EXCEL INDO - CAN INDUSTRIES

DAILY PREVENTIVE MANTAINENCE CHECK SHEET


Month -
Machine / Check Points 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Equipment
Check Bag Filter & Replace once
in a week

Degreasing 1
Check Chemical water Level
Check Valve Positions for ON
condition

Check Bag Filter & Replace once


in a week

Degreasing 2
Check Chemical water Level
Check Valve Positions for ON
condition

Water Rinse 1 Check Water Level


Water Rinse 2 Check Water Level
Check Chemical Level
Acid cleaning
Check Valve Positions

Water Rinse 3 Check Water Level


Check Chemical Level
Neutralizer
Check Valve Positions

Check Bag Filter & Replace once


Activation in a week
Check Chemical Level
Check Valve Positions

Check Bag Filter & Replace once


in a week
Phosphating Check Chemical Level
Check Outer Water Level
Check Valve Positions

Water Rinse 4 Check Water Level


Check Chemical Level
Non chrome sealer
Check Valve Positions

Page 1 of 4
EXCEL INDO - CAN INDUSTRIES

DAILY PREVENTIVE MANTAINENCE CHECK SHEET


Month -
Machine / Check Points 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Equipment

Water Rinse 5 Check Water Level

Water Rinse 6 Check Water Level

Check Pressure Guages


CED Check Valve Positions
Check Paint Level

Check Bag Filter & Replace once


UF1 in a week
Check Level

Check Bag Filter & Replace once


UF2 in a week
Check Level

Final DI Rinse Check Level


Check Level
Anolyte Tank Check Conductivity
Check Flow Meter

Clean Ovens
Check Leakages
Ovens
Check working of all swithches

Check Flow Meter


RO Plant Check Bottom Tank Level
Check RO water

Check Oil Level


Compressor
Check for Air leakages

Check Oil Level


Check Diesel Level
Generator
Check Battery
Key Ok - Replace - R Not Ok -
Check paint contamination on
Jig
JIG CLEANING
JIG Cleaning (Once in 15 day)
Key Ok - Replace - R Not Ok -
Maintenance Done By - Sign
Form No - MNT/02

Page 2 of 4
EXCEL INDO - CAN INDUSTRIES

TANK DRAIN SCHEDULE


Month -

Machine / Frequency W1 W2 W3 W4 Remark


Equipment

Water Rinse 1 Weekly

Water Rinse 2 Weekly

Activation Weekly

Phosphating Monthly

Water Rinse 3 Weekly

Water Rinse 4 Weekly

Drain Done By - Sign / Date

Form No - MNT/03
EXCEL INDO - CAN INDUSTRIES

TANK DRAIN SCHEDULE, YEARLY -


Year -

Machine / Frequency Q1 Q2 Q3 Q4 Remark


Equipment

Degreasing 1 Quarterly

Degreasing 2 Quarterly

Permeate Tank Yearly

UF1 Yearly

UF2 Yearly

Six Monthly
Final DI Rinse

Drain Done By - Sign / Date

Form No - MNT/04