You are on page 1of 33

-

18/02/2024 Mall of Arabia

Oxxo
Approved With Notes 05

ð Approved With Notes


ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð - Approved With Notes
ð - Approved With Notes
ð Approved With Notes
ð - Approved With Notes
ð - Approved With Notes
ð Approved With Notes
ð Approved With Notes
ð
ð
ð
ð
ð
ð
ð Approved With Notes

MEP SUBMITTAL REVIEW STATUS

……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 18/02/2024
Reviewer MEP TEAM
MEP SUBMITTAL REVIEW STATUS
Scale Bar:

……
… General Notes

(A) Approved (B) Approved with Notsed


s (C) Not Approved ,Resubmit as noted 1.1) All works shall be conform to the applicable codes and authority rules.
1.2) All dimensions and levels are in millimeters (mm) unless mentioned
otherwise.
1.3) The drawing shall not be scaled. Only written dimensions shall be
Center MOA followed.
1.4) All Architectural drawings shall be read in conjunction with the
Unit Name /Unit No. Oxoo Structural, Services drawings and specifications for proper coordination.
Any discrepancies shall be brought to the attention of the Engineer.
Date 18/02/2024 Please follow all the ARCH. comments 1.5) All levels shown in the drawing are finished floor levels.

Reviewer MEP TEAM

Reflected Ceiling Legend

Track Light spot

°
17
Track Light spot

24°
H: +490.0 cm
Down Light
EMR H: +440.0 cm

36°

36 °
Recessed Double Spot

17°

17°

17°
24°

17°

17°

17°
17°

17°

17°
17°

17°

17°

17°

17°

17°

17°
17°

17°

17°

17°
Recessed Single Spot

°
17

°
17
17°
°
17
17°
36°
EXIT

24°

H: +350.0 cm
24°
60*60Lighting Panel
17°
24°

24°
24° 24°

H: +490.0 cm

°
17
24°
H: +400.0 cm

Closed Ceiling at higher level


H: +490.0 cm 24°
EMR

°
Emergency Lighting

°
24

17
EMR
EMR

17°

24°
40mm*60mm Steel Boxes with Black Paint

EMR
°
24
36°

EXIT

24°
24°
°
Exit Sign

24°
24° 24° 24° ° 24 EXIT

24°

EMR
24
24°

24°

24°
°
Pendant Smoke Detector
24
24° 24
° H: +440.0 cm
° 24 24
24 ° °
24° 24°

EMR
CCTV
36°
°
24

Closed Ceiling at higher level


24° 24°

24°

Speakers
°
24
24°

24° 17° 36°


Pendant Sprinklers
40mm*60mm Steel Boxes H: +440.0 cm
H: +490.0 cm
17°

with Black Paint 17° H: +350.0 cm


17°

EMR
EMR
17°
17° 24°
°
24

24°
17°

36°

17°

24° 24
° 24 24
° 24° 24
°
24° 24°
° ° °
° 24 24 24
17°

°
24

17°
17° 24°

24°

24°
24
EXIT

17°
EMR

36°
17°
°
24°
24
24
24

24

°
°

24° 17°

24°
24°
24°
EMR

EXIT

17°
H: +490.0 cm 40mm*60mm Steel Boxes Grid with Black Paint 17°

H: +440.0 cm
24

17°
°

24

24°
°

H: +490.0 cm

24°
24

EMR
°

17° 17°
24

24° 24°
24
°
Date Submission Stage
°

24

24°
°

36°
1/2024 Shop drawing
17
°

17°
Nadine Mamdouh

17
Rev: 1 Date: 1/2024 Revision note: By:

°
17°

Sheet title

17
17

°
°

17°
17°

17°

17°
17°

17°

17°

17°

°
24
17°

17°

17°

17°

17°

17°
17°

17°

17°

17°
17
17

17

17
°
°

°
Reflected Ceiling Plan

EMR
EXIT
36° 36°

EMR General Contractor:


H: +440.0 cm
H: +400.0 cm
H: +490.0 cm

BOLD EGYPT

Owner:

1.Provide access doors for all MEP services and components


MAZAYA GROUP
coordinated with false ceiling levels and MEP fixtures.as per
operation teams recommendations.
Consultant :
2.All fire alarm and fighting elements on ceiling have to be a
minimum of 90 Cm Away from from any HVAC grill
3. All MEP elements should be shown on the drawings Project:
4. Provide maintenance platform for all MEP equipment and unit
tie-ins. Maintenance platform to be designed as per site condition.
OXXO - MALL OF ARABIA

Project Code Discpline Locator Drawing No Size Scale


ox 2401 ARCH OXXO-MOA-RCP-07 A3 To Fit
MEP SUBMITTAL REVIEW STATUS

OXXO - MOA ……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 11.01.2024

Center MOA Operator


Telephone
Unit Name /Unit No. Oxoo Fax
Date 21/01/2024 e-Mail
Reviewer MEP TEAM
OXXO - MOA / Luminaire parts list

38 Pieces PHILIPS DN140B PSED-E D162 1 xLED10S/840 See our luminaire catalog
WR for an image of the
Article No.: luminaire.
Luminous flux (Luminaire): 1100 lm
Luminous flux (Lamps): 1100 lm
Luminaire Wattage: 11.5 W
Luminaire classification according to CIE: 100
CIE flux code: 64 91 98 100 100
Fitting: 1 x LED10S/840 (Correction Factor 1.000).

