT 명령어를 사용해야 함
최대 변위는 지표에서 흙막이 벽체 바닥까지의 변위중 최대치임

>> 공사단계별 흙막이 벽의 최대변위 및 허용변위와 비교 <<


(흙막이 벽의 허용변위 = 굴착깊이 x 0.20 % )
단계별 최대 변위는 지표에서 흙막이 벽체 바닥 사이의 최대 변위임
최대허용변위율 = 0.20 % 는 DISPLACEMENT 명령문에서 바꿀 수 있음
허용변위량 산정기준 : 최종굴착깊이
스텝 스텝명칭 굴착깊이 최대변위 허용변위 최대/허용 안전여부
번호 m mm mm %
1 굴착 1단계 2.1 10.6 56.6 18.7 O.K
2 1F 슬래브 설치 및 2단계 굴착 3.9 9.0 56.6 15.9 O.K
3 1단 가설지보재 설치 및 3단계 굴착 5.7 9.6 56.6 17.0 O.K
4 B1 슬래브 설치 및 4단계 굴착 9.0 12.2 56.6 21.6 O.K
5 B2 슬래브 설치 및 5단계 굴착 12.4 16.2 56.6 28.7 O.K
6 B3 슬래브 설치 및 6단계 굴착 15.8 18.8 56.6 33.2 O.K
7 B4 슬래브 설치 및 7단계 굴착 19.3 18.4 56.6 32.5 O.K
8 B5 슬래브 설치 및 8단계 굴착 22.7 18.1 56.6 32.0 O.K
9 B6 슬래브 설치 및 9단계 굴착 24.8 18.1 56.6 32.0 O.K
10 가설지보재 설치 및 10단계 굴착 28.3 18.1 56.6 32.0 O.K
11 슬래브, 벽체설치 및 가설지보재해체 28.3 18.1 56.6 32.0 O.K
12 벽체설치 및 가설지보재해체 28.3 18.1 56.6 32.0 O.K
13 벽체설치 28.3 18.1 56.6 32.0 O.K
6.3 OUTPUT DATA
S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:52
--------------------------------------------------------------------------------
Step No. 1 << 굴착 1단계 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 2.10
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -10.568 0.091 0.00 0.00


4 0.50 3.71 -9.773 0.091 -0.90 -0.14
7 1.10 8.44 -8.819 0.091 -4.56 -1.59
12 2.10 22.36 -7.239 0.090 -20.01 -12.63
13 2.30 18.21 -6.927 0.089 -24.07 -17.08
19 3.40 -2.02 -5.285 0.081 -32.99 -50.63
22 3.90 -11.26 -4.609 0.074 -29.67 -66.55
26 4.60 -24.23 -3.775 0.062 -17.25 -83.45
27 4.70 -26.08 -3.668 0.060 -14.73 -85.20
32 5.70 -20.21 -2.793 0.040 13.92 -85.00
36 6.40 -4.11 -2.381 0.028 23.74 -71.87
44 8.00 20.54 -1.914 0.008 6.00 -43.00
45 8.10 -14.38 -1.902 0.007 6.91 -42.37
50 9.00 -6.00 -1.862 -0.001 15.78 -31.29
62 11.40 4.53 -2.105 -0.007 16.01 11.73
67 12.40 9.59 -2.186 -0.002 9.15 24.77
71 13.10 14.97 -2.189 0.002 2.50 28.46
75 13.90 4.10 -2.127 0.007 -12.59 23.43
80 14.80 -0.86 -1.991 0.010 -12.01 11.11
85 15.80 -4.87 -1.799 0.011 -10.98 -1.69
89 16.60 -5.10 -1.648 0.010 -6.35 -8.65
97 18.20 -2.34 -1.423 0.006 -4.37 -14.97
98 18.30 -2.52 -1.413 0.005 1.26 -15.13
103 19.30 -5.18 -1.351 0.002 2.69 -14.28
107 20.00 -1.36 -1.342 0.000 7.42 -11.95
116 21.70 1.71 -1.401 -0.003 6.32 -4.00
121 22.70 1.50 -1.462 -0.004 2.00 -0.66
129 24.30 0.62 -1.568 -0.004 0.31 0.99
132 24.80 0.40 -1.600 -0.004 0.05 1.08
135 25.30 0.23 -1.632 -0.004 3.00 1.06
137 25.60 0.15 -1.650 -0.004 2.98 1.03
143 26.80 -0.04 -1.723 -0.003 -0.20 0.79
151 28.30 -0.07 -1.812 -0.003 -0.09 0.57
154 28.80 -0.07 -1.841 -0.003 3.44 0.53
157 29.30 -0.06 -1.871 -0.003 3.53 0.51
160 29.80 -0.05 -1.900 -0.003 3.61 0.51
163 30.30 -0.05 -1.929 -0.003 3.69 0.52
166 30.80 -0.05 -1.959 -0.003 3.77 0.54
169 31.30 -0.05 -1.988 -0.003 3.85 0.57
172 31.80 -0.05 -2.018 -0.003 3.94 0.62
175 32.30 -0.06 -2.047 -0.003 4.02 0.68
178 32.80 -0.05 -2.077 -0.003 4.10 0.75
181 33.30 -0.03 -2.106 -0.003 4.18 0.84
191 35.30 0.30 -2.22 -0.003 -8.43 1.12

노트 1) 최종횡력은 주동측 및 수동측 양측의 토압, 수압 기타 압력을 모두 고려한 합력이다


굴착측으로 작용할때 (+) 이다
2) 지보공의 반력은 배면측으로 밀때 (+) 이다
3) 압력, 전단력 및 모멘트는 벽체폭 1m 당이다
4) 지보공의 축력은 1개당의 값이며, 경사로 인하여 증가된 값이 포함 되어있다
5) 건물 벽체와 슬래브가 토압에 대하여 안전한지 별도의 검토가 필요하다
6) 본 리스트는 지정된 절점들에 대한 출력이며, 최대값은 본 리스트에 없는 절점에서
발생할 수 있다. 따라서 최대치는 xxx.tot 파일에 있는 값을 참조.

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 3.90
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.707 -0.010 0.00 0.00


4 0.50 3.71 -8.790 -0.010 -0.90 -0.14
7 1.10 8.44 -8.891 -0.010 70.41 -1.59 74.97(SL1)
12 2.10 22.36 -9.017 -0.002 54.96 62.36
13 2.30 24.56 -9.020 0.001 50.27 72.91
19 3.40 39.28 -8.796 0.024 15.14 110.46
22 3.90 45.92 -8.529 0.037 -6.16 112.88
26 4.60 32.95 -7.970 0.054 -33.77 98.13
27 4.70 31.10 -7.874 0.056 -36.97 94.74
32 5.70 12.53 -6.734 0.072 -58.79 45.21
36 6.40 -0.48 -5.819 0.076 -63.01 1.96
44 8.00 -19.27 -3.842 0.060 -42.02 -86.16
45 8.10 -67.89 -3.739 0.058 -35.21 -90.01
50 9.00 -35.36 -2.985 0.038 10.49 -98.45
62 11.40 6.61 -2.298 0.002 34.77 -24.19
67 12.40 14.68 -2.290 0.000 24.04 5.94
71 13.10 20.51 -2.280 0.002 13.69 18.75
75 13.90 8.48 -2.225 0.006 -5.75 20.86
80 14.80 2.90 -2.105 0.009 -8.72 13.00
85 15.80 -1.57 -1.925 0.011 -11.30 1.60
89 16.60 -4.91 -1.775 0.010 -8.72 -6.61
97 18.20 -3.15 -1.540 0.006 -5.19 -15.33
98 18.30 -3.27 -1.530 0.006 0.96 -15.54
103 19.30 -5.50 -1.462 0.002 2.70 -14.86
107 20.00 -1.49 -1.450 0.000 7.79 -12.50
116 21.70 1.77 -1.507 -0.003 6.69 -4.23
121 22.70 1.56 -1.568 -0.004 2.10 -0.71
129 24.30 0.65 -1.674 -0.004 0.33 1.04
132 24.80 0.42 -1.706 -0.004 0.06 1.13
135 25.30 0.24 -1.738 -0.004 3.20 1.12
137 25.60 0.16 -1.757 -0.004 3.18 1.08
143 26.80 -0.04 -1.830 -0.003 -0.21 0.83
151 28.30 -0.08 -1.919 -0.003 -0.10 0.60
154 28.80 -0.07 -1.948 -0.003 3.64 0.56
157 29.30 -0.06 -1.977 -0.003 3.73 0.54
160 29.80 -0.05 -2.007 -0.003 3.81 0.54
163 30.30 -0.05 -2.036 -0.003 3.89 0.55
166 30.80 -0.05 -2.066 -0.003 3.98 0.57
169 31.30 -0.05 -2.095 -0.003 4.06 0.60
172 31.80 -0.06 -2.125 -0.003 4.14 0.65
175 32.30 -0.06 -2.154 -0.003 4.23 0.71
178 32.80 -0.05 -2.183 -0.003 4.31 0.79
181 33.30 -0.03 -2.213 -0.003 4.39 0.88
191 35.30 0.32 -2.33 -0.003 -8.84 1.18

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 5.70
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.455 -0.021 0.00 0.00


4 0.50 3.71 -8.635 -0.021 -0.90 -0.14
7 1.10 8.44 -8.853 -0.021 30.95 -1.59 35.51(SL1)
12 2.10 22.36 -9.201 -0.018 15.50 22.90
13 2.30 24.56 -9.263 -0.017 10.81 25.55
19 3.40 39.28 -9.526 -0.011 113.40 19.71 0.00 413.17(ST1)
22 3.90 45.92 -9.600 -0.005 92.10 71.27
26 4.60 55.19 -9.579 0.010 56.71 123.51
27 4.70 56.51 -9.558 0.013 51.13 129.19
32 5.70 69.72 -9.048 0.046 -11.99 149.94
36 6.40 56.70 -8.345 0.068 -56.23 125.44
44 8.00 26.95 -6.011 0.090 -123.16 -24.82
45 8.10 -85.68 -5.855 0.089 -120.22 -37.20
50 9.00 -80.14 -4.564 0.073 -37.42 -108.30
62 11.40 -0.61 -2.766 0.018 43.52 -62.63
67 12.40 14.43 -2.552 0.008 36.16 -21.44
71 13.10 22.87 -2.464 0.007 25.15 -0.84
75 13.90 11.22 -2.366 0.008 3.11 9.92
80 14.80 6.23 -2.230 0.010 -2.53 8.82
85 15.80 1.81 -2.049 0.011 -8.60 1.80
89 16.60 -1.51 -1.899 0.010 -8.74 -5.34
97 18.20 -3.85 -1.656 0.006 -5.95 -15.59
98 18.30 -3.93 -1.645 0.006 0.71 -15.85
103 19.30 -5.79 -1.572 0.002 2.69 -15.34
107 20.00 -1.60 -1.558 0.000 8.12 -12.98
116 21.70 1.82 -1.612 -0.003 7.04 -4.43
121 22.70 1.62 -1.674 -0.004 2.19 -0.75
129 24.30 0.68 -1.780 -0.004 0.35 1.08
132 24.80 0.44 -1.813 -0.004 0.07 1.18
135 25.30 0.26 -1.844 -0.004 3.40 1.17
137 25.60 0.17 -1.863 -0.004 3.38 1.13
143 26.80 -0.04 -1.937 -0.003 -0.22 0.88
151 28.30 -0.08 -2.025 -0.003 -0.10 0.63
154 28.80 -0.07 -2.055 -0.003 3.84 0.59
157 29.30 -0.06 -2.084 -0.003 3.93 0.57
160 29.80 -0.06 -2.113 -0.003 4.01 0.57
163 30.30 -0.05 -2.143 -0.003 4.10 0.58
166 30.80 -0.05 -2.172 -0.003 4.18 0.60
169 31.30 -0.06 -2.202 -0.003 4.26 0.63
172 31.80 -0.06 -2.231 -0.003 4.35 0.68
175 32.30 -0.06 -2.261 -0.003 4.44 0.75
178 32.80 -0.05 -2.290 -0.003 4.52 0.83
181 33.30 -0.04 -2.319 -0.003 4.60 0.92
191 35.30 0.33 -2.43 -0.003 -9.24 1.23

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.


Input Data File = 3.B-B(L).dat Date : 2022-12-07
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 9.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.748 -0.003 0.00 0.00


4 0.50 3.71 -8.774 -0.003 -0.90 -0.14
7 1.10 8.44 -8.805 -0.003 -18.90 -1.59 -14.34(SL1)
12 2.10 22.36 -8.877 -0.006 -34.35 -26.96
13 2.30 24.56 -8.900 -0.007 -39.04 -34.28
19 3.40 39.28 -9.167 -0.023 -74.17 -95.15 0.00 209.65(ST1)
22 3.90 45.92 -9.414 -0.034 -25.58 -102.24
26 4.60 55.19 -9.936 -0.052 -60.97 -132.37
27 4.70 56.51 -10.030 -0.055 230.89 -138.74 297.45(SL2)
32 5.70 69.72 -11.130 -0.063 167.77 62.07
36 6.40 78.94 -11.804 -0.045 115.74 161.74
44 8.00 100.01 -12.013 0.034 -27.42 237.02
45 8.10 78.61 -11.949 0.040 -36.35 233.30
50 9.00 90.41 -10.976 0.082 -105.34 167.80
62 11.40 -52.33 -6.628 0.103 -66.27 -73.43
67 12.40 -52.20 -5.005 0.081 -4.48 -109.23
71 13.10 -16.69 -4.116 0.064 22.72 -103.00
75 13.90 -10.49 -3.342 0.047 21.74 -85.10
80 14.80 2.72 -2.727 0.032 27.18 -63.81
85 15.80 8.37 -2.281 0.020 18.42 -41.28
89 16.60 8.19 -2.048 0.014 11.58 -29.29
97 18.20 1.08 -1.793 0.005 0.47 -19.35
98 18.30 0.85 -1.784 0.005 7.17 -18.97
103 19.30 -2.84 -1.735 0.001 5.00 -14.29
107 20.00 0.17 -1.737 -0.001 9.13 -11.02
116 21.70 1.94 -1.813 -0.004 6.72 -2.91
121 22.70 1.43 -1.878 -0.004 1.56 0.16
129 24.30 0.48 -1.985 -0.004 0.08 1.27
132 24.80 0.28 -2.017 -0.004 -0.10 1.26
135 25.30 0.13 -2.048 -0.004 3.69 1.18
137 25.60 0.06 -2.067 -0.004 3.70 1.12
143 26.80 -0.08 -2.139 -0.003 -0.20 0.84
151 28.30 -0.08 -2.227 -0.003 -0.07 0.64
154 28.80 -0.06 -2.257 -0.003 4.25 0.62
157 29.30 -0.05 -2.286 -0.003 4.33 0.61
160 29.80 -0.05 -2.315 -0.003 4.42 0.61
163 30.30 -0.05 -2.345 -0.003 4.49 0.63
166 30.80 -0.05 -2.374 -0.003 4.57 0.65
169 31.30 -0.05 -2.404 -0.003 4.66 0.69
172 31.80 -0.06 -2.433 -0.003 4.74 0.75
175 32.30 -0.06 -2.463 -0.003 4.83 0.82
178 32.80 -0.06 -2.492 -0.003 4.92 0.90
181 33.30 -0.04 -2.521 -0.003 5.00 1.00
191 35.30 0.36 -2.63 -0.003 -10.01 1.33

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 12.40
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.700 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.820 -0.006 -4.56 -1.59 1.31(SL1)
12 2.10 22.36 -8.938 -0.008 -18.70 -11.32
13 2.30 24.56 -8.965 -0.008 -23.39 -15.51
19 3.40 39.28 -9.186 -0.017 -58.52 -59.17 0.00 220.74(ST1)
22 3.90 45.92 -9.360 -0.023 -6.24 -56.59
26 4.60 55.19 -9.702 -0.033 -41.63 -73.18
27 4.70 56.51 -9.762 -0.035 81.05 -77.62 128.27(SL2)
32 5.70 69.72 -10.481 -0.046 17.93 -26.66
36 6.40 78.94 -11.064 -0.050 -34.10 -32.27
44 8.00 100.01 -12.803 -0.085 320.55 -196.84 497.81(SL3)
45 8.10 78.61 -12.955 -0.089 311.62 -165.27
50 9.00 90.41 -14.473 -0.096 235.56 82.24
62 11.40 121.88 -15.946 0.051 -19.18 357.22
67 12.40 135.00 -14.382 0.125 -140.55 275.18
71 13.10 43.34 -12.621 0.160 -178.25 162.40
75 13.90 -55.42 -10.242 0.176 -195.84 8.57
80 14.80 -110.06 -7.551 0.162 -121.38 -138.48
85 15.80 -80.44 -5.065 0.121 -11.42 -201.40
89 16.60 -35.00 -3.632 0.085 33.55 -189.82
97 18.20 4.68 -2.112 0.029 47.98 -114.78
98 18.30 5.37 -2.064 0.026 51.44 -109.80
103 19.30 9.71 -1.794 0.007 42.55 -63.06
107 20.00 14.95 -1.766 -0.001 36.88 -36.93
116 21.70 10.29 -1.927 -0.007 13.93 -1.01
121 22.70 5.40 -2.050 -0.007 2.49 5.72
129 24.30 0.66 -2.206 -0.005 -1.79 5.24
132 24.80 -0.02 -2.244 -0.004 -1.94 4.29
135 25.30 -0.41 -2.279 -0.004 2.51 3.35
137 25.60 -0.55 -2.298 -0.004 2.69 2.82
143 26.80 -0.63 -2.370 -0.003 -0.91 1.26
151 28.30 -0.32 -2.454 -0.003 -0.19 0.49
154 28.80 -0.22 -2.482 -0.003 4.66 0.51
157 29.30 -0.14 -2.511 -0.003 4.80 0.52
160 29.80 -0.09 -2.539 -0.003 4.91 0.50
163 30.30 -0.06 -2.568 -0.003 5.00 0.52
166 30.80 -0.04 -2.598 -0.003 5.08 0.59
169 31.30 -0.03 -2.627 -0.003 5.15 0.67
172 31.80 -0.04 -2.657 -0.003 5.23 0.76
175 32.30 -0.04 -2.686 -0.003 5.30 0.86
178 32.80 -0.04 -2.715 -0.003 5.38 0.96
181 33.30 -0.02 -2.745 -0.003 5.45 1.08
191 35.30 0.38 -2.86 -0.003 -10.86 1.45

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 15.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.702 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.85 -1.59 -0.29(SL1)
12 2.10 22.36 -8.935 -0.008 -20.30 -12.91
13 2.30 24.56 -8.962 -0.008 -24.99 -17.42
19 3.40 39.28 -9.191 -0.017 -60.12 -62.84 0.00 223.67(ST1)
22 3.90 45.92 -9.375 -0.024 -6.86 -60.57
26 4.60 55.19 -9.735 -0.035 -42.25 -77.59
27 4.70 56.51 -9.798 -0.037 103.52 -82.09 151.36(SL2)
32 5.70 69.72 -10.547 -0.046 40.40 -8.67
36 6.40 78.94 -11.113 -0.046 -11.63 1.86
44 8.00 100.01 -12.519 -0.062 163.67 -127.16 318.46(SL3)
45 8.10 78.61 -12.630 -0.065 154.74 -111.28
50 9.00 90.41 -13.762 -0.076 78.68 -4.98
62 11.40 121.88 -16.808 -0.079 367.03 -106.52 543.09(SL4)
67 12.40 135.00 -18.172 -0.066 238.59 197.48
71 13.10 144.19 -18.741 -0.023 140.88 330.73
75 13.90 141.09 -18.611 0.044 22.68 396.27
80 14.80 135.88 -17.290 0.123 -101.95 360.18
85 15.80 130.08 -14.521 0.188 -222.87 191.54
89 16.60 -39.12 -11.730 0.207 -210.99 14.79
97 18.20 -136.23 -6.394 0.160 -70.72 -231.94
98 18.30 -130.63 -6.118 0.155 -51.56 -237.84
103 19.30 -57.59 -3.899 0.099 33.74 -242.42
107 20.00 -28.13 -2.916 0.063 65.61 -207.65
116 21.70 22.12 -2.009 0.006 69.41 -85.16
121 22.70 25.16 -2.027 -0.006 40.61 -30.93
129 24.30 12.86 -2.283 -0.010 9.39 6.27
132 24.80 8.95 -2.364 -0.009 3.96 9.51
135 25.30 5.69 -2.436 -0.008 4.95 10.49
137 25.60 4.08 -2.475 -0.007 3.56 10.35
143 26.80 0.09 -2.598 -0.005 -3.29 7.19
151 28.30 -1.12 -2.702 -0.003 -2.17 2.86
154 28.80 -1.07 -2.731 -0.003 3.57 1.92
157 29.30 -0.94 -2.759 -0.003 4.13 1.24
160 29.80 -0.76 -2.786 -0.003 4.61 0.80
163 30.30 -0.59 -2.813 -0.003 4.99 0.55
166 30.80 -0.43 -2.840 -0.003 5.30 0.64
169 31.30 -0.31 -2.868 -0.003 5.54 0.65
172 31.80 -0.21 -2.896 -0.003 5.72 0.58
175 32.30 -0.14 -2.925 -0.003 5.86 0.66
178 32.80 -0.07 -2.953 -0.003 5.97 0.83
181 33.30 -0.02 -2.982 -0.003 6.04 1.02
191 35.30 0.51 -3.09 -0.003 -11.75 1.57

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 19.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)
1 0.00 0.00 -8.702 -0.006 0.00 0.00
4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.82 -1.59 -0.26(SL1)
12 2.10 22.36 -8.935 -0.008 -20.27 -12.88
13 2.30 24.56 -8.962 -0.008 -24.96 -17.38
19 3.40 39.28 -9.190 -0.017 -60.09 -62.77 0.00 222.99(ST1)
22 3.90 45.92 -9.373 -0.024 -7.06 -60.60
26 4.60 55.19 -9.733 -0.035 -42.45 -77.75
27 4.70 56.51 -9.796 -0.037 102.00 -82.28 150.03(SL2)
32 5.70 69.72 -10.546 -0.046 38.88 -10.37
36 6.40 78.94 -11.116 -0.047 -13.15 -1.32
44 8.00 100.01 -12.555 -0.064 185.19 -132.37 341.51(SL3)
45 8.10 78.61 -12.670 -0.067 176.26 -114.34
50 9.00 90.41 -13.830 -0.076 100.21 11.35
62 11.40 121.88 -16.523 -0.056 209.25 -38.55 363.79(SL4)
67 12.40 135.00 -17.469 -0.046 80.81 107.68
71 13.10 144.19 -17.919 -0.027 -16.90 130.49
75 13.90 141.09 -18.143 -0.007 -135.09 69.80
80 14.80 135.88 -18.226 -0.009 329.58 -108.96 589.31(SL5)
85 15.80 130.08 -18.411 -0.002 196.60 154.29
89 16.60 125.45 -18.185 0.038 94.39 270.41
97 18.20 116.20 -15.640 0.144 -98.93 264.74
98 18.30 115.62 -15.383 0.150 -110.52 254.26
103 19.30 109.84 -12.355 0.191 -211.18 87.18
107 20.00 -53.29 -9.988 0.193 -188.74 -55.16
116 21.70 -110.43 -5.084 0.125 -13.77 -251.15
121 22.70 -51.71 -3.403 0.069 60.89 -224.30
129 24.30 22.28 -2.412 0.010 73.74 -99.46
132 24.80 27.53 -2.373 0.000 61.07 -65.62
135 25.30 27.73 -2.399 -0.006 51.67 -39.61
137 25.60 26.30 -2.436 -0.008 43.62 -26.72
143 26.80 15.89 -2.643 -0.010 13.33 4.39
151 28.30 4.48 -2.882 -0.007 -1.18 11.28
154 28.80 2.17 -2.942 -0.006 2.77 10.22
157 29.30 0.57 -2.992 -0.005 2.21 8.61
160 29.80 -0.45 -3.035 -0.005 2.28 6.84
163 30.30 -1.03 -3.072 -0.004 2.73 5.18
166 30.80 -1.27 -3.105 -0.004 3.38 3.77
169 31.30 -1.30 -3.134 -0.003 4.08 2.67
172 31.80 -1.19 -3.163 -0.003 4.76 1.90
175 32.30 -1.01 -3.190 -0.003 5.37 1.42
178 32.80 -0.79 -3.216 -0.003 5.87 1.20
181 33.30 -0.54 -3.242 -0.003 6.25 1.17
191 35.30 0.76 -3.34 -0.003 -12.70 1.70

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 22.70
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.702 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.81 -1.59 -0.25(SL1)
12 2.10 22.36 -8.935 -0.008 -20.26 -12.87
13 2.30 24.56 -8.962 -0.008 -24.95 -17.37
19 3.40 39.28 -9.190 -0.017 -60.08 -62.74 0.00 223.07(ST1)
22 3.90 45.92 -9.373 -0.024 -7.02 -60.55
26 4.60 55.19 -9.733 -0.035 -42.41 -77.68
27 4.70 56.51 -9.796 -0.037 102.01 -82.20 150.00(SL2)
32 5.70 69.72 -10.545 -0.046 38.89 -10.29
36 6.40 78.94 -11.115 -0.047 -13.14 -1.22
44 8.00 100.01 -12.552 -0.064 183.38 -132.26 339.68(SL3)
45 8.10 78.61 -12.667 -0.067 174.45 -114.40
50 9.00 90.41 -13.826 -0.077 98.39 9.65
62 11.40 121.88 -16.560 -0.059 230.39 -44.61 386.74(SL4)
67 12.40 135.00 -17.542 -0.048 101.95 122.76
71 13.10 144.19 -17.987 -0.024 4.24 160.36
75 13.90 141.09 -18.132 0.002 -113.96 116.58
80 14.80 135.88 -17.983 0.011 -238.59 -43.16 436.53(SL5)
85 15.80 130.08 -17.761 0.019 64.96 88.45
89 16.60 125.45 -17.372 0.037 -37.26 99.25
97 18.20 116.20 -16.070 0.043 -230.57 -117.63
98 18.30 115.62 -15.998 0.040 274.22 -141.27 516.38(SL6)
103 19.30 109.84 -15.418 0.035 161.49 76.64
107 20.00 105.79 -14.888 0.054 86.02 163.08
116 21.70 95.97 -12.209 0.126 -85.47 161.12
121 22.70 96.31 -9.763 0.149 -168.16 28.64
129 24.30 -102.99 -5.863 0.118 -66.29 -176.52
132 24.80 -90.49 -4.929 0.096 -14.71 -196.43
135 25.30 -62.21 -4.189 0.074 27.18 -194.04
137 25.60 -48.76 -3.836 0.061 43.45 -184.42
143 26.80 5.22 -3.030 0.019 64.97 -113.79
151 28.30 21.99 -2.897 -0.005 38.73 -32.91
154 28.80 20.06 -2.952 -0.008 33.76 -17.46
157 29.30 16.80 -3.025 -0.009 24.65 -5.79
160 29.80 13.10 -3.103 -0.009 17.32 2.93
163 30.30 9.53 -3.179 -0.008 11.82 7.14
166 30.80 6.40 -3.250 -0.008 7.99 8.96
169 31.30 3.86 -3.313 -0.007 5.57 9.16
172 31.80 1.94 -3.367 -0.006 4.24 8.40
175 32.30 0.56 -3.415 -0.005 3.73 7.13
178 32.80 -0.35 -3.456 -0.004 3.77 5.72
181 33.30 -0.91 -3.493 -0.004 4.16 4.39
191 35.30 -1.23 -3.62 -0.003 -13.74 1.82

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 24.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.702 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.81 -1.59 -0.25(SL1)
12 2.10 22.36 -8.935 -0.008 -20.26 -12.87
13 2.30 24.56 -8.962 -0.008 -24.95 -17.37
19 3.40 39.28 -9.190 -0.017 -60.08 -62.74 0.00 223.07(ST1)
22 3.90 45.92 -9.373 -0.024 -7.02 -60.56
26 4.60 55.19 -9.733 -0.035 -42.41 -77.69
27 4.70 56.51 -9.796 -0.037 102.01 -82.21 150.01(SL2)
32 5.70 69.72 -10.545 -0.046 38.90 -10.29
36 6.40 78.94 -11.115 -0.047 -13.13 -1.22
44 8.00 100.01 -12.553 -0.064 183.45 -132.24 339.75(SL3)
45 8.10 78.61 -12.667 -0.067 174.52 -114.38
50 9.00 90.41 -13.826 -0.077 98.46 9.74
62 11.40 121.88 -16.558 -0.059 229.06 -44.33 385.33(SL4)
67 12.40 135.00 -17.538 -0.048 100.62 121.70
71 13.10 144.19 -17.984 -0.025 2.90 158.37
75 13.90 141.09 -18.136 0.001 -115.29 113.52
80 14.80 135.88 -18.003 0.010 -239.92 -47.42 448.80(SL5)
85 15.80 130.08 -17.807 0.018 75.90 95.13
89 16.60 125.45 -17.421 0.038 -26.31 114.68
97 18.20 116.20 -15.988 0.053 -219.63 -84.70
98 18.30 115.62 -15.898 0.050 -231.22 -107.24 432.64(SL6)
103 19.30 109.84 -15.117 0.045 88.69 37.87
107 20.00 105.79 -14.521 0.054 13.22 73.35
116 21.70 95.97 -12.603 0.067 172.44 -52.86 330.71(SL7)
121 22.70 96.31 -11.438 0.071 77.68 72.73
129 24.30 105.50 -8.982 0.105 -83.76 69.89
132 24.80 108.38 -8.043 0.110 -125.17 15.04
135 25.30 -36.85 -7.089 0.108 -112.89 -45.50
137 25.60 -51.59 -6.534 0.104 -99.62 -77.58
143 26.80 -68.85 -4.677 0.071 -11.20 -147.19
151 28.30 -9.66 -3.466 0.024 48.04 -108.53
154 28.80 4.85 -3.304 0.013 55.26 -85.16
157 29.30 12.97 -3.227 0.005 50.46 -61.62
160 29.80 16.44 -3.211 -0.001 42.94 -41.24
163 30.30 16.80 -3.235 -0.005 34.59 -24.92
166 30.80 15.27 -3.285 -0.007 26.62 -12.76
169 31.30 12.78 -3.347 -0.008 19.70 -4.41
172 31.80 9.96 -3.414 -0.008 14.14 2.11
175 32.30 7.21 -3.479 -0.007 9.98 4.79
178 32.80 4.72 -3.542 -0.007 7.13 5.67
181 33.30 2.57 -3.599 -0.006 5.43 5.36
191 35.30 -3.51 -3.80 -0.005 -14.43 1.90

