Issue Date: 1.5.

2015
CONTINUAL IMPROVEMENT PLAN Doc. No. : F/PROD/20
Rev. No:01
Rev. Date: 15.2.2016
SR. NO. DATE IMPROVEMENT SUGGESTED / RECOMMENDED PLAN DATE STATUS

1 1/4/2015 SST chamber to be installed. 1/5/2016

Oven cleaninig will be improved with applying a oven coat on


2 10/4/2015 inside the chamber. 30/8/2015 Implemented

3 1/5/2015 Imrove Lifting Mechanism of Basket 20/05/2015 Implemented

4 24/6/2015 Dock Level Installment 15/7/2015 Implemented

5 8/1/2016 Auto Doasing system to install 1/5/2016

6 15/2/2016 Direct Online LPG System 15/5/2016


7
8
9
Concerned TPM Prepared Approved

Kaizen Form
Pillar (Pl tick P) QM PM SHE OTPM ET SCM By By
Result Area SAMADH
Name & Sign PRAVIN
(Pl tick P) S Q D C M E AN

Shop: ED LINE Line: ED TANK Operation Name: PAINT CIRCULATION Registration No:

BEFORE AFTER

1 PROBLEM FACED 4 IMPROVEMENT DONE

ED PUMP CIRULATION MECHANICAL SEAL DAMANGED PROVIDED NEW ADDITIONAL COOLING FACILITY TO SEAL UNIT OF PUMP

2 ANALYSIS 3 ROOT CAUSE 5 RESULT (Please quantify with details)

Why 1:SEAL NOT FIXED PROP SEAL WAS GETTING OVER HEATED

Why 2: SEAL QUALITY NOT GOOD

Why 3:EXCESS HEAT THERE IS NO WEAR OUT OF SEAL AFTER IMRPOVEMENT

Why 4:

Why 5:

Team Members
P. No. 6 Kaizen Sustenance Plan 7 Scope & Plan for Horizontal Deployment
Name
SAMADHAN What: S. No. Machine / Station Target Date Who
BIRJESH When: NIL
Who:
How:
PS22-F26-01 01.04.11
Date of
Kaizen

10/5/2015

AFTER

IMPROVEMENT DONE

PROVIDED NEW ADDITIONAL COOLING FACILITY TO SEAL UNIT OF PUMP

RESULT (Please quantify with details)

THERE IS NO WEAR OUT OF SEAL AFTER IMRPOVEMENT

Scope & Plan for Horizontal Deployment

Status