Professional Documents
Culture Documents
Forklift Checklist
Forklift Checklist
DOCUMENT: ASB-CEEC-HSE-CL-005-00
Revision: ______________ Date: ________________
AL-SHUAIBAH SOLAR PV IPP - KSA
Contact phone:
Serial number:
BLACK SMOKE
Date of inspection: _________ / _________ / 20_______ G B
Inspector: Signature:
H&S Team
Received (name):
Signature:
This form must be filled before the plant/equipment is authorised to enter the project premises. All inspection items will be inspected by H&S Team before access is granted to site. Plan/equipment will be authorised
only if all items are marked as “good”. Otherwise, the owner/supplier must repair/replace all those items marked as “bad” (H&S Team is not responsible for any loss time or production suspension due to
plant/equipment being rejected because of its bad conditions). Once all defects have been corrected and verified, a permanent pass (sticker located on a visible place) or a temporary pass (a card located on a visible
place) will be delivered to the operator as required. The operator must attend induction training, use all mandatory EPP and follow any instructions given by supervision or H&S staff.
Document: ASB-CEEC-HSE-CL-005-00