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 28.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.702 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.81 -1.59 -0.25(SL1)
12 2.10 22.36 -8.935 -0.008 -20.26 -12.87
13 2.30 24.56 -8.962 -0.008 -24.95 -17.37
19 3.40 39.28 -9.190 -0.017 -60.08 -62.75 0.00 223.06(ST1)
22 3.90 45.92 -9.373 -0.024 -7.02 -60.56
26 4.60 55.19 -9.733 -0.035 -42.41 -77.69
27 4.70 56.51 -9.796 -0.037 102.02 -82.21 150.02(SL2)
32 5.70 69.72 -10.545 -0.046 38.90 -10.29
36 6.40 78.94 -11.115 -0.047 -13.13 -1.22
44 8.00 100.01 -12.553 -0.064 183.51 -132.24 339.81(SL3)
45 8.10 78.61 -12.667 -0.067 174.58 -114.38
50 9.00 90.41 -13.826 -0.077 98.53 9.80
62 11.40 121.88 -16.556 -0.058 228.25 -44.13 384.46(SL4)
67 12.40 135.00 -17.536 -0.047 99.81 121.10
71 13.10 144.19 -17.982 -0.025 2.09 157.20
75 13.90 141.09 -18.137 0.001 -116.10 111.70
80 14.80 135.88 -18.013 0.009 -240.73 -49.97 455.26(SL5)
85 15.80 130.08 -17.832 0.017 81.54 98.23
89 16.60 125.45 -17.452 0.038 -20.67 122.30
97 18.20 116.20 -15.959 0.057 -213.99 -68.05
98 18.30 115.62 -15.861 0.055 -225.58 -90.03 401.16(SL6)
103 19.30 109.84 -14.975 0.051 62.86 29.25
107 20.00 105.79 -14.320 0.057 -12.61 46.64
116 21.70 95.97 -12.545 0.052 -184.10 -123.47 282.13(SL7)
121 22.70 96.31 -11.842 0.031 3.27 -72.30
129 24.30 105.50 -11.443 -0.010 306.37 -194.19 0.00 1393.62(ST2)
132 24.80 108.38 -11.602 -0.024 252.90 -54.30
135 25.30 111.25 -11.817 -0.023 197.99 58.51
137 25.60 112.98 -11.925 -0.018 164.36 112.89
143 26.80 119.88 -11.824 0.032 24.65 227.17
151 28.30 128.51 -10.012 0.100 -149.58 126.42
154 28.80 -16.71 -9.087 0.110 -147.36 51.28
157 29.30 -41.29 -8.110 0.112 -132.86 -19.57
160 29.80 -65.87 -7.152 0.106 -106.07 -79.98
163 30.30 -90.44 -6.272 0.095 -66.99 -123.44
166 30.80 -80.31 -5.512 0.079 -16.43 -146.40
169 31.30 -56.73 -4.895 0.062 17.05 -148.09
172 31.80 -38.68 -4.423 0.046 40.26 -135.50
175 32.30 -19.56 -4.085 0.032 58.91 -114.00
178 32.80 -0.12 -3.859 0.020 63.13 -86.75
181 33.30 12.81 -3.718 0.012 59.49 -59.36
191 35.30 35.97 -3.53 0.003 -13.42 2.03

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>

Caspe(1966) 방법에 따른 지표면 침하 계산


(FOUNDATION ANALYSIS AND DESIGN 5th ed., Bowles, p804)

굴착깊이 (HW) = 28.30 m


평균 내부마찰각 = 28.47 Deg (흙막이 벽 하단까지)
굴착폭 (B) = 50.00 m
Hp = (0.5 B tan(45+PHI/2) = 42.00 m
Ht = (Hw+Hp) = 70.30 m
영향거리 D=Ht*tan(45-PHI/2)) = 41.85 m
영향거리/굴착깊이(D/Hw) 의 최대비율 = 10.00
Settlement at x from the wall, Sx = Sw x (1 - x/D) ^2
수정된 영향거리 = 41.85 m

횡방향 변위의 체적 (Vs) = 0.41229 m3


벽체에서의 침하 (Sw) = 2 Vs/D = 0.01971 m = -19.71 mm
벽체에서 x만큼 떨어진 지점의 침하Sx = Sw x (1 - x/D) ^2, (^2는 제곱임)

벽체에서의 거리 0.0*D 0.1*D 0.2*D 0.3*D 0.5*D 1.0*D


( m ) 0.0 4.2 8.4 12.6 20.9 41.8

침하 (mm) -19.71 -15.96 -12.61 -9.66 -4.93 0.00


(- 값은 침하이며 + 값은 융기를 나타냄)
For X1 = 1.0 m S1 = -18.77 mm
For X2 = 6.0 m S2 = -14.46 mm
Slope = 1000 x (6.0 - 1.0) / (18.77 - 14.46) = 1/1,159

Note. 결과는 Caspe가 제안한 방법에 의한 개략치임

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>

근입장 체크 (WALL DEPTH CHECK)


최하단 지보공의 깊이 = 24.30, 절점번호 = 129

Node Depth 주동 기타 합계 주동 수동 기타 수동 안전율


No. GL 토압 횡력 횡력 모멘트 토압 횡력 모멘트
(kN/m2) (kN/m2) (kNm) (kN/m2) (kN/m2) (kNm)
129 24.30 138.07 35.69 173.77 0.00
130 24.50 140.49 33.91 174.40 5.23
131 24.60 141.69 33.02 174.71 7.86
132 24.80 144.11 31.23 175.34 17.53
133 25.00 146.52 29.45 175.97 24.64
134 25.20 148.94 27.66 176.60 23.84
135 25.30 150.15 26.77 176.92 26.54
136 25.50 152.56 24.99 177.55 31.96
137 25.60 153.77 24.09 177.86 34.68
138 25.80 156.19 22.31 178.50 53.55
139 26.00 158.60 20.52 179.13 60.90
140 26.20 161.02 18.74 179.76 68.31
141 26.40 163.43 16.95 180.39 75.76
142 26.60 165.85 15.17 181.02 83.27
143 26.80 168.27 13.39 181.65 90.83
144 27.00 170.68 11.60 182.28 98.43
145 27.20 173.10 9.82 182.91 106.09
146 27.40 175.51 8.03 183.54 113.80
147 27.60 177.93 6.25 184.18 121.56
148 27.80 180.35 4.46 184.81 129.37
149 28.00 182.76 2.68 185.44 102.92
150 28.10 183.97 1.78 185.75 105.88
151 28.30 186.39 0.00 186.39 149.11 -120.65 0.00 -96.52 0.06
152 28.50 187.02 0.00 187.02 157.10 -131.63 0.00 -110.57 0.12
153 28.70 187.65 0.00 187.65 123.85 -142.61 0.00 -94.12 0.17
154 28.80 187.96 0.00 187.96 126.88 -148.10 0.00 -99.97 0.21
155 29.00 188.60 0.00 188.60 177.28 -159.08 0.00 -149.54 0.26
156 29.20 189.23 0.00 189.23 139.08 -170.06 0.00 -124.99 0.30
157 29.30 189.54 0.00 189.54 142.16 -175.55 0.00 -131.66 0.34
158 29.50 190.18 0.00 190.18 197.78 -186.53 0.00 -194.00 0.39
159 29.70 190.81 0.00 190.81 154.55 -197.51 0.00 -159.99 0.42
160 29.80 191.12 0.00 191.12 157.68 -203.01 0.00 -167.48 0.46
161 30.00 191.76 0.00 191.76 218.60 -213.99 0.00 -243.95 0.50
162 30.20 192.39 0.00 192.39 170.26 -224.97 0.00 -199.10 0.54
163 30.30 192.70 0.00 192.70 173.43 -230.46 0.00 -207.41 0.57
164 30.50 193.33 0.00 193.33 239.74 -241.44 0.00 -299.39 0.61
165 30.70 193.97 0.00 193.97 186.21 -252.42 0.00 -242.32 0.65
166 30.80 194.28 0.00 194.28 189.42 -257.91 0.00 -251.46 0.68
167 31.00 194.91 0.00 194.91 261.19 -268.89 0.00 -360.32 0.72
168 31.20 195.55 0.00 195.55 202.39 -279.87 0.00 -289.67 0.75
169 31.30 195.86 0.00 195.86 205.66 -285.36 0.00 -299.63 0.78
170 31.50 196.49 0.00 196.49 282.95 -296.35 0.00 -426.74 0.82
171 31.70 197.13 0.00 197.13 218.81 -307.33 0.00 -341.13 0.85
172 31.80 197.44 0.00 197.44 222.12 -312.82 0.00 -351.92 0.88
173 32.00 198.07 0.00 198.07 305.04 -323.80 0.00 -498.65 0.92
174 32.20 198.71 0.00 198.71 235.47 -334.78 0.00 -396.71 0.95
175 32.30 199.02 0.00 199.02 238.83 -340.27 0.00 -408.32 0.98
176 32.50 199.66 0.00 199.66 327.44 -351.25 0.00 -576.06 1.02
177 32.70 200.29 0.00 200.29 252.36 -362.23 0.00 -456.41 1.05
178 32.80 200.60 0.00 200.60 255.77 -367.72 0.00 -468.85 1.08
179 33.00 201.24 0.00 201.24 350.15 -378.71 0.00 -658.95 1.12
180 33.20 201.87 0.00 201.87 269.49 -389.69 0.00 -520.23 1.14
181 33.30 202.18 0.00 202.18 272.95 -395.18 0.00 -533.49 1.17
182 33.50 202.82 0.00 202.82 373.18 -406.16 0.00 -747.34 1.21
183 33.70 203.45 0.00 203.45 382.49 -417.14 0.00 -784.23 1.25
184 33.90 204.08 0.00 204.08 391.83 -428.12 0.00 -821.99 1.28
185 34.10 204.71 0.00 204.71 401.24 -439.10 0.00 -860.64 1.32
186 34.30 205.35 0.00 205.35 410.69 -450.08 0.00 -900.17 1.35
187 34.50 205.98 0.00 205.98 420.20 -461.07 0.00 -940.58 1.39
188 34.70 206.61 0.00 206.61 429.75 -472.05 0.00 -981.86 1.43
189 34.90 207.24 0.00 207.24 439.35 -483.03 0.00 -1024.02 1.46
190 35.10 207.88 0.00 207.88 449.01 -494.01 0.00 -1067.06 1.50
191 35.30 208.51 0.00 208.51 229.36 -504.99 0.00 -555.49 1.51

11616.53 418.52 11913.78-12605.92 0.00-18042.92

합계 주동 모멘트 (Ma) = 11913.78


합계 수동 모멘트 (Mp) = -18042.92
안전율 (Mp/Ma) = 1.51

최소 안전율 = 1.2 이상이어야 함

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 11 << 슬래브, 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 28.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.702 -0.006 0.00 0.00


4 0.50 3.71 -8.755 -0.006 -0.90 -0.14
7 1.10 8.44 -8.819 -0.006 -4.68 -1.59 -0.25(SL1)
12 2.10 22.36 -8.935 -0.008 -20.26 -12.88
13 2.30 24.56 -8.962 -0.008 -24.95 -17.37
19 3.40 39.28 -9.190 -0.017 -60.08 -62.75 0.00 223.06(ST1)
22 3.90 45.92 -9.373 -0.024 -7.03 -60.56
26 4.60 55.19 -9.733 -0.035 -42.42 -77.70
27 4.70 56.51 -9.796 -0.037 27.01 -82.21 150.02(SL2)
32 5.70 69.72 -10.546 -0.046 38.90 -10.29
36 6.40 78.94 -11.115 -0.047 -13.13 -1.22
44 8.00 100.01 -12.553 -0.064 13.64 -132.23 339.86(SL3)
45 8.10 78.61 -12.667 -0.067 174.64 -114.36
50 9.00 90.41 -13.826 -0.076 98.58 9.87
62 11.40 121.88 -16.555 -0.058 35.54 -43.92 383.39(SL4)
67 12.40 135.00 -17.533 -0.047 98.80 120.29
71 13.10 144.19 -17.980 -0.025 1.08 155.68
75 13.90 141.09 -18.139 0.001 -117.11 109.38
80 14.80 135.88 -18.028 0.008 -9.46 -53.20 464.58(SL5)
85 15.80 130.08 -17.867 0.016 89.85 103.30
89 16.60 125.45 -17.490 0.039 -12.36 134.02
97 18.20 116.20 -15.897 0.065 -205.68 -43.04
98 18.30 115.62 -15.785 0.063 -48.53 -64.19 337.47(SL6)
103 19.30 109.84 -14.747 0.058 7.48 -0.29
107 20.00 105.79 -14.042 0.057 -67.99 -22.19
116 21.70 95.97 -12.846 0.007 28.09 -285.93 535.14(SL7)
121 22.70 96.31 -13.117 -0.028 200.90 -37.13
129 24.30 105.50 -13.661 0.001 39.46 157.19
132 24.80 108.38 -13.572 0.019 -14.01 163.63
135 25.30 111.25 -13.324 0.037 -57.61 142.98
137 25.60 112.98 -13.105 0.046 -51.73 126.01
143 26.80 119.88 -11.842 0.071 24.37 53.94 233.40(SL8)
151 28.30 128.51 -9.549 0.106 -121.38 79.40
154 28.80 -16.71 -8.599 0.111 -128.44 13.72
157 29.30 -41.29 -7.636 0.109 -113.93 -47.66
160 29.80 -65.87 -6.719 0.100 -87.15 -98.61
163 30.30 -90.44 -5.898 0.087 -48.07 -132.61
166 30.80 -68.71 -5.207 0.071 -2.82 -147.08
169 31.30 -47.78 -4.659 0.054 25.58 -143.18
172 31.80 -32.20 -4.253 0.039 45.01 -127.23
175 32.30 -10.92 -3.971 0.026 59.33 -104.28
178 32.80 4.89 -3.793 0.016 60.25 -77.66
181 33.30 14.88 -3.691 0.008 54.94 -52.15
191 35.30 29.94 -3.61 0.000 -13.72 2.03

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 12 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 28.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.537 -0.016 0.00 0.00


4 0.50 3.71 -8.674 -0.016 -0.90 -0.14
7 1.10 8.44 -8.839 -0.016 5.77 -1.59 20.66(SL1)
12 2.10 22.36 -9.109 -0.015 0.65 8.05
13 2.30 24.56 -9.160 -0.014 -4.04 7.73
19 3.40 39.28 -9.430 -0.015 -39.17 -14.66
22 3.90 45.92 -9.567 -0.018 -60.47 -39.20
26 4.60 55.19 -9.835 -0.028 -95.35 -93.74
27 4.70 56.51 -9.886 -0.030 2.82 -103.50 206.50(SL2)
32 5.70 69.72 -10.554 -0.044 47.52 -25.19
36 6.40 78.94 -11.104 -0.046 -4.96 -10.04
44 8.00 100.01 -12.546 -0.065 16.09 -131.12 335.48(SL3)
45 8.10 78.61 -12.661 -0.067 174.83 -113.22
50 9.00 90.41 -13.825 -0.077 98.15 10.82
62 11.40 121.88 -16.555 -0.058 35.38 -43.96 383.67(SL4)
67 12.40 135.00 -17.533 -0.047 98.81 120.24
71 13.10 144.19 -17.980 -0.025 1.11 155.65
75 13.90 141.09 -18.139 0.001 -117.09 109.37
80 14.80 135.88 -18.028 0.008 -9.45 -53.19 464.55(SL5)
85 15.80 130.08 -17.867 0.016 89.83 103.30
89 16.60 125.45 -17.489 0.039 -12.40 133.99
97 18.20 116.20 -15.897 0.065 -205.74 -43.16
98 18.30 115.62 -15.785 0.063 -48.51 -64.31 337.63(SL6)
103 19.30 109.84 -14.748 0.058 7.65 -0.29
107 20.00 105.79 -14.043 0.057 -67.65 -22.02
116 21.70 95.97 -12.846 0.007 28.70 -284.81 534.96(SL7)
121 22.70 96.31 -13.111 -0.028 200.88 -35.64
129 24.30 105.50 -13.636 0.002 34.54 155.60
132 24.80 108.38 -13.542 0.020 -21.76 158.90
135 25.30 111.25 -13.293 0.037 -57.32 133.60
137 25.60 112.98 -13.078 0.045 -41.23 119.92
143 26.80 119.88 -11.841 0.070 26.79 58.61 222.37(SL8)
151 28.30 128.51 -9.561 0.105 -122.15 80.69
154 28.80 -16.71 -8.613 0.111 -128.95 14.75
157 29.30 -41.29 -7.649 0.109 -114.45 -46.89
160 29.80 -65.87 -6.731 0.101 -87.66 -98.09
163 30.30 -90.44 -5.908 0.087 -48.59 -132.35
166 30.80 -69.03 -5.215 0.071 -3.20 -147.06
169 31.30 -48.03 -4.666 0.055 25.34 -143.31
172 31.80 -32.37 -4.257 0.039 44.87 -127.46
175 32.30 -11.15 -3.974 0.026 59.32 -104.54
178 32.80 4.76 -3.794 0.016 60.33 -77.90
181 33.30 14.82 -3.691 0.008 55.07 -52.35
191 35.30 30.10 -3.61 0.000 -13.71 2.03

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 3.B-B(L).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(BH-2) Time : 16:20:53
--------------------------------------------------------------------------------
Step No. 13 << 벽체설치 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 28.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 0.00 -8.537 -0.016 0.00 0.00


4 0.50 3.71 -8.674 -0.016 -0.89 -0.14
7 1.10 8.44 -8.839 -0.016 5.79 -1.58 20.67(SL1)
12 2.10 22.36 -9.109 -0.015 0.66 8.08
13 2.30 24.56 -9.160 -0.014 -4.04 7.76
19 3.40 39.28 -9.429 -0.015 -39.26 -14.66
22 3.90 45.92 -9.567 -0.017 -60.63 -39.26
26 4.60 55.19 -9.835 -0.028 -95.12 -93.96
27 4.70 56.51 -9.885 -0.030 3.28 -103.64 205.95(SL2)
32 5.70 69.72 -10.554 -0.044 47.61 -25.19
36 6.40 78.94 -11.104 -0.046 -4.94 -10.00
44 8.00 100.01 -12.546 -0.065 16.07 -131.09 335.48(SL3)
45 8.10 78.61 -12.661 -0.067 174.81 -113.19
50 9.00 90.41 -13.825 -0.077 98.13 10.84
62 11.40 121.88 -16.555 -0.058 35.38 -43.97 383.67(SL4)
67 12.40 135.00 -17.533 -0.047 98.81 120.24
71 13.10 144.19 -17.980 -0.025 1.11 155.65
75 13.90 141.09 -18.139 0.001 -117.09 109.37
80 14.80 135.88 -18.028 0.008 -9.45 -53.19 464.55(SL5)
85 15.80 130.08 -17.867 0.016 89.83 103.30
89 16.60 125.45 -17.489 0.039 -12.40 133.99
97 18.20 116.20 -15.897 0.065 -205.74 -43.16
98 18.30 115.62 -15.785 0.063 -48.51 -64.31 337.63(SL6)
103 19.30 109.84 -14.748 0.058 7.65 -0.29
107 20.00 105.79 -14.043 0.057 -67.65 -22.02
116 21.70 95.97 -12.846 0.007 28.70 -284.81 534.96(SL7)
121 22.70 96.31 -13.111 -0.028 200.88 -35.64
129 24.30 105.50 -13.636 0.002 34.54 155.60
132 24.80 108.38 -13.542 0.020 -21.76 158.90
135 25.30 111.25 -13.293 0.037 -57.32 133.60
137 25.60 112.98 -13.078 0.045 -41.23 119.92
143 26.80 119.88 -11.841 0.070 26.79 58.61 222.37(SL8)
151 28.30 128.51 -9.561 0.105 -122.15 80.69
154 28.80 -16.71 -8.613 0.111 -128.95 14.75
157 29.30 -41.29 -7.649 0.109 -114.45 -46.89
160 29.80 -65.87 -6.731 0.101 -87.66 -98.09
163 30.30 -90.44 -5.908 0.087 -48.59 -132.35
166 30.80 -69.03 -5.215 0.071 -3.20 -147.06
169 31.30 -48.03 -4.666 0.055 25.34 -143.31
172 31.80 -32.37 -4.257 0.039 44.87 -127.46
175 32.30 -11.15 -3.974 0.026 59.32 -104.54
178 32.80 4.76 -3.794 0.016 60.33 -77.90
181 33.30 14.82 -3.691 0.008 55.07 -52.35
191 35.30 30.10 -3.61 0.000 -13.71 2.03
S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:35:21

Step No. 1 << 굴착 1단계 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -10.57


-10.6 0.00 0.00
4 0.50 3.71 -9.77 -0.90 -0.12
7 1.10 8.44 -8.82 -4.56 -1.58
19.6
12
13 2.10
2.30 22.36
18.21 -7.24
-6.93 -20.01
-24.07 -12.63
-17.08
33.1
19 3.40 -2.02 -5.29 -32.99 -50.63
22 3.90 -11.26 -4.61 -29.67 -66.55
26
27 4.60
4.70 -24.23
-26.08 -3.77
-3.67 -17.25
-14.73 -83.45
-85.20 89.0
32 5.70 -20.21 -2.79 13.92 -84.99
36 6.40 -4.11 -2.38 23.74 -71.58

44
45 8.00
8.10 20.54
-14.38 -1.91
-1.90 6.00
6.91 -43.00
-42.37
50 9.00 -6.00 -1.86 15.78 -31.28

62 11.40 4.53 -2.10 16.01 11.73

67 12.40 9.59 -2.19 9.15 24.77


71 13.10 14.97 -2.19 2.50 28.46
75 13.90 4.10 -2.13 -12.59 23.40
80 14.80 -0.86 -1.99 -12.01 11.11

85 15.80 -4.87 -1.80 -10.98 -1.69


89 16.60 -5.10 -1.65 -6.35 -8.65

97
98 18.20
18.30 -2.34
-2.52 -1.42
-1.41 -4.37
1.26 -14.97
-14.61
103 19.30 -5.18 -1.35 2.69 -14.27
107 20.00 -1.36 -1.34 7.42 -11.44

116 21.70 1.71 -1.40 6.32 -3.46

121 22.70 1.50 -1.46 2.00 -0.65

129 24.30 0.62 -1.57 0.31 0.99


132 24.80 0.40 -1.60 0.05 1.08
135 25.30 0.23 -1.63 3.00 1.06
137 25.60 0.15 -1.65 2.98 1.03

143 26.80 -0.04 -1.72 -0.20 0.79

151 28.30 -0.07 -1.81 -0.09 0.57


154 28.80 -0.07 -1.84 3.44 0.53
157 29.30 -0.06 -1.87 3.53 0.51
160 29.80 -0.05 -1.90 3.61 0.51
163 30.30 -0.05 -1.93 3.69 0.52
166 30.80 -0.05 -1.96 3.77 0.54
169 31.30 -0.05 -1.99 3.85 0.57
172 31.80 -0.05 -2.02 3.94 0.62
175 32.30 -0.06 -2.05 4.02 0.68
178 32.80 -0.05 -2.08 4.10 0.75
181 33.30 -0.03 -2.11 4.18 0.84

191 35.30 0.30 -2.22 -8.43 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:05

Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.71 0.00 0.00


4 0.50 3.71 -8.79 -0.90 75.0 -0.12
7 1.10 8.44 -8.89 -4.56 70.4 -1.58
70.41
12
13 2.10
2.30 22.36
24.56 -9.02
-9.02
-9.0 54.96
50.27 62.36
72.91

19 3.40 39.28 43.3 -8.80 15.14 110.46 113.2


22 3.90 45.92 -8.53 -6.16 112.88
26
27 4.60
4.70 32.95
31.10 -7.97
-7.87 -33.77
-36.97 98.13
94.74

32 5.70 12.53 -6.73 -58.79 45.19


36 6.40 -0.48 -5.82 -63.01 1.94

44
45 8.00
8.10 -19.27
-67.89 -3.84
-3.74 -42.02
-35.21 -86.16
-90.01
50 9.00 -35.36 -2.98 10.49 -98.44

62 11.40 6.61 -2.30 34.77 -24.18

67 12.40 14.68 -2.29 24.04 5.94


71 13.10 20.51 -2.28 13.69 18.75
75 13.90 8.48 -2.23 -5.75 20.83
80 14.80 2.90 -2.10 -8.72 13.00

85 15.80 -1.57 -1.93 -11.30 1.59


89 16.60 -4.91 -1.78 -8.72 -6.44

97
98 18.20
18.30 -3.15
-3.27 -1.54
-1.53 -5.19
0.96 -15.33
-14.98
103 19.30 -5.50 -1.46 2.70 -14.86
107 20.00 -1.49 -1.45 7.79 -11.96

116 21.70 1.77 -1.51 6.69 -3.64

121 22.70 1.56 -1.57 2.10 -0.70

129 24.30 0.65 -1.67 0.33 1.04


132 24.80 0.42 -1.71 0.06 1.13
135 25.30 0.24 -1.74 3.20 1.12
137 25.60 0.16 -1.76 3.18 1.08

143 26.80 -0.04 -1.83 -0.21 0.83

151 28.30 -0.08 -1.92 -0.10 0.60


154 28.80 -0.07 -1.95 3.64 0.56
157 29.30 -0.06 -1.98 3.73 0.54
160 29.80 -0.05 -2.01 3.81 0.54
163 30.30 -0.05 -2.04 3.89 0.55
166 30.80 -0.05 -2.07 3.98 0.57
169 31.30 -0.05 -2.10 4.06 0.60
172 31.80 -0.06 -2.12 4.14 0.65
175 32.30 -0.06 -2.15 4.23 0.71
178 32.80 -0.05 -2.18 4.31 0.79
181 33.30 -0.03 -2.21 4.39 0.88

191 35.30 0.32 -2.33 -8.84 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:12

Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.45 0.00 0.00


4 0.50 3.71 -8.64 -0.90 35.5 -0.12
7 1.10 8.44 -8.85 -4.56
30.95 -1.58
12
13 2.10
2.30 22.36
24.56 -9.20
-9.26 15.50
10.81 22.90
25.55
413.2
19 3.40 39.28 -9.53 -24.32
113.40 19.71
22 3.90 45.92 -9.60 -9.6 92.10 71.27
26
27 4.60
4.70 55.19
56.51 -9.58
-9.56 56.71
51.13 123.51
129.19
67.1 151.0
32 5.70 69.72 -9.05 -11.99 149.93
36 6.40 56.70 -8.35 -56.23 125.44

123.2
44
45 8.00
8.10 26.95
-85.68 -6.01
-5.86 -123.16
-120.22 -24.82
-37.20
50 9.00 -80.14 -4.56 -37.42 -108.29

62 11.40 -0.61 -2.77 43.52 -62.62

67 12.40 14.43 -2.55 36.16 -21.43


71 13.10 22.87 -2.46 25.15 -0.30
75 13.90 11.22 -2.37 3.11 9.89
80 14.80 6.23 -2.23 -2.53 8.82

85 15.80 1.81 -2.05 -8.60 1.79


89 16.60 -1.51 -1.90 -8.74 -5.34

97
98 18.20
18.30 -3.85
-3.93 -1.66
-1.64 -5.95
0.71 -15.59
-15.25
103 19.30 -5.79 -1.57 2.69 -15.34
107 20.00 -1.60 -1.56 8.12 -12.39

116 21.70 1.82 -1.61 7.04 -3.80

121 22.70 1.62 -1.67 2.19 -0.74

129 24.30 0.68 -1.78 0.35 1.08


132 24.80 0.44 -1.81 0.07 1.18
135 25.30 0.26 -1.84 3.40 1.17
137 25.60 0.17 -1.86 3.38 1.13

143 26.80 -0.04 -1.94 -0.22 0.88

151 28.30 -0.08 -2.03 -0.10 0.63


154 28.80 -0.07 -2.05 3.84 0.59
157 29.30 -0.06 -2.08 3.93 0.57
160 29.80 -0.06 -2.11 4.01 0.57
163 30.30 -0.05 -2.14 4.10 0.58
166 30.80 -0.05 -2.17 4.18 0.60
169 31.30 -0.06 -2.20 4.26 0.63
172 31.80 -0.06 -2.23 4.35 0.68
175 32.30 -0.06 -2.26 4.44 0.75
178 32.80 -0.05 -2.29 4.52 0.83
181 33.30 -0.04 -2.32 4.60 0.92

191 35.30 0.33 -2.43 -9.24 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:18

Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.75 0.00 0.00


4 0.50 3.71 -8.77 -0.90 0.1 -0.12
7 1.10 8.44 -8.81 -4.56
-18.90 -1.58
12
13 2.10
2.30 22.36
24.56 -8.88
-8.90 -34.35
-39.04 -26.95
-34.26
209.6
19 3.40 39.28 -9.17 -74.17
-4.28 -94.94
22 3.90 45.92 -9.41 -25.58 -102.23
297.4 230.9
26
27 4.60
4.70 55.19
56.51 -9.94
-10.03 -66.56
-60.97
230.89 -132.36
-138.45

32 5.70 69.72 -11.13 167.77 62.07


36 6.40 78.94 -11.80 115.74 161.74
-12.2
100.0 240.5
44
45 8.00
8.10 100.01
78.61 -12.01
-11.95 -27.42
-36.35 236.52
233.29
50 9.00 90.41 -10.98 -105.34 167.60

62 11.40 -52.33 -6.63 -66.27 -73.43

67 12.40 -52.20 -5.00 -4.48 -109.22


71 13.10 -16.69 -4.12 22.72 -102.38
75 13.90 -10.49 -3.34 21.74 -85.10
80 14.80 2.72 -2.73 27.18 -63.29

85 15.80 8.37 -2.28 18.42 -41.28


89 16.60 8.19 -2.05 11.58 -29.29

97
98 18.20
18.30 1.08
0.85 -1.79
-1.78 0.47
7.17 -19.35
-18.29
103 19.30 -2.84 -1.74 5.00 -14.29
107 20.00 0.17 -1.74 9.13 -10.35

116 21.70 1.94 -1.81 6.72 -2.21

121 22.70 1.43 -1.88 1.56 0.16

129 24.30 0.48 -1.98 0.08 1.27


132 24.80 0.28 -2.02 -0.10 1.26
135 25.30 0.13 -2.05 3.69 1.18
137 25.60 0.06 -2.07 3.70 1.12

143 26.80 -0.08 -2.14 -0.20 0.84

151 28.30 -0.08 -2.23 -0.07 0.64


154 28.80 -0.06 -2.26 4.25 0.62
157 29.30 -0.05 -2.29 4.33 0.61
160 29.80 -0.05 -2.32 4.42 0.61
163 30.30 -0.05 -2.34 4.49 0.63
166 30.80 -0.05 -2.37 4.57 0.65
169 31.30 -0.05 -2.40 4.66 0.69
172 31.80 -0.06 -2.43 4.74 0.75
175 32.30 -0.06 -2.46 4.83 0.82
178 32.80 -0.06 -2.49 4.92 0.90
181 33.30 -0.04 -2.52 5.00 1.00

191 35.30 0.36 -2.63 -10.01 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:24

Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.75 -0.90 1.3 -0.12
7 1.10 8.44 -8.82 -4.56
-3.25 -1.58
12
13 2.10
2.30 22.36
24.56 -8.94
-8.97 -18.70
-23.39 -11.31
-15.49
220.7
19 3.40 39.28 -9.19 -58.52
15.06 -58.96
22 3.90 45.92 -9.36 -6.24 -56.58
128.3
26
27 4.60
4.70 55.19
56.51 -9.70
-9.76 -47.22
-41.63
81.05 -73.18
-77.33

32 5.70 69.72 -10.48 17.93 -26.65


36 6.40 78.94 -11.06 -34.10 -31.87

497.8 320.6
44
45 8.00
8.10 100.01
78.61 -12.80
-12.95 -177.26
311.62
320.55 -196.84
-165.27
50 9.00 90.41 -14.47 235.56 82.24

-16.2
358.6
62 11.40 121.88 -15.95 -19.18 357.22
132.4
67 12.40 135.00 -14.38 -140.55 274.98
71 13.10 43.34 -12.62 -178.25 162.40
75 13.90 -55.42 -10.24 -195.84 8.32
80 14.80 -110.06 -7.55 -121.38 -138.48

85 15.80 -80.44 -5.07 -11.42 -201.40


89 16.60 -35.00 -3.63 33.55 -189.82

97
98 18.20
18.30 4.68
5.37 -2.11
-2.06 47.98
51.44 -114.78
-109.39
103 19.30 9.71 -1.79 42.55 -63.06
107 20.00 14.95 -1.77 36.88 -36.19

116 21.70 10.29 -1.93 13.93 -0.22

121 22.70 5.40 -2.05 2.49 5.72

129 24.30 0.66 -2.21 -1.79 5.24


132 24.80 -0.02 -2.24 -1.94 4.29
135 25.30 -0.41 -2.28 2.51 3.35
137 25.60 -0.55 -2.30 2.69 2.82

143 26.80 -0.63 -2.37 -0.91 1.26

151 28.30 -0.32 -2.45 -0.19 0.49


154 28.80 -0.22 -2.48 4.66 0.44
157 29.30 -0.14 -2.51 4.80 0.43
160 29.80 -0.09 -2.54 4.91 0.47
163 30.30 -0.06 -2.57 5.00 0.52
166 30.80 -0.04 -2.60 5.08 0.59
169 31.30 -0.03 -2.63 5.15 0.67
172 31.80 -0.04 -2.66 5.23 0.76
175 32.30 -0.04 -2.69 5.30 0.86
178 32.80 -0.04 -2.72 5.38 0.96
181 33.30 -0.02 -2.74 5.45 1.08

