You are on page 1of 1

MOM 27th March

Minutes of yesterday's meeting along with latest updates


Firstly, the Acharya saw the Ganesh Murthy and was very much impressed with its Lakshana.
1. Kumbabishekam has to be done *within Uthrayana ie,. Before mid June 2024*.
2. Chitta Nakshatra, Bhanu vaara, Chathurthi are auspicious days for Kumbabhishekam.
3. Sri Yantra will be installed in the kubera moola of Ganapathi idol and Maha Ganapathi Yantra will be
installed in the Agni Moola of Ganapathi.
4. Coordinate with stapathi and fix mandap/ nethra opening- Balaji/Puneetha/Chaithanya
5. Negotiate cost with stapathi - Puneetha Shankar
6. Flooring and granite fixing Pramod &
7. Hole Provision for fencing pillars while laying the flooring - Pramod 312W B202
8. Coordinating with acharya on fixing the dates and arrangements for kumbabiskekam - Balaji 312W A008
9. Polling for kumbabiskekam date with Uthrayana Chaithanya
10. Door to door collection for 312 west - Chaithanya
11. 302 and 77 phase 1 buildings - .
12. Only backside of temple will be covered fully now. Rest sides will have small patch for water outlet.
13. Store room arrangement for keeping temple related items -

MOM 3rd April 24


Bali Peeta and Peeta Idol is required
Stapathi will only install Mandapam
Aacharya will install Idol
Stapati should come again for Eye opening
Resposibilities divided acroos the team
Provision for Nesing should be provided while doing the flooring
4 Balipeeta should be built 4 side whith gtanite while intallation of ganite
Balaji and Deepak visiting Stapati for Peeta order on 5th April 2024
D2D collection volunteers required for Each block
Below are the roles and responsibilities of the volunteers:
1. D2D collection - @Chaithanya PH1, @Deepak Gupta 77PH2 301
312 - @Prem 312W
PH1- @Pavan B PH1 G01,@Sourabh 77PH1 208 @Karthik Ramaseshan 77PH1 207
302W A- @Puneethashankar
2. ⁠co-ordinations with stapathi, aacharya, follow up on vedic process, and daily pooja - @Balaji 312W A008
3. ⁠co-ordination with sponsors -@puneethashankar
4. ⁠shamiyana items, Prasadam - @Prem 312W
5. ⁠financial activities - @Deepak Gupta 77PH2 301
6. ⁠arranging crane for mandap installation, - @Karthik Natrajan 312W B201
7. ⁠G ranite installation, floor finishing, making steps - @Pramod 312W B202
8. ⁠Idol measurements for Peeta 4th April- @Balaji 312W A008 @puneethashankar @Chaitanya

You might also like