S/N MATERIAL (S) QUANTITY UNIT RATE AMOUNT

REQUIRED

1 0.55 guage long span 5M² 3500 490,000


roof sheets (pale
green) 20

2 0.55 guage long span M² 650 13,000


roof sheets (pale
green) 20

3 50×75 mm softwood 20 M² 800 16,000


purlin

4 50×100 mm hardwood M² 1400 112,000


rafter
80

5 50×150 hardwood king 40 M² 2400 96,000


post

6 50 × 50 softwood 20 M² 500 10,000


Noggins

7 0.25 × 25 thick 20 M² 400 8,000


softwood thyroid

8 50×150 hardwood Tie 20 M² 2400 48,000


beam

9 50×100 hardwood wall M² 1400 28,000


plate
20

10 50×100 hardwood 25 M² 1400 35,000


Roof trusses

11 Transportation,
loading and off-loading
of wood and roof - M/s 40,000 40,000
sheets items

12 4" nail 40 Kg 625 25,000


13 3" nail 20 Kg 350 14,000

14 Steel rod 20 Kg 250 5,00p

15 Gasket(silicone 6 Kg 600 3,600


rubber)

16 Washer 3 Kg 600 1,800

17 Rivet bolt 25 Packet 2,000 2,000

18 Timber guard 2 Kg 7,000 14,000

19 Kerosine 2 M³ 1,500 3,000

20 Carpenter 40 % 40
workmanship

21 Roof nail 25 Kg 900 22,500

22 Black oi/condermed oil 1 Kg 1200 1,200

#420,100

GROSS TOTAL:#420,100

COST OF REPLACEMENT: #992,100 - 420,100= #572,000


COST OF REMOVER

S/N LOCATION DESCRIPTIO QUANTIT UNIT RATE AMOUNT


N Y

1 TWIN THEATER FAILED ROOF 20 M/2 1,200 24,000


FPN WALLPLATE

2 TWIN THEATER FAILED KING 20 M/2 1,000 20,000


FPN POST

3 TWIN THEATER FAILED 20 M/2 500 10,000


FPN EAVES
ANGLE

4 TWIN THEATER FAILED 20 M/2 700 14,000


FPN RIDGE CAP

5 TWIN THEATER SHRINKED 20 M/2 300 6,000


FPN RIDGE
THYROID

6 TWIN THEATER FAILED SEMI 20 M/2 200 4,000


FPN HARD WOOD
PURLIN

7 TWIN THEATER FAILED KING 20 M/2 800 16,000


FPN POST

8 TWIN THEATER DISTORTED 20 M/2 700 14,000


FPN HARDWOOD
RAFTER

9 TWIN THEATER PUNCTURED 20 M/2 1,200 24,000


FPN ALLUMINIUM
ROOF SHEET

10 TWIN THEATER SAGGING TIE 20 M/2 2000 40,000


FPN BEAM