2 Pieces PHILIPS PT320T 1 xLED17S/827 MB


Article No.:
Luminous flux (Luminaire): 1717 lm
Luminous flux (Lamps): 1700 lm
Luminaire Wattage: 14.4 W
Luminaire classification according to CIE: 100
CIE flux code: 100 100 100 100 101
Fitting: 1 x LED17S/827 (Correction Factor 1.000).

6 Pieces PHILIPS RC132V W60L60 PSD 1 xLED43S/840


OC EL
Article No.:
Luminous flux (Luminaire): 4300 lm
Luminous flux (Lamps): 4300 lm
Luminaire Wattage: 37.0 W
Luminaire classification according to CIE: 100
CIE flux code: 60 87 97 100 100
Fitting: 1 x LED43S/840 (Correction Factor 1.000).

20 Pieces PHILIPS RS340B 1 xLED27S/830 VWB


Article No.:
Luminous flux (Luminaire): 2778 lm
Luminous flux (Lamps): 2750 lm
Luminaire Wattage: 23.5 W
Luminaire classification according to CIE: 100
CIE flux code: 97 99 100 100 101
Fitting: 1 x LED27S/830 (Correction Factor 1.000).

191 Pieces PHILIPS ST714T 1 xLED12S/PC930 FPO12


Article No.:
Luminous flux (Luminaire): 1150 lm
Luminous flux (Lamps): 1150 lm
Luminaire Wattage: 15.6 W
Luminaire classification according to CIE: 100
CIE flux code: 98 100 100 100 100
Fitting: 1 x LED12S/PC930 (Correction Factor
1.000). 1.The recommended Lux levels 1200-1500 lux at
shop front and 800-1000 lux inside the unit.
2.The tenant's contractor is responsible for the lux
levels for the unit.
Please submit samples for approval 3.Lux levels to be measured on site. Page 3
4.Ligthing selection must be as per the LUX
calculation
MEP SUBMITTAL REVIEW STATUS

OXXO - MOA ……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 11.01.2024

Center MOA Operator


Telephone
Unit Name /Unit No. Oxoo Fax
Date 21/01/2024 e-Mail
Reviewer MEP TEAM
Enterance / Summary

Please follow the comments in the lighting layout

1.The recommended Lux levels 1200-1500 lux at


shop front and 800-1000 lux inside the unit.
2.The tenant's contractor is responsible for the lux
levels for the unit.
3.Lux levels to be measured on site.
4.Ligthing selection must be as per the LUX
calculation

Height of Room: 4.900 m, Light loss factor: 0.80 Values in Lux, Scale 1:132

Surface r [%] Eav [lx] Emin [lx] Emax [lx] u0


Workplane / 1159 752 1356 0.649
Floor 20 1160 746 1356 0.643
Ceiling 80 184 133 234 0.723
Walls (4) 50 522 115 1146 /

Workplane:
Height: 0.000 m
Grid: 32 x 128 Points
Boundary Zone: 0.000 m
Illuminance Quotient (according to LG7): Walls / Working Plane: 0.453, Ceiling / Working Plane: 0.158.

Luminaire Parts List

No. Pieces Designation (Correction Factor) F (Luminaire) [lm] F (Lamps) [lm] P [W]
1 20 PHILIPS RS340B 1 xLED27S/830 VWB (1.000) 2778 2750 23.5
Total: 55550 Total: 55000 470.0

Specific connected load: 32.86 W/m² = 2.84 W/m²/100 lx (Ground area: 14.30 m²)

Please submit samples for approval


Page 4
MEP SUBMITTAL REVIEW STATUS

OXXO - MOA ……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 11.01.2024

Center MOA Operator


Telephone
Unit Name /Unit No. Oxoo Fax
Date 21/01/2024 e-Mail
Please follow the comments in the lighting layout
Reviewer MEP TEAM
Unit Area / Summary

Height of Room: 4.400 m, Light loss factor: 0.80 Values in Lux, Scale 1:132

Surface r [%] Eav [lx] Emin [lx] Emax [lx] u0


Workplane / 1108 167 4660 0.120
Floor 20 1394 170 4656 0.122
Ceiling 80 199 118 250 0.593
Walls (19) 50 241 103 2605 /

Workplane:
Height: 0.000 m
Grid: 128 x 128 Points
Boundary Zone: 0.000 m
Illuminance Quotient (according to LG7): Walls / Working Plane: 0.173, Ceiling / Working Plane: 0.143.

