PROJECT: - TIDONG HEP, DESIGN OF TRANSITION for stresses
1.0 Introduction
A steel transition from is erected at site as shown in figure above. It is assumed that
a lift of 1 to 1.5 m of concrete shall be poured at a time while doing back fill
concreting. The concrete will be first poured in sideways and subsequently we move
towards top. Load component of wet concrete poured in sideways will act towards
downside and will not buckle the steel transition from outside. Weight of wet concrete
will tend to bend the top panels from outside and same has to be checked for
bending. For the design purpose the largest panel at the top has been checked for
the bending stresses and same section are provided in other panels.
2
PROJECT: - TIDONG HEP, DESIGN OF TRANSITION
Thickness of sheet = 5 mm
Material = IS 2062
3
PROJECT: - TIDONG HEP, DESIGN OF TRANSITION
4y
4x
25
2y 3y
b =100
50
2x 3x
25
a = 50 a = 50
4
PROJECT: - TIDONG HEP, DESIGN OF TRANSITION
b/a =100 / 50 = 2.0 ‘K’ value for b/a = 2.0 from table below is
2x = 600 kg/cm2 < 1530 kg/cm2 2Y = 228kg/cm2 < 1530 kg/cm2
3x = 1200 kg/cm2 < 1530 kg/cm2 3Y = 360 kg/cm2 < 1530 kg/cm2
4x = 246 kg/cm2 < 1530 kg/cm2 4Y = 824 kg/cm2 < 1530 kg/cm2
5
PROJECT: - TIDONG HEP, DESIGN OF TRANSITION
Design of stiffeners :
25
2
W3 = ½ X 2 X 25 X 0.24= 150 kg
B 25 25 C
100
W4 = 2 X 50 X 25 X 0.24 = 600 kg
RB = RC = 450 kg
BM = 13750 kgcm
L =100 B = 25
2VB = 2 X 0.50 X 25 = 25 cm
6
PROJECT: - TIDONG HEP, DESIGN OF TRANSITION
Sectional Properties