191 35.30 0.38 -2.86 -10.86 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:30

Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.75 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.85 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.30
-24.99 -12.90
-17.41
223.7
19 3.40 39.28 -9.19 -60.12
14.44 -62.63
22 3.90 45.92 -9.37 -6.86 -60.56
151.4
26
27 4.60
4.70 55.19
56.51 -9.74
-9.80 -47.84
-42.25
103.52 -77.59
-81.80

32 5.70 69.72 -10.55 40.40 -8.65


36 6.40 78.94 -11.11 -11.63 1.86

318.5
44
45 8.00
8.10 100.01
78.61 -12.52
-12.63 -154.79
154.74
163.67 -127.16
-111.28
50 9.00 90.41 -13.76 78.68 -4.97

543.1 367.0
62 11.40 121.88 -16.81 -176.06
367.03 -106.51

67 12.40 135.00 -18.17 238.59 197.48


71 13.10 144.19 -18.74 -18.8 140.88 330.73
152.1 398.0
75 13.90 141.09 -18.61 22.68 396.23
80 14.80 135.88 -17.29 -101.95 360.18

85 15.80 130.08 -14.52 -222.87 191.18


89 16.60 -39.12 -11.73 -210.99 14.73

97
98 18.20
18.30 -136.23
-130.63 -6.39
-6.12 -70.72
-51.56 -231.13
-237.18
103 19.30 -57.59 -3.90 33.74 -242.42
107 20.00 -28.13 -2.92 65.61 -207.24

116 21.70 22.12 -2.01 69.41 -84.29

121 22.70 25.16 -2.03 40.61 -30.93

129 24.30 12.86 -2.28 9.39 6.27


132 24.80 8.95 -2.36 3.96 9.51
135 25.30 5.69 -2.44 4.95 10.49
137 25.60 4.08 -2.47 3.56 10.35

143 26.80 0.09 -2.60 -3.29 7.19

151 28.30 -1.12 -2.70 -2.17 2.86


154 28.80 -1.07 -2.73 3.57 1.92
157 29.30 -0.94 -2.76 4.13 1.24
160 29.80 -0.76 -2.79 4.61 0.80
163 30.30 -0.59 -2.81 4.99 0.55
166 30.80 -0.43 -2.84 5.30 0.44
169 31.30 -0.31 -2.87 5.54 0.45
172 31.80 -0.21 -2.90 5.72 0.53
175 32.30 -0.14 -2.92 5.86 0.66
178 32.80 -0.07 -2.95 5.97 0.83
181 33.30 -0.02 -2.98 6.04 1.02

191 35.30 0.51 -3.09 -11.75 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:36

Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.76 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.82 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.27
-24.96 -12.87
-17.37
223.0
19 3.40 39.28 -9.19 -60.09
14.24 -62.56
22 3.90 45.92 -9.37 -7.06 -60.58
150.0
26
27 4.60
4.70 55.19
56.51 -9.73
-9.80 -48.03
-42.45
102.00 -77.75
-81.98

32 5.70 69.72 -10.55 38.88 -10.36


36 6.40 78.94 -11.12 -13.15 -0.91

341.5
44
45 8.00
8.10 100.01
78.61 -12.56
-12.67 -156.31
176.26
185.19 -132.37
-114.34
50 9.00 90.41 -13.83 100.21 11.35

363.8
62 11.40 121.88 -16.52 -154.54
209.25 -38.53

67 12.40 135.00 -17.47 80.81 107.68


71 13.10 144.19 152.1 -17.92 -16.90 130.49
75 13.90 141.09 -18.14 -135.09 69.77
589.3 329.6
80 14.80 135.88 -18.23 -259.73
329.58 -108.29

85 15.80 130.08 -18.41


-18.4 196.60 154.28
89 16.60 125.45 -18.18 94.39 270.40
306.2
97
98 18.20
18.30 116.20
115.62 -15.64
-15.38 -98.93
-110.52 264.16
254.26
103 19.30 109.84 -12.35 -211.18 86.83
107 20.00 -53.29 -9.99 -188.74 -55.16

116 21.70 -110.43 -5.08 -13.77 -250.74

121 22.70 -51.71 -3.40 60.89 -223.97

129 24.30 22.28 -2.41 73.74 -99.46


132 24.80 27.53 -2.37 61.07 -65.61
135 25.30 27.73 -2.40 51.67 -38.56
137 25.60 26.30 -2.44 43.62 -25.66

143 26.80 15.89 -2.64 13.33 4.39

151 28.30 4.48 -2.88 -1.18 11.28


154 28.80 2.17 -2.94 2.77 10.22
157 29.30 0.57 -2.99 2.21 8.61
160 29.80 -0.45 -3.03 2.28 6.84
163 30.30 -1.03 -3.07 2.73 5.18
166 30.80 -1.27 -3.10 3.38 3.77
169 31.30 -1.30 -3.13 4.08 2.67
172 31.80 -1.19 -3.16 4.76 1.90
175 32.30 -1.01 -3.19 5.37 1.42
178 32.80 -0.79 -3.22 5.87 1.20
181 33.30 -0.54 -3.24 6.25 1.17

191 35.30 0.76 -3.34 -12.70 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:42

Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.76 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.81 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.26
-24.95 -12.86
-17.36
223.1
19 3.40 39.28 -9.19 -60.08
14.28 -62.54
22 3.90 45.92 -9.37 -7.02 -60.54
150.0
26
27 4.60
4.70 55.19
56.51 -9.73
-9.80 -48.00
-42.41
102.01 -77.68
-81.91

32 5.70 69.72 -10.55 38.89 -10.27


36 6.40 78.94 -11.11 -13.14 -0.82

339.7
44
45 8.00
8.10 100.01
78.61 -12.55
-12.67 -156.30
174.45
183.38 -132.26
-114.40
50 9.00 90.41 -13.83 98.39 9.65

386.7
62 11.40 121.88 -16.56 -156.35
230.39 -44.59

67 12.40 135.00 -17.54 101.95 122.76


71 13.10 144.19 152.1 -17.99 4.24 160.36
75 13.90 141.09 -18.13
-18.1 -113.96 116.55
436.5
80 14.80 135.88 -17.98 -238.59
197.94 -42.48

85 15.80 130.08 -17.76 64.96 88.44


89 16.60 125.45 -17.37 -37.26 99.24

516.4 274.2
97
98 18.20
18.30 116.20
115.62 -16.07
-16.00 -230.57
-242.16
274.22 -117.63
-140.70
103 19.30 109.84 -15.42 161.49 76.64
107 20.00 105.79 -14.89 86.02 163.08
198.5
116 21.70 95.97 -12.21 -85.47 161.12

121 22.70 96.31 -9.76 -168.16 28.29

129 24.30 -102.99 -5.86 -66.29 -176.01


132 24.80 -90.49 -4.93 -14.71 -196.43
135 25.30 -62.21 -4.19 27.18 -193.55
137 25.60 -48.76 -3.84 43.45 -183.93

143 26.80 5.22 -3.03 64.97 -113.78

151 28.30 21.99 -2.90 38.73 -32.91


154 28.80 20.06 -2.95 33.76 -16.24
157 29.30 16.80 -3.02 24.65 -4.56
160 29.80 13.10 -3.10 17.32 2.93
163 30.30 9.53 -3.18 11.82 7.14
166 30.80 6.40 -3.25 7.99 8.96
169 31.30 3.86 -3.31 5.57 9.16
172 31.80 1.94 -3.37 4.24 8.40
175 32.30 0.56 -3.41 3.73 7.13
178 32.80 -0.35 -3.46 3.77 5.72
181 33.30 -0.91 -3.49 4.16 4.39

191 35.30 -1.23 -3.62 -13.74 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:49

Step No. 9 << B6 슬래브 설치 및 9단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.76 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.81 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.26
-24.95 -12.86
-17.36
223.1
19 3.40 39.28 -9.19 -60.08
14.28 -62.54
22 3.90 45.92 -9.37 -7.02 -60.54
150.0
26
27 4.60
4.70 55.19
56.51 -9.73
-9.80 -48.00
-42.41
102.01 -77.69
-81.92

32 5.70 69.72 -10.55 38.90 -10.27


36 6.40 78.94 -11.12 -13.13 -0.82

339.7
44
45 8.00
8.10 100.01
78.61 -12.55
-12.67 -156.30
174.52
183.45 -132.24
-114.38
50 9.00 90.41 -13.83 98.46 9.74

385.3
62 11.40 121.88 -16.56 -156.28
229.06 -44.32

67 12.40 135.00 -17.54 100.62 121.70


71 13.10 144.19 -17.98 2.90 158.37
158.4
152.1 -18.1
75 13.90 141.09 -18.14 -115.29 113.49
80 14.80 135.88 -18.00 -239.92
448.8 239.9 -46.75
208.88
85 15.80 130.08 -17.81 75.90 95.12
89 16.60 125.45 -17.42 -26.31 114.68

432.6
97
98 18.20
18.30 116.20
115.62 -15.99
-15.90 -219.63
-231.22
201.42 -84.70
-106.66
103 19.30 109.84 -15.12 88.69 37.87
107 20.00 105.79 -14.52 13.22 73.35

330.7
116 21.70 95.97 -12.60 -158.27
172.44 -52.38

121 22.70 96.31 -11.44 77.68 72.73

129 24.30 105.50 -8.98 -83.76 69.89


132 24.80 108.38 -8.04 -125.17 14.69
135 25.30 -36.85 -7.09 -112.89 -45.50
137 25.60 -51.59 -6.53 -99.62 -77.58

143 26.80 -68.85 -4.68 -11.20 -147.19

151 28.30 -9.66 -3.47 48.04 -108.52


154 28.80 4.85 -3.30 55.26 -83.88
157 29.30 12.97 -3.23 50.46 -60.33
160 29.80 16.44 -3.21 42.94 -39.94
163 30.30 16.80 -3.24 34.59 -23.60
166 30.80 15.27 -3.28 26.62 -11.44
169 31.30 12.78 -3.35 19.70 -3.07
172 31.80 9.96 -3.41 14.14 2.11
175 32.30 7.21 -3.48 9.98 4.79
178 32.80 4.72 -3.54 7.13 5.67
181 33.30 2.57 -3.60 5.43 5.36

191 35.30 -3.51 -3.80 -14.43 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:36:55

Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.76 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.81 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.26
-24.95 -12.86
-17.36
223.1
19 3.40 39.28 -9.19 -60.08
14.28 -62.54
22 3.90 45.92 -9.37 -7.02 -60.55
150.0
26
27 4.60
4.70 55.19
56.51 -9.73
-9.80 -48.00
-42.41
102.02 -77.69
-81.92

32 5.70 69.72 -10.55 38.90 -10.27


36 6.40 78.94 -11.12 -13.13 -0.82

339.8
44
45 8.00
8.10 100.01
78.61 -12.55
-12.67 -156.29
174.58
183.51 -132.24
-114.38
50 9.00 90.41 -13.83 98.53 9.80

384.5
62 11.40 121.88 -16.56 -156.21
228.25 -44.11

67 12.40 135.00 -17.54 99.81 121.10


71 13.10 144.19 152.1 -17.98 2.09 157.20
75 13.90 141.09 -18.14
-18.1 -116.10 111.67
455.3
80 14.80 135.88 -18.01 -240.73
214.52 -49.29

85 15.80 130.08 -17.83 81.54 98.22


89 16.60 125.45 -17.45 -20.67 122.29

401.2
97
98 18.20
18.30 116.20
115.62 -15.96
-15.86 -213.99
-225.58
175.58 -68.05
-89.46
103 19.30 109.84 -14.98 62.86 29.24
107 20.00 105.79 -14.32 -12.61 46.64

282.1
116 21.70 95.97 -12.55 -184.10
98.03 -123.00

121 22.70 96.31 -11.84 3.27 -72.30

1393.6 306.4
129 24.30 105.50 -11.44 -158.17
306.37 -194.19
132 24.80 108.38 -11.60 252.90 -54.29
135 25.30 111.25 -11.82 197.99 58.51
137 25.60 112.98 -11.93 164.36 112.89

143 26.80 119.88 -11.82 24.65 227.17 229.7

151 28.30 128.51 -10.01 -149.58 126.07


154 28.80 -16.71 -9.09 -147.36 51.16
157 29.30 -41.29 -8.11 -132.86 -19.57
160 29.80 -65.87 -7.15 -106.07 -79.98
163 30.30 -90.44 -6.27 -66.99 -123.31
166 30.80 -80.31 -5.51 -16.43 -145.76
169 31.30 -56.73 -4.89 17.05 -147.45
172 31.80 -38.68 -4.42 40.26 -134.85
175 32.30 -19.56 -4.08 58.91 -112.54
178 32.80 -0.12 -3.86 63.13 -85.28
181 33.30 12.81 -3.72 59.49 -57.88

191 35.30 35.97 -3.53 -13.42 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:37:01

Step No. 11 << 슬래브, 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.70 0.00 0.00


4 0.50 3.71 -8.76 -0.90 0.1 -0.12
7 1.10 8.44 -8.82 -4.68 -1.58
12
13 2.10
2.30 22.36
24.56 -8.93
-8.96 -20.26
-24.95 -12.86
-17.36
223.1
19 3.40 39.28 -9.19 -60.08
14.27 -62.54
22 3.90 45.92 -9.37 -7.03 -60.55
150.0
26
27 4.60
4.70 55.19
56.51 -9.73
-9.80 -42.42
27.01 -77.70
-81.92

32 5.70 69.72 -10.55 38.90 -10.27


36 6.40 78.94 -11.12 -13.13 -0.81

339.9
44
45 8.00
8.10 100.01
78.61 -12.55
-12.67 13.64
174.64 -132.23
-114.36
50 9.00 90.41 -13.83 98.58 9.87

383.4
62 11.40 121.88 -16.55 35.54 -43.90

67 12.40 135.00 -17.53 98.80 120.29


71 13.10 144.19 152.1 -17.98 1.08 155.68
75 13.90 141.09 -18.14
-18.1 -117.11 109.35
464.6
80 14.80 135.88 -18.03 -9.46 -52.53

85 15.80 130.08 -17.87 89.85 103.29


89 16.60 125.45 -17.49 -12.36 134.01

337.5
97
98 18.20
18.30 116.20
115.62 -15.90
-15.78 -205.68
-48.53 -43.04
-63.61
103 19.30 109.84 -14.75 7.48 -0.29
107 20.00 105.79 -14.04 -67.99 -21.67

116 21.70 95.97 -12.85 28.09


535.1 276.6 -285.45
285.9
121 22.70 96.31 -13.12 200.90 -37.12

129 24.30 105.50 -13.66 39.46 157.19


132 24.80 108.38 -13.57 -14.01 163.63
135 25.30 111.25 -13.32 -57.61 142.98
137 25.60 112.98 -13.11 -51.73 126.01
233.4
143 26.80 119.88 -11.84 24.37 53.94

151 28.30 128.51 -9.55 -121.38 79.05


154 28.80 -16.71 -8.60 -128.44 13.61
157 29.30 -41.29 -7.64 -113.93 -47.66
160 29.80 -65.87 -6.72 -87.15 -98.61
163 30.30 -90.44 -5.90 -48.07 -132.48
166 30.80 -68.71 -5.21 -2.82 -146.44
169 31.30 -47.78 -4.66 25.58 -142.53
172 31.80 -32.20 -4.25 45.01 -126.16
175 32.30 -10.92 -3.97 59.33 -102.82
178 32.80 4.89 -3.79 60.25 -76.19
181 33.30 14.88 -3.69 54.94 -50.68

191 35.30 29.94 -3.61 -13.72 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:37:08

Step No. 12 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.54 0.00 0.00


4 0.50 3.71 -8.67 -0.90 20.7 -0.12
7 1.10 8.44 -8.84 5.77 -1.58
12
13 2.10
2.30 22.36
24.56 -9.11
-9.16 0.65
-4.04 8.05
7.73

19 3.40 39.28 -9.43 -39.17 -14.45


22 3.90 45.92 -9.57 -60.47 -39.18
206.5
26
27 4.60
4.70 55.19
56.51 -9.84
-9.89 -95.35
2.82 -93.74
-103.21

32 5.70 69.72 -10.55 47.52 -25.18


36 6.40 78.94 -11.10 -4.96 -9.63

335.5
44
45 8.00
8.10 100.01
78.61 -12.55
-12.66 16.09
174.83 -131.12
-113.22
50 9.00 90.41 -13.83 98.15 10.82

383.7
62 11.40 121.88 -16.55 35.38 -43.95

67 12.40 135.00 -17.53 98.81 120.24


71 13.10 144.19 152.1 -17.98 1.11 155.65
75 13.90 141.09 -18.14
-18.1 -117.09 109.34
464.5
80 14.80 135.88 -18.03 -9.45 -52.51

85 15.80 130.08 -17.87 89.83 103.29


89 16.60 125.45 -17.49 -12.40 133.98

337.6
97
98 18.20
18.30 116.20
115.62 -15.90
-15.79 -205.74
-48.51 -43.16
-63.74
103 19.30 109.84 -14.75 7.65 -0.29
107 20.00 105.79 -14.04 -67.65 -21.49

116 21.70 95.97 -12.85 28.70


535.0 277.1 -284.33
284.8
121 22.70 96.31 -13.11 200.88 -35.64

129 24.30 105.50 -13.64 34.54 155.60


132 24.80 108.38 -13.54 -21.76 158.90
135 25.30 111.25 -13.29 -57.32 133.60
137 25.60 112.98 -13.08 -41.23 119.92
222.4
143 26.80 119.88 -11.84 26.79 58.61

151 28.30 128.51 -9.56 -122.15 80.35


154 28.80 -16.71 -8.61 -128.95 14.64
157 29.30 -41.29 -7.65 -114.45 -46.89
160 29.80 -65.87 -6.73 -87.66 -98.09
163 30.30 -90.44 -5.91 -48.59 -132.22
166 30.80 -69.03 -5.22 -3.20 -146.41
169 31.30 -48.03 -4.67 25.34 -142.66
172 31.80 -32.37 -4.26 44.87 -126.38
175 32.30 -11.15 -3.97 59.32 -103.09
178 32.80 4.76 -3.79 60.33 -76.44
181 33.30 14.82 -3.69 55.07 -50.87

191 35.30 30.10 -3.61 -13.71 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 3.B-B(L).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(L)(.. Date : 2022-12-07 Time : 17:37:14

Step No. 13 << 벽체설치 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 0.00 -8.54 0.00 0.00


4 0.50 3.71 -8.67 -0.89 20.7 -0.12
7 1.10 8.44 -8.84 5.79 -1.57
12
13 2.10
2.30 22.36
24.56 -9.11
-9.16 0.66
-4.04 8.08
7.76

19 3.40 39.28 -9.43 -39.26 -14.46


22 3.90 45.92 -9.57 -60.63 -39.25
205.9
26
27 4.60
4.70 55.19
56.51 -9.83
-9.88 -95.12
3.28 -93.96
-103.35

32 5.70 69.72 -10.55 47.61 -25.17


36 6.40 78.94 -11.10 -4.94 -9.60

335.5
44
45 8.00
8.10 100.01
78.61 -12.55
-12.66 16.07
174.81 -131.09
-113.19
50 9.00 90.41 -13.83 98.13 10.84

383.7
62 11.40 121.88 -16.55 35.38 -43.95

67 12.40 135.00 -17.53 98.81 120.24


71 13.10 144.19 152.1 -17.98 1.11 155.65
75 13.90 141.09 -18.14
-18.1 -117.09 109.34
464.5
80 14.80 135.88 -18.03 -9.45 -52.51

85 15.80 130.08 -17.87 89.83 103.29


89 16.60 125.45 -17.49 -12.40 133.98

337.6
97
98 18.20
18.30 116.20
115.62 -15.90
-15.79 -205.74
-48.51 -43.16
-63.74
103 19.30 109.84 -14.75 7.65 -0.29
107 20.00 105.79 -14.04 -67.65 -21.49

116 21.70 95.97 -12.85 28.70


535.0 277.1 -284.33
284.8
121 22.70 96.31 -13.11 200.88 -35.64

129 24.30 105.50 -13.64 34.54 155.60


132 24.80 108.38 -13.54 -21.76 158.90
135 25.30 111.25 -13.29 -57.32 133.60
137 25.60 112.98 -13.08 -41.23 119.92
222.4
143 26.80 119.88 -11.84 26.79 58.61

151 28.30 128.51 -9.56 -122.15 80.35


154 28.80 -16.71 -8.61 -128.95 14.64
157 29.30 -41.29 -7.65 -114.45 -46.89
160 29.80 -65.87 -6.73 -87.66 -98.09
163 30.30 -90.44 -5.91 -48.59 -132.22
166 30.80 -69.03 -5.22 -3.20 -146.41
169 31.30 -48.03 -4.67 25.34 -142.66
172 31.80 -32.37 -4.26 44.87 -126.38
175 32.30 -11.15 -3.97 59.32 -103.09
178 32.80 4.76 -3.79 60.33 -76.44
181 33.30 14.82 -3.69 55.07 -50.87

191 35.30 30.10 -3.61 -13.71 0.00


4.B-B(R)
1.설계요약
1.1 C.I.P
단면검토 비고
부재 적용
구분 발생응력(MPa) 허용응력(MPa) 판정 (설계안전율)
40 Mpa 압축응력 14.598 19.200 O.K 76.03%
흙막이벽 HD32×8 인장응력 199.077 270.000 O.K 73.73%
D13@200 전단응력 1.039 1.329 O.K 78.20%

1.2 안전성 검토
1) 측면파일 근입장
근입장 안전율 : 1.67 > 1.20 ---> O.K

2) 수평변위 검토
허용 수평변위 : 21.67mm < 64.56mm ---> O.K
허용수평변위 = 32.28 m x 0.20 % = 0.0646 m ( 64.56mm)
수 평 변 위 (mm)
시공단계 부재 굴착깊이 판 정 비고
최대발생변위 허용변위
STEP-1 CIP 1.495 3.20 64.56 O.K 4.96%
STEP-2 CIP 5.395 4.50 64.56 O.K 6.97%
STEP-3 CIP 8.795 6.50 64.56 O.K 10.07%
STEP-4 CIP 12.195 8.90 64.56 O.K 13.79%
STEP-5 CIP 15.595 9.90 64.56 O.K 15.33%
STEP-6 CIP 19.020 9.40 64.56 O.K 14.56%
STEP-7 CIP 22.470 9.40 64.56 O.K 14.56%
STEP-8 CIP 25.895 9.40 64.56 O.K 14.56%
STEP-9 CIP 28.780 10.90 64.56 O.K 16.88%
STEP-10 CIP 32.280 14.90 64.56 O.K 23.08%
STEP-11 CIP 32.280 20.20 64.56 O.K 31.29%
STEP-12 CIP 32.280 21.70 64.56 O.K 33.61%
STEP-13 CIP 32.280 21.50 64.56 O.K 33.61%
STEP-14 CIP 32.280 21.50 64.56 O.K 33.61%
STEP-15 CIP 32.280 21.50 64.56 O.K 33.61%

3) 침하량 검토
허용 침하량 : 18.58 < 25.00 ---> O.K
2.결과 정리
구 분 해석결과 (단위) 비고

외측파일 모멘트 411.64 kN·m


CIP
외측파일 최대 전단력 405.79 kN

최대 수평 변위 21.67 mm

주동토압 모멘트 (Ma) 10829.22 kN·m


근입장검토
수동토압 모멘트 (Mp) 18042.92 kN·m
3.C.I.P 설계
3.1 흙막이벽
가. 설계 제원
C.I.P 직경(D, mm) 600.0
C.I.P 설치간격
600.0 전단철근 주철근
(C.T.C, mm)
H-pile 제원 H-300x300x10x15

600.0
직경
H-pile 설치간격
1200.0
(C.T.C, mm)
콘크리트 설계기준강도 CIP 간격
40.0
(fck, MPa)
600.0
주철근 항복강도(fy, MPa) 400.0
전단철근 항복강도(fy, MPa) 400.0
콘크리트 설계기준강도
0.8
저감계수
허용응력보정계수 1.5
탄성계수비(n) 8
피복두께(mm) 80.0

나. 단면력 산정
(1) 최대 휨모멘트 ( Mmax )
Mmax = 411.640 kN·m/m
= 411.640 (kN·m/m) × 0.60 m (C.I.P 설치간격) = 246.984 kN·m
(2) 최대 전단력 ( Smax )
Smax = 405.790 kN/m
= 405.790 (kN/m) × 0.60 m (C.I.P 설치간격) = 243.474 kN

다. C.I.P의 허용 응력
(1) 콘크리트 허용압축강도 ( fca )
fck' = 0.8 × 40.0 = 32.000 MPa
fca = 보정계수 × ( 0.4 × fck' ) = 1.5 × ( 0.4 × 32.000 )
= 19.200 MPa
(2) 콘크리트 허용전단강도 ( τa )
τca = 보정계수 × ( 0.08 × fck' ) = 1.5 × ( 0.08 × 32.000 )
= 0.679 MPa
(3) 주철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa
(4) 전단철근의 허용 인장응력 ( fsa )
fsa = 보정계수 × ( 0.5 × fy )
= 1.5 × Min. ( 0.5 × 400.000 , 180 MPa )
= 270.000 MPa

라. 철근량 검토
(1) 환산단면
4 3 4 4
π × D B × B π × 600 B
= → = → B = 525.6 mm
64 12 64 12

(2) 환산 단면적 : B × H = 526 × 526


b = 526 mm , d = 526 - 80.0 = 445.6 mm
n × fca 8 × 19.200
k0 = = = 0.363 (평형철근비)
n × fca + fsa 8 × 19.200 + 270.00
k0 0.363
j0 = 1 - = 1 - = 0.879
3 3

(3) 휨에 대한 검토
Mmax 246.984 × 1000000
소요철근량 = = = 2,335 mm2
fsa × j × d 270.0 × 0.88 × 445.6

사용철근량 (As) : 4 ea HD 32 = 3,175.3 mm2

소요철근량 < 사용철근량 ---> O.K

스트럿에 의한 축력의 작용방향과 토압의 작용방향은 서로 반대이므로 양측에 모두 배근해야 하므로


※ 철근 : 8 ea HD 32 사용 ( As = 6350.6 mm2 )

(4) 전단에 대한 검토
Smax 243.474 x 1000
τ = = = 1.039 MPa
bxd 525.6 × 445.6
∴ τ > τca = 0.679 MPa ---> N.G 최소전단철근 배치
τ' = τ - τca
= 1.039 - 0.679
= 0.361 MPa

∴ 사용철근량 (Av) : 2 ea D 13 = 253.2 mm2


∴ s = 200 mm 간격으로 배치

τ'ㆍsㆍb 0.361 × 200.0 × 525.6


Av req = = = 140.4 mm2
fsa 270.000

사용철근량(Av) > 필요철근량(Av req) → O.K

Avㆍfsa 253.225 × 270.0


τsa = = = 0.650 MPa
sㆍb 200.000 × 525.6
τa = τca + τsa = 0.679 + 0.650 = 1.329 MPa
∴ τa > τ = 1.039 MPa ---> O.K

마. 응력 검토
(1) 압축응력 검토
ρ = 3175.3 / ( 445.6 × 525.6 ) = 0.0136
2
k = (n·ρ) + 2·n·ρ - n·ρ
= ( 8 × 0.0136 )2 + 2 × 8 × 0.0136 - 8 × 0.0136 = 0.370
j = 1 - (k/3) = 1 - ( 0.370 / 3 ) = 0.877
2ㆍMmax 2 × 246.984 × 1000000
fc = = = 14.598 MPa
2 2
kㆍjㆍbㆍd 0.370 × 0.877 × 525.6 × 445.6
∴ fc < fca = 19.200 MPa ---> O.K

(2) 인장응력 검토
Mmax Mmax 246.984 × 1000000
fs = = = = 199.077 MPa
pㆍjㆍbㆍd2 Asㆍjㆍd 3175.294 × 0.877 × 445.6
∴ fs < fsa = 270.000 MPa ---> O.K
4.침하량 (GROUND SETTLMENT CHECK) 검토
SUNEX PROGRAM OUT DATA Caspe(1966) 방법에 따른 지표면 침하 계산

Excavation Depth (HW) = 32.30 m


Average Phi to ex. Depth = 27.84 deg
Width of Excavation (B) = 45.00 m
Hp = (0.5 B tan(45+PHI/2 = 37.33 m
Ht = (Hw+Hp) = 69.63 m
Distance of Influnce (D=Ht*tan(45-PHI/2)) = 41.97 m

Volume of deflection (Vs) = 0.38993 ㎥


Settlement at wall (Sw) = 2 Vs/D = 0.01858 m = -18.58 mm

Distance 0.0×D 0.1×D 0.2×D 0.3×D 0.5×D 1.0×D


(m) 0.0 4.2 8.4 12.6 21.0 42.0

Settlement(mm) -18.58 -15.05 -11.89 -9.10 -4.65 0.00

- SUNEX에의한 침하예상량은 다음과 같다. -


절점범호 DISTANCE (m) SETTLEMENT (mm)
1 0.0 -18.58
2 4.2 -15.05
3 8.4 -11.89
4 12.6 -9.10
5 21.0 -4.65
6 42.0 0.00

-5
SETTLEMENT (mm)

-10

-15

-20

-25
0 5 10 15 20 25 30 35 40 45
DISTANCE (m)

※ 침하 및 각변위 허용치
허용침하량은 국도설계실무요령(2018)이 제안한 25mm로 적용하였으며, 허용 각변위는 Bjerrum(1981)이 제안한
건물에 균열이 없도록 하는 안정한계 1/500을 적용 하였다.
- 인접부지의 예상 피해 판단

* 가장 인접하여있는 건물 은 32.79 m 거리에 위치하고,

인접한 건물 폭을 50.00 m로 가정 할 때

32.79 m 지점의 침하량 = 0.888 mm < 25.0 ∴ O.K

82.79 m 지점의 침하량 = 0.000 mm

→ 부등침하량 = 0.888 mm < 25.0 ∴ O.K

0.888 1 1
→ 각변위 (δ/L) = = < ∴ O.K
50000 56298 500

* 통신관
1.43 m 지점의 침하량 = 17.335 mm < 25.0 ∴ O.K
* 상수관
4.84 m 지점의 침하량 = 14.541 mm < 25.0 ∴ O.K
* 오수관
5.90 m 지점의 침하량 = 13.723 mm < 25.0 ∴ O.K
* 우수관
7.77 m 지점의 침하량 = 12.336 mm < 25.0 ∴ O.K
* 오수관
10.19 m 지점의 침하량 = 10.651 mm < 25.0 ∴ O.K
* 통신관
10.35 m 지점의 침하량 = 10.548 mm < 25.0 ∴ O.K

최대침하량 허용침하
해석방법 각변위 허용각변위 판정
(mm) (mm)
1 1
Caspe 18.58 25.00 O.K
2259 500
5.흙막이 벽체의 근입장 검토
근입장에 대한 검토는 최하단 지보공 위치를 중심으로 하는 주동토압 (Pa)에 의한
회전 모멘트 (Ma = Pa X La)와 최하단 지보공 위치를 중심으로 하는 수동토압 (Pp)에 의한
회전 모멘트 (Ma = Pp X Lp)를 비교하여 판별한다.
또한 엄지말뚝에 작용하는 수동토압의 작용폭은 다음 표와 같으며 주동토압의 작용폭은 굴착저면
이상은 말뚝의 간격, 굴착면 이하는 플랜지 폭만을 적용한다.
[ 엄지말뚝의 토압작용폭 (근입부) ]
사 질 토 N > 30 30 ≥ N > 10 N ≤ 10
지반의 상태
점 성 토 N > 8 8 ≥ N > 4 N ≤ 4
토압의 작용폭 플랜지폭의 3배 플랜지폭의 2배 플랜지폭의 1배
(흙막이 가시설 세부설계기준 , 한국도로공사, 2005)

최하단 지보공 H-PILE

La
Lp Pa

Pp

Mp Pp X Lp
Fs = = ≥ 1.2 이어야 한다.
Ma Pa X La

1) 토압에 의한 근입장 검토
전산해석 결과 : Ma = 10829.22 KN.m
Mp = 18042.92 KN.m

18042.92
∴ Fs (안전율) = = 1.67 > 1.2 - O.K -
10829.22
6. 전산INPUT
6.1 INPUT DATA
PROJECT 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1)

UNIT kN

SOIL 1 매립층(자갈 및 실트섞인 모래)


18 9 0 24 14300 0 0 0
2 퇴적층(점토질실트)
17 8 20 10 10000 0 0 0
3 퇴적층(자갈섞인 모래)
18 9 0 25 25500 0 0 0
4 풍화토
19 10 17 28 33800 0 0 0
5 풍화암
20 11 27 30 38000 0 0 0
6 연암
23 14 40 33 48000 0 0 0

PROFILE 1 1.37 1 1
2 4.07 2 2
3 8.07 3 3
4 9.57 4 4
5 50.00 5 5

VWALL 1 39.28 0.055116 0.0012304 2.05E+08 1 1 1 0 0

STRUT 1 3.110 0.01348 5 3 0 0 0 0 0


2 24.895 0.01348 5 3 0 0 0 0 0
3 28.280 0.01348 5 3 0 0 0 0 0

SLAB 1 0.495 0.25 5 0


2 4.394 0.15 5 0
3 7.795 0.15 5 0
4 11.195 0.15 5 0
5 14.595 0.15 5 0
6 18.020 0.20 5 0
7 21.470 0.20 5 0
8 30.750 3.06 5 0

WALL 1 29.220 32.280 1.0 0


2 25.895 29.220 1.0 0
3 17.920 25.895 1.0 0
4 11.120 17.920 0.6 0
5 4.395 11.120 0.5 0
6 0.000 4.395 0.4 0

Division 0.2
Solution 0
Output 0
NoteMode 0
MINKS 0
ECHO

STEP 1 굴착 1단계
RANKINE 1.0 0.0 50
SURCHARGE 13.0
LOAD 10.98 32.794 545.0 82.794 545.0
WATERPRESSURE 0.85 0.0 9.57 87.2 32.28 0.0
EXCAVATION 1.495

STEP 2 1F 슬래브 설치 및 2단계 굴착


CONST SLAB 1
EXCAVATION 3.61

STEP 3 1단 가설지보재 설치 및 3단계 굴착


CONST STRUT 1
EXCAVATION 5.395
STEP 4 B1 슬래브 설치 및 4단계 굴착
CONST SLAB 2
EXCAVATION 8.795

STEP 5 B2 슬래브 설치 및 5단계 굴착


CONST SLAB 3
EXCAVATION 12.195

STEP 6 B3 슬래브 설치 및 6단계 굴착


CONST SLAB 4
EXCAVATION 15.595

STEP 7 B4 슬래브 설치 및 7단계 굴착


CONST SLAB 5
EXCAVATION 19.020

STEP 8 B5 슬래브 설치 및 8단계 굴착


CONST SLAB 6
EXCAVATION 22.470

STEP 9 B6 슬래브 설치 설치 및 9단계 굴착


CONST SLAB 7
EXCAVATION 25.895

STEP 10 가설지보재 설치 및 10단계 굴착


CONST STRUT 2
EXCAVATION 28.780

STEP 11 가설지보재 설치 및 11단계 굴착


CONST STRUT 3
EXCAVATION 32.280
DEPTH_CHECK
GROUND_SETTLEMENT 45
DISPLACEMENT 0.2

STEP 12 슬래브, 벽체설치 및 가설지보재해체


CONST SLAB 8
CONST WALL 1
REMOVE STRUT 3

STEP 13 벽체설치 및 가설지보재해체


CONST WALL 2
REMOVE STRUT 2

STEP 14 벽체설치 및 가설지보재해체


CONST WALL 3
CONST WALL 4
CONST WALL 5
REMOVE STRUT 1

STEP 15 벽체설치
CONST WALL 6

END
6.2 TOT DATA

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:21
--------------------------------------------------------------------------------
Step No. 99 << Pile, Strut, Anchor and Slab Force for each Step >>

>> 흙막이 벽의 최소 최대값 (Min and Max of Pile Force) <<

Step 굴착 ---- 전 단 력(kN/m) ---- --- 휨 모멘트 (kNm/m) ---


No 깊이 최대 깊이 최소 깊이 최대 깊이 최소 깊이.