Luminaire Parts List

No. Pieces Designation (Correction Factor) F (Luminaire) [lm] F (Lamps) [lm] P [W]
PHILIPS DN140B PSED-E D162 1 xLED10S/840
1 30 1100 1100 11.5
WR (1.000)
2 2 PHILIPS PT320T 1 xLED17S/827 MB (1.000) 1717 1700 14.4
PHILIPS ST714T 1 xLED12S/PC930 FPO12
3 191 1150 1150 15.6
(1.000)
1.The recommended Lux levels
Total: 256084 Total:1200-1500 lux at
256050 3353.4
shop front and 800-1000 lux inside the unit.
Specific connected load: 22.26 W/m² = 1.60 W/m²/100 lx (Ground area: 150.66
2.The tenant's m²)
contractor is responsible for the lux
levels for the unit.
Please submit samples for approval 3.Lux levels to be measured on site. Page 5
4.Ligthing selection must be as per the LUX
calculation
MEP SUBMITTAL REVIEW STATUS

OXXO - MOA ……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 11.01.2024

Center MOA Operator


Telephone
Unit Name /Unit No. Oxoo Fax
Date 21/01/2024 e-Mail
Reviewer MEP TEAM
Fitting Room / Summary

Please follow the comments in the lighting layout

1.The recommended Lux levels 1200-1500 lux at


shop front and 800-1000 lux inside the unit.
2.The tenant's contractor is responsible for the lux
levels for the unit.
3.Lux levels to be measured on site.
4.Ligthing selection must be as per the LUX
calculation

Please submit samples for approval

Height of Room: 3.000 m, Mounting Height: 3.100 m, Light loss factor: 0.80 Values in Lux, Scale 1:57

Surface r [%] Eav [lx] Emin [lx] Emax [lx] u0


Workplane / 381 167 548 0.440
Floor 20 303 180 395 0.594
Ceiling 80 86 55 126 0.636
Walls (4) 50 192 65 667 /

Workplane:
Height: 0.760 m
Grid: 64 x 64 Points
Boundary Zone: 0.000 m
Illuminance Quotient (according to LG7): Walls / Working Plane: 0.546, Ceiling / Working Plane: 0.226.

Luminaire Parts List

No. Pieces Designation (Correction Factor) F (Luminaire) [lm] F (Lamps) [lm] P [W]
PHILIPS DN140B PSED-E D162 1 xLED10S/840
1 8 1100 1100 11.5
WR (1.000)
Total: 8800 Total: 8800 92.0

Specific connected load: 8.04 W/m² = 2.11 W/m²/100 lx (Ground area: 11.44 m²)

Page 6
MEP SUBMITTAL REVIEW STATUS

OXXO - MOA ……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 11.01.2024

Center MOA Operator


Telephone
Unit Name /Unit No. Oxoo Fax
Date 21/01/2024 e-Mail
Reviewer MEP TEAM
Storage / Summary

Please follow the comments in the lighting layout

1.The recommended Lux levels 1200-1500 lux at


shop front and 800-1000 lux inside the unit.
2.The tenant's contractor is responsible for the lux
levels for the unit.
3.Lux levels to be measured on site.
4.Ligthing selection must be as per the LUX
calculation

Please submit samples for approval

Height of Room: 4.000 m, Mounting Height: 4.011 m, Light loss factor: 0.80 Values in Lux, Scale 1:129

Surface r [%] Eav [lx] Emin [lx] Emax [lx] u0


Workplane / 402 182 458 0.453
Floor 20 339 160 382 0.471
Ceiling 80 116 37 402 0.318
Walls (6) 50 260 67 2693 /

Workplane:
Height: 0.760 m
Grid: 64 x 16 Points
Boundary Zone: 0.000 m
Illuminance Quotient (according to LG7): Walls / Working Plane: 0.708, Ceiling / Working Plane: 0.289.

Luminaire Parts List

No. Pieces Designation (Correction Factor) F (Luminaire) [lm] F (Lamps) [lm] P [W]
PHILIPS RC132V W60L60 PSD 1 xLED43S/840
1 6 4300 4300 37.0
OC EL (1.000)
Total: 25800 Total: 25800 222.0

Specific connected load: 9.11 W/m² = 2.27 W/m²/100 lx (Ground area: 24.37 m²)

