ABL Consultants Malaysia Sdn Bhd

Lot 1, Level 9 Menara Great Eastern 2


No. 50 Jalan Ampang
50450 Kuala Lumpur, Malaysia

T +603 21412494

CoA Ref. : KL-G30-033728-C566


UMR : N/A
Client : Tanjung Offshore Services Sdn. Bhd.
Project Title : Provision of MWS for Tow Approval of AWB PERDANA EXCELSIOR

Seafastening and Sailaway of Conductor onboard Accommodation Work Barge “PERDANA


EXCELSIOR” towed by the Tug “ZD AQUARIUS” from Songkhla Anchorage, Thailand to
Nong Yao Field, Offshore Thailand

This is to Certify that this office, acting on behalf of Tanjung Offshore Services Sdn. Bhd. has reviewed the
procedures for the above operation(s) in the document(s):
Title: AWB Towing & Anchor Handling Procedures
Doc. No: NY-MOPU-TOS-TI-N-PRC-0003
Rev. No. :0
Title: Conductor Installation Miscellaneous Design Report
Doc. No: NY-MOPU-TOS-TI-S-RPT-0001
Rev. No.: 0

The referenced transportation procedure and associated seafastening details are considered satisfactory and,
based on documentation provided, the proposed transportation is within the stated capacity of the AWB
PERDANA EXCELSIOR, seafastening equipment and the transported item.

The undersigned has also witnessed the preparations for the towage. Tug “ZD AQUARIUS” (IMO No.
9529085) owned by Hung Hai Nguyen Company Limited is hereby approved based on a bollard pull of 57.43
tonnes as stated in the Certificate issued by Class ABS on 29 January 2024 and that it is generally fit to
undertake the tow.

Subject to compliance with the stated procedures and any additional recommendations submitted by this office
or attending surveyor, the Sailaway of the AWB “PERDANA EXCELSIOR” from Songkhla Anchorage,
Thailand to Nong Yao Field, Offshore Thailand is hereby approved to proceed.

This certificate is issued solely for the purposes of the proposed operation and is based upon external
conditions observed by the undersigned of the hull, machinery and equipment without removal, exposure,
operating or testing of parts. This Certificate shall not be deemed or considered to be a general Certificate of
Seaworthiness.

No responsibility is accepted by this office for the way in which the towage is undertaken following departure.
Any alterations to the surveyed items and / or deviations from the approved procedures following the issuance
of this Certificate may render the Certificate invalid unless the changes have been approved by this office.

This Certificate of Approval is issued without prejudice to any insurance interests or to any or all parties
concerned and is issued subject to ABL Consultants Malaysia Sdn Bhd Terms and Conditions of Business,
Purchase Order, PO No.: TOSPGP024-0177 dated 29/01/2024.

For ABL Consultants Malaysia Sdn Bhd

___________________________________________________________________
Name: Lukmanul Hakim (Marine Warranty Surveyor)

Issue Date: 21st March 2024 Time: 1100 Hours LT Place of Issue: Songkhla Anchorage,
Thailand

Page 1 of 3
An ASL Group Company
CoA Ref: KL-G30-033728-C566

RECOMMENDATIONS

1. The following are to be reported to the Owners, the below signed representative of ABL and
copied to surveys.offshore.my@abl-group.com, & nassir.rahman@abl-group.com for the
duration of the voyage:
i. Daily noon report (in the format on the following page).
ii. Weather forecast and weather routing recommendations.
iii. Any emergency situations which necessitate the diversion to a port of refuge.
iv. If the final agreed destination changes after departure, this office must be informed and
approval must be obtained.
v. Significant events affecting the tow must be reported e.g., deviations, tow line failure,
Tropical Depressions on route etc.
2. The Owners of the towed vessel shall comply with all legal requirements for the duration of the
voyage.
3. The tow route shall comply with the agreed passage plan.
4. Daily weather forecasts from a recognized weather forecasting company are to be forwarded to
the tug.
5. The tug(s) bunkers and other consumables are to be monitored to ensure (as a minimum) a 5-
day reserve is always maintained onboard.
6. No hot work to take place onboard the tow without prior approval from the above signed
representative of ABL.
7. Adequate securing and lashing for moveable items on AWB Perdana Excelsior main deck to be
done prior sailaway and to be monitor at all times during the tow passage.
8. The certificate shall ceased to be valid at anytime once the towline is disconnected or safely
arrived at final destination.

Receipt of CoA and Recommendations by:


for Tanjung Offshore Services Sdn. Bhd.

Signature: ________________
MNZDAQUA I
IMO : 9529
Name: Umar Hafiz Faruqi (Marine Coordinator) FLAG :VI
Date: 21st March 2024 Call Sign:
GT/NT : 16
Time: 1100 Hours LT
apt. -
Location: Songkhla Anchorage, Thailand

Page 2 of 3
An ASL Group Company
CoA Ref: KL-G30-033728-C566

NOON REPORT FORMAT

Daily noon report to be sent in the following format:

AA. Vessel Name I Call Sign


BB. Date/Local Time
CC. Position - Longitude/Latitude
DD. Heading T Co./Speed/Average RPM/Engine power%
EE. Steaming Time Last 24 Hours/Total Steaming Time
FF. ETA Date/ETA Time/Next Port
GG. Distance Made Good Last 24 Hours/Distance to Go/Total Distance Made Good
HH. Bunkers ROB (min 5 day reserve to be held) : HFO/MOO/FW/Lubes
II. Wind Direction/Wind Force/Wave Height
JJ. Towline length/remaining wire on drum/catenary/tow line tension
KK. Vessel motion/tow motion/unusual behaviour of tow (e.g fish tailing etc.)
LL. Additional remarks

Note: Significant events affecting the tow must be reported e.g. deviations, tow line failure, changes
in towed vessel draft, Tropical Depressions on route etc

085
:VIETNAM
C II ign: XVJN4
GT/NT : 1678/503
Capt. Bui Quang

Page 3 of 3