1 1.50 12.48 5.80 -13.57 1.40 13.91 7.40 -13.63 2.30


2 3.60 41.58 0.50 -32.32 6.20 74.00 4.30 -33.94 10.00
3 5.40 121.76 3.10 -102.82 8.00 162.91 5.60 -76.63 10.20
4 8.80 203.72 4.40 -152.33 9.40 250.65 7.20 -120.67 11.40
5 12.20 224.17 7.80 -158.74 12.20 217.04 10.20 -138.09 14.50
6 15.60 221.43 11.20 -177.99 11.20 175.33 13.70 -134.79 17.80
7 19.00 219.10 14.60 -166.62 11.20 160.46 17.20 -124.31 21.00
8 22.50 243.67 18.00 -171.03 18.00 185.87 20.80 -169.27 18.00
9 25.90 300.90 21.50 -180.21 21.50 255.76 24.40 -198.06 21.50
10 28.80 307.71 24.90 -183.63 21.50 323.69 27.40 -205.24 21.50
11 32.30 405.79 28.30 -237.72 28.30 404.68 31.20 -215.17 35.80
12 32.30 384.29 24.90 -213.67 24.90 323.87 28.00 -287.22 24.90
13 32.30 326.44 21.70 -244.35 21.40 271.69 31.80 -411.64 21.50
14 32.30 328.73 21.70 -243.58 21.40 271.64 31.80 -410.80 21.50
15 32.30 328.73 21.70 -243.58 21.40 271.64 31.80 -410.80 21.50

Max/Min 405.79 28.30 -244.35 21.40 404.68 31.20 -411.64 21.50

Note : (파일 간격이 고려되지 않았으므로 파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)

>> Strut Force <<

------- S T R U T N o. a n d D E P T H --------
Step Exca 1 2 3
No Depth 3.1 24.9 28.3

1 1.5 0.0 0.0 0.0


2 3.6 0.0 0.0 0.0
3 5.4 443.5 0.0 0.0
4 8.8 305.5 0.0 0.0
5 12.2 317.2 0.0 0.0
6 15.6 318.3 0.0 0.0
7 19.0 318.0 0.0 0.0
8 22.5 318.0 0.0 0.0
9 25.9 318.0 0.0 0.0
10 28.8 318.0 1354.7 0.0
11 32.3 318.0 1051.5 1930.5
12 32.3 318.0 1793.9 0.0
13 32.3 318.0 0.0 0.0
14 32.3 0.0 0.0 0.0
15 32.3 0.0 0.0 0.0

(스트럿 1개당의 축력임, 경사가 고려되어 증가된 값임, 1/cosθ)

>> 슬래브 축력 (Slab Force) <<

-------- 슬 래 브 번 호 깊 이, 축 력 --------
Step Exca 1 2 3 4 5 6 7 8
No Depth 0.5 4.4 7.8 11.2 14.6 18.0 21.5 30.8

1 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


2 3.6 44.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 5.4 10.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 8.8 -17.3 201.2 0.0 0.0 0.0 0.0 0.0 0.0
5 12.2 -8.4 92.0 382.9 0.0 0.0 0.0 0.0 0.0
6 15.6 -9.2 104.6 276.0 399.4 0.0 0.0 0.0 0.0
7 19.0 -9.2 104.0 288.1 299.3 381.3 0.0 0.0 0.0
8 22.5 -9.2 104.0 286.9 315.5 263.9 414.7 0.0 0.0
9 25.9 -9.2 104.0 287.0 312.9 287.8 270.2 481.1 0.0
10 28.8 -9.2 104.0 287.1 312.6 289.7 265.1 394.0 0.0
11 32.3 -9.2 104.0 287.0 312.8 287.9 275.4 366.0 0.0
12 32.3 -9.2 104.0 287.1 312.6 289.0 272.8 317.1 310.5
13 32.3 -9.2 104.0 287.1 310.9 304.2 182.1 599.1 225.2
14 32.3 17.4 190.7 280.5 311.4 304.1 182.2 600.5 227.5
15 32.3 17.4 190.7 280.5 311.4 304.1 182.2 600.5 227.5

Note : (단위폭당의 축력임)

>> 흙막이 벽의 전단력, 휨모멘트의 최대치 최소치, 변위, 토압의 최대치 (선택된 절점) <<

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

1 0.00 0.00( 1) 0.00( 0) 0.04( 3) 0.00( 0) 3.21( 1) 4.83( 1)


4 0.50 41.58( 2) -20.59( 4) 0.00( 0) -0.73(14) 3.12( 2) 8.18( 1)
9 1.40 31.30( 2) -30.87( 4) 32.45( 2) -23.51( 4) 3.90(14) 5.01( 1)
10 1.50 30.75( 2) -31.42( 4) 35.58( 2) -26.63( 4) 3.99(14) 6.01( 1)
18 3.10 121.76( 3) -53.87( 4) 70.34( 2) -91.31( 4) 5.37(14) 22.05( 2)
21 3.60 109.32( 3) -31.62(15) 71.55( 2) -70.28( 4) 5.80(14) 28.34(15)
24 4.10 92.44( 3) -48.50(15) 89.82( 3) -56.51( 4) 6.24(14) 51.80( 3)
26 4.40 203.72( 4) -5.17( 2) 115.19( 3) -53.30( 4) 6.53( 4) 55.77( 3)
31 5.40 141.34( 4) -27.67( 2) 161.49( 3) -4.76( 1) 7.88( 4) 69.00( 3)
43 7.80 224.17( 5) -158.74( 5) 230.95( 4) -56.87( 5) 9.14( 5) 100.76( 4)
45 8.10 194.49( 5) -95.72( 3) 207.56( 4) -18.85( 2) 9.32( 5) 81.83( 4)
49 8.80 133.99( 5) -145.48( 4) 122.56( 4) -42.95( 3) 9.71( 5) 91.05( 4)
53 9.60 58.20( 5) -145.31( 4) 198.14( 5) -70.75( 3) 9.87( 5) 88.95( 5)
61 11.10 15.46( 3) -169.20( 6) 185.27( 5) -117.62( 4) 9.30( 6) 87.95(15)
62 11.20 221.43( 6) -177.99( 6) 177.83( 5) -119.30( 4) 9.30( 6) 87.88( 5)
67 12.20 133.88( 6) -158.74( 5) 72.26( 6) -112.27( 4) 9.41( 6) 87.21(15)
71 12.90 73.00( 6) -121.73( 5) 144.64( 6) -93.84( 4) 9.36( 6) 86.75(15)
80 14.60 219.10( 7) -162.24( 7) 143.91( 6) -137.83( 5) 8.61( 7) 85.65(15)
85 15.60 133.77( 7) -146.81( 6) 54.85( 7) -116.08( 5) 8.70( 7) 85.02(15)
97 17.90 28.84( 5) -162.66( 8) 138.42( 7) -152.58( 8) 8.01( 8) 83.68( 7)
98 18.00 243.67( 8) -171.03( 8) 132.40( 7) -169.27( 8) 8.04( 8) 83.62(15)
103 19.00 160.31( 8) -139.86( 7) 33.09( 8) -102.20( 6) 8.50( 8) 83.09( 7)
107 19.80 93.90( 8) -102.73(13) 134.80( 8) -110.71(13) 8.82( 8) 83.74(15)
116 21.50 300.90( 9) -183.63(10) 168.61( 8) -411.64(13) 8.97(14) 93.90(15)
121 22.50 250.68(14) -141.93( 8) 63.93( 8) -113.74(13) 11.36(13) 99.93( 8)
125 23.20 178.17(15) -115.45( 8) 173.40( 9) -84.50(12) 13.37(13) 104.17( 9)
134 24.90 384.29(12) -213.67(12) 243.31( 9) -287.22(12) 17.67(13) 114.54( 9)
139 25.90 266.68(12) -158.87( 9) 177.73(10) -96.78( 8) 19.33(13) 120.68(15)
143 26.60 180.69(12) -146.95( 9) 280.90(10) -70.14( 8) 20.20(13) 125.01(15)
152 28.30 405.79(11) -237.72(11) 317.72(12) -177.41(11) 21.49(13) 135.57(10)
155 28.80 337.23(11) -173.87(10) 280.27(12) -143.69( 9) 21.67(12) 138.69(10)
157 29.20 281.25(11) -177.20(10) 225.39(12) -137.16( 9) 21.62(12) 141.20(11)
159 29.60 224.27(11) -172.74(10) 234.01(11) -124.48( 9) 21.43(12) 143.71(15)
165 30.80 107.85(13) -112.69(10) 397.91(11) -123.15(10) 20.24(12) 151.25(11)
173 32.30 23.54( 9) -174.62(11) 295.53(11) -187.43(10) 18.20(11) 160.73(11)
176 32.80 49.11(10) -188.59(11) 203.71(11) -171.38(10) 16.86(11) 0.00( 0)
179 33.30 67.47(10) -190.42(11) 108.36(11) -145.74(10) 15.32(11) 0.00( 0)
182 33.80 70.23(10) -180.11(11) 15.18(11) -114.82(10) 13.68(11) 0.00( 0)
185 34.30 65.17(10) -157.67(11) 6.63( 9) -99.57(12) 12.01(11) 0.00( 0)
188 34.80 55.99(10) -123.09(11) 7.21( 9) -160.20(12) 10.42(11) 0.00( 0)
191 35.30 45.29(10) -76.38(11) 6.92( 9) -200.50(12) 8.97(11) 0.00( 0)
194 35.80 34.80(10) -10.27(11) 6.15( 9) -215.48(14) 7.70(11) 0.00( 0)
197 36.30 51.67(12) 0.00( 0) 5.21( 9) -209.22(11) 6.64(11) 0.00( 0)
200 36.80 79.98(12) 0.00( 0) 4.28( 9) -181.29(11) 5.78(11) 0.00( 0)
203 37.30 100.65(13) 0.00( 0) 3.48( 9) -139.46(11) 5.11(11) 0.00( 0)

Max/Min 405.79 -244.35 404.68 -411.64 21.67 160.73

-- 전단력(kN/m) -- -- 휨모멘트(kNm/m) -- 변위(mm) 토압(kN/m2)


Node GL Max.(Step) Min.(step) Max.(step) Min.(step) Max.(step) Max(step)

최대변위/최대굴착깊이 = 21.67mm/32.30m = 0.07%

Note : (전단력과 모멘트는 파일 간격이 고려되지 않았으므로


파일 1개당 부재력은 이 값에 파일 간격을 곱해야 함)
() 내는 최대치/최소치가 발생한 스텝 번호임
모든 절점에 대한 상세한 결과를 얻으려면 WALLOUT 명령어를 사용해야 함
최대 변위는 지표에서 흙막이 벽체 바닥까지의 변위중 최대치임
>> 공사단계별 흙막이 벽의 최대변위 및 허용변위와 비교 <<
(흙막이 벽의 허용변위 = 굴착깊이 x 0.20 % )
단계별 최대 변위는 지표에서 흙막이 벽체 바닥 사이의 최대 변위임
최대허용변위율 = 0.20 % 는 DISPLACEMENT 명령문에서 바꿀 수 있음
허용변위량 산정기준 : 최종굴착깊이

스텝 스텝명칭 굴착깊이 최대변위 허용변위 최대/허용 안전여부


번호 m mm mm %
1 굴착 1단계 1.5 3.2 64.6 5.0 O.K
2 1F 슬래브 설치 및 2단계 굴착 3.6 4.5 64.6 7.0 O.K
3 1단 가설지보재 설치 및 3단계 굴착 5.4 6.5 64.6 10.1 O.K
4 B1 슬래브 설치 및 4단계 굴착 8.8 8.9 64.6 13.8 O.K
5 B2 슬래브 설치 및 5단계 굴착 12.2 9.9 64.6 15.3 O.K
6 B3 슬래브 설치 및 6단계 굴착 15.6 9.4 64.6 14.6 O.K
7 B4 슬래브 설치 및 7단계 굴착 19.0 9.4 64.6 14.6 O.K
8 B5 슬래브 설치 및 8단계 굴착 22.5 9.4 64.6 14.6 O.K
9 B6 슬래브 설치 설치 및 9단계 굴착 25.9 10.9 64.6 16.8 O.K
10 가설지보재 설치 및 10단계 굴착 28.8 14.9 64.6 23.0 O.K
11 가설지보재 설치 및 11단계 굴착 32.3 20.2 64.6 31.3 O.K
12 슬래브, 벽체설치 및 가설지보재해체 32.3 21.7 64.6 33.5 O.K
13 벽체설치 및 가설지보재해체 32.3 21.5 64.6 33.3 O.K
14 벽체설치 및 가설지보재해체 32.3 21.5 64.6 33.3 O.K
15 벽체설치 32.3 21.5 64.6 33.3 O.K
6.3 OUTPUT DATA
S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 1 << 굴착 1단계 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 1.50
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -3.211 0.016 0.00 0.04


4 0.50 8.18 -3.072 0.016 -3.25 -0.73
9 1.40 5.01 -2.827 0.015 -13.53 -7.90
10 1.50 6.01 -2.801 0.015 -11.31 -9.31
18 3.10 1.55 -2.446 0.010 2.97 -11.82
21 3.60 8.25 -2.362 0.009 0.51 -10.77
24 4.10 -18.63 -2.288 0.008 -2.12 -12.06
26 4.40 -15.24 -2.250 0.007 2.94 -12.35
31 5.40 -4.65 -2.150 0.005 11.37 -4.76
43 7.80 20.95 -1.903 0.009 -7.25 12.57
45 8.10 -11.09 -1.854 0.010 -10.72 9.32
49 8.80 -1.43 -1.731 0.010 -7.89 2.71
53 9.60 -7.39 -1.585 0.010 -9.52 -4.28
61 11.10 -4.02 -1.351 0.007 0.50 -11.03
62 11.20 -3.46 -1.338 0.007 3.42 -10.96
67 12.20 0.45 -1.236 0.005 2.14 -8.60
71 12.90 1.54 -1.187 0.003 3.64 -7.78
80 14.60 -0.33 -1.126 0.001 1.64 -7.46
85 15.60 -2.35 -1.130 -0.001 1.40 -6.83
97 17.90 0.82 -1.228 -0.003 1.80 -2.26
98 18.00 0.83 -1.234 -0.003 4.06 -2.09
103 19.00 0.71 -1.298 -0.004 0.92 -0.31
107 19.80 0.49 -1.352 -0.004 0.44 0.23
116 21.50 0.11 -1.465 -0.004 2.75 0.49
121 22.50 0.01 -1.532 -0.004 -0.09 0.42
125 23.20 -0.03 -1.578 -0.004 2.92 0.36
134 24.90 -0.03 -1.692 -0.004 3.20 0.37
139 25.90 -0.02 -1.759 -0.004 0.01 0.27
143 26.60 -0.01 -1.807 -0.004 3.46 0.40
152 28.30 0.00 -1.925 -0.004 3.69 0.40
155 28.80 0.00 -1.960 -0.004 0.03 0.36
157 29.20 0.00 -1.988 -0.004 0.03 0.37
159 29.60 0.00 -2.016 -0.004 0.03 0.38
165 30.80 -0.01 -2.102 -0.004 0.04 0.42
173 32.30 0.00 -2.209 -0.004 0.04 0.48
176 32.80 0.00 -2.245 -0.004 4.31 0.51
179 33.30 -0.01 -2.282 -0.004 4.38 0.53
182 33.80 -0.02 -2.318 -0.004 4.46 0.56
185 34.30 -0.03 -2.354 -0.004 4.54 0.59
188 34.80 -0.04 -2.391 -0.004 4.62 0.63
191 35.30 -0.05 -2.428 -0.004 4.72 0.68
194 35.80 -0.06 -2.464 -0.004 4.81 0.74
197 36.30 -0.07 -2.501 -0.004 4.92 0.81
200 36.80 -0.06 -2.538 -0.004 5.02 0.91
203 37.30 -0.04 -2.574 -0.004 5.11 1.02
213 39.30 0.38 -2.72 -0.004 -10.32 1.38
노트 1) 최종횡력은 주동측 및 수동측 양측의 토압, 수압 기타 압력을 모두 고려한 합력이다
굴착측으로 작용할때 (+) 이다
2) 지보공의 반력은 배면측으로 밀때 (+) 이다
3) 압력, 전단력 및 모멘트는 벽체폭 1m 당이다
4) 지보공의 축력은 1개당의 값이며, 경사로 인하여 증가된 값이 포함 되어있다
5) 건물 벽체와 슬래브가 토압에 대하여 안전한지 별도의 검토가 필요하다
6) 본 리스트는 지정된 절점들에 대한 출력이며, 최대값은 본 리스트에 없는 절점에서
발생할 수 있다. 따라서 최대치는 xxx.tot 파일에 있는 값을 참조.

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 3.60
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.787 -0.038 0.00 0.04


4 0.50 8.18 -3.115 -0.038 41.58 -0.73 44.83(SL1)
9 1.40 5.01 -3.688 -0.034 31.30 32.45
10 1.50 6.01 -3.747 -0.033 30.75 35.58
18 3.10 22.05 -4.427 -0.013 8.30 70.34
21 3.60 28.34 -4.507 -0.005 0.36 71.55
24 4.10 37.32 -4.515 0.003 5.19 73.69
26 4.40 31.76 -4.485 0.008 -5.17 73.61
31 5.40 13.23 -4.205 0.023 -27.67 55.55
43 7.80 5.84 -2.875 0.034 -22.66 -11.34
45 8.10 -30.76 -2.700 0.033 -20.99 -18.85
49 8.80 -12.42 -2.320 0.029 -8.25 -28.74
53 9.60 -13.01 -1.954 0.023 -4.03 -33.30
61 11.10 -4.75 -1.493 0.012 7.92 -29.05
62 11.20 -4.58 -1.473 0.012 9.78 -28.23
67 12.20 2.37 -1.322 0.006 9.20 -18.54
71 12.90 4.15 -1.263 0.004 9.19 -13.36
80 14.60 1.32 -1.215 0.000 3.34 -7.40
85 15.60 -1.52 -1.229 -0.002 1.71 -5.87
97 17.90 0.77 -1.340 -0.004 1.48 -1.75
98 18.00 0.77 -1.346 -0.004 3.96 -1.61
103 19.00 0.60 -1.410 -0.004 0.70 -0.06
107 19.80 0.39 -1.463 -0.004 0.31 0.34
116 21.50 0.07 -1.576 -0.004 2.94 0.48
121 22.50 -0.01 -1.642 -0.004 -0.08 0.40
125 23.20 -0.03 -1.689 -0.004 3.14 0.35
134 24.90 -0.03 -1.802 -0.004 3.42 0.39
139 25.90 -0.02 -1.870 -0.004 0.02 0.30
143 26.60 -0.01 -1.918 -0.004 3.67 0.42
152 28.30 0.00 -2.035 -0.004 3.90 0.41
155 28.80 0.00 -2.070 -0.004 0.03 0.39
157 29.20 0.00 -2.099 -0.004 0.03 0.40
159 29.60 0.00 -2.127 -0.004 0.03 0.41
165 30.80 -0.01 -2.212 -0.004 0.04 0.45
173 32.30 0.00 -2.320 -0.004 0.04 0.51
176 32.80 0.00 -2.356 -0.004 4.52 0.54
179 33.30 -0.01 -2.392 -0.004 4.59 0.56
182 33.80 -0.02 -2.428 -0.004 4.67 0.59
185 34.30 -0.03 -2.465 -0.004 4.75 0.62
188 34.80 -0.04 -2.502 -0.004 4.83 0.66
191 35.30 -0.05 -2.538 -0.004 4.93 0.71
194 35.80 -0.06 -2.575 -0.004 5.03 0.77
197 36.30 -0.07 -2.612 -0.004 5.13 0.85
200 36.80 -0.07 -2.648 -0.004 5.24 0.95
203 37.30 -0.04 -2.685 -0.004 5.33 1.06
213 39.30 0.40 -2.83 -0.004 -10.74 1.43

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 5.40
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.674 -0.047 0.00 0.04


4 0.50 8.18 -3.082 -0.047 7.20 -0.73 10.45(SL1)
9 1.40 5.01 -3.816 -0.047 -3.08 1.51
10 1.50 6.01 -3.897 -0.047 -3.63 1.20
18 3.10 22.05 -5.211 -0.049 121.76 -19.06 0.00 443.53(ST1)
21 3.60 28.34 -5.635 -0.048 109.32 38.90
24 4.10 51.80 -6.022 -0.040 92.44 89.82
26 4.40 55.77 -6.215 -0.033 76.31 115.19
31 5.40 69.00 -6.527 -0.001 13.93 161.49
43 7.80 24.52 -4.919 0.066 -98.29 38.63
45 8.10 -85.55 -4.569 0.068 -95.72 8.33
49 8.80 -52.55 -3.755 0.064 -51.32 -42.95
53 9.60 -42.06 -2.926 0.054 -20.95 -70.75
61 11.10 -10.66 -1.857 0.028 15.46 -69.07
62 11.20 -9.46 -1.809 0.027 18.18 -67.47
67 12.20 -0.53 -1.464 0.014 21.55 -47.60
71 12.90 6.22 -1.340 0.007 21.79 -33.40
80 14.60 5.36 -1.266 -0.001 9.38 -11.36
85 15.60 1.20 -1.297 -0.003 4.23 -5.69
97 17.90 1.04 -1.440 -0.004 1.00 -0.36
98 18.00 0.98 -1.447 -0.004 3.65 0.29
103 19.00 0.49 -1.516 -0.004 0.17 0.78
107 19.80 0.20 -1.570 -0.004 -0.10 0.80
116 21.50 -0.05 -1.682 -0.004 3.02 0.51
121 22.50 -0.07 -1.747 -0.004 -0.11 0.37
125 23.20 -0.06 -1.793 -0.004 3.35 0.37
134 24.90 -0.02 -1.906 -0.004 3.64 0.44
139 25.90 -0.01 -1.974 -0.004 0.03 0.31
143 26.60 0.00 -2.021 -0.004 3.88 0.43
152 28.30 0.01 -2.139 -0.004 4.10 0.42
155 28.80 0.00 -2.174 -0.004 0.03 0.42
157 29.20 0.00 -2.202 -0.004 0.03 0.43
159 29.60 0.00 -2.231 -0.004 0.03 0.44
165 30.80 -0.01 -2.316 -0.004 0.04 0.48
173 32.30 0.00 -2.424 -0.004 0.04 0.54
176 32.80 0.00 -2.460 -0.004 4.72 0.57
179 33.30 -0.01 -2.496 -0.004 4.79 0.59
182 33.80 -0.02 -2.532 -0.004 4.87 0.62
185 34.30 -0.03 -2.569 -0.004 4.95 0.65
188 34.80 -0.04 -2.606 -0.004 5.03 0.69
191 35.30 -0.06 -2.642 -0.004 5.13 0.74
194 35.80 -0.07 -2.679 -0.004 5.23 0.80
197 36.30 -0.07 -2.716 -0.004 5.33 0.89
200 36.80 -0.07 -2.752 -0.004 5.44 0.98
203 37.30 -0.05 -2.789 -0.004 5.54 1.10
213 39.30 0.41 -2.93 -0.004 -11.13 1.48

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 8.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.752 -0.035 0.00 0.04


4 0.50 8.18 -3.056 -0.035 -20.59 -0.73 -17.34(SL1)
9 1.40 5.01 -3.616 -0.037 -30.87 -23.51
10 1.50 6.01 -3.682 -0.038 -31.42 -26.63
18 3.10 22.05 -4.967 -0.058 -53.87 -91.31 0.00 305.48(ST1)
21 3.60 28.34 -5.516 -0.067 35.51 -70.28
24 4.10 51.80 -6.135 -0.074 18.64 -56.51
26 4.40 55.77 -6.535 -0.078 203.72 -53.30 201.22(SL2)
31 5.40 69.00 -7.880 -0.069 141.34 120.71
43 7.80 100.76 -8.534 0.048 -62.36 230.95
45 8.10 81.83 -8.241 0.063 -92.04 207.56
49 8.80 91.05 -7.290 0.090 -145.48 122.56
53 9.60 -72.63 -5.928 0.101 -145.31 2.06
61 11.10 -58.00 -3.516 0.076 -19.67 -117.62
62 11.20 -53.66 -3.385 0.073 -10.87 -119.30
67 12.20 -20.14 -2.341 0.046 21.38 -112.27
71 12.90 -6.80 -1.876 0.030 32.18 -93.84
80 14.60 9.36 -1.420 0.004 29.21 -41.41
85 15.60 8.14 -1.413 -0.003 17.79 -18.86
97 17.90 3.82 -1.610 -0.006 2.55 1.74
98 18.00 3.56 -1.620 -0.005 5.26 2.61
103 19.00 1.44 -1.710 -0.005 -0.25 3.39
107 19.80 0.40 -1.774 -0.004 -0.95 2.85
116 21.50 -0.35 -1.892 -0.004 2.81 1.19
121 22.50 -0.33 -1.957 -0.004 -0.44 0.58
125 23.20 -0.25 -2.002 -0.004 3.57 0.41
134 24.90 -0.07 -2.113 -0.004 4.04 0.58
139 25.90 -0.02 -2.180 -0.004 0.07 0.28
143 26.60 0.01 -2.228 -0.004 4.31 0.51
152 28.30 0.02 -2.346 -0.004 4.51 0.45
155 28.80 0.01 -2.381 -0.004 0.04 0.47
157 29.20 0.01 -2.409 -0.004 0.04 0.48
159 29.60 0.00 -2.437 -0.004 0.03 0.50
165 30.80 -0.01 -2.523 -0.004 0.04 0.54
173 32.30 0.00 -2.630 -0.004 0.04 0.60
176 32.80 0.00 -2.666 -0.004 5.11 0.62
179 33.30 -0.01 -2.703 -0.004 5.18 0.65
182 33.80 -0.02 -2.739 -0.004 5.26 0.68
185 34.30 -0.03 -2.776 -0.004 5.34 0.71
188 34.80 -0.05 -2.812 -0.004 5.43 0.75
191 35.30 -0.06 -2.849 -0.004 5.53 0.80
194 35.80 -0.07 -2.886 -0.004 5.63 0.87
197 36.30 -0.08 -2.922 -0.004 5.74 0.95
200 36.80 -0.07 -2.959 -0.004 5.84 1.06
203 37.30 -0.05 -2.995 -0.004 5.94 1.18
213 39.30 0.44 -3.14 -0.004 -11.92 1.59