Page 7
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer

LIGHTING PLAN MEP TEAM


L.O

L2/DB-OXXO1
3(1*3)mm2
EMR
L1/DB-OXXO1 PVC conduit.
3(1*3)mm2 36° 36°

L9/DB-OXXO1 EXIT

PVC conduit. L6/DB-OXXO1 3(1*3)mm2 DB

36°
3(1*3)mm2 36°
PVC conduit. 36°

PVC conduit.
L.O 24° L.O L.O L.O L.O

17°

17°

17°
17°

17°

17°

17°
17°

17°

17°

17°

17°

17°

17°

17°

17°
17°

17°

17°

17°

17°

17°
17°
17°
17°
36°

24°

36° 24° 36°


17°
L.O 24°
L.O L.O
24° 24°

24°
L.O

17°
24°
24°
24°

17°
17°

24°
24°
36°

24° 24° 24° 24° 24°

24°
L.O 24° L.O

24°
24°

24°
36° 36°

24°

24°
24°
24° 24°

24° 24°
24° 24° 24° 36°
L.O 24° L.O

24° 24°

36° L7/DB-OXXO1 36°


24°

3(1*3)mm2 24°

PVC conduit.
24°

L3/DB-OXXO1
°63

°63

°63

°63

°63

36°
36°
24° 17°

3(1*3)mm2 17°

17°

PVC conduit.
17°
°63

°63

°63

°63

°63

36°
17°
24°
17°

24°

L4/DB-OXXO1

DB-OXXO2
24°
36°
17°
36°

3(1*3)mm2 17°

L.O 24° L.O


PVC conduit.
24° 24° 24° 24° 24° 24° 24°
24° 24° 24° 17°

24°

17°

17° 24°

24°

24°
24°

17°
36°
36° 36°
17° 24°
L.O 24° L.O
24°
24°

24°

17°
24°

24°
24°
DRAWN BY REVISION APPROVED
24°

17° 17°
Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel
17°
24°

24°
24°

24°
24°

17° 17°
24°

24° 24°
24° Electrical Drawing
L.O L.O
24°

24°
36° Details Sections Elevations Plans
17°

36° 36° 17°

17°
17°

Revision/Issue DATE No. DRAWING NUMBER:


17° DRAWING Name: Lighting Layout
17°

17°

L.O
30/12/2023
17°

17°

17°
17°

17°

17°

17°

DATE :

17°
24°
17°

17°

17°

17°

17°

17°

17°
17°

17°

17°
L.O L.O L.O L.O
17°

17°

17°
SCALE : 1:50 @ A3

Door 90x300 cm
36°

L5/DB-OXXO1 36°
36° 36°
OXXO
L10/DB-OXXO1
3(1*3)mm2 L8/DB-OXXO1 MOA
3(1*3)mm2 DB-OXXO1
PVC conduit. 3(1*3)mm2 Interior Designer
PVC conduit. L11/DB-OXXO1
PVC conduit. 3(1*3)mm2
PVC conduit.
VIA PB

All Track in Gypsum Board will be inside Cove Main Contractor


SWAT
Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo
TEL. 0225633748

MEP Contractor

Please use single spot


Drawing:-
Lighting Plan
MEP SUBMITTAL REVIEW STATUS NOTES
1.Lighting and socket and AC to be controlled Via push push button
2.Manufacturer shop drawing by contractor to be provided for review/approval.
……
… 3.All the mentioned loads are tenant's responsibility.
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted
4.The minimum short circuit level shall not be less than 15 kA service.
Center MOA 5.Main Cable to be same as main cable from landlord.
Unit Name /Unit No. Oxoo 6.Cables sizes to match the corresponding circuit breaker size
Date 21/01/2024 7.Distribution Board location to be unobstructed and required direct access.
8.Panel board location to be show on the drawings with IP54.
Reviewer MEP TEAM 9.Main cables to be CU/XLPE/PVC.
10.All kitchen,HVAC and roof equipment (Including water heaters) to be connected to earth

F.LIGHTING PLAN
L.O
leakage 30mA minimum.
11.All HVAC equipment and water heater to be terminated with cables not wires
12. Tenant is fully responsible for the DB phase balance and it will be tested on site before
operation
13..Main MCCB to be (model NSX100B)
EMR

EXIT

DB

L.O L.O L.O L.O L.O L.O


Illuminated Logo Illuminated Logo
L.O
Stainless with led StainlessL.O
with led Plant
led lights power Oak veneer- Natural lacquered led lights power led lights power Oak veneer- Natural lacquered led lights power
Shelves: Solid oak- natural lacquered Shelves: Solid oak- natural lacquered L.O
led lights power
Panels: MDF - white lacquered 5 partitioned panel Panels: MDF - white lacquered 6 partitioned panel Accessories table
Shoe Table Mirror Shoe Table
2 partitioned wardrobe to display 2 partitioned wardrobe to display

Metallic black enamel paint


Mid-Hanger Crossed Legged Nesting Table Crossed Legged Nesting Table Solid oak- natural lacquered
Material: Solid Oak, Natural Lacquered Mid-Hanger Material: Solid Oak, Natural Lacquered Mid-Hanger Counter of the cash desk
Metallic black enamel paint Metallic black enamel paint power
L.O

Circular Table Group

Shoe Table Shoe Table


Metallic black enamel paint

Back Cash Desk


Mid-Hanger

L15/DB-OXXO1 L.O

3(1*3)mm2
led lights power

Mid-Hanger Mid-Hanger Plant Hanger

Curtain
Mid-Hanger
Metallic black enamel paint PVC conduit. Denim Table
Metallic black enamel paint Metallic black enamel paint

