# Item Criteria 1 2 3 4 5 Visual Inspection 1 Priming tank Priming water level Ventilating Operating freely 2 Louvers 3 Housekeeping Room free of combustible storage Valves Pump suction, discharge and bypass valves 4 fully open 5 Piping Free of leaks 6 Suction Line Pressure gauge normal 7 Reservoir/Tanks Suction reservoir or tank full Controller Pilot Pilot light (power on) illuminated 8 Light 9 Fuel Tank Fuel tank at least two-thirds full 10 Controller Selector switch in “AUTO” position 11.1 Batteries Voltage readings normal 11.2 Charging current readings normal 11.3 Pilot lights on 11.4 Pilot lights off terminals free of corrosion 12 Engine Oil Engine oil is full 13 Cooling Water Cooling water is full Engine Running Meter is reading 14 Time Meter 15 Jockey Pump Power to jockey pump No Flow (“Churn”) Test 16.1 Pump Start Properly 16.2 Run for 30 minutes 17.1 Record pressures Suction pressure (psi) 17.2 readings Discharge pressure (psi) 18 Pump glands Slight discharge when running General pump No unusual noises or vibration 19 function Packing Box, No signs of overheating in packing box, 20 bearings, and bearings, or pump casings pump casings 21 Heat Exchanger Cooling water flow Responsibility & Signature Week 1 Checked by Date Comments
# Item Criteria 1 2 3 4 5 Visual Inspection - Weekly 1 Priming tank Priming water level 2 Housekeeping Room free of combustible storage Valves Pump suction, discharge and bypass valves fully 3 open 4 Piping Free of leaks 5 Suction Line Pressure gauge normal 6 Reservoir/Tanks Suction reservoir or tank full Controller Pilot Pilot light (power on) illuminated 7 Light 8 Controller Selector switch in “AUTO” position No Flow (“Churn”) Test - Monthly 9.1 Pump Start Properly 9.2 Run for 10 minutes 10.1 Record pressures Suction pressure (psi) 10.2 readings Discharge pressure (psi) 11 Pump glands Slight discharge when running General pump No unusual noises or vibration 12 function Packing Box, No signs of overheating in packing box, bearings, 13 bearings, and or pump casings pump casings 14 Heat Exchanger Cooling water flow Responsibility & Signature Week 1 Checked by Date Comments