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 12.20
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -11.67 -0.73 -8.41(SL1)
9 1.40 5.01 -3.660 -0.039 -21.95 -15.48
10 1.50 6.01 -3.729 -0.039 -22.50 -17.70
18 3.10 22.05 -4.987 -0.054 60.77 -68.10 0.00 317.16(ST1)
21 3.60 28.34 -5.486 -0.060 48.33 -40.66
24 4.10 51.80 -6.026 -0.063 31.46 -20.48
26 4.40 55.77 -6.361 -0.065 107.35 -13.42 92.02(SL2)
31 5.40 69.00 -7.453 -0.058 44.97 64.22
43 7.80 100.76 -9.142 -0.034 224.17 -56.87 382.91(SL3)
45 8.10 81.83 -9.325 -0.035 194.49 5.71
49 8.80 91.05 -9.713 -0.025 133.99 121.12
53 9.60 88.95 -9.869 0.005 58.20 198.14
61 11.10 87.95 -8.804 0.076 -74.47 185.27
62 11.20 87.88 -8.668 0.080 -83.26 177.83
67 12.20 87.21 -6.992 0.107 -158.74 51.05
71 12.90 -72.33 -5.665 0.107 -121.73 -49.31
80 14.60 -43.25 -3.045 0.064 7.64 -137.83
85 15.60 -17.01 -2.193 0.035 33.32 -116.08
97 17.90 14.25 -1.715 -0.003 28.84 -29.45
98 18.00 14.30 -1.720 -0.004 30.68 -26.64
103 19.00 11.60 -1.818 -0.007 14.11 -5.40
107 19.80 7.81 -1.918 -0.007 6.33 2.55
116 21.50 1.63 -2.108 -0.005 2.91 5.47
121 22.50 0.00 -2.195 -0.005 -1.81 3.87
125 23.20 -0.47 -2.247 -0.004 2.65 2.65
134 24.90 -0.52 -2.361 -0.004 3.85 0.74
139 25.90 -0.32 -2.426 -0.004 -0.21 0.33
143 26.60 -0.19 -2.473 -0.004 4.66 0.69
152 28.30 0.00 -2.588 -0.004 5.02 0.63
155 28.80 0.01 -2.623 -0.004 0.10 0.41
157 29.20 0.02 -2.651 -0.004 0.09 0.45
159 29.60 0.02 -2.679 -0.004 0.09 0.49
165 30.80 0.01 -2.765 -0.004 0.07 0.58
173 32.30 0.01 -2.872 -0.004 0.05 0.67
176 32.80 0.00 -2.908 -0.004 5.57 0.70
179 33.30 -0.01 -2.945 -0.004 5.64 0.72
182 33.80 -0.02 -2.981 -0.004 5.72 0.75
185 34.30 -0.03 -3.018 -0.004 5.80 0.78
188 34.80 -0.05 -3.054 -0.004 5.89 0.83
191 35.30 -0.06 -3.091 -0.004 5.99 0.88
194 35.80 -0.08 -3.128 -0.004 6.09 0.95
197 36.30 -0.08 -3.165 -0.004 6.21 1.04
200 36.80 -0.08 -3.201 -0.004 6.32 1.15
203 37.30 -0.05 -3.238 -0.004 6.42 1.28
213 39.30 0.47 -3.38 -0.004 -12.84 1.71
S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 15.60
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.45 -0.73 -9.20(SL1)
9 1.40 5.01 -3.658 -0.039 -22.73 -16.19
10 1.50 6.01 -3.726 -0.039 -23.29 -18.49
18 3.10 22.05 -4.989 -0.054 60.37 -70.15 0.00 318.31(ST1)
21 3.60 28.34 -5.493 -0.061 47.93 -42.91
24 4.10 51.80 -6.041 -0.064 31.05 -22.94
26 4.40 55.77 -6.381 -0.066 119.55 -16.00 104.64(SL2)
31 5.40 69.00 -7.490 -0.058 57.17 73.84
43 7.80 100.76 -8.972 -0.021 -146.53 -17.95 275.97(SL3)
45 8.10 81.83 -9.083 -0.021 99.76 16.21
49 8.80 91.05 -9.303 -0.014 39.25 65.31
53 9.60 88.95 -9.409 -0.001 -36.53 66.54
61 11.10 87.95 -9.301 0.001 -169.20 -88.42
62 11.20 87.88 -9.302 -0.002 221.43 -105.78 399.42(SL4)
67 12.20 87.21 -9.407 -0.004 133.88 72.26
71 12.90 86.75 -9.357 0.014 73.00 144.64
80 14.60 85.65 -8.001 0.077 -73.54 143.91
85 15.60 85.02 -6.429 0.098 -146.81 27.98
97 17.90 -46.55 -3.094 0.054 8.34 -134.19
98 18.00 -43.71 -3.003 0.051 15.71 -133.12
103 19.00 -11.61 -2.370 0.023 42.53 -102.20
107 19.80 8.08 -2.161 0.008 42.92 -66.85
116 21.50 13.87 -2.193 -0.006 24.06 -13.10
121 22.50 9.17 -2.320 -0.008 8.27 1.46
125 23.20 5.80 -2.411 -0.007 7.64 5.27
134 24.90 0.66 -2.592 -0.005 3.17 5.10
139 25.90 -0.42 -2.674 -0.004 -1.79 3.23
143 26.60 -0.64 -2.725 -0.004 3.77 2.11
152 28.30 -0.43 -2.840 -0.004 4.98 0.62
155 28.80 -0.33 -2.873 -0.004 -0.22 0.47
157 29.20 -0.25 -2.901 -0.004 -0.11 0.41
159 29.60 -0.19 -2.928 -0.004 -0.02 0.38
165 30.80 -0.05 -3.011 -0.004 0.11 0.45
173 32.30 0.02 -3.118 -0.004 0.12 0.64
176 32.80 0.02 -3.154 -0.004 6.10 0.70
179 33.30 0.02 -3.190 -0.004 6.16 0.75
182 33.80 0.00 -3.227 -0.004 6.22 0.80
185 34.30 -0.02 -3.264 -0.004 6.29 0.85
188 34.80 -0.04 -3.300 -0.004 6.38 0.90
191 35.30 -0.06 -3.337 -0.004 6.47 0.96
194 35.80 -0.08 -3.374 -0.004 6.57 1.03
197 36.30 -0.09 -3.411 -0.004 6.68 1.13
200 36.80 -0.08 -3.447 -0.004 6.80 1.24
203 37.30 -0.06 -3.484 -0.004 6.90 1.38
213 39.30 0.49 -3.62 -0.004 -13.77 1.84

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.


Input Data File = 4.B-B(R).dat Date : 2022-12-07
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 19.00
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.44 -0.73 -9.19(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.18
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.27 -70.12 0.00 317.98(ST1)
21 3.60 28.34 -5.493 -0.061 47.83 -42.93
24 4.10 51.80 -6.040 -0.064 30.95 -23.01
26 4.40 55.77 -6.380 -0.066 118.84 -16.09 104.02(SL2)
31 5.40 69.00 -7.490 -0.058 56.46 73.03
43 7.80 100.76 -8.991 -0.022 -147.25 -20.48 288.06(SL3)
45 8.10 81.83 -9.107 -0.022 111.14 17.10
49 8.80 91.05 -9.338 -0.014 50.63 74.16
53 9.60 88.95 -9.432 0.001 -25.16 84.49
61 11.10 87.95 -9.162 0.012 -157.83 -53.40
62 11.20 87.88 -9.143 0.010 -166.62 -69.62 299.34(SL4)
67 12.20 87.21 -9.026 0.006 45.18 19.71
71 12.90 86.75 -8.924 0.011 -15.71 30.00
80 14.60 85.65 -8.607 0.001 219.10 -121.96 381.35(SL5)
85 15.60 85.02 -8.703 -0.005 133.77 54.85
97 17.90 83.68 -7.660 0.065 -60.21 138.42
98 18.00 83.62 -7.545 0.068 -68.58 132.40
103 19.00 83.09 -6.163 0.087 -139.86 22.42
107 19.80 -80.83 -4.970 0.081 -92.19 -73.37
116 21.50 -39.82 -3.157 0.038 26.20 -118.59
121 22.50 -1.59 -2.708 0.015 41.77 -82.24
125 23.20 10.26 -2.598 0.004 43.13 -54.73
134 24.90 12.15 -2.687 -0.007 20.95 -8.52
139 25.90 7.53 -2.815 -0.007 5.96 3.04
143 26.60 4.54 -2.902 -0.007 7.28 5.61
152 28.30 0.31 -3.076 -0.005 4.10 4.58
155 28.80 -0.21 -3.118 -0.005 -1.76 3.70
157 29.20 -0.45 -3.149 -0.004 -1.63 3.02
159 29.60 -0.58 -3.179 -0.004 -1.42 2.40
165 30.80 -0.55 -3.264 -0.004 -0.70 1.14
173 32.30 -0.25 -3.368 -0.004 -0.09 0.61
176 32.80 -0.17 -3.403 -0.004 6.48 0.70
179 33.30 -0.11 -3.438 -0.004 6.61 0.69
182 33.80 -0.07 -3.474 -0.004 6.72 0.67
185 34.30 -0.05 -3.510 -0.004 6.82 0.75
188 34.80 -0.04 -3.546 -0.004 6.91 0.83
191 35.30 -0.05 -3.583 -0.004 7.01 0.93
194 35.80 -0.06 -3.620 -0.004 7.10 1.04
197 36.30 -0.07 -3.656 -0.004 7.21 1.16
200 36.80 -0.06 -3.693 -0.004 7.31 1.30
203 37.30 -0.04 -3.729 -0.004 7.41 1.46
213 39.30 0.53 -3.87 -0.004 -14.70 1.96

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 22.50
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.43 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.71 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.10 0.00 318.03(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.89
24 4.10 51.80 -6.040 -0.064 30.98 -22.96
26 4.40 55.77 -6.380 -0.066 118.83 -16.04 103.98(SL2)
31 5.40 69.00 -7.489 -0.058 56.44 73.08
43 7.80 100.76 -8.990 -0.022 -147.26 -20.46 286.92(SL3)
45 8.10 81.83 -9.105 -0.022 109.98 16.76
49 8.80 91.05 -9.336 -0.014 49.47 73.01
53 9.60 88.95 -9.433 0.001 -26.32 82.42
61 11.10 87.95 -9.185 0.010 -158.99 -57.22
62 11.20 87.88 -9.169 0.009 -167.78 -73.56 315.51(SL4)
67 12.20 87.21 -9.075 0.006 60.19 30.78
71 12.90 86.75 -8.967 0.013 -0.70 51.58
80 14.60 85.65 -8.420 0.016 -147.23 -74.87 263.88(SL5)
85 15.60 85.02 -8.226 0.009 31.32 -0.51
97 17.90 83.68 -8.015 -0.012 -162.66 -152.58
98 18.00 83.62 -8.038 -0.015 243.67 -169.27 414.69(SL6)
103 19.00 83.09 -8.495 -0.029 160.31 33.09
107 19.80 83.74 -8.815 -0.013 93.90 134.80
116 21.50 93.90 -8.257 0.053 -57.08 168.61
121 22.50 99.93 -7.049 0.081 -141.93 63.93
125 23.20 -54.91 -6.025 0.084 -115.45 -28.13
134 24.90 -49.69 -3.974 0.048 7.30 -120.70
139 25.90 -14.60 -3.360 0.023 37.00 -96.78
143 26.60 3.84 -3.165 0.010 46.11 -70.14
152 28.30 13.19 -3.160 -0.006 26.86 -16.24
155 28.80 11.52 -3.217 -0.007 14.65 -6.14
157 29.20 9.77 -3.268 -0.007 10.38 -1.17
159 29.60 7.93 -3.320 -0.008 6.84 2.24
165 30.80 3.16 -3.469 -0.006 0.37 5.96
173 32.30 0.10 -3.616 -0.005 -1.69 4.38
176 32.80 -0.31 -3.658 -0.005 5.32 3.54
179 33.30 -0.53 -3.697 -0.004 5.61 2.78
182 33.80 -0.62 -3.734 -0.004 5.97 2.15
185 34.30 -0.62 -3.771 -0.004 6.35 1.67
188 34.80 -0.56 -3.807 -0.004 6.72 1.34
191 35.30 -0.49 -3.842 -0.004 7.05 1.15
194 35.80 -0.41 -3.878 -0.004 7.34 1.09
197 36.30 -0.32 -3.913 -0.004 7.59 1.13
200 36.80 -0.24 -3.949 -0.004 7.80 1.25
203 37.30 -0.14 -3.984 -0.004 7.96 1.43
213 39.30 0.69 -4.12 -0.004 -15.66 2.09

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 9 << B6 슬래브 설치 설치 및 9단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 25.90
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.44 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.10 0.00 318.02(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.90
24 4.10 51.80 -6.040 -0.064 30.97 -22.97
26 4.40 55.77 -6.380 -0.066 118.84 -16.05 104.00(SL2)
31 5.40 69.00 -7.489 -0.058 56.46 73.08
43 7.80 100.76 -8.990 -0.022 -147.25 -20.43 287.03(SL3)
45 8.10 81.83 -9.105 -0.022 110.11 16.84
49 8.80 91.05 -9.336 -0.014 49.60 73.17
53 9.60 88.95 -9.433 0.001 -26.18 82.69
61 11.10 87.95 -9.182 0.011 -158.85 -56.75
62 11.20 87.88 -9.164 0.009 -167.65 -73.08 312.87(SL4)
67 12.20 87.21 -9.068 0.006 57.68 28.75
71 12.90 86.75 -8.962 0.012 -3.21 47.79
80 14.60 85.65 -8.458 0.013 -149.74 -82.92 287.81(SL5)
85 15.60 85.02 -8.313 0.007 52.73 12.85
97 17.90 83.68 -7.875 0.006 -141.25 -89.98
98 18.00 83.62 -7.866 0.004 -149.62 -104.52 270.16(SL6)
103 19.00 83.09 -7.942 -0.009 37.19 -25.29
107 19.80 83.74 -8.100 -0.013 -29.23 -22.09
116 21.50 93.90 -8.830 -0.047 300.90 -198.06 481.10(SL7)
121 22.50 99.93 -9.868 -0.062 203.99 55.40
125 23.20 104.17 -10.528 -0.043 132.56 173.40
134 24.90 114.54 -10.536 0.047 -53.32 243.31
139 25.90 120.68 -9.286 0.092 -158.87 132.05
143 26.60 -34.07 -8.072 0.104 -146.95 23.25
152 28.30 -77.44 -5.258 0.075 -21.79 -139.73
155 28.80 -54.90 -4.675 0.059 6.10 -143.69
157 29.20 -40.76 -4.311 0.046 25.15 -137.16
159 29.60 -27.53 -4.033 0.034 38.97 -124.48
165 30.80 9.60 -3.630 0.007 45.60 -68.67
173 32.30 15.41 -3.661 -0.007 23.54 -15.78
176 32.80 13.29 -3.725 -0.008 23.41 -7.35
179 33.30 10.63 -3.796 -0.008 17.55 0.76
182 33.80 7.93 -3.868 -0.008 13.05 4.68
185 34.30 5.48 -3.937 -0.008 9.84 6.63
188 34.80 3.44 -4.000 -0.007 7.75 7.21
191 35.30 1.86 -4.057 -0.006 6.55 6.92
194 35.80 0.70 -4.109 -0.006 6.02 6.15
197 36.30 -0.08 -4.156 -0.005 5.97 5.21
200 36.80 -0.55 -4.199 -0.005 6.22 4.28
203 37.30 -0.79 -4.239 -0.004 6.63 3.48
213 39.30 -0.34 -4.38 -0.004 -16.64 2.21

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>
계산결과 토압, 변위, 회전, 전단력 및 모멘트
굴착깊이 = 28.80
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.44 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.10 0.00 318.02(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.90
24 4.10 51.80 -6.040 -0.064 30.97 -22.97
26 4.40 55.77 -6.380 -0.066 118.84 -16.05 104.00(SL2)
31 5.40 69.00 -7.489 -0.058 56.46 73.07
43 7.80 100.76 -8.990 -0.022 -147.25 -20.43 287.06(SL3)
45 8.10 81.83 -9.105 -0.022 110.13 16.84
49 8.80 91.05 -9.336 -0.014 49.62 73.19
53 9.60 88.95 -9.433 0.001 -26.16 82.72
61 11.10 87.95 -9.181 0.011 -158.83 -56.68
62 11.20 87.88 -9.164 0.009 -167.62 -73.01 312.59(SL4)
67 12.20 87.21 -9.068 0.006 57.42 28.57
71 12.90 86.75 -8.961 0.012 -3.47 47.42
80 14.60 85.65 -8.461 0.013 -150.00 -83.73 289.71(SL5)
85 15.60 85.02 -8.321 0.007 54.37 13.69
97 17.90 83.68 -7.871 0.007 -139.61 -85.35
98 18.00 83.62 -7.860 0.005 -147.97 -99.73 265.09(SL6)
103 19.00 83.09 -7.906 -0.007 33.77 -23.92
107 19.80 83.74 -8.036 -0.011 -32.65 -23.45
116 21.50 93.90 -8.726 -0.047 210.35 -205.24 393.98(SL7)
121 22.50 99.93 -9.832 -0.073 113.44 -42.33
125 23.20 104.17 -10.750 -0.075 42.01 12.28
134 24.90 114.54 -12.929 -0.077 307.71 -72.31 0.00 1354.73(ST2)
139 25.90 120.68 -14.231 -0.063 190.10 177.73
143 26.60 125.01 -14.788 -0.026 104.11 280.90
152 28.30 135.57 -13.783 0.093 -117.37 272.25
155 28.80 138.69 -12.850 0.120 -173.87 196.82
157 29.20 -1.41 -11.959 0.134 -177.20 125.93
159 29.60 -20.87 -10.988 0.143 -172.74 55.55
165 30.80 -79.21 -8.028 0.132 -112.69 -123.15
173 32.30 -59.86 -5.298 0.073 20.21 -187.43
176 32.80 -38.68 -4.752 0.053 49.11 -171.38
179 33.30 -17.38 -4.375 0.034 67.47 -145.74
182 33.80 3.16 -4.141 0.020 70.23 -114.82
185 34.30 15.07 -4.020 0.008 65.17 -84.54
188 34.80 20.63 -3.984 0.000 55.99 -57.92
191 35.30 21.82 -4.004 -0.005 45.29 -36.37
194 35.80 20.27 -4.061 -0.008 34.80 -20.23
197 36.30 17.18 -4.139 -0.010 25.55 -9.13
200 36.80 13.42 -4.225 -0.010 18.05 -2.31
203 37.30 9.48 -4.313 -0.010 12.50 2.85
213 39.30 -4.73 -4.65 -0.009 -17.66 2.32

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 11 << 가설지보재 설치 및 11단계 굴착 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -12.44 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.10 0.00 318.02(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.90
24 4.10 51.80 -6.040 -0.064 30.97 -22.97
26 4.40 55.77 -6.380 -0.066 118.84 -16.05 104.00(SL2)
31 5.40 69.00 -7.489 -0.058 56.46 73.07
43 7.80 100.76 -8.990 -0.022 -147.25 -20.44 287.05(SL3)
45 8.10 81.83 -9.105 -0.022 110.12 16.84
49 8.80 91.05 -9.336 -0.014 49.61 73.18
53 9.60 88.95 -9.433 0.001 -26.17 82.70
61 11.10 87.95 -9.182 0.011 -158.84 -56.72
62 11.20 87.88 -9.164 0.009 -167.63 -73.04 312.79(SL4)
67 12.20 87.21 -9.068 0.006 57.61 28.72
71 12.90 86.75 -8.962 0.012 -3.28 47.71
80 14.60 85.65 -8.458 0.013 -149.81 -83.12 287.94(SL5)
85 15.60 85.02 -8.315 0.007 52.79 12.71
97 17.90 83.68 -7.881 0.006 -141.19 -89.97
98 18.00 83.62 -7.872 0.004 -149.55 -104.50 275.40(SL6)
103 19.00 83.09 -7.947 -0.009 42.50 -19.96
107 19.80 83.74 -8.089 -0.011 -23.92 -12.51
116 21.50 93.90 -8.693 -0.040 191.07 -179.46 365.97(SL7)
121 22.50 99.93 -9.639 -0.063 94.16 -35.83
125 23.20 104.17 -10.426 -0.065 22.73 5.29
134 24.90 114.54 -12.393 -0.075 187.35 -112.08 0.00 1051.51(ST2)
139 25.90 120.68 -13.826 -0.084 69.75 17.60
143 26.60 125.01 -14.825 -0.079 -16.24 36.53
152 28.30 135.57 -17.193 -0.094 405.79 -177.41 0.00 1930.54(ST3)
155 28.80 138.69 -18.072 -0.104 337.23 9.12
157 29.20 141.20 -18.779 -0.097 281.25 132.86
159 29.60 143.71 -19.404 -0.080 224.27 234.01
165 30.80 151.25 -20.214 0.010 47.30 397.91
173 32.30 160.73 -18.195 0.138 -174.62 295.53
176 32.80 15.80 -16.859 0.166 -188.59 203.71
179 33.30 -8.48 -15.321 0.184 -190.42 108.36
182 33.80 -32.75 -13.676 0.191 -180.11 15.18
185 34.30 -57.02 -12.015 0.188 -157.67 -70.12
188 34.80 -81.29 -10.422 0.176 -123.09 -140.98
191 35.30 -105.56 -8.966 0.157 -76.38 -191.51
194 35.80 -128.74 -7.697 0.134 -10.27 -215.17
197 36.30 -88.06 -6.638 0.109 42.63 -209.22
200 36.80 -55.18 -5.785 0.087 77.37 -181.29
203 37.30 -29.07 -5.109 0.069 97.57 -139.46
213 39.30 114.17 -3.34 0.044 -12.68 2.45

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 11 << 가설지보재 설치 및 11단계 굴착 >>

Caspe(1966) 방법에 따른 지표면 침하 계산


(FOUNDATION ANALYSIS AND DESIGN 5th ed., Bowles, p804)

굴착깊이 (HW) = 32.30 m


평균 내부마찰각 = 27.84 Deg (흙막이 벽 하단까지)
굴착폭 (B) = 45.00 m
Hp = (0.5 B tan(45+PHI/2) = 37.33 m
Ht = (Hw+Hp) = 69.63 m
영향거리 D=Ht*tan(45-PHI/2)) = 41.97 m
영향거리/굴착깊이(D/Hw) 의 최대비율 = 10.00
Settlement at x from the wall, Sx = Sw x (1 - x/D) ^2
수정된 영향거리 = 41.97 m

횡방향 변위의 체적 (Vs) = 0.38993 m3


벽체에서의 침하 (Sw) = 2 Vs/D = 0.01858 m = -18.58 mm
벽체에서 x만큼 떨어진 지점의 침하Sx = Sw x (1 - x/D) ^2, (^2는 제곱임)

벽체에서의 거리 0.0*D 0.1*D 0.2*D 0.3*D 0.5*D 1.0*D


( m ) 0.0 4.2 8.4 12.6 21.0 42.0

침하 (mm) -18.58 -15.05 -11.89 -9.10 -4.65 0.00


(- 값은 침하이며 + 값은 융기를 나타냄)

For X1 = 1.0 m S1 = -17.71 mm


For X2 = 6.0 m S2 = -13.65 mm
Slope = 1000 x (6.0 - 1.0) / (17.71 - 13.65) = 1/1,232

Note. 결과는 Caspe가 제안한 방법에 의한 개략치임

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 11 << 가설지보재 설치 및 11단계 굴착 >>

근입장 체크 (WALL DEPTH CHECK)


최하단 지보공의 깊이 = 28.30, 절점번호 = 152

Node Depth 주동 기타 합계 주동 수동 기타 수동 안전율


No. GL 토압 횡력 횡력 모멘트 토압 횡력 모멘트
(kN/m2) (kN/m2) (kNm) (kN/m2) (kN/m2) (kNm)
152 28.30 136.26 15.37 151.63 0.00
153 28.50 137.76 14.60 152.36 4.57
154 28.60 138.51 14.21 152.72 6.87
155 28.80 140.01 13.44 153.45 15.35
156 29.00 141.51 12.68 154.19 21.59
157 29.20 143.01 11.91 154.92 27.89
158 29.40 144.51 11.14 155.65 34.24
159 29.60 146.02 10.37 156.39 40.66
160 29.80 147.52 9.60 157.13 47.14
161 30.00 149.03 8.84 157.86 53.67
162 30.20 150.53 8.07 158.60 60.27
163 30.40 152.04 7.30 159.34 66.92
164 30.60 153.55 6.53 160.08 73.64
165 30.80 155.06 5.76 160.82 80.41
166 31.00 156.57 4.99 161.56 87.24
167 31.20 158.08 4.23 162.31 94.14
168 31.40 159.59 3.46 163.05 101.09
169 31.60 161.11 2.69 163.79 108.10
170 31.80 162.62 1.92 164.54 115.18
171 32.00 164.13 1.15 165.29 91.73
172 32.10 164.89 0.77 165.66 94.43
173 32.30 166.41 0.00 166.41 133.13 -120.65 0.00 -96.52 0.07
174 32.50 167.15 0.00 167.15 140.41 -131.63 0.00 -110.57 0.14
175 32.70 167.90 0.00 167.90 110.82 -142.61 0.00 -94.12 0.19
176 32.80 168.28 0.00 168.28 113.59 -148.10 0.00 -99.97 0.23
177 33.00 169.03 0.00 169.03 158.89 -159.08 0.00 -149.54 0.29
178 33.20 169.78 0.00 169.78 124.79 -170.06 0.00 -124.99 0.34
179 33.30 170.15 0.00 170.15 127.61 -175.55 0.00 -131.66 0.38
180 33.50 170.90 0.00 170.90 177.74 -186.53 0.00 -194.00 0.43
181 33.70 171.66 0.00 171.66 139.04 -197.51 0.00 -159.99 0.47
182 33.80 172.03 0.00 172.03 141.93 -203.01 0.00 -167.48 0.51
183 34.00 172.79 0.00 172.79 196.98 -213.99 0.00 -243.95 0.56
184 34.20 173.54 0.00 173.54 153.58 -224.97 0.00 -199.10 0.60
185 34.30 173.92 0.00 173.92 156.52 -230.46 0.00 -207.41 0.64
186 34.50 174.67 0.00 174.67 216.59 -241.44 0.00 -299.39 0.69
187 34.70 175.43 0.00 175.43 168.41 -252.42 0.00 -242.32 0.72
188 34.80 175.80 0.00 175.80 171.41 -257.91 0.00 -251.46 0.76
189 35.00 176.56 0.00 176.56 236.59 -268.89 0.00 -360.32 0.80
190 35.20 177.31 0.00 177.31 183.52 -279.87 0.00 -289.67 0.84
191 35.30 177.69 0.00 177.69 186.58 -285.36 0.00 -299.63 0.87
192 35.50 178.45 0.00 178.45 256.97 -296.35 0.00 -426.74 0.92
193 35.70 179.21 0.00 179.21 198.92 -307.33 0.00 -341.13 0.95
194 35.80 179.58 0.00 179.58 202.03 -312.82 0.00 -351.92 0.98
195 36.00 180.34 0.00 180.34 277.73 -323.80 0.00 -498.65 1.03
196 36.20 181.10 0.00 181.10 214.60 -334.78 0.00 -396.71 1.06
197 36.30 181.48 0.00 181.48 217.77 -340.27 0.00 -408.32 1.09
198 36.50 182.24 0.00 182.24 298.87 -351.25 0.00 -576.06 1.13
199 36.70 183.00 0.00 183.00 230.57 -362.23 0.00 -456.41 1.17
200 36.80 183.38 0.00 183.38 233.80 -367.72 0.00 -468.85 1.20
201 37.00 184.14 0.00 184.14 320.40 -378.71 0.00 -658.95 1.24
202 37.20 184.89 0.00 184.89 246.83 -389.69 0.00 -520.23 1.27
203 37.30 185.27 0.00 185.27 250.12 -395.18 0.00 -533.49 1.30
204 37.50 186.03 0.00 186.03 342.30 -406.16 0.00 -747.34 1.34
205 37.70 186.79 0.00 186.79 351.17 -417.14 0.00 -784.23 1.38
206 37.90 187.55 0.00 187.55 360.10 -428.12 0.00 -821.99 1.42
207 38.10 188.31 0.00 188.31 369.09 -439.10 0.00 -860.64 1.46
208 38.30 189.08 0.00 189.08 378.15 -450.08 0.00 -900.17 1.49
209 38.50 189.84 0.00 189.84 387.27 -461.07 0.00 -940.58 1.53
210 38.70 190.60 0.00 190.60 396.44 -472.05 0.00 -981.86 1.57
211 38.90 191.36 0.00 191.36 405.68 -483.03 0.00 -1024.02 1.61
212 39.10 192.12 0.00 192.12 414.97 -494.01 0.00 -1067.06 1.65
213 39.30 192.88 0.00 192.88 212.17 -504.99 0.00 -555.49 1.67

10510.95 169.02 10829.22-12605.92 0.00-18042.92

합계 주동 모멘트 (Ma) = 10829.22


합계 수동 모멘트 (Mp) = -18042.92
안전율 (Mp/Ma) = 1.67

최소 안전율 = 1.2 이상이어야 함

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -7.84 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.10 0.00 318.02(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.90
24 4.10 51.80 -6.040 -0.064 30.97 -22.97
26 4.40 55.77 -6.380 -0.066 66.84 -16.05 104.00(SL2)
31 5.40 69.00 -7.489 -0.058 56.46 73.07
43 7.80 100.76 -8.990 -0.022 -3.72 -20.44 287.06(SL3)
45 8.10 81.83 -9.105 -0.022 110.13 16.84
49 8.80 91.05 -9.336 -0.014 49.63 73.19
53 9.60 88.95 -9.433 0.001 -26.16 82.72
61 11.10 87.95 -9.181 0.011 -158.83 -56.68
62 11.20 87.88 -9.164 0.009 -11.30 -73.00 312.64(SL4)
67 12.20 87.21 -9.068 0.006 57.47 28.62
71 12.90 86.75 -8.961 0.012 -3.42 47.51
80 14.60 85.65 -8.460 0.013 -5.48 -83.55 288.95(SL5)
85 15.60 85.02 -8.319 0.007 53.67 13.15
97 17.90 83.68 -7.879 0.006 -140.31 -87.51
98 18.00 83.62 -7.869 0.004 -12.26 -101.96 272.84(SL6)
103 19.00 83.09 -7.928 -0.008 40.80 -19.11
107 19.80 83.74 -8.055 -0.010 -25.61 -13.02
116 21.50 93.90 -8.635 -0.040 -18.02 -182.85 317.15(SL7)
121 22.50 99.93 -9.615 -0.069 43.65 -89.74
125 23.20 104.17 -10.541 -0.082 -27.78 -84.50
134 24.90 114.54 -13.704 -0.144 384.29 -287.22 0.00 1793.86(ST2)
139 25.90 120.68 -16.552 -0.170 266.68 39.40
143 26.60 125.01 -18.536 -0.151 180.69 196.18
152 28.30 135.57 -21.474 -0.040 -40.78 317.72
155 28.80 138.69 -21.668 -0.005 -109.35 280.27
157 29.20 141.20 -21.622 0.018 -136.90 225.39
159 29.60 143.71 -21.433 0.036 -96.42 180.40
165 30.80 151.25 -20.238 0.076 86.24 121.43 310.46(SL8)
173 32.30 160.73 -17.347 0.151 -137.19 225.15
176 32.80 15.80 -15.929 0.172 -168.12 143.56
179 33.30 -8.48 -14.368 0.184 -169.96 58.45
182 33.80 -32.75 -12.750 0.186 -159.65 -24.69
185 34.30 -57.02 -11.155 0.178 -137.20 -99.57
188 34.80 -81.29 -9.657 0.164 -102.62 -160.20
191 35.30 -105.56 -8.315 0.143 -55.91 -200.50
194 35.80 -108.71 -7.170 0.119 7.47 -215.30
197 36.30 -72.74 -6.235 0.095 51.67 -202.74
200 36.80 -44.33 -5.499 0.074 79.98 -171.86
203 37.30 -18.32 -4.932 0.057 100.39 -129.91
213 39.30 100.30 -3.52 0.035 -13.37 2.45

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 13 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.738 -0.037 0.00 0.04