Material: Solid Oak, Natural Lacquered


L.Opower
led lights
Mirror
Mirror
Plant Plant Fitting Room
L.O L.O

Mirror
Plant

led lights power led lights power

Accessories frame

Accessories frame
Signage
Mid-Hanger Mid-Hanger L.O
Mid-Hanger Metallic black enamel paint Metallic black enamel paint
Hanger

Curtain
Metallic black enamel paint

DB-OXXO2
L.O
Mirror
Fitting Room

Mirror
Metallic black enamel paint

Illuminated Logo
Stainless with led
Signage
L.O L.O
DRAWN BY REVISION APPROVED
Mid-Hanger

Metallic black enamel paint


Hanger

Curtain
Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel
L17/DB-OXXO1

Bamboo Display Unit


3(1*3)mm2
Shoe Table Shoe Table
Electrical Drawing
Fitting Room

Mirror
Details Sections Elevations Plans
Circular Table Group
PVC conduit For

Cushion : Black leather upholstery


Legs:Solid oak- natural lacquered
Signage
L.O
Revision/Issue DRAWING NUMBER:

LOGO.
DATE No.

Curtain
Metallic black enamel paint DRAWING Name: Furniture Lighting Layout
Material: Solid Oak, Natural Lacquered Mid-Hanger Material: Solid Oak, Natural Lacquered
Crossed Legged Nesting Table Crossed Legged Nesting Table DATE : 30/12/2023
SCALE : 1:50 @ A3

Pouf
Metallic black enamel paint
Mid-Hanger
Fitting Room

L12/DB-OXXO1 L13/DB-OXXO1

Mirror
Plant OXXO
L16/DB-OXXO1 L18/DB-OXXO1 3(1*3)mm2
Signage
L.O
3(1*3)mm2 MOA
3(1*3)mm2 3(1*3)mm2 PVC conduit. PVC conduit.
L20/DB-OXXO1 Interior Designer

Door 90x300 cm
PVC conduit. PVC conduit For
4 partitioned wardrobe to display 2 partitioned wardrobe to display
3(1*3)mm2
Shoe Table
5 partitioned panel LOGO. Shoe Table
5 partitioned panel

PVC conduit For


Panels: MDF - white lacquered Panels: MDF - white lacquered
Plant Plant Shelves: Solid oak- natural lacquered Mirror Shelves: Solid oak- natural lacquered DB-OXXO1
Oak veneer- Natural lacquered Oak veneer- Natural lacquered Oak veneer- Natural lacquered
Stainless with led
L.O Stainless with led
L.O
Illuminated Logo Illuminated Logo
L.O

led lights power


L.O L.O

led lights power


L.O

led lights power


L.O L.O

led lights power


SIGNAGE.
L14/DB-OXXO1 Main Contractor
3(1*3)mm2 SWAT
Specialists With Advanced Tools
PVC conduit. 1.Lighting fixture schedule to be shown on the drawings 594 Al Narges Buildings ,New Cairo

including wattage of each lighting fixture, based on LUX TEL. 0225633748

calculation MEP Contractor


2.All Lighting fixture should be Led type
3.Light switch position is missing
4.Light fixture and transformer specification or sample to be
Submitted for review , All light transformers shall be installed in
well ventilated place Drawing:-
Furniture Lighting
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer

LIGHTING ABOVE CEILING PLAN MEP TEAM

L.O

EMR

EXIT

DB

1. Above
ceiling light to
be WP IP54.
2. to be
connected
with separate
circuit .

DB-OXXO2
DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

Electrical Drawing

Details Sections Elevations Plans

Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: E. Lighting Layout
DATE : 30/12/2023
SCALE : 1:50 @ A3

OXXO
MOA

Door 90x300 cm
Interior Designer
DB-OXXO1

Main Contractor
L19/DB-OXXO1
SWAT
3(1*3)mm2 Specialists With Advanced Tools
PVC conduit. 594 Al Narges Buildings ,New Cairo
TEL. 0225633748

MEP Contractor
Lighting fixtures quantity & Location to be
co-ordinated on site
Drawing:-
E.Lighting Plan
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer MEP TEAM

EMERGANCY LIGHTING PLAN Emergency lighting fixtures must be embedded


L.O

EMR

EXIT

DB

EMR
EXIT

EMR
EMR

EMR
EXIT

EMR
EMR

EMR
EMR

DB-OXXO2
DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel


EXIT
EMR

Electrical Drawing

Details Sections Elevations Plans


EMR

EXIT

Revision/Issue DATE No. DRAWING NUMBER:

EMR
DRAWING Name: E. Lighting Layout
DATE : 30/12/2023
SCALE : 1:50 @ A3

OXXO
MOA

EMR
L23/DB-OXXO1
Interior Designer

Door 90x300 cm
3(1*3)mm2

EXIT
EMR

PVC conduit. DB-OXXO1

Main Contractor
1.Emergency lighting to be designed in line with BS5266/ NFPA with SWAT
Specialists With Advanced Tools
consider the maximum spacing between Emergency Light to Emergency 594 Al Narges Buildings ,New Cairo
TEL. 0225633748

light is 7.5 M. Lux level shall be 10 lux at Floor level and all closed areas
to have emergence light MEP Contractor
2.Concealed Emergency and Exit Fitting are complete with
self-Contained battery back-up suitable for 3 hours operation.
3.No transparent Exit light to be used and Exit signage to be the
maintained type and to incorporate a running man legend.
4.Exit signage to be visible from inside the unit Drawing:-
E.Lighting Plan
MEP SUBMITTAL REVIEW STATUS
NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo -M.C.B for AC units
Date 21/01/2024 must be 32 A & must DB

Reviewer MEP TEAM be connected with E.O

ELCB.

