You are on page 1of 1

PILING – TUT No 3 - 6th May 6, 2022

Pile = 25000mm from Reduced Ground Level to bottom of toe


Pile Cap to have 20 Mpa, blinding and formwork to sides
Reinforcement: 10 of Y12 vertically
R6 spiral binding at 150mm pitch
All piles = 1200 diameter
Concrete cover to reinforcing minimum : 50mm
Top of all caps on the same level :33000
Reduced Ground Level: 30000
Piles to be cast the level 28000 and later stripped back to level 27500

Under Ream to 3000mm at the extreme


Piles Size 6000mm x 2000mm x 2000mm
Number of Piles Required 30 No - 3 No Pile per pile cap