4 0.50 8.18 -3.064 -0.037 -7.85 -0.73 -9.18(SL1)
9 1.40 5.01 -3.658 -0.039 -22.72 -16.17
10 1.50 6.01 -3.726 -0.039 -23.27 -18.47
18 3.10 22.05 -4.989 -0.054 60.29 -70.11 0.00 318.02(ST1)
21 3.60 28.34 -5.493 -0.061 47.85 -42.90
24 4.10 51.80 -6.040 -0.064 30.97 -22.98
26 4.40 55.77 -6.380 -0.066 66.84 -16.06 104.01(SL2)
31 5.40 69.00 -7.490 -0.058 56.46 73.07
43 7.80 100.76 -8.990 -0.022 -3.67 -20.42 287.14(SL3)
45 8.10 81.83 -9.106 -0.022 110.22 16.88
49 8.80 91.05 -9.336 -0.014 49.71 73.30
53 9.60 88.95 -9.432 0.001 -26.07 82.90
61 11.10 87.95 -9.179 0.011 -158.74 -56.38
62 11.20 87.88 -9.161 0.009 -12.07 -72.69 310.94(SL4)
67 12.20 87.21 -9.063 0.006 55.86 27.32
71 12.90 86.75 -8.958 0.012 -5.03 45.09
80 14.60 85.65 -8.484 0.011 0.53 -88.71 304.17(SL5)
85 15.60 85.02 -8.375 0.005 67.28 21.61
97 17.90 83.68 -7.791 0.018 -126.70 -47.74
98 18.00 83.62 -7.761 0.016 -44.02 -60.83 182.10(SL6)
103 19.00 83.09 -7.577 0.005 -36.32 -55.10
107 19.80 83.74 -7.598 -0.010 -102.73 -110.71
116 21.50 93.90 -8.970 -0.102 45.81 -411.64 599.05(SL7)
121 22.50 99.93 -11.359 -0.160 248.43 -113.74
125 23.20 104.17 -13.375 -0.166 177.00 35.36
134 24.90 114.54 -17.670 -0.114 -8.88 180.83
139 25.90 120.68 -19.332 -0.079 -98.69 113.70
143 26.60 125.01 -20.200 -0.064 14.42 77.02
152 28.30 135.57 -21.488 -0.015 17.21 181.03
155 28.80 138.69 -21.527 0.006 -58.63 171.57
157 29.20 141.20 -21.437 0.020 -71.09 134.48
159 29.60 143.71 -21.259 0.031 -11.32 124.97
165 30.80 151.25 -20.232 0.068 107.85 152.16 225.16(SL8)
173 32.30 160.73 -17.440 0.150 -141.43 233.26
176 32.80 15.80 -16.031 0.172 -170.51 150.49
179 33.30 -8.48 -14.474 0.184 -172.34 64.18
182 33.80 -32.75 -12.852 0.186 -162.03 -20.15
185 34.30 -57.02 -11.250 0.180 -139.58 -96.22
188 34.80 -81.29 -9.741 0.165 -105.00 -158.03
191 35.30 -105.56 -8.387 0.145 -58.29 -199.52
194 35.80 -110.88 -7.227 0.121 5.60 -215.48
197 36.30 -74.39 -6.278 0.097 50.73 -203.64
200 36.80 -45.49 -5.530 0.075 79.73 -173.06
203 37.30 -19.73 -4.951 0.058 100.65 -131.12
213 39.30 101.82 -3.50 0.036 -13.30 2.45

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 14 << 벽체설치 및 가설지보재해체 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.636 -0.052 0.00 0.04


4 0.50 8.18 -3.089 -0.052 5.42 -0.73 17.35(SL1)
9 1.40 5.01 -3.901 -0.051 3.82 7.72
10 1.50 6.01 -3.990 -0.051 3.27 8.10
18 3.10 22.05 -5.372 -0.049 -19.18 -1.11
21 3.60 28.34 -5.798 -0.049 -31.62 -13.64
24 4.10 51.80 -6.239 -0.052 -48.50 -33.44
26 4.40 55.77 -6.518 -0.055 30.74 -50.37 190.74(SL2)
31 5.40 69.00 -7.501 -0.054 70.45 49.53
43 7.80 100.76 -8.979 -0.023 -0.37 -18.34 280.55(SL3)
45 8.10 81.83 -9.099 -0.023 109.88 18.94
49 8.80 91.05 -9.334 -0.015 48.86 74.90
53 9.60 88.95 -9.434 0.001 -26.91 83.80
61 11.10 87.95 -9.180 0.011 -159.22 -56.44
62 11.20 87.88 -9.162 0.009 -12.30 -72.80 311.40(SL4)
67 12.20 87.21 -9.063 0.006 55.90 27.23
71 12.90 86.75 -8.958 0.012 -4.98 45.03
80 14.60 85.65 -8.484 0.011 0.54 -88.69 304.14(SL5)
85 15.60 85.02 -8.375 0.005 67.26 21.61
97 17.90 83.68 -7.791 0.018 -126.76 -47.84
98 18.00 83.62 -7.761 0.016 -44.05 -60.93 182.16(SL6)
103 19.00 83.09 -7.578 0.005 -36.27 -55.19
107 19.80 83.74 -7.599 -0.010 -102.53 -110.70
116 21.50 93.90 -8.972 -0.102 47.35 -410.80 600.51(SL7)
121 22.50 99.93 -11.356 -0.160 250.68 -110.59
125 23.20 104.17 -13.362 -0.165 178.17 39.83
134 24.90 114.54 -17.599 -0.112 -21.02 179.24
139 25.90 120.68 -19.233 -0.079 -100.21 92.08
143 26.60 125.01 -20.117 -0.067 31.04 70.61
152 28.30 135.57 -21.467 -0.016 17.04 185.84
155 28.80 138.69 -21.517 0.005 -60.20 175.90
157 29.20 141.20 -21.432 0.019 -73.23 138.05
159 29.60 143.71 -21.257 0.031 -13.62 127.64
165 30.80 151.25 -20.232 0.068 106.73 152.05 227.52(SL8)
173 32.30 160.73 -17.440 0.150 -141.42 233.22
176 32.80 15.80 -16.031 0.172 -170.49 150.46
179 33.30 -8.48 -14.473 0.184 -172.33 64.16
182 33.80 -32.75 -12.852 0.186 -162.02 -20.17
185 34.30 -57.02 -11.249 0.180 -139.57 -96.23
188 34.80 -81.29 -9.741 0.165 -104.99 -158.04
191 35.30 -105.56 -8.386 0.145 -58.28 -199.53
194 35.80 -110.88 -7.227 0.121 5.61 -215.48
197 36.30 -74.38 -6.278 0.097 50.73 -203.63
200 36.80 -45.48 -5.529 0.075 79.73 -173.05
203 37.30 -19.72 -4.951 0.058 100.65 -131.11
213 39.30 101.81 -3.50 0.036 -13.30 2.45

S U N E X Ver W7.53 ,Copyright 1994 by Geo Group Eng Co., Ltd.

Input Data File = 4.B-B(R).dat Date : 2022-12-07


Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(BH-1) Time : 16:20:20
--------------------------------------------------------------------------------
Step No. 15 << 벽체설치 >>

계산결과 토압, 변위, 회전, 전단력 및 모멘트


굴착깊이 = 32.30
*1 *2
절점 심도 최종 벽체 회전 전단력 휨 지보공 지보공
No. GL 횡력 변위 각 모멘트 초기하중 계산반력
(m) (m) (kN/m2) (mm) (deg) (kN/m) (kN-m/m) (kN/ea) (kN/ea)

1 0.00 4.83 -2.636 -0.052 0.00 0.04


4 0.50 8.18 -3.089 -0.052 5.42 -0.73 17.35(SL1)
9 1.40 5.01 -3.901 -0.051 3.82 7.72
10 1.50 6.01 -3.990 -0.051 3.27 8.10
18 3.10 22.05 -5.372 -0.049 -19.18 -1.11
21 3.60 28.34 -5.798 -0.049 -31.62 -13.64
24 4.10 51.80 -6.239 -0.052 -48.50 -33.44
26 4.40 55.77 -6.518 -0.055 30.74 -50.37 190.74(SL2)
31 5.40 69.00 -7.501 -0.054 70.45 49.53
43 7.80 100.76 -8.979 -0.023 -0.37 -18.34 280.55(SL3)
45 8.10 81.83 -9.099 -0.023 109.88 18.94
49 8.80 91.05 -9.334 -0.015 48.86 74.90
53 9.60 88.95 -9.434 0.001 -26.91 83.80
61 11.10 87.95 -9.180 0.011 -159.22 -56.44
62 11.20 87.88 -9.162 0.009 -12.30 -72.80 311.40(SL4)
67 12.20 87.21 -9.063 0.006 55.90 27.23
71 12.90 86.75 -8.958 0.012 -4.98 45.03
80 14.60 85.65 -8.484 0.011 0.54 -88.69 304.14(SL5)
85 15.60 85.02 -8.375 0.005 67.26 21.61
97 17.90 83.68 -7.791 0.018 -126.76 -47.84
98 18.00 83.62 -7.761 0.016 -44.05 -60.93 182.16(SL6)
103 19.00 83.09 -7.578 0.005 -36.27 -55.19
107 19.80 83.74 -7.599 -0.010 -102.53 -110.70
116 21.50 93.90 -8.972 -0.102 47.35 -410.80 600.51(SL7)
121 22.50 99.93 -11.356 -0.160 250.68 -110.59
125 23.20 104.17 -13.362 -0.165 178.17 39.83
134 24.90 114.54 -17.599 -0.112 -21.02 179.24
139 25.90 120.68 -19.233 -0.079 -100.21 92.08
143 26.60 125.01 -20.117 -0.067 31.04 70.61
152 28.30 135.57 -21.467 -0.016 17.04 185.84
155 28.80 138.69 -21.517 0.005 -60.20 175.90
157 29.20 141.20 -21.432 0.019 -73.23 138.05
159 29.60 143.71 -21.257 0.031 -13.62 127.64
165 30.80 151.25 -20.232 0.068 106.73 152.05 227.52(SL8)
173 32.30 160.73 -17.440 0.150 -141.42 233.22
176 32.80 15.80 -16.031 0.172 -170.49 150.46
179 33.30 -8.48 -14.473 0.184 -172.33 64.16
182 33.80 -32.75 -12.852 0.186 -162.02 -20.17
185 34.30 -57.02 -11.249 0.180 -139.57 -96.23
188 34.80 -81.29 -9.741 0.165 -104.99 -158.04
191 35.30 -105.56 -8.386 0.145 -58.28 -199.53
194 35.80 -110.88 -7.227 0.121 5.61 -215.48
197 36.30 -74.38 -6.278 0.097 50.73 -203.63
200 36.80 -45.48 -5.529 0.075 79.73 -173.05
203 37.30 -19.72 -4.951 0.058 100.65 -131.11
213 39.30 101.81 -3.50 0.036 -13.30 2.45
S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:37:35

Step No. 1 << 굴착 1단계 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -3.21


-3.2 0.00 0.04
4 0.50 8.18 -3.07 -3.25 -0.69
9 1.40 5.01
16.2 -2.83 -13.53
13.5 -7.89
10 1.50 6.01 -2.80 -11.31 -9.11

18 3.10 1.55 -2.45 2.97 -11.81


21 3.60 8.25 -2.36 0.51 -10.76
24
26 4.10
4.40 -18.63
-15.24 -2.29
-2.25 -2.12
2.94 -11.87
-12.13
31 5.40 -4.65 -2.15 11.37 -4.75

13.9
43 7.80 20.95 -1.90 -7.25 12.57
45 8.10 -11.09 -1.85 -10.72 9.32
49 8.80 -1.43 -1.73 -7.89 2.71
53 9.60 -7.39 -1.59 -9.52 -4.28

61
62 11.10
11.20 -4.02
-3.46 -1.35
-1.34 0.50
3.42 -11.03
-10.47
67 12.20 0.45 -1.24 2.14 -8.60
71 12.90 1.54 -1.19 3.64 -7.32

80 14.60 -0.33 -1.13 1.64 -7.04


85 15.60 -2.35 -1.13 1.40 -6.83

97
98 17.90
18.00 0.82
0.83 -1.23 1.80
4.06 -2.26
-1.61
103 19.00 0.71 -1.30 0.92 -0.30
107 19.80 0.49 -1.35 0.44 0.23

116 21.50 0.11 -1.47 2.75 0.49


121 22.50 0.01 -1.53 -0.09 0.42
125 23.20 -0.03 -1.58 2.92 0.36

134 24.90 -0.03 -1.69 3.20 0.28


139 25.90 -0.02 -1.76 0.01 0.27
143 26.60 -0.01 -1.81 3.46 0.29

152 28.30 0.00 -1.92 3.69 0.34


155 28.80 0.00 -1.96 0.03 0.36
157 29.20 0.00 -1.99 0.03 0.37
159 29.60 0.00 -2.02 0.03 0.38

165 30.80 -0.01 -2.10 0.04 0.42

173 32.30 0.00 -2.21 0.04 0.48


176 32.80 0.00 -2.25 4.31 0.51
179 33.30 -0.01 -2.28 4.38 0.53
182 33.80 -0.02 -2.32 4.46 0.56
185 34.30 -0.03 -2.35 4.54 0.59
188 34.80 -0.04 -2.39 4.62 0.63
191 35.30 -0.05 -2.43 4.72 0.68
194 35.80 -0.06 -2.46 4.81 0.74
197 36.30 -0.07 -2.50 4.92 0.81
200 36.80 -0.06 -2.54 5.02 0.91
203 37.30 -0.04 -2.57 5.11 1.02

213 39.30 0.38 -2.72 -10.32 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:37:45

Step No. 2 << 1F 슬래브 설치 및 2단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.79 0.00 44.8 41.6 0.04


4 0.50 8.18 -3.12 -3.25
41.58 -0.69
9
10 1.40
1.50 5.01
6.01 -3.69
-3.75 31.30
30.75 32.44
35.58

18 3.10 22.05 25.3 -4.43 8.30 70.34


21
24
3.60
4.10
28.34
37.32
-4.51
-4.51
-4.5 0.36
5.19
71.55
73.69
74.0
26 4.40 31.76 -4.49 -5.17 73.61
31 5.40 13.23 -4.20 -27.67 55.53

43 7.80 5.84 -2.88 -22.66 -11.33


45 8.10 -30.76 -2.70 -20.99 -18.56
49 8.80 -12.42 -2.32 -8.25 -28.73
53 9.60 -13.01 -1.95 -4.03 -33.30

61
62 11.10
11.20 -4.75
-4.58 -1.49
-1.47 7.92
9.78 -29.05
-27.83
67 12.20 2.37 -1.32 9.20 -18.54
71 12.90 4.15 -1.26 9.19 -12.86

80 14.60 1.32 -1.22 3.34 -6.93


85 15.60 -1.52 -1.23 1.71 -5.87

97
98 17.90
18.00 0.77 -1.34
-1.35 1.48
3.96 -1.75
-1.09
103 19.00 0.60 -1.41 0.70 -0.05
107 19.80 0.39 -1.46 0.31 0.34

116 21.50 0.07 -1.58 2.94 0.48


121 22.50 -0.01 -1.64 -0.08 0.40
125 23.20 -0.03 -1.69 3.14 0.35

134 24.90 -0.03 -1.80 3.42 0.29


139 25.90 -0.02 -1.87 0.02 0.30
143 26.60 -0.01 -1.92 3.67 0.32

152 28.30 0.00 -2.04 3.90 0.37


155 28.80 0.00 -2.07 0.03 0.39
157 29.20 0.00 -2.10 0.03 0.40
159 29.60 0.00 -2.13 0.03 0.41

165 30.80 -0.01 -2.21 0.04 0.45

173 32.30 0.00 -2.32 0.04 0.51


176 32.80 0.00 -2.36 4.52 0.54
179 33.30 -0.01 -2.39 4.59 0.56
182 33.80 -0.02 -2.43 4.67 0.59
185 34.30 -0.03 -2.46 4.75 0.62
188 34.80 -0.04 -2.50 4.83 0.66
191 35.30 -0.05 -2.54 4.93 0.71
194 35.80 -0.06 -2.58 5.03 0.77
197 36.30 -0.07 -2.61 5.13 0.85
200 36.80 -0.07 -2.65 5.24 0.95
203 37.30 -0.04 -2.68 5.33 1.06

213 39.30 0.40 -2.83 -10.74 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:37:51

Step No. 3 << 1단 가설지보재 설치 및 3단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.67 0.00 10.5 0.04


4 0.50 8.18 -3.08 -3.25
7.20 -0.69
9
10 1.40
1.50 5.01
6.01 -3.82
-3.90 -3.08
-3.63 1.50
1.20
443.5 121.8
18 3.10 22.05 -5.21 -26.09
121.76 -19.05
21 3.60 28.34 -5.64 109.32 38.90
24
26 4.10
4.40 51.80
55.77 -6.02
-6.22 92.44
76.31 89.82
115.19
66.4 -6.5 162.9
31 5.40 69.00 -6.53 13.93 161.49

43 7.80 24.52 -4.92 -98.29 38.61


45 8.10 -85.55 -4.57 -95.72 8.33
49 8.80 -52.55 -3.76 -51.32 -42.94
53 9.60 -42.06 -2.93 -20.95 -70.75

61
62 11.10
11.20 -10.66
-9.46 -1.86
-1.81 15.46
18.18 -69.07
-67.18
67 12.20 -0.53 -1.46 21.55 -47.45
71 12.90 6.22 -1.34 21.79 -32.86

80 14.60 5.36 -1.27 9.38 -10.86


85 15.60 1.20 -1.30 4.23 -5.69

97
98 17.90
18.00 1.04
0.98 -1.44
-1.45 1.00
3.65 -0.36
0.29
103 19.00 0.49 -1.52 0.17 0.78
107 19.80 0.20 -1.57 -0.10 0.80

116 21.50 -0.05 -1.68 3.02 0.51


121 22.50 -0.07 -1.75 -0.11 0.37
125 23.20 -0.06 -1.79 3.35 0.31

134 24.90 -0.02 -1.91 3.64 0.28


139 25.90 -0.01 -1.97 0.03 0.31
143 26.60 0.00 -2.02 3.88 0.34

152 28.30 0.01 -2.14 4.10 0.40


155 28.80 0.00 -2.17 0.03 0.42
157 29.20 0.00 -2.20 0.03 0.43
159 29.60 0.00 -2.23 0.03 0.44

165 30.80 -0.01 -2.32 0.04 0.48

173 32.30 0.00 -2.42 0.04 0.54


176 32.80 0.00 -2.46 4.72 0.57
179 33.30 -0.01 -2.50 4.79 0.59
182 33.80 -0.02 -2.53 4.87 0.62
185 34.30 -0.03 -2.57 4.95 0.65
188 34.80 -0.04 -2.61 5.03 0.69
191 35.30 -0.06 -2.64 5.13 0.74
194 35.80 -0.07 -2.68 5.23 0.80
197 36.30 -0.07 -2.72 5.33 0.89
200 36.80 -0.07 -2.75 5.44 0.98
203 37.30 -0.05 -2.79 5.54 1.10

213 39.30 0.41 -2.93 -11.13 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:37:58

Step No. 4 << B1 슬래브 설치 및 4단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.75 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-20.59 -0.69
9
10 1.40
1.50 5.01
6.01 -3.62
-3.68 -30.87
-31.42 -23.51
-26.59
305.5
18 3.10 22.05 -4.97 -53.87
47.95 -91.30
21 3.60 28.34 -5.52 35.51 201.2 -70.26
24
26 4.10
4.40 51.80
55.77 -6.14
-6.53 18.64
2.50
203.72
203.7 -56.24
-53.01
31 5.40 69.00 -7.88 141.34 120.71

-8.9 250.7
43 7.80 100.76 103.4 -8.53 -62.36 230.95
45 8.10 81.83 -8.24 -92.04 207.56
49 8.80 91.05 -7.29 -145.48 122.37
53 9.60 -72.63 -5.93 -145.31 1.83

61
62 11.10
11.20 -58.00
-53.66 -3.52
-3.39 -19.67
-10.87 -117.62
-118.93
67 12.20 -20.14 -2.34 21.38 -112.27
71 12.90 -6.80 -1.88 32.18 -93.52

80 14.60 9.36 -1.42 29.21 -40.83


85 15.60 8.14 -1.41 17.79 -18.85

97
98 17.90
18.00 3.82
3.56 -1.61
-1.62 2.55
5.26 1.74
2.61
103 19.00 1.44 -1.71 -0.25 3.39
107 19.80 0.40 -1.77 -0.95 2.85

116 21.50 -0.35 -1.89 2.81 1.19


121 22.50 -0.33 -1.96 -0.44 0.58
125 23.20 -0.25 -2.00 3.57 0.35

134 24.90 -0.07 -2.11 4.04 0.23


139 25.90 -0.02 -2.18 0.07 0.28
143 26.60 0.01 -2.23 4.31 0.34

152 28.30 0.02 -2.35 4.51 0.44


155 28.80 0.01 -2.38 0.04 0.47
157 29.20 0.01 -2.41 0.04 0.48
159 29.60 0.00 -2.44 0.03 0.50

165 30.80 -0.01 -2.52 0.04 0.54

173 32.30 0.00 -2.63 0.04 0.60


176 32.80 0.00 -2.67 5.11 0.62
179 33.30 -0.01 -2.70 5.18 0.65
182 33.80 -0.02 -2.74 5.26 0.68
185 34.30 -0.03 -2.78 5.34 0.71
188 34.80 -0.05 -2.81 5.43 0.75
191 35.30 -0.06 -2.85 5.53 0.80
194 35.80 -0.07 -2.89 5.63 0.87
197 36.30 -0.08 -2.92 5.74 0.95
200 36.80 -0.07 -2.96 5.84 1.06
203 37.30 -0.05 -3.00 5.94 1.18

213 39.30 0.44 -3.14 -11.92 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:04

Step No. 5 << B2 슬래브 설치 및 5단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-11.67 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -21.95
-22.50 -15.48
-17.66
317.2
18 3.10 22.05 -4.99 -44.95
60.77 -68.09
21 3.60 28.34 -5.49 48.33 92.0 -40.64
24
26 4.10
4.40 51.80
55.77 -6.03
-6.36 31.46
15.32 -20.21
-13.13
107.35
31 5.40 69.00 -7.45 44.97 64.22

382.9 224.2
43 7.80 100.76 103.4 -9.14 -158.74
224.17 -56.86
45 8.10 81.83 -9.32 194.49 5.71
49 8.80 91.05 -9.71 133.99 121.12
-9.9
53 9.60 88.95 -9.87 58.20 198.11 217.0
61
62 11.10
11.20 87.95
87.88 -8.80
-8.67 -74.47
-83.26 185.27
177.83
67 12.20 87.21 -6.99 -158.74 50.70
71 12.90 -72.33 -5.67 -121.73 -49.31

80 14.60 -43.25 -3.04 7.64 -137.47


85 15.60 -17.01 -2.19 33.32 -116.08

97
98 17.90
18.00 14.25
14.30 -1.71
-1.72 28.84
30.68 -29.45
-25.91
103 19.00 11.60 -1.82 14.11 -5.40
107 19.80 7.81 -1.92 6.33 2.55

116 21.50 1.63 -2.11 2.91 5.47


121 22.50 0.00 -2.19 -1.81 3.87
125 23.20 -0.47 -2.25 2.65 2.65

134 24.90 -0.52 -2.36 3.85 0.74


139 25.90 -0.32 -2.43 -0.21 0.33
143 26.60 -0.19 -2.47 4.66 0.25

152 28.30 0.00 -2.59 5.02 0.36


155 28.80 0.01 -2.62 0.10 0.41
157 29.20 0.02 -2.65 0.09 0.45
159 29.60 0.02 -2.68 0.09 0.49

165 30.80 0.01 -2.76 0.07 0.58

173 32.30 0.01 -2.87 0.05 0.67


176 32.80 0.00 -2.91 5.57 0.70
179 33.30 -0.01 -2.94 5.64 0.72
182 33.80 -0.02 -2.98 5.72 0.75
185 34.30 -0.03 -3.02 5.80 0.78
188 34.80 -0.05 -3.05 5.89 0.83
191 35.30 -0.06 -3.09 5.99 0.88
194 35.80 -0.08 -3.13 6.09 0.95
197 36.30 -0.08 -3.16 6.21 1.04
200 36.80 -0.08 -3.20 6.32 1.15
203 37.30 -0.05 -3.24 6.42 1.28

213 39.30 0.47 -3.38 -12.84 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:12

Step No. 6 << B3 슬래브 설치 및 6단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.45 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.73
-23.29 -16.19
-18.45
318.3
18 3.10 22.05 -4.99 -45.74
60.37 -70.14
21 3.60 28.34 -5.49 47.93 104.6 -42.89
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 31.05
14.92 -22.66
-15.71
119.55
31 5.40 69.00 -7.49 57.17 73.84

276.0
43 7.80 100.76 103.4 -8.97 -146.53
129.44 -17.94
45 8.10 81.83 -9.08 99.76 16.21
49 8.80 91.05 -9.30 39.25 65.31
53 9.60 88.95 -9.41 -36.53 66.52
399.4 221.4
61
62 11.10
11.20 87.95
87.88 -9.30
-9.30 -169.20
-177.99
221.43 -88.42
-105.34
67 12.20 87.21 -9.41 -9.4 133.88 72.26
71 12.90 86.75 -9.36 73.00 144.64
175.3
80 14.60 85.65 -8.00 -73.54 143.91
85 15.60 85.02 -6.43 -146.81 27.62

97
98 17.90
18.00 -46.55
-43.71 -3.09
-3.00 8.34
15.71 -134.19
-132.77
103 19.00 -11.61 -2.37 42.53 -102.20
107 19.80 8.08 -2.16 42.92 -66.84

116 21.50 13.87 -2.19 24.06 -12.19


121 22.50 9.17 -2.32 8.27 1.46
125 23.20 5.80 -2.41 7.64 5.27

134 24.90 0.66 -2.59 3.17 5.10


139 25.90 -0.42 -2.67 -1.79 3.23
143 26.60 -0.64 -2.72 3.77 2.11

152 28.30 -0.43 -2.84 4.98 0.62


155 28.80 -0.33 -2.87 -0.22 0.47
157 29.20 -0.25 -2.90 -0.11 0.41
159 29.60 -0.19 -2.93 -0.02 0.38

165 30.80 -0.05 -3.01 0.11 0.45

173 32.30 0.02 -3.12 0.12 0.64


176 32.80 0.02 -3.15 6.10 0.70
179 33.30 0.02 -3.19 6.16 0.75
182 33.80 0.00 -3.23 6.22 0.80
185 34.30 -0.02 -3.26 6.29 0.85
188 34.80 -0.04 -3.30 6.38 0.90
191 35.30 -0.06 -3.34 6.47 0.96
194 35.80 -0.08 -3.37 6.57 1.03
197 36.30 -0.09 -3.41 6.68 1.13
200 36.80 -0.08 -3.45 6.80 1.24
203 37.30 -0.06 -3.48 6.90 1.38

213 39.30 0.49 -3.62 -13.77 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:19

Step No. 7 << B4 슬래브 설치 및 7단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.44 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.18
-18.44
318.0
18 3.10 22.05 -4.99 -45.72
60.27 -70.11
21 3.60 28.34 -5.49 47.83 104.0 -42.91
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.95
14.82 -22.73
-15.81
118.84
31 5.40 69.00 -7.49 56.46 73.03

288.1
43 7.80 100.76 103.4 -8.99 -147.25
140.81 -20.46
45 8.10 81.83 -9.11 111.14 17.10
49 8.80 91.05 -9.34 50.63 74.16
53 9.60 88.95 -9.43 -9.4 -25.16 84.47
299.3
61
62 11.10
11.20 87.95
87.88 -9.16
-9.14 -157.83
-166.62
132.72 -53.40
-69.19
67 12.20 87.21 -9.03 45.18 19.70
71 12.90 86.75 -8.92 -15.71 30.00

381.3 219.1
80 14.60 85.65 -8.61 -162.24
219.10 -121.53
85 15.60 85.02 -8.70 133.77 54.85
160.5
97
98 17.90
18.00 83.68
83.62 -7.66
-7.54 -60.21
-68.58 138.42
132.40
103 19.00 83.09 -6.16 -139.86 22.07
107 19.80 -80.83 -4.97 -92.19 -73.37

116 21.50 -39.82 -3.16 26.20 -117.87


121 22.50 -1.59 -2.71 41.77 -82.24
125 23.20 10.26 -2.60 43.13 -53.69

134 24.90 12.15 -2.69 20.95 -7.44


139 25.90 7.53 -2.82 5.96 3.04
143 26.60 4.54 -2.90 7.28 5.61

152 28.30 0.31 -3.08 4.10 4.58


155 28.80 -0.21 -3.12 -1.76 3.70
157 29.20 -0.45 -3.15 -1.63 3.02
159 29.60 -0.58 -3.18 -1.42 2.40

165 30.80 -0.55 -3.26 -0.70 1.14

173 32.30 -0.25 -3.37 -0.09 0.61


176 32.80 -0.17 -3.40 6.48 0.59
179 33.30 -0.11 -3.44 6.61 0.62
182 33.80 -0.07 -3.47 6.72 0.67
185 34.30 -0.05 -3.51 6.82 0.75
188 34.80 -0.04 -3.55 6.91 0.83
191 35.30 -0.05 -3.58 7.01 0.93
194 35.80 -0.06 -3.62 7.10 1.04
197 36.30 -0.07 -3.66 7.21 1.16
200 36.80 -0.06 -3.69 7.31 1.30
203 37.30 -0.04 -3.73 7.41 1.46

213 39.30 0.53 -3.87 -14.70 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:26

Step No. 8 << B5 슬래브 설치 및 8단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.43 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.71
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.09
21 3.60 28.34 -5.49 47.85 104.0 -42.87
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.98
14.85 -22.68
-15.75
118.83
31 5.40 69.00 -7.49 56.44 73.08

286.9
43 7.80 100.76 103.4 -8.99 -147.26
139.65 -20.45
45 8.10 81.83 -9.11 109.98 16.76
49 8.80 91.05 -9.34 49.47 73.01
53 9.60 88.95 -9.43 -9.4 -26.32 82.39
315.5
61
62 11.10
11.20 87.95
87.88 -9.19
-9.17 -158.99
-167.78
147.73 -57.22
-73.12
67 12.20 87.21 -9.08 60.19 30.78
71 12.90 86.75 -8.97 -0.70 51.58

263.9
80 14.60 85.65 -8.42 -147.23
116.65 -74.44
85 15.60 85.02 -8.23 31.32 -0.51

414.7 243.7
97
98 17.90
18.00 83.68
83.62 -8.01
-8.04 -162.66
-171.03
243.67 -152.58
-168.85
103 19.00 83.09 -8.50 160.31 33.09
107 19.80 83.74 -8.82 93.90 134.80
185.9
116 21.50 93.90 -8.26 -57.08 168.61
121 22.50 99.93 -7.05 -141.93 63.58
125 23.20 -54.91 -6.02 -115.45 -28.13

134 24.90 -49.69 -3.97 7.30 -120.20


139 25.90 -14.60 -3.36 37.00 -96.77
143 26.60 3.84 -3.16 46.11 -68.92

152 28.30 13.19 -3.16 26.86 -14.97


155 28.80 11.52 -3.22 14.65 -6.14
157 29.20 9.77 -3.27 10.38 -1.16
159 29.60 7.93 -3.32 6.84 2.24

165 30.80 3.16 -3.47 0.37 5.96

173 32.30 0.10 -3.62 -1.69 4.38


176 32.80 -0.31 -3.66 5.32 3.54
179 33.30 -0.53 -3.70 5.61 2.78
182 33.80 -0.62 -3.73 5.97 2.15
185 34.30 -0.62 -3.77 6.35 1.67
188 34.80 -0.56 -3.81 6.72 1.34
191 35.30 -0.49 -3.84 7.05 1.15
194 35.80 -0.41 -3.88 7.34 1.09
197 36.30 -0.32 -3.91 7.59 1.13
200 36.80 -0.24 -3.95 7.80 1.25
203 37.30 -0.14 -3.98 7.96 1.43

213 39.30 0.69 -4.12 -15.66 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:33

Step No. 9 << B6 슬래브 설치 설치 및 9단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.44 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.09
21 3.60 28.34 -5.49 47.85 104.0 -42.88
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.97
14.84 -22.69
-15.76
118.84
31 5.40 69.00 -7.49 56.46 73.08

287.0
43 7.80 100.76 -8.99 -147.25
139.79 -20.42
45 8.10 81.83 -9.11 110.11 16.84
49 8.80 91.05 -9.34 49.60 73.17
53 9.60 88.95 -9.43 -26.18 82.66
312.9
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -158.85
-167.65
145.22 -56.75
-72.64
67 12.20 87.21 -9.07 57.68 28.75
71 12.90 86.75 -8.96 -3.21 47.79

287.8
80 14.60 85.65 -8.46 -149.74
138.06 -82.49
85 15.60 85.02 -8.31 52.73 12.85

270.2
97
98 17.90
18.00 83.68
83.62 -7.87 -141.25
-149.62
120.54 -89.98
-104.10
103 19.00 83.09 -7.94 37.19 -25.29
107 19.80 83.74 -8.10 -29.23 -22.08