POWER PLAN
W

L2/DB-OXXO2
3(1*4)mm2
L4/DB-OXXO2
PVC conduit.
3(1*4)mm2
Plant

PVC conduit. Oak veneer- Natural lacquered Oak veneer- Natural lacquered

1.For normal power,


Shelves: Solid oak- natural lacquered Shelves: Solid oak- natural lacquered
Panels: MDF - white lacquered 5 partitioned panel Panels: MDF - white lacquered 6 partitioned panel Accessories table
Shoe Table Mirror Shoe Table

E.O 2 partitioned wardrobe to display 2 partitioned wardrobe to display

L1/DB-OXXO2 Wires are allowed


3(1*4)mm2 with 4mm2 minimum
L3/DB-OXXO2 PVC conduit.
3(1*4)mm2
wire size and with
Metallic black enamel paint
Mid-Hanger Crossed Legged Nesting Table
Material: Solid Oak, Natural Lacquered Mid-Hanger
Metallic black enamel paint
Crossed Legged Nesting Table
Material: Solid Oak, Natural Lacquered Mid-Hanger
Metallic black enamel paint
PVC conduit. Solid oak- natural lacquered
Counter of the cash desk
450/750 V rating.
E.O
Circular Table Group
2.Thermosetting
E.O
Shoe Table Shoe Table
cables to be
3x4mm2 minimum
Metallic black enamel paint

L6/DB-OXXO2 Back Cash Desk

3(1*4)mm2 and with 300/500 V


Mid-Hanger

PVC conduit E.O insulation rating.


FOR SHUTTER. E.O Mid-Hanger Mid-Hanger Plant Hanger
3.PVC conduits are

Curtain
Mid-Hanger Metallic black enamel paint Metallic black enamel paint
Metallic black enamel paint Denim Table E.O L7/DB-OXXO2
Material: Solid Oak, Natural Lacquered

Plant
Mirror
Plant
Mirror
Fitting Room 3(1*4)mm2 allowed for normal

Mirror
Plant

PVC conduit power wiring and

Accessories frame

Accessories frame
E.O
Signage
Mid-Hanger Mid-Hanger
Mid-Hanger Metallic black enamel paint Metallic black enamel paint

E.O
Hanger
For RACK. cables. Each circuit

Curtain
Metallic black enamel paint

DB-OXXO2
Mirror
Fitting Room to be in a separate

Mirror
Metallic black enamel paint

Signage
conduit.
Mid-Hanger

Metallic black enamel paint


Hanger

Curtain
Bamboo Display Unit
Shoe Table Shoe Table
Fitting Room

Mirror
E.O E.O Circular Table Group

Cushion : Black leather upholstery


Legs:Solid oak- natural lacquered
Signage DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel


L15/DB-OXXO2

Curtain
Metallic black enamel paint
Material: Solid Oak, Natural Lacquered Mid-Hanger Material: Solid Oak, Natural Lacquered

3(1*4)mm2
Crossed Legged Nesting Table Crossed Legged Nesting Table

Pouf
Metallic black enamel paint Electrical Drawing
Mid-Hanger
Fitting Room

PVC conduit
Details Sections Elevations Plans

Mirror
Plant

Signage

For COUNTER. Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: Power Layout

DATE : 30/12/2023

Door 90x300 cm
SCALE : 1:50 @ A3

E.O 4 partitioned wardrobe to display 2 partitioned wardrobe to display

Panels: MDF - white lacquered


Shoe Table
5 partitioned panel Panels: MDF - white lacquered
Shoe Table
5 partitioned panel OXXO
L5/DB-OXXO2 Plant
Oak veneer- Natural lacquered Oak veneer- Natural lacquered
Plant Shelves: Solid oak- natural lacquered
Oak veneer- Natural lacquered
Mirror Shelves: Solid oak- natural lacquered E.O DB-OXXO1
MOA
3(1*4)mm2
PVC conduit. L21/DB-OXXO2 Interior Designer
1.For single phase equipment, 3(1*4)mm2
Thermosetting cables to be used and 1-All up lights, floor boxes, kitchen and roof PVC conduit
to be 3x4mm2 minimum and with 1.Lighting and socket and AC to be controlled Via push push button
For FACP.
equipment (Including HVAC and water 2.Manufacturer shop drawing by contractor to be provided for review/approval. Main Contractor
300/500 V insulation rating. heaters) to be connected to earth leakage 3.All the mentioned loads are tenant's responsibility. SWAT
4.The minimum short circuit level shall not be less than 15 kA service. Specialists With Advanced Tools
2.For 3-Phase equipment, multicore 30mA minimum. 5.Main Cable to be same as main cable from landlord. 594 Al Narges Buildings ,New Cairo