481.1 300.9
116 21.50 93.90 -8.83 -180.21
300.90 -197.58
121 22.50 99.93 -9.87 203.99 55.40
125 23.20 104.17 -10.53 132.56 173.40
-10.9 255.8
134 24.90 114.54 -10.54 -53.32 243.31
119.5
139 25.90 120.68 -9.29 -158.87 131.71
143 26.60 -34.07 -8.07 -146.95 23.05

152 28.30 -77.44 -5.26 -21.79 -139.12


155 28.80 -54.90 -4.67 6.10 -143.69
157 29.20 -40.76 -4.31 25.15 -137.15
159 29.60 -27.53 -4.03 38.97 -124.06

165 30.80 9.60 -3.63 45.60 -68.66

173 32.30 15.41 -3.66 23.54 -15.78


176 32.80 13.29 -3.72 23.41 -5.86
179 33.30 10.63 -3.80 17.55 0.74
182 33.80 7.93 -3.87 13.05 4.68
185 34.30 5.48 -3.94 9.84 6.63
188 34.80 3.44 -4.00 7.75 7.21
191 35.30 1.86 -4.06 6.55 6.92
194 35.80 0.70 -4.11 6.02 6.15
197 36.30 -0.08 -4.16 5.97 5.21
200 36.80 -0.55 -4.20 6.22 4.28
203 37.30 -0.79 -4.24 6.63 3.48

213 39.30 -0.34 -4.38 -16.64 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:41

Step No. 10 << 가설지보재 설치 및 10단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.44 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.09
21 3.60 28.34 -5.49 47.85 104.0 -42.88
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.97
14.84 -22.69
-15.76
118.84
31 5.40 69.00 -7.49 56.46 73.07

287.1
43 7.80 100.76 -8.99 -147.25
139.81 -20.42
45 8.10 81.83 -9.11 110.13 16.84
49 8.80 91.05 -9.34 49.62 73.19
53 9.60 88.95 -9.43 -26.16 82.70
312.6
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -158.83
-167.62
144.96 -56.68
-72.57
67 12.20 87.21 -9.07 57.42 28.56
71 12.90 86.75 -8.96 -3.47 47.42

289.7
80 14.60 85.65 -8.46 -150.00
139.71 -83.30
85 15.60 85.02 -8.32 54.37 13.69

265.1
97
98 17.90
18.00 83.68
83.62 -7.87
-7.86 -139.61
-147.97
117.12 -85.35
-99.31
103 19.00 83.09 -7.91 33.77 -23.92
107 19.80 83.74 -8.04 -32.65 -23.45

394.0
116 21.50 93.90 -8.73 -183.63
210.35 -204.77
121 22.50 99.93 -9.83 113.44 -42.33
125 23.20 104.17 -10.75 42.01 12.28

1354.7 307.7
134 24.90 114.54 -12.93 -143.87
307.71 -71.73
139 25.90 120.68 -14.23 190.10 177.73
143 26.60 125.01 -14.79 -14.9 104.11 280.90
323.7
152 28.30 135.57 137.4 -13.78 -117.37 272.25
155 28.80 138.69 -12.85 -173.87 196.48
157 29.20 -1.41 -11.96 -177.20 125.88
159 29.60 -20.87 -10.99 -172.74 55.50

165 30.80 -79.21 -8.03 -112.69 -123.15

173 32.30 -59.86 -5.30 20.21 -187.43


176 32.80 -38.68 -4.75 49.11 -170.67
179 33.30 -17.38 -4.37 67.47 -144.16
182 33.80 3.16 -4.14 70.23 -113.23
185 34.30 15.07 -4.02 65.17 -82.94
188 34.80 20.63 -3.98 55.99 -56.30
191 35.30 21.82 -4.00 45.29 -34.73
194 35.80 20.27 -4.06 34.80 -18.58
197 36.30 17.18 -4.14 25.55 -7.47
200 36.80 13.42 -4.22 18.05 -0.63
203 37.30 9.48 -4.31 12.50 2.85

213 39.30 -4.73 -4.65 -17.66 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:49

Step No. 11 << 가설지보재 설치 및 11단계 굴착 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -3.25
-12.44 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.09
21 3.60 28.34 -5.49 47.85 104.0 -42.88
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.97
14.84 -22.69
-15.76
118.84
31 5.40 69.00 -7.49 56.46 73.07

287.0
43 7.80 100.76 -8.99 -147.25
139.80 -20.42
45 8.10 81.83 -9.11 110.12 16.84
49 8.80 91.05 -9.34 49.61 73.18
53 9.60 88.95 -9.43 -26.17 82.68
312.8
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -158.84
-167.63
145.15 -56.72
-72.60
67 12.20 87.21 -9.07 57.61 28.72
71 12.90 86.75 -8.96 -3.28 47.71

287.9
80 14.60 85.65 -8.46 -149.81
138.13 -82.69
85 15.60 85.02 -8.31 52.79 12.71

275.4
97
98 17.90
18.00 83.68
83.62 -7.88
-7.87 -141.19
-149.55
125.85 -89.97
-104.09
103 19.00 83.09 -7.95 42.50 -19.96
107 19.80 83.74 -8.09 -23.92 -12.51

366.0
116 21.50 93.90 -8.69 -174.90
191.07 -178.99
121 22.50 99.93 -9.64 94.16 -35.83
125 23.20 104.17 -10.43 22.73 5.29

1051.5
134 24.90 114.54 -12.39 -163.15
187.35 -111.50
139 25.90 120.68 -13.83 69.75 17.60
143 26.60 125.01 -14.83 -16.24 36.53

1930.5405.8
152 28.30 135.57 -17.19 -237.72
405.79 -176.72
155 28.80 138.69 -18.07 337.23 9.12
157 29.20 141.20 -18.78 281.25 132.86
159 29.60 143.71 -19.40 224.27 234.01
-20.2
165 30.80 151.25 -20.21 47.30 397.91 404.7
159.5
173 32.30 160.73 -18.20 -174.62 295.18
176 32.80 15.80 -16.86 -188.59 203.71
179 33.30 -8.48 -15.32 -190.42 108.29
182 33.80 -32.75 -13.68 -180.11 14.99
185 34.30 -57.02 -12.01 -157.67 -70.12
188 34.80 -81.29 -10.42 -123.09 -140.98
191 35.30 -105.56 -8.97 -76.38 -191.51
194 35.80 -128.74 -7.70 -10.27 -214.16
197 36.30 -88.06 -6.64 42.63 -208.40
200 36.80 -55.18 -5.78 77.37 -180.47
203 37.30 -29.07 -5.11 97.57 -138.12

213 39.30 114.17 -3.34 -12.68 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:38:56

Step No. 12 << 슬래브, 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -7.84 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.09
21 3.60 28.34 -5.49 47.85 104.0 -42.88
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.97
66.84 -22.69
-15.76
31 5.40 69.00 -7.49 56.46 73.07

287.1
43 7.80 100.76 -8.99 -3.72 -20.42
45 8.10 81.83 -9.11 110.13 16.84
49 8.80 91.05 -9.34 49.63 73.19
53 9.60 88.95 -9.43 -26.16 82.70
312.6
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -158.83
-11.30 -56.68
-72.56
67 12.20 87.21 -9.07 57.47 28.62
71 12.90 86.75 -8.96 -3.42 47.51

289.0
80 14.60 85.65 -8.46 -5.48 -83.12
85 15.60 85.02 -8.32 53.67 13.15

272.8
97
98 17.90
18.00 83.68
83.62 -7.88
-7.87 -140.31
-12.26 -87.51
-101.55
103 19.00 83.09 -7.93 40.80 -19.11
107 19.80 83.74 -8.05 -25.61 -13.02

317.1
116 21.50 93.90 -8.63 -18.02 -182.37
121 22.50 99.93 -9.62 43.65 -89.73
125 23.20 104.17 -10.54 -27.78 -83.98

1793.9 384.3
134 24.90 114.54 -13.70 -213.67
384.29 -286.64
139 25.90 120.68 -16.55 266.68 39.40
143 26.60 125.01 -18.54 180.69 196.18
323.9
152 28.30 135.57 -21.47 -21.7 -40.78 317.72
155 28.80 138.69 -21.67 -109.35 280.27
157 29.20 141.20 -21.62 -136.90 225.39
159 29.60 143.71 -21.43 -96.42 180.40
310.5
165 30.80 151.25 -20.24 86.24 121.43
159.5
173 32.30 160.73 -17.35 -137.19 224.80
176 32.80 15.80 -15.93 -168.12 143.56
179 33.30 -8.48 -14.37 -169.96 58.38
182 33.80 -32.75 -12.75 -159.65 -24.69
185 34.30 -57.02 -11.15 -137.20 -99.57
188 34.80 -81.29 -9.66 -102.62 -160.20
191 35.30 -105.56 -8.32 -55.91 -200.50
194 35.80 -108.71 -7.17 7.47 -214.48
197 36.30 -72.74 -6.24 51.67 -201.92
200 36.80 -44.33 -5.50 79.98 -171.04
203 37.30 -18.32 -4.93 100.39 -128.00

213 39.30 100.30 -3.52 -13.37 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:39:03

Step No. 13 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.74 0.00 0.1 0.04


4 0.50 8.18 -3.06 -7.85 -0.69
9
10 1.40
1.50 5.01
6.01 -3.66
-3.73 -22.72
-23.27 -16.17
-18.43
318.0
18 3.10 22.05 -4.99 -45.72
60.29 -70.10
21 3.60 28.34 -5.49 47.85 104.0 -42.89
24
26 4.10
4.40 51.80
55.77 -6.04
-6.38 30.97
66.84 -22.70
-15.77
31 5.40 69.00 -7.49 56.46 73.07

287.1
43 7.80 100.76 -8.99 -3.67 -20.40
45 8.10 81.83 -9.11 110.22 16.88
49 8.80 91.05 -9.34 49.71 73.30
53 9.60 88.95 -9.43 -26.07 82.87
310.9
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -158.74
-12.07 -56.38
-72.25
67 12.20 87.21 -9.06 55.86 27.32
71 12.90 86.75 -8.96 -5.03 45.09

304.2
80 14.60 85.65 -8.48 0.53 -88.28
85 15.60 85.02 -8.37 67.28 21.61

182.1
97
98 17.90
18.00 83.68
83.62 -7.79
-7.76 -126.70
-44.02 -47.74
-60.41
103 19.00 83.09 -7.58 -36.32 -55.10
107 19.80 83.74 -7.60 -102.73 -110.70

116 21.50 93.90 -8.97 45.81


599.1 326.4 -411.17
411.6
121 22.50 99.93 -11.36 248.43 -113.74
125 23.20 104.17 -13.37 177.00 35.36

134 24.90 114.54 -17.67 -8.88 180.83


139 25.90 120.68 -19.33 -98.69 113.70
143 26.60 125.01 -20.20 14.42 77.02

152 28.30 135.57 -21.49 -21.5 17.21 181.03


155 28.80 138.69 -21.53 -58.63 171.57
157 29.20 141.20 -21.44 -71.09 134.48
159 29.60 143.71 -21.26 -11.32 124.97
225.2
165 30.80 151.25 -20.23 107.85 152.16
159.5
173 32.30 160.73 -17.44 -141.43 232.92
176 32.80 15.80 -16.03 -170.51 150.49
179 33.30 -8.48 -14.47 -172.34 64.11
182 33.80 -32.75 -12.85 -162.03 -20.15
185 34.30 -57.02 -11.25 -139.58 -96.22
188 34.80 -81.29 -9.74 -105.00 -158.03
191 35.30 -105.56 -8.39 -58.29 -199.52
194 35.80 -110.88 -7.23 5.60 -214.66
197 36.30 -74.39 -6.28 50.73 -202.81
200 36.80 -45.49 -5.53 79.73 -172.23
203 37.30 -19.73 -4.95 100.65 -129.20

213 39.30 101.82 -3.50 -13.30 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:39:10

Step No. 14 << 벽체설치 및 가설지보재해체 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.64 0.00 17.4 0.04


4 0.50 8.18 -3.09 5.42 -0.69
9
10 1.40
1.50 5.01
6.01 -3.90
-3.99 3.82
3.27 7.71
8.10

18 3.10 22.05 -5.37 -19.18 -1.10


21 3.60 28.34 -5.80 -31.62 190.7 -13.62
24
26 4.10
4.40 51.80
55.77 -6.24
-6.52 -48.50
30.74 -33.17
-50.08
31 5.40 69.00 -7.50 70.45 49.53

280.5
43 7.80 100.76 -8.98 -0.37 -18.32
45 8.10 81.83 -9.10 109.88 18.94
49 8.80 91.05 -9.33 48.86 74.90
53 9.60 88.95 -9.43 -26.91 83.77
311.4
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -159.22
-12.30 -56.44
-72.36
67 12.20 87.21 -9.06 55.90 27.23
71 12.90 86.75 -8.96 -4.98 45.03

304.1
80 14.60 85.65 -8.48 0.54 -88.27
85 15.60 85.02 -8.37 67.26 21.61

182.2
97
98 17.90
18.00 83.68
83.62 -7.79
-7.76 -126.76
-44.05 -47.84
-60.51
103 19.00 83.09 -7.58 -36.27 -55.19
107 19.80 83.74 -7.60 -102.53 -110.70

116 21.50 93.90 -8.97 47.35


600.5 328.7 -410.32
410.8
121 22.50 99.93 -11.36 250.68 -110.58
125 23.20 104.17 -13.36 178.17 39.83

134 24.90 114.54 -17.60 -21.02 179.24


139 25.90 120.68 -19.23 -100.21 92.08
143 26.60 125.01 -20.12 31.04 70.61

152 28.30 135.57 -21.47 -21.5 17.04 185.84


155 28.80 138.69 -21.52 -60.20 175.90
157 29.20 141.20 -21.43 -73.23 138.05
159 29.60 143.71 -21.26 -13.62 127.64
227.5
165 30.80 151.25 -20.23 106.73 152.05
159.5
173 32.30 160.73 -17.44 -141.42 232.88
176 32.80 15.80 -16.03 -170.49 150.46
179 33.30 -8.48 -14.47 -172.33 64.08
182 33.80 -32.75 -12.85 -162.02 -20.17
185 34.30 -57.02 -11.25 -139.57 -96.23
188 34.80 -81.29 -9.74 -104.99 -158.04
191 35.30 -105.56 -8.39 -58.28 -199.53
194 35.80 -110.88 -7.23 5.61 -214.66
197 36.30 -74.38 -6.28 50.73 -202.81
200 36.80 -45.48 -5.53 79.73 -172.23
203 37.30 -19.72 -4.95 100.65 -129.20

213 39.30 101.81 -3.50 -13.30 0.00


S U N E X Ver W7.53, by Geo Group Eng Input Data File = 4.B-B(R).dat
Project : 춘천시 약사동 주상복합 신축설계 B-B(R)(.. Date : 2022-12-07 Time : 17:39:16

Step No. 15 << 벽체설치 >>

Pressure (kN/㎡) Displacement (mm) Shear (kN/m) Moment (kNm/m)


Node Depth
-300 -100 100 300 -30 -10 10 30 600 200 -200 -600 600 200 -200 -600
No. (m) Value -200 0 200 Value -20 0 20 Value 400 0 -400 Value 400 0 -400

1 0.00 4.83 -2.64 0.00 17.4 0.04


4 0.50 8.18 -3.09 5.42 -0.69
9
10 1.40
1.50 5.01
6.01 -3.90
-3.99 3.82
3.27 7.71
8.10

18 3.10 22.05 -5.37 -19.18 -1.10


21 3.60 28.34 -5.80 -31.62 190.7 -13.62
24
26 4.10
4.40 51.80
55.77 -6.24
-6.52 -48.50
30.74 -33.17
-50.08
31 5.40 69.00 -7.50 70.45 49.53

280.5
43 7.80 100.76 -8.98 -0.37 -18.32
45 8.10 81.83 -9.10 109.88 18.94
49 8.80 91.05 -9.33 48.86 74.90
53 9.60 88.95 -9.43 -26.91 83.77
311.4
61
62 11.10
11.20 87.95
87.88 -9.18
-9.16 -159.22
-12.30 -56.44
-72.36
67 12.20 87.21 -9.06 55.90 27.23
71 12.90 86.75 -8.96 -4.98 45.03

304.1
80 14.60 85.65 -8.48 0.54 -88.27
85 15.60 85.02 -8.37 67.26 21.61

182.2
97
98 17.90
18.00 83.68
83.62 -7.79
-7.76 -126.76
-44.05 -47.84
-60.51
103 19.00 83.09 -7.58 -36.27 -55.19
107 19.80 83.74 -7.60 -102.53 -110.70

116 21.50 93.90 -8.97 47.35


600.5 328.7 -410.32
410.8
121 22.50 99.93 -11.36 250.68 -110.58
125 23.20 104.17 -13.36 178.17 39.83

134 24.90 114.54 -17.60 -21.02 179.24


139 25.90 120.68 -19.23 -100.21 92.08
143 26.60 125.01 -20.12 31.04 70.61

152 28.30 135.57 -21.47 -21.5 17.04 185.84


155 28.80 138.69 -21.52 -60.20 175.90
157 29.20 141.20 -21.43 -73.23 138.05
159 29.60 143.71 -21.26 -13.62 127.64
227.5
165 30.80 151.25 -20.23 106.73 152.05
159.5
173 32.30 160.73 -17.44 -141.42 232.88
176 32.80 15.80 -16.03 -170.49 150.46
179 33.30 -8.48 -14.47 -172.33 64.08
182 33.80 -32.75 -12.85 -162.02 -20.17
185 34.30 -57.02 -11.25 -139.57 -96.23
188 34.80 -81.29 -9.74 -104.99 -158.04
191 35.30 -105.56 -8.39 -58.28 -199.53
194 35.80 -110.88 -7.23 5.61 -214.66
197 36.30 -74.38 -6.28 50.73 -202.81
200 36.80 -45.48 -5.53 79.73 -172.23
203 37.30 -19.72 -4.95 100.65 -129.20

213 39.30 101.81 -3.50 -13.30 0.00


2. 기초검토
춘천시 약사동 주상복합 신축설계 직접 기초 총괄표

시추 경험식 및 문헌치에 따른 허용지지력


예상침하량
구분 공번 지지층 하중 비교
(mm)
(No.) Ter Mey Han 문헌

주차장 BH-2 풍화암 800.00 3113.80 5196.69 14026.62 850.00 23.08 -

기계실 BH-1 풍화암 800.00 3452.75 6088.86 14606.58 850.00 20.67 -

전기실 BH-1 풍화암 800.00 3441.13 6377.97 15210.19 850.00 18.66 -


▣ 직접기초 안정성 검토
1-1 지하주차장 구간
위치: 지하주차장 시추공 : 풍화암 적용하중 800 kPa
a. Terzaghi (1943) Foundation Analysis and Design, joseph E. Bowles, 도로교설계기준
: 세장기초에 대한 전반전단파괴시의 극한 지지력 (기초바닥위의 흙은 상재하중으로 고려, 전단저항은 무시)
1) 기초의 조건
B: 8.80 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 28.46 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (감소내부마찰각) c' : 18.0 kPa (감소점착력)
γ1 : 3 γ2 : 3
20.00 kN/m (기초저면상부단위중량) 20.00 kN/m (기초저면하부단위중량)
α: 1.24 (기초형상계수) β: 0.419 (기초형상계수)
Nc : 37.16 (전반지지력계수) Nc' : 18.99 (국부지지력계수)
Nq : 22.46 (전반지지력계수) Nq' : 8.31 (국부지지력계수)
Nr : 20.12 (전반지지력계수) Nr' : 5.13 (국부지지력계수)
α, β 결정
기초형상
연 속 정방형 장방형 원 형
형상계수
α 1.00 1.30 1.0 + 0.3B/L 1.30
β 0.50 0.40 0.5 - 0.1B/L 0.30

2) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 188)


ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
1.5π+1 = 5.712 (Ø = 0 인 경우)
Nq 2 (0.75π - Ø/2) tanØ 2
ⓑ = [e ]/[2cos (45 + Ø/2)]
ⓒ Nr = 1/2 (Kpr/cos2Ø - 1)tanØ ≒ 2(Nq + 1)tanØ/(1+0.4sin(4Ø))

3) 극한지지력의 계산
ⓐ 전반전단파괴시
qult = αcxNc + γ1DfNq + βγ2BNr = 9341.39 kPa
ⓑ 국부전단파괴시 (경험적인 방법)
qult = αc'xNc + γ1DfNq + βγ2BNr = 3326.15 kPa

4) 허용지지력의 계산
ⓐ 전반전단파괴시
qa = 3113.8 kPa (상시)
ⓑ 국부전단파괴시 (경험적인 방법)
qa = 1108.7 kPa (상시)
b. Meyerhof (1951, 1963) Foundation Analysis and Design, joseph E. Bowles, NAVFAC, 구조물기초설계기준

: 모든 얕은기초에 대한 극한 지지력 (파괴면이 대수나선과 같이 직선으로 지표면까지 연장된다고 가정)

1) 기초의 조건
B: 8.80 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 28.46 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) c' : 18.0 kPa (점착력)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
α: 0.00 rad (연직면과 하중방향) NØ : 3.00
sc : 1.48 (기초형상계수) dc : 2.12 (깊이계수)
sq : 1.24 (기초형상계수) dq : 1.56 (깊이계수)
sr : 1.24 (기초형상계수) dr : 1.56 (깊이계수)
ic : 1.00 (하중경사계수)
iq : 1.00 (하중경사계수)
ir : 1.00 (하중경사계수)
Nc : 30.14 (전반지지력계수) Nc' : 15.87 (국부지지력계수)
Nq : 18.40 (전반지지력계수) Nq' : 7.11 (국부지지력계수)
Nr : 15.67 (전반지지력계수) Nr' : 3.45 (국부지지력계수)

2) sc, sq, sr의 산정


ⓐ sc = 1.0 + 0.2 NØ(B/L)
ⓑ sq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
ⓒ sr = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
3) dc, dq, dr의 산정
ⓐ dc = 1.0 + 0.2 NØ1/2(Df/B)
ⓑ dq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ1/2(Df/B) (Ø > 10 인 경우)
ⓒ dr = 1.0 (Ø = 0 인 경우)
1/2
= 1.0 + 0.1 NØ (Df/B) (Ø > 10 인 경우)
4) ic, iq, ir의 산정
ⓐ ic = (1.0 - α/90)2
ⓑ iq = (1.0 - α/90)2
ⓒ ir = (1.0 - α/Ø)2 (Ø > 0 인 경우)
= 0.0 (Ø = 0 인 경우)
5) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 193)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
= Ø+2 = 5.14 (Ø = 0 인 경우)
Nq π tanØ 2
ⓑ = e tan (45 + Ø/2)
ⓒ Nr = (Nq -1) tan(1.4Ø)
6) 극한지지력 및 허용지지력의 계산
ⓐ 전반전단파괴시
qu = cxNcscdcic + γ1DfxNqsqdqiq + 1/2xγ2BxNrsrdrir = 15590.1 kPa
qa = 5196.7 kPa (상시)

ⓑ 국부전단파괴시 (경험적인 방법)


: cl = 2/3 c , fl = tan-1(2/3 tanf) 적용

qu = (cl)xNcscdcic + (gtB/2)xNgsgdgig + (gtDf)xNqsqdqiq = 5687.5 kPa


qa = 1895.8 kPa (상시)

c. Hansen (1970) Found. Analysis and Design, joseph E. Bowles, Found. Design & Const., Tomlinson, CGS, 도표시

: 모든 기초에 대한 극한 지지력

1) 기초의 조건
B: 8.80 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 28.46 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) ca : 16.2 kPa (기초저면점착력)
Af : 95.92 m2 (기초유효재하면적)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
2 Hi :
V: 800.0 kN/m (기초수직하중) 0.00 ton (기초하중의 수평분력)

ψ: 0.00 rad (지반경사, 하향각 : +) η: 0.00 rad (기초저면경사, 상향각 : +)

sc : 1.49 (기초형상계수) dc : 29.13 (깊이계수)


sq : 1.40 (기초형상계수) dq : 22.02 (깊이계수)
sr : 0.68 (기초형상계수) dr : 1.00 (깊이계수)
ic : 1.00 (하중경사계수) gc : 1.00 (지반경사계수)
iq : 1.00 (하중경사계수) gq : 1.00 (지반경사계수)
ir : 1.00 (하중경사계수) gr : 1.00 (지반경사계수)
bc : 1.00 (기초저면경사계수) Nc : 30.14 (전반지지력계수)
bq : 1.00 (기초저면경사계수) Nq : 18.40 (전반지지력계수)
br : 1.00 (기초저면경사계수) Nr : 15.07 (전반지지력계수)
2) sc, sq, sr의 산정
ⓐ sc = 0.2 B/L (Ø = 0 인 경우)
= 1.0 + (Nq/Nc)(B/L) (Ø = 0 이 아닌 경우)
ⓑ sq = 1.0 + (B/L)xsinØ
ⓒ sr = 1.0 - 0.4(B/L) ≥ 0.6
3) dc, dq, dr의 산정
① Df/B ≤ 1 인 경우
ⓐ dc = 0.4(Df/B) (Ø = 0 인 경우)
= 1.0 + 0.4(Df/B) (Ø = 0 이 아닌 경우)
2
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ) x(Df/B)
ⓒ dr = 1.0
② Df/B > 1 인 경우
ⓐ dc = 0.4 tan-1(Df/B) (Ø = 0 인 경우)
-1
= 1+0.4 tan (Df/B) (Ø = 0 이 아닌 경우)
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ)2xtan-1(Df/B)
ⓒ dr = 1.0
4) ic, iq, ir의 산정
ⓐ ic = 0.5-√(1-Hi/(Afca)) (Ø = 0 인 경우)
= iq - [(1 - iq)/(Nq - 1)] (Ø = 0 이 아닌 경우)
5
ⓑ iq = [1 - (0.5 Hi/(V + AfcacotØ))]
ⓒ ir = [1.0 - 0.7Hi/(V+AfcacotØ)]5 (수평지반의 경우)
= [1.0 - (0.7-η°/450°)Hi/(V+AfcacotØ)]5 (경사지반의 경우)
5) gc, gq, gr의 산정
ⓐ gc = ψ°/147° (Ø = 0 인 경우)
= 1 - ψ°/147° (Ø = 0 이 아닌 경우)
ⓑ gq = (1.0 - 0.5 tanψ)5
ⓒ gr = (1.0 - 0.5 tanψ)5
6) bc, bq, br의 산정
ⓐ bc = η°/147° (Ø = 0 인 경우)
= 1.0 - (η°/147°) (Ø = 0 이 아닌 경우)
bq (-2ηtanØ)
ⓑ = e (η는 rad 단위)
ⓒ br = e(-2.7ηtanØ) (η는 rad 단위)
7) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 195)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우) Meyerhof의 값과 같음
= Ø+2 = 5.14 (Ø = 0 인 경우) Meyerhof의 값과 같음
ⓑ Nq = eπ tanØtan2(45 + Ø/2) Meyerhof의 값과 같음
ⓒ Nr = 1.5(Nq - 1) tanØ
8) 전반전단 극한지지력 및 허용지지력의 계산
qu = cxNcscdcicgcbc + γ1DfxNqsqdqiqgqbq + 1/2γ2BxNrsrdrirgrbr = 42079.85 kPa
qa = 14026.6 kPa (상시)
d. 경험식(NAVFAC, 구조물기초설계기준)
: 개략적인 지지력 예측이 필요하거나, 정밀한 토성치 조사를 시행할 여건이 못되는 경우에 사용한다.
(구조물기초 설계기준 2018 p 209)
허용지지력(kN/m2)
지지층 현장연경도 상태
범위 추천값
괴상의 결정질 화강암, 변성암 :
경질의 신선한 암 6,500∼10,000 8,000
화강암, 섬록암, 현무암, 완전히 고결된 역암
엽리성의 변성암:슬레이트, 편암 중간경질의 신선한 암 3,000∼4,000 3,500
퇴적암:시멘트화된 경질의 셰일,실트암, 중간경질의 신선한
1600∼2700 2,000
사암, 동공이 없는 석회암 암

풍화되거나 파쇄된 모암,


연암 850∼1300 1,000
이질암(셰일)이외의 모든암, RQD<25
컴팩션 셰일이나 신선한 이질암 연암 850∼1600 1,000

입도분포가 양호한 세립토 모래자갈의 혼합물:


빙하 퇴적물, 하드팬(Hardpan), 매우 조밀함 850∼1300 1,000
점성토 섞인 자갈(GW-GC, GC, SC)

매우 조밀함 650∼1050 700


자갈, 모래-모래 혼합물
중간정도 조밀 400∼750 500
호박돌-자갈 혼합물(GW,GP,SW,SP)
느슨함 200∼650 300
매우 조밀함 400∼650 400
입자가 굵거나 중간정도의
중간정도 조밀 200∼400 300
모래 자갈이 약간 섞인 모래(SW, SP)
느슨함 100∼300 150
매우 조밀함 300∼500 300
가는 모래, 실트질이나 점토질 중간정도 입도나
중간정도 조밀 200∼400 200
굵은 모래(SW, SM, SC)
느슨함 100∼300 150
굳음 300∼600 400
균질한 점토, 모래질이나 실트질, 점토 중간정도 굳음 100∼300 200
느슨함 50∼100 50
매우 굳음 200∼400 300
실트, 모래질 실트, 점토질 실트,
중간정도 굳음 100∼300 150
교호된 (Varved)실트-점토-세사층
연함 500∼100 50

1) 허용지지력의 계산
qa = 850.0 kPa (상시)

1-2 결과의 요약
구분 Ter Mey Han 문헌
상시 3113.8 5196.7 14026.6 850.0

구분 적용 응력 판정
상시 850.0 800.0 OK
2-1 지하주차장 구간 풍화암기준 침하량 검토
a. 변형영향계수에 의한 침하량 검토(Schmertmann & Hartman (1978)) 구조물 기초설계기준 2009 p255
1) 기초의 조건
B: 8.80 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 28.46 m (관입기초길이) γ' : 20.00 kN/m3 (기초저면하부단위중량)
συ0' : 296.90 kPa (기초의 근입깊이에서의 유효응력, γ'Df)
qb : 2
800.00 kN/m (기초저면 접지압)
C1 : 0.70 (기초근입깊이보정계수) C2 : 1.40 (모래Creep보정계수)
2) C1, C2의 산정
ⓐ C1 = 1 - 0.5[συ0'/(qb - συ0')] 단, C1 > 0.5
= 1 - 0.5 x [296.9/(800-296.9)] = 0.70
ⓑ C2 = 1 + 0.2 log[10 x10(년)] = 1.4
3) 침하량의 계산
S = C1C2 (qb - συ0') x (Iz/E) x Δz
= 0.705x1.4x(800-296.9)x0.000032x1000 = 15.888 mm

토층 From To Δz N E z+Δz/2 Iz (Iz/E)*Δz


풍화암 0.000 1.956 1.956 50 167580 0.98 0.233 0.0000027
풍화암 1.956 3.520 1.564 50 167580 2.74 0.293 0.0000027
풍화암 3.520 3.813 0.293 50 167580 3.67 0.325 0.0000006
풍화암 3.813 4.107 0.293 50 167580 3.96 0.335 0.0000006
풍화암 4.107 7.899 3.793 50 167580 6.00 0.405 0.0000092
풍화암 7.899 8.800 0.901 50 167580 8.35 0.485 0.0000026
풍화암 8.800 10.835 2.035 50 167580 9.82 0.442 0.0000054
풍화암 10.835 12.320 1.485 50 167580 11.58 0.342 0.0000030
풍화암 12.320 14.080 1.760 50 167580 13.20 0.250 0.0000026
풍화암 14.080 15.840 1.760 50 167580 14.96 0.150 0.0000016
풍화암 15.840 17.600 1.760 50 167580 16.72 0.050 0.0000005
∑ 0.0000320
변형영향계수(Iz)
0.00 0.10 0.20 0.30 0.40 0.50 0.60
0

10

20

30

40

50

60
b.Harr (1966) 구조물 기초설계기준 2009 p247, 지반공학시리즈 얕은기초
1) 기초의 조건
B: 8.80 m (기초직경, 폭) L: 10.90 m (기초길이)
2
E: 1.7E+05 kN/m (탄성계수) υ: 0.30 (포아송비)
q: 503.1 kN (총 하중) L/B : 1.24
Is : 0.96 (탄성침하의 영향계수)
2) Is의 산정
ⓐ L/B 결정 = 10.9 / 8.8 = 1.23863636363636
ⓑ Is 결정
연성기초
구분 강성기초 비고
중심점 외변의 중점 모서리점 평균
원형기초 0.79 1.00 0.64 - 0.85
연성기초의 중심점의
정방형기초 0.88 1.12 0.76 0.56 0.95 영향치는 모서리점의
영향치의 2배임.
L/B 2.0 1.12 1.53 1.12 0.76 1.30
즉, 중심점의 침하량은
구형 모서리점의 침하량의
L/B 5.0 1.60 2.10 1.68 1.05 1.82
기초 2배임
L/B ## 2.00 2.56 2.10 1.28 2.24

3) 침하량의 계산
S = q B(1 - υ2)/E x Is = 503.1 x 8.8 x ( 1 - 0.3 ²) / 167580 x 0.96 = 23.080 mm

2-2 결과의 요약
발생침하량 (mm) 허용침하량
구분 판정
Schmertmann Harr 적용치 (mm)

결과값 15.89 23.08 23.08 25.0 O.K


▣ 직접기초 안정성 검토
1-1 기계실 구간
위치: 기계실 시추공 : 풍화암 적용하중 800 kPa
a. Terzaghi (1943) Foundation Analysis and Design, joseph E. Bowles, 도로교설계기준
: 세장기초에 대한 전반전단파괴시의 극한 지지력 (기초바닥위의 흙은 상재하중으로 고려, 전단저항은 무시)
1) 기초의 조건
B: 8.60 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (감소내부마찰각) c' : 18.0 kPa (감소점착력)
γ1 : 3 γ2 : 3
20.00 kN/m (기초저면상부단위중량) 20.00 kN/m (기초저면하부단위중량)
α: 1.24 (기초형상계수) β: 0.421 (기초형상계수)
Nc : 37.16 (전반지지력계수) Nc' : 18.99 (국부지지력계수)
Nq : 22.46 (전반지지력계수) Nq' : 8.31 (국부지지력계수)
Nr : 20.12 (전반지지력계수) Nr' : 5.13 (국부지지력계수)
α, β 결정
기초형상
연 속 정방형 장방형 원 형
형상계수
α 1.00 1.30 1.0 + 0.3B/L 1.30
β 0.50 0.40 0.5 - 0.1B/L 0.30

2) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 188)


ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
1.5π+1 = 5.712 (Ø = 0 인 경우)
Nq 2 (0.75π - Ø/2) tanØ 2
ⓑ = [e ]/[2cos (45 + Ø/2)]
ⓒ Nr = 1/2 (Kpr/cos2Ø - 1)tanØ ≒ 2(Nq + 1)tanØ/(1+0.4sin(4Ø))

3) 극한지지력의 계산
ⓐ 전반전단파괴시
qult = αcxNc + γ1DfNq + βγ2BNr = 10358.26 kPa
ⓑ 국부전단파괴시 (경험적인 방법)
qult = αc'xNc + γ1DfNq + βγ2BNr = 3704.34 kPa

4) 허용지지력의 계산
ⓐ 전반전단파괴시
qa = 3452.8 kPa (상시)
ⓑ 국부전단파괴시 (경험적인 방법)
qa = 1234.8 kPa (상시)
b. Meyerhof (1951, 1963) Foundation Analysis and Design, joseph E. Bowles, NAVFAC, 구조물기초설계기준

: 모든 얕은기초에 대한 극한 지지력 (파괴면이 대수나선과 같이 직선으로 지표면까지 연장된다고 가정)

1) 기초의 조건
B: 8.60 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) c' : 18.0 kPa (점착력)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
α: 0.00 rad (연직면과 하중방향) NØ : 3.00
sc : 1.47 (기초형상계수) dc : 2.32 (깊이계수)
sq : 1.24 (기초형상계수) dq : 1.66 (깊이계수)
sr : 1.24 (기초형상계수) dr : 1.66 (깊이계수)
ic : 1.00 (하중경사계수)
iq : 1.00 (하중경사계수)
ir : 1.00 (하중경사계수)
Nc : 30.14 (전반지지력계수) Nc' : 15.87 (국부지지력계수)
Nq : 18.40 (전반지지력계수) Nq' : 7.11 (국부지지력계수)
Nr : 15.67 (전반지지력계수) Nr' : 3.45 (국부지지력계수)

2) sc, sq, sr의 산정


ⓐ sc = 1.0 + 0.2 NØ(B/L)
ⓑ sq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
ⓒ sr = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
3) dc, dq, dr의 산정
ⓐ dc = 1.0 + 0.2 NØ1/2(Df/B)
ⓑ dq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ1/2(Df/B) (Ø > 10 인 경우)
ⓒ dr = 1.0 (Ø = 0 인 경우)
1/2
= 1.0 + 0.1 NØ (Df/B) (Ø > 10 인 경우)
4) ic, iq, ir의 산정
ⓐ ic = (1.0 - α/90)2
ⓑ iq = (1.0 - α/90)2
ⓒ ir = (1.0 - α/Ø)2 (Ø > 0 인 경우)
= 0.0 (Ø = 0 인 경우)
5) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 193)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
= Ø+2 = 5.14 (Ø = 0 인 경우)
Nq π tanØ 2
ⓑ = e tan (45 + Ø/2)
ⓒ Nr = (Nq -1) tan(1.4Ø)
6) 극한지지력 및 허용지지력의 계산
ⓐ 전반전단파괴시
qu = cxNcscdcic + γ1DfxNqsqdqiq + 1/2xγ2BxNrsrdrir = 18266.6 kPa
qa = 6088.9 kPa (상시)

ⓑ 국부전단파괴시 (경험적인 방법)


: cl = 2/3 c , fl = tan-1(2/3 tanf) 적용

qu = (cl)xNcscdcic + (gtB/2)xNgsgdgig + (gtDf)xNqsqdqiq = 6705.5 kPa


qa = 2235.2 kPa (상시)

c. Hansen (1970) Found. Analysis and Design, joseph E. Bowles, Found. Design & Const., Tomlinson, CGS, 도표시

: 모든 기초에 대한 극한 지지력

1) 기초의 조건
B: 8.60 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) ca : 16.2 kPa (기초저면점착력)
Af : 93.74 m2 (기초유효재하면적)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
2 Hi :
V: 800.0 kN/m (기초수직하중) 0.00 ton (기초하중의 수평분력)

ψ: 0.00 rad (지반경사, 하향각 : +) η: 0.00 rad (기초저면경사, 상향각 : +)

sc : 1.48 (기초형상계수) dc : 30.10 (깊이계수)


sq : 1.39 (기초형상계수) dq : 22.72 (깊이계수)
sr : 0.68 (기초형상계수) dr : 1.00 (깊이계수)
ic : 1.00 (하중경사계수) gc : 1.00 (지반경사계수)
iq : 1.00 (하중경사계수) gq : 1.00 (지반경사계수)
ir : 1.00 (하중경사계수) gr : 1.00 (지반경사계수)
bc : 1.00 (기초저면경사계수) Nc : 30.14 (전반지지력계수)
bq : 1.00 (기초저면경사계수) Nq : 18.40 (전반지지력계수)
br : 1.00 (기초저면경사계수) Nr : 15.07 (전반지지력계수)
2) sc, sq, sr의 산정
ⓐ sc = 0.2 B/L (Ø = 0 인 경우)
= 1.0 + (Nq/Nc)(B/L) (Ø = 0 이 아닌 경우)
ⓑ sq = 1.0 + (B/L)xsinØ
ⓒ sr = 1.0 - 0.4(B/L) ≥ 0.6
3) dc, dq, dr의 산정
① Df/B ≤ 1 인 경우
ⓐ dc = 0.4(Df/B) (Ø = 0 인 경우)
= 1.0 + 0.4(Df/B) (Ø = 0 이 아닌 경우)
2
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ) x(Df/B)
ⓒ dr = 1.0
② Df/B > 1 인 경우
ⓐ dc = 0.4 tan-1(Df/B) (Ø = 0 인 경우)
-1
= 1+0.4 tan (Df/B) (Ø = 0 이 아닌 경우)
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ)2xtan-1(Df/B)
ⓒ dr = 1.0
4) ic, iq, ir의 산정
ⓐ ic = 0.5-√(1-Hi/(Afca)) (Ø = 0 인 경우)
= iq - [(1 - iq)/(Nq - 1)] (Ø = 0 이 아닌 경우)
5
ⓑ iq = [1 - (0.5 Hi/(V + AfcacotØ))]
ⓒ ir = [1.0 - 0.7Hi/(V+AfcacotØ)]5 (수평지반의 경우)
= [1.0 - (0.7-η°/450°)Hi/(V+AfcacotØ)]5 (경사지반의 경우)
5) gc, gq, gr의 산정
ⓐ gc = ψ°/147° (Ø = 0 인 경우)
= 1 - ψ°/147° (Ø = 0 이 아닌 경우)
ⓑ gq = (1.0 - 0.5 tanψ)5
ⓒ gr = (1.0 - 0.5 tanψ)5
6) bc, bq, br의 산정
ⓐ bc = η°/147° (Ø = 0 인 경우)
= 1.0 - (η°/147°) (Ø = 0 이 아닌 경우)
bq (-2ηtanØ)
ⓑ = e (η는 rad 단위)
ⓒ br = e(-2.7ηtanØ) (η는 rad 단위)
7) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 195)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우) Meyerhof의 값과 같음
= Ø+2 = 5.14 (Ø = 0 인 경우) Meyerhof의 값과 같음
ⓑ Nq = eπ tanØtan2(45 + Ø/2) Meyerhof의 값과 같음
ⓒ Nr = 1.5(Nq - 1) tanØ
8) 전반전단 극한지지력 및 허용지지력의 계산
qu = cxNcscdcicgcbc + γ1DfxNqsqdqiqgqbq + 1/2γ2BxNrsrdrirgrbr = 43819.74 kPa
qa = 14606.6 kPa (상시)
d. 경험식(NAVFAC, 구조물기초설계기준)
: 개략적인 지지력 예측이 필요하거나, 정밀한 토성치 조사를 시행할 여건이 못되는 경우에 사용한다.
(구조물기초 설계기준 2018 p 209)
허용지지력(kN/m2)
지지층 현장연경도 상태
범위 추천값
괴상의 결정질 화강암, 변성암 :
경질의 신선한 암 6,500∼10,000 8,000
화강암, 섬록암, 현무암, 완전히 고결된 역암
엽리성의 변성암:슬레이트, 편암 중간경질의 신선한 암 3,000∼4,000 3,500
퇴적암:시멘트화된 경질의 셰일,실트암, 중간경질의 신선한
1600∼2700 2,000
사암, 동공이 없는 석회암 암

풍화되거나 파쇄된 모암,


연암 850∼1300 1,000
이질암(셰일)이외의 모든암, RQD<25
컴팩션 셰일이나 신선한 이질암 연암 850∼1600 1,000

입도분포가 양호한 세립토 모래자갈의 혼합물:


빙하 퇴적물, 하드팬(Hardpan), 매우 조밀함 850∼1300 1,000
점성토 섞인 자갈(GW-GC, GC, SC)

매우 조밀함 650∼1050 700


자갈, 모래-모래 혼합물
중간정도 조밀 400∼750 500
호박돌-자갈 혼합물(GW,GP,SW,SP)
느슨함 200∼650 300
매우 조밀함 400∼650 400
입자가 굵거나 중간정도의
중간정도 조밀 200∼400 300
모래 자갈이 약간 섞인 모래(SW, SP)
느슨함 100∼300 150
매우 조밀함 300∼500 300
가는 모래, 실트질이나 점토질 중간정도 입도나
중간정도 조밀 200∼400 200
굵은 모래(SW, SM, SC)
느슨함 100∼300 150
굳음 300∼600 400
균질한 점토, 모래질이나 실트질, 점토 중간정도 굳음 100∼300 200
느슨함 50∼100 50
매우 굳음 200∼400 300
실트, 모래질 실트, 점토질 실트,
중간정도 굳음 100∼300 150
교호된 (Varved)실트-점토-세사층
연함 500∼100 50

1) 허용지지력의 계산
qa = 850.0 kPa (상시)

1-2 결과의 요약
구분 Ter Mey Han 문헌
상시 3452.8 6088.9 14606.6 850.0

구분 적용 응력 판정
상시 850.0 800.0 OK
2-1 기계실 구간 풍화암기준 침하량 검토
a. 변형영향계수에 의한 침하량 검토(Schmertmann & Hartman (1978)) 구조물 기초설계기준 2009 p255
1) 기초의 조건
B: 8.60 m (기초직경, 폭) L: 10.90 m (기초길이)
Df : 32.66 m (관입기초길이) γ' : 20.00 kN/m3 (기초저면하부단위중량)
συ0' : 338.90 kPa (기초의 근입깊이에서의 유효응력, γ'Df)
qb : 2
800.00 kN/m (기초저면 접지압)
C1 : 0.63 (기초근입깊이보정계수) C2 : 1.40 (모래Creep보정계수)
2) C1, C2의 산정
ⓐ C1 = 1 - 0.5[συ0'/(qb - συ0')] 단, C1 > 0.5
= 1 - 0.5 x [338.9/(800-338.9)] = 0.63
ⓑ C2 = 1 + 0.2 log[10 x10(년)] = 1.4
3) 침하량의 계산
S = C1C2 (qb - συ0') x (Iz/E) x Δz
= 0.633x1.4x(800-338.9)x0.000031x1000 = 12.658 mm

토층 From To Δz N E z+Δz/2 Iz (Iz/E)*Δz


풍화암 0.000 1.911 1.911 50 167580 0.96 0.233 0.0000027
풍화암 1.911 3.440 1.529 50 167580 2.68 0.293 0.0000027
풍화암 3.440 3.727 0.287 50 167580 3.58 0.325 0.0000006
풍화암 3.727 4.013 0.287 50 167580 3.87 0.335 0.0000006
풍화암 4.013 7.720 3.707 50 167580 5.87 0.405 0.0000090
풍화암 7.720 8.600 0.880 50 167580 8.16 0.485 0.0000025
풍화암 8.600 10.588 1.988 50 167580 9.59 0.442 0.0000052
풍화암 10.588 12.040 1.452 50 167580 11.31 0.342 0.0000030
풍화암 12.040 13.760 1.720 50 167580 12.90 0.250 0.0000026
풍화암 13.760 15.480 1.720 50 167580 14.62 0.150 0.0000015
풍화암 15.480 17.200 1.720 50 167580 16.34 0.050 0.0000005
∑ 0.0000310
변형영향계수(Iz)
0.00 0.10 0.20 0.30 0.40 0.50 0.60
0

10

20

30

40

50

60
b.Harr (1966) 구조물 기초설계기준 2009 p247, 지반공학시리즈 얕은기초
1) 기초의 조건
B: 8.60 m (기초직경, 폭) L: 10.90 m (기초길이)
2
E: 1.7E+05 kN/m (탄성계수) υ: 0.30 (포아송비)
q: 461.1 kN (총 하중) L/B : 1.27
Is : 0.96 (탄성침하의 영향계수)
2) Is의 산정
ⓐ L/B 결정 = 10.9 / 8.6 = 1.26744186046512
ⓑ Is 결정
연성기초
구분 강성기초 비고
중심점 외변의 중점 모서리점 평균
원형기초 0.79 1.00 0.64 - 0.85
연성기초의 중심점의
정방형기초 0.88 1.12 0.76 0.56 0.95 영향치는 모서리점의
영향치의 2배임.
L/B 2.0 1.12 1.53 1.12 0.76 1.30
즉, 중심점의 침하량은
구형 모서리점의 침하량의
L/B 5.0 1.60 2.10 1.68 1.05 1.82
기초 2배임
L/B ## 2.00 2.56 2.10 1.28 2.24

3) 침하량의 계산
S = q B(1 - υ2)/E x Is = 461.1 x 8.6 x ( 1 - 0.3 ²) / 167580 x 0.96 = 20.672 mm

2-2 결과의 요약
발생침하량 (mm) 허용침하량
구분 판정
Schmertmann Harr 적용치 (mm)

결과값 12.66 20.67 20.67 25.0 O.K


▣ 직접기초 안정성 검토
1-1 전기실 구간
위치: 전기실 시추공 : 풍화암 적용하중 800 kPa
a. Terzaghi (1943) Foundation Analysis and Design, joseph E. Bowles, 도로교설계기준
: 세장기초에 대한 전반전단파괴시의 극한 지지력 (기초바닥위의 흙은 상재하중으로 고려, 전단저항은 무시)
1) 기초의 조건
B: 8.10 m (기초직경, 폭) L: 9.15 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (감소내부마찰각) c' : 18.0 kPa (감소점착력)
γ1 : 3 γ2 : 3
20.00 kN/m (기초저면상부단위중량) 20.00 kN/m (기초저면하부단위중량)
α: 1.27 (기초형상계수) β: 0.411 (기초형상계수)
Nc : 37.16 (전반지지력계수) Nc' : 18.99 (국부지지력계수)
Nq : 22.46 (전반지지력계수) Nq' : 8.31 (국부지지력계수)
Nr : 20.12 (전반지지력계수) Nr' : 5.13 (국부지지력계수)
α, β 결정
기초형상
연 속 정방형 장방형 원 형
형상계수
α 1.00 1.30 1.0 + 0.3B/L 1.30
β 0.50 0.40 0.5 - 0.1B/L 0.30

2) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 188)


ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
1.5π+1 = 5.712 (Ø = 0 인 경우)
Nq 2 (0.75π - Ø/2) tanØ 2
ⓑ = [e ]/[2cos (45 + Ø/2)]
ⓒ Nr = 1/2 (Kpr/cos2Ø - 1)tanØ ≒ 2(Nq + 1)tanØ/(1+0.4sin(4Ø))

3) 극한지지력의 계산
ⓐ 전반전단파괴시
qult = αcxNc + γ1DfNq + βγ2BNr = 10323.39 kPa
ⓑ 국부전단파괴시 (경험적인 방법)
qult = αc'xNc + γ1DfNq + βγ2BNr = 3697.94 kPa

4) 허용지지력의 계산
ⓐ 전반전단파괴시
qa = 3441.1 kPa (상시)
ⓑ 국부전단파괴시 (경험적인 방법)
qa = 1232.6 kPa (상시)
b. Meyerhof (1951, 1963) Foundation Analysis and Design, joseph E. Bowles, NAVFAC, 구조물기초설계기준

: 모든 얕은기초에 대한 극한 지지력 (파괴면이 대수나선과 같이 직선으로 지표면까지 연장된다고 가정)

1) 기초의 조건
B: 8.10 m (기초직경, 폭) L: 9.15 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) c' : 18.0 kPa (점착력)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
α: 0.00 rad (연직면과 하중방향) NØ : 3.00
sc : 1.53 (기초형상계수) dc : 2.40 (깊이계수)
sq : 1.27 (기초형상계수) dq : 1.70 (깊이계수)
sr : 1.27 (기초형상계수) dr : 1.70 (깊이계수)
ic : 1.00 (하중경사계수)
iq : 1.00 (하중경사계수)
ir : 1.00 (하중경사계수)
Nc : 30.14 (전반지지력계수) Nc' : 15.87 (국부지지력계수)
Nq : 18.40 (전반지지력계수) Nq' : 7.11 (국부지지력계수)
Nr : 15.67 (전반지지력계수) Nr' : 3.45 (국부지지력계수)

2) sc, sq, sr의 산정


ⓐ sc = 1.0 + 0.2 NØ(B/L)
ⓑ sq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
ⓒ sr = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ(B/L) (Ø > 10 인 경우)
3) dc, dq, dr의 산정
ⓐ dc = 1.0 + 0.2 NØ1/2(Df/B)
ⓑ dq = 1.0 (Ø = 0 인 경우)
= 1.0 + 0.1 NØ1/2(Df/B) (Ø > 10 인 경우)
ⓒ dr = 1.0 (Ø = 0 인 경우)
1/2
= 1.0 + 0.1 NØ (Df/B) (Ø > 10 인 경우)
4) ic, iq, ir의 산정
ⓐ ic = (1.0 - α/90)2
ⓑ iq = (1.0 - α/90)2
ⓒ ir = (1.0 - α/Ø)2 (Ø > 0 인 경우)
= 0.0 (Ø = 0 인 경우)
5) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 193)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우)
= Ø+2 = 5.14 (Ø = 0 인 경우)
Nq π tanØ 2
ⓑ = e tan (45 + Ø/2)
ⓒ Nr = (Nq -1) tan(1.4Ø)
6) 극한지지력 및 허용지지력의 계산
ⓐ 전반전단파괴시
qu = cxNcscdcic + γ1DfxNqsqdqiq + 1/2xγ2BxNrsrdrir = 19133.9 kPa
qa = 6378.0 kPa (상시)

ⓑ 국부전단파괴시 (경험적인 방법)


: cl = 2/3 c , fl = tan-1(2/3 tanf) 적용

qu = (cl)xNcscdcic + (gtB/2)xNgsgdgig + (gtDf)xNqsqdqiq = 7036.3 kPa


qa = 2345.4 kPa (상시)

c. Hansen (1970) Found. Analysis and Design, joseph E. Bowles, Found. Design & Const., Tomlinson, CGS, 도표시

: 모든 기초에 대한 극한 지지력

1) 기초의 조건
B: 8.10 m (기초직경, 폭) L: 9.15 m (기초길이)
Df : 32.66 m (관입기초깊이) Dw : 1.23 m (지하수위깊이)
Ø: 30.0 deg (내부마찰각) c: 27.0 kPa (점착력)
Ø' : 21.1 deg (내부마찰각) ca : 16.2 kPa (기초저면점착력)
Af : 74.12 m2 (기초유효재하면적)
γ1 : 20.00 kN/m3 (기초저면상부단위중량) γ2 : 20.00 kN/m3 (기초저면하부단위중량)
2 Hi :
V: 800.0 kN/m (기초수직하중) 0.00 ton (기초하중의 수평분력)

ψ: 0.00 rad (지반경사, 하향각 : +) η: 0.00 rad (기초저면경사, 상향각 : +)

sc : 1.54 (기초형상계수) dc : 30.43 (깊이계수)


sq : 1.44 (기초형상계수) dq : 22.96 (깊이계수)
sr : 0.65 (기초형상계수) dr : 1.00 (깊이계수)
ic : 1.00 (하중경사계수) gc : 1.00 (지반경사계수)
iq : 1.00 (하중경사계수) gq : 1.00 (지반경사계수)
ir : 1.00 (하중경사계수) gr : 1.00 (지반경사계수)
bc : 1.00 (기초저면경사계수) Nc : 30.14 (전반지지력계수)
bq : 1.00 (기초저면경사계수) Nq : 18.40 (전반지지력계수)
br : 1.00 (기초저면경사계수) Nr : 15.07 (전반지지력계수)
2) sc, sq, sr의 산정
ⓐ sc = 0.2 B/L (Ø = 0 인 경우)
= 1.0 + (Nq/Nc)(B/L) (Ø = 0 이 아닌 경우)
ⓑ sq = 1.0 + (B/L)xsinØ
ⓒ sr = 1.0 - 0.4(B/L) ≥ 0.6
3) dc, dq, dr의 산정
① Df/B ≤ 1 인 경우
ⓐ dc = 0.4(Df/B) (Ø = 0 인 경우)
= 1.0 + 0.4(Df/B) (Ø = 0 이 아닌 경우)
2
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ) x(Df/B)
ⓒ dr = 1.0
② Df/B > 1 인 경우
ⓐ dc = 0.4 tan-1(Df/B) (Ø = 0 인 경우)
-1
= 1+0.4 tan (Df/B) (Ø = 0 이 아닌 경우)
ⓑ dq = 1.0 + 2.0 tanØ(1-sinØ)2xtan-1(Df/B)
ⓒ dr = 1.0
4) ic, iq, ir의 산정
ⓐ ic = 0.5-√(1-Hi/(Afca)) (Ø = 0 인 경우)
= iq - [(1 - iq)/(Nq - 1)] (Ø = 0 이 아닌 경우)
5
ⓑ iq = [1 - (0.5 Hi/(V + AfcacotØ))]
ⓒ ir = [1.0 - 0.7Hi/(V+AfcacotØ)]5 (수평지반의 경우)
= [1.0 - (0.7-η°/450°)Hi/(V+AfcacotØ)]5 (경사지반의 경우)
5) gc, gq, gr의 산정
ⓐ gc = ψ°/147° (Ø = 0 인 경우)
= 1 - ψ°/147° (Ø = 0 이 아닌 경우)
ⓑ gq = (1.0 - 0.5 tanψ)5
ⓒ gr = (1.0 - 0.5 tanψ)5
6) bc, bq, br의 산정
ⓐ bc = η°/147° (Ø = 0 인 경우)
= 1.0 - (η°/147°) (Ø = 0 이 아닌 경우)
bq (-2ηtanØ)
ⓑ = e (η는 rad 단위)
ⓒ br = e(-2.7ηtanØ) (η는 rad 단위)
7) 지지력 계수의 산정 (구조물기초 설계기준 2009 p 195)
ⓐ Nc = (Nq -1) cotØ (Ø = 0 이 아닌 경우) Meyerhof의 값과 같음
= Ø+2 = 5.14 (Ø = 0 인 경우) Meyerhof의 값과 같음
ⓑ Nq = eπ tanØtan2(45 + Ø/2) Meyerhof의 값과 같음
ⓒ Nr = 1.5(Nq - 1) tanØ
8) 전반전단 극한지지력 및 허용지지력의 계산
qu = cxNcscdcicgcbc + γ1DfxNqsqdqiqgqbq + 1/2γ2BxNrsrdrirgrbr = 45630.56 kPa
qa = 15210.2 kPa (상시)
d. 경험식(NAVFAC, 구조물기초설계기준)
: 개략적인 지지력 예측이 필요하거나, 정밀한 토성치 조사를 시행할 여건이 못되는 경우에 사용한다.
(구조물기초 설계기준 2018 p 209)
허용지지력(kN/m2)
지지층 현장연경도 상태
범위 추천값
괴상의 결정질 화강암, 변성암 :
경질의 신선한 암 6,500∼10,000 8,000
화강암, 섬록암, 현무암, 완전히 고결된 역암
엽리성의 변성암:슬레이트, 편암 중간경질의 신선한 암 3,000∼4,000 3,500
퇴적암:시멘트화된 경질의 셰일,실트암, 중간경질의 신선한
1600∼2700 2,000
사암, 동공이 없는 석회암 암

풍화되거나 파쇄된 모암,


연암 850∼1300 1,000
이질암(셰일)이외의 모든암, RQD<25
컴팩션 셰일이나 신선한 이질암 연암 850∼1600 1,000

입도분포가 양호한 세립토 모래자갈의 혼합물:


빙하 퇴적물, 하드팬(Hardpan), 매우 조밀함 850∼1300 1,000
점성토 섞인 자갈(GW-GC, GC, SC)

매우 조밀함 650∼1050 700


자갈, 모래-모래 혼합물
중간정도 조밀 400∼750 500
호박돌-자갈 혼합물(GW,GP,SW,SP)
느슨함 200∼650 300
매우 조밀함 400∼650 400
입자가 굵거나 중간정도의
중간정도 조밀 200∼400 300
모래 자갈이 약간 섞인 모래(SW, SP)
느슨함 100∼300 150
매우 조밀함 300∼500 300
가는 모래, 실트질이나 점토질 중간정도 입도나
중간정도 조밀 200∼400 200
굵은 모래(SW, SM, SC)
느슨함 100∼300 150
굳음 300∼600 400
균질한 점토, 모래질이나 실트질, 점토 중간정도 굳음 100∼300 200
느슨함 50∼100 50
매우 굳음 200∼400 300
실트, 모래질 실트, 점토질 실트,
중간정도 굳음 100∼300 150
교호된 (Varved)실트-점토-세사층
연함 500∼100 50

1) 허용지지력의 계산
qa = 850.0 kPa (상시)

1-2 결과의 요약
구분 Ter Mey Han 문헌
상시 3441.1 6378.0 15210.2 850.0

구분 적용 응력 판정
상시 850.0 800.0 OK
2-1 전기실 구간 풍화암기준 침하량 검토
a. 변형영향계수에 의한 침하량 검토(Schmertmann & Hartman (1978)) 구조물 기초설계기준 2009 p255
1) 기초의 조건
B: 8.10 m (기초직경, 폭) L: 9.15 m (기초길이)
Df : 32.66 m (관입기초길이) γ' : 20.00 kN/m3 (기초저면하부단위중량)
συ0' : 338.90 kPa (기초의 근입깊이에서의 유효응력, γ'Df)
qb : 2
800.00 kN/m (기초저면 접지압)
C1 : 0.63 (기초근입깊이보정계수) C2 : 1.40 (모래Creep보정계수)
2) C1, C2의 산정
ⓐ C1 = 1 - 0.5[συ0'/(qb - συ0')] 단, C1 > 0.5
= 1 - 0.5 x [338.9/(800-338.9)] = 0.63
ⓑ C2 = 1 + 0.2 log[10 x10(년)] = 1.4
3) 침하량의 계산
S = C1C2 (qb - συ0') x (Iz/E) x Δz
= 0.633x1.4x(800-338.9)x0.000029x1000 = 11.841 mm

토층 From To Δz N E z+Δz/2 Iz (Iz/E)*Δz


풍화암 0.000 1.800 1.800 50 167580 0.90 0.233 0.0000025
풍화암 1.800 3.240 1.440 50 167580 2.52 0.293 0.0000025
풍화암 3.240 3.510 0.270 50 167580 3.38 0.325 0.0000005
풍화암 3.510 3.780 0.270 50 167580 3.65 0.335 0.0000005
풍화암 3.780 7.271 3.491 50 167580 5.53 0.405 0.0000084
풍화암 7.271 8.100 0.829 50 167580 7.69 0.485 0.0000024
풍화암 8.100 9.973 1.873 50 167580 9.04 0.442 0.0000049
풍화암 9.973 11.340 1.367 50 167580 10.66 0.342 0.0000028
풍화암 11.340 12.960 1.620 50 167580 12.15 0.250 0.0000024
풍화암 12.960 14.580 1.620 50 167580 13.77 0.150 0.0000015
풍화암 14.580 16.200 1.620 50 167580 15.39 0.050 0.0000005
∑ 0.0000290
변형영향계수(Iz)
0.00 0.10 0.20 0.30 0.40 0.50 0.60
0

10

20

30

40

50

60
b.Harr (1966) 구조물 기초설계기준 2009 p247, 지반공학시리즈 얕은기초
1) 기초의 조건
B: 8.10 m (기초직경, 폭) L: 9.15 m (기초길이)
2
E: 1.7E+05 kN/m (탄성계수) υ: 0.30 (포아송비)
q: 461.1 kN (총 하중) L/B : 1.13
Is : 0.92 (탄성침하의 영향계수)
2) Is의 산정
ⓐ L/B 결정 = 9.15 / 8.1 = 1.12962962962963
ⓑ Is 결정
연성기초
구분 강성기초 비고
중심점 외변의 중점 모서리점 평균
원형기초 0.79 1.00 0.64 - 0.85
연성기초의 중심점의
정방형기초 0.88 1.12 0.76 0.56 0.95 영향치는 모서리점의
영향치의 2배임.
L/B 2.0 1.12 1.53 1.12 0.76 1.30
즉, 중심점의 침하량은
구형 모서리점의 침하량의
L/B 5.0 1.60 2.10 1.68 1.05 1.82
기초 2배임
L/B ## 2.00 2.56 2.10 1.28 2.24

3) 침하량의 계산
S = q B(1 - υ2)/E x Is = 461.1 x 8.1 x ( 1 - 0.3 ²) / 167580 x 0.92 = 18.659 mm

2-2 결과의 요약
발생침하량 (mm) 허용침하량
구분 판정
Schmertmann Harr 적용치 (mm)

결과값 11.84 18.66 18.66 25.0 O.K


3. 현장타설말뚝 검토
4. 슬래브지지공법 검토
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163

You might also like