6.Cables sizes to match the corresponding circuit breaker size TEL. 0225633748

cables (CU/PVC/PVC) to be used and 2-please make sure that the FACP power 7.Distribution Board location to be unobstructed and required direct access.
MEP Contractor
8.Panel board location to be show on the drawings with IP54.
to be 4x4mm2 minimum and with circuit is connected separately 9.Main cables to be CU/XLPE/PVC.
10.All kitchen and roof equipment (Including water heaters) to be connected to earth leakage 30mA minimum.
600/1000 V rating. 3- Exit and Emergency lighting to be on a 11.All HVAC equipment and water heater to be terminated with cables not wires
12. Tenant is fully responsible for the DB phase balance and it will be tested on site before operation
3.Use CU/XLPE/PVC cables for separate circuit. 13..Main MCCB to be (model NSX family)

outdoor applications (except for Drawing:-


Power Plan
underground cables to be STA).
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer MEP TEAM

LOAD SCHEDULE FOR FIRST ELECTRICAL BOARD

1.Lighting and socket and AC to be controlled


1-All up lights, floor Via push push button
2.Manufacturer shop drawing by contractor to
boxes, kitchen and be provided for review/approval.
3.All the mentioned loads are tenant's
roof equipment responsibility.
4.The minimum short circuit level shall not be
(Including HVAC and less than 15 kA service.
5.Main Cable to be same as main cable from
water heaters) to be landlord.
6.Cables sizes to match the corresponding
connected to earth circuit breaker size
7.Distribution Board location to be
leakage 30mA unobstructed and required direct access.
8.Panel board location to be show on the
minimum. drawings with IP54.
9.Main cables to be CU/XLPE/PVC.
2-please make sure 10.All kitchen and roof equipment (Including
water heaters) to be connected to earth
that the FACP power leakage 30mA minimum.
11.All HVAC equipment and water heater to
circuit is connected be terminated with cables not wires
12. Tenant is fully responsible for the DB
separately phase balance and it will be tested on site
before operation
3- Exit and 13..Main MCCB to be (model NSX100B)
Emergency lighting to
be on a separate
circuit.

DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

Electrical Drawing

Details Sections Elevations Plans

1.For single phase equipment, Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: Load Schedule

Thermosetting cables to be DATE :

SCALE :
30/12/2023
NTS

used and to be 3x4mm2 OXXO


minimum and with 300/500 V MOA
insulation rating. Interior Designer
2.For 3-Phase equipment,
multicore cables
(CU/PVC/PVC) to be used and Main Contractor
to be 4x4mm2 minimum and SWAT
Specialists With Advanced Tools
with 600/1000 V rating. 594 Al Narges Buildings ,New Cairo
TEL. 0225633748

1.For normal power, Wires are allowed with 4mm2 3.Use CU/XLPE/PVC cables MEP Contractor
minimum wire size and with 450/750 V rating. for outdoor applications
2.Thermosetting cables to be 3x4mm2 minimum and (except for underground cables
with 300/500 V insulation rating. to be STA).
Drawing:-
3.PVC conduits are allowed for normal power wiring
Load Schedule
and cables. Each circuit to be in a separate conduit.
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer MEP TEAM

LOAD SCHEDULE FOR SECOND ELECTRICAL BOARD


1-All up lights, floor
boxes, kitchen and
roof equipment 1.Lighting and socket and AC to be controlled
(Including HVAC and Via push push button
2.Manufacturer shop drawing by contractor to
water heaters) to be be provided for review/approval.
3.All the mentioned loads are tenant's
connected to earth responsibility.
4.The minimum short circuit level shall not be
leakage 30mA less than 15 kA service.
5.Main Cable to be same as main cable from
minimum. landlord.
6.Cables sizes to match the corresponding
2-please make sure circuit breaker size
7.Distribution Board location to be
that the FACP power unobstructed and required direct access.
8.Panel board location to be show on the
circuit is connected drawings with IP54.
9.Main cables to be CU/XLPE/PVC.
separately 10.All kitchen and roof equipment (Including
water heaters) to be connected to earth
3- Exit and leakage 30mA minimum.
11.All HVAC equipment and water heater to
Emergency lighting to be terminated with cables not wires
12. Tenant is fully responsible for the DB
be on a separate phase balance and it will be tested on site
before operation
circuit. 13..Main MCCB to be (model NSX100B)

DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

1.For single phase equipment, Details Sections


Electrical Drawing

Elevations Plans

Thermosetting cables to be Revision/Issue DATE No. DRAWING NUMBER:

used and to be 3x4mm2


DRAWING Name: Load Schedule

DATE : 30/12/2023
SCALE : NTS

minimum and with 300/500 V OXXO


insulation rating. MOA
2.For 3-Phase equipment, Interior Designer
multicore cables
(CU/PVC/PVC) to be used and
to be 4x4mm2 minimum and
Main Contractor
with 600/1000 V rating. SWAT
1.For normal power, Wires are allowed with 4mm2 3.Use CU/XLPE/PVC cables Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo

minimum wire size and with 450/750 V rating. for outdoor applications TEL. 0225633748

(except for underground cables MEP Contractor


2.Thermosetting cables to be 3x4mm2 minimum and
with 300/500 V insulation rating. to be STA).
3.PVC conduits are allowed for normal power wiring
and cables. Each circuit to be in a separate conduit. Drawing:-
Load Schedule
MEP SUBMITTAL REVIEW STATUS 1-All up lights, floor boxes, kitchen and NOTES
roof equipment (Including HVAC and
……
… water heaters) to be connected to 1.For single phase equipment,
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted
earth leakage 30mA minimum. Thermosetting cables to be
Center MOA 2-please make sure that the FACP used and to be 3x4mm2
Unit Name /Unit No. Oxoo minimum and with 300/500 V
Date 21/01/2024 power circuit is connected separately
Reviewer MEP TEAM 3- Exit and Emergency lighting to be insulation rating.

SLD FOR FIRST


on a separate circuit. 2.For 3-Phase equipment,
multicore cables
(CU/PVC/PVC) to be used and
to be 4x4mm2 minimum and
with 600/1000 V rating.
3.Use CU/XLPE/PVC cables

ELECTRICAL BOARD
for outdoor applications
(except for underground cables
to be STA).

1.Lighting and socket and AC to be controlled


Via push push button
2.Manufacturer shop drawing by contractor to
be provided for review/approval.
3.All the mentioned loads are tenant's
responsibility.
4.The minimum short circuit level shall not be
less than 15 kA service.
5.Main Cable to be same as main cable from
landlord.
6.Cables sizes to match the corresponding
circuit breaker size
7.Distribution Board location to be
unobstructed and required direct access.
8.Panel board location to be show on the
drawings with IP54.
9.Main cables to be CU/XLPE/PVC.
10.All kitchen and roof equipment (Including
water heaters) to be connected to earth
leakage 30mA minimum.
11.All HVAC equipment and water heater to
be terminated with cables not wires
12. Tenant is fully responsible for the DB
phase balance and it will be tested on site
before operation
13..Main MCCB to be (model NSX100B)

DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

Electrical Drawing

Details Sections Elevations Plans

Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: SLD

DATE : 30/12/2023
SCALE : NTS

OXXO
MOA
Interior Designer

Main Contractor
SWAT
Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo
TEL. 0225633748

MEP Contractor

1.For normal power, Wires are allowed with 4mm2 minimum wire size and with 450/750 V rating.
2.Thermosetting cables to be 3x4mm2 minimum and with 300/500 V insulation rating. Drawing:-
3.PVC conduits are allowed for normal power wiring and cables. Each circuit to be in a separate SLD
conduit.
MEP SUBMITTAL REVIEW STATUS 1.For single phase equipment, NOTES
1-All up lights, floor boxes, kitchen and Thermosetting cables to be
……
… roof equipment (Including HVAC and used and to be 3x4mm2
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted
water heaters) to be connected to minimum and with 300/500 V
Center MOA earth leakage 30mA minimum. insulation rating.
Unit Name /Unit No. Oxoo 2-please make sure that the FACP
Date 21/01/2024
2.For 3-Phase equipment,
power circuit is connected separately multicore cables
Reviewer MEP TEAM
3- Exit and Emergency lighting to be (CU/PVC/PVC) to be used and
on a separate circuit. to be 4x4mm2 minimum and
with 600/1000 V rating.
3.Use CU/XLPE/PVC cables

SLD FOR SECOND for outdoor applications


(except for underground cables
to be STA).

ELECTRICAL BOARD 1.Lighting and socket and AC to be controlled


Via push push button
2.Manufacturer shop drawing by contractor to
be provided for review/approval.
3.All the mentioned loads are tenant's
responsibility.
4.The minimum short circuit level shall not be
less than 15 kA service.
5.Main Cable to be same as main cable from
landlord.
6.Cables sizes to match the corresponding
circuit breaker size
7.Distribution Board location to be
unobstructed and required direct access.
8.Panel board location to be show on the
drawings with IP54.
9.Main cables to be CU/XLPE/PVC.
10.All kitchen and roof equipment (Including
water heaters) to be connected to earth
leakage 30mA minimum.
11.All HVAC equipment and water heater to
be terminated with cables not wires
12. Tenant is fully responsible for the DB
phase balance and it will be tested on site
before operation
13..Main MCCB to be (model NSX100B)

DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

Electrical Drawing

Details Sections Elevations Plans

Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: SLD

DATE : 30/12/2023
SCALE : NTS

OXXO
MOA
Interior Designer

Main Contractor
SWAT
Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo
TEL. 0225633748

1.For normal power, Wires are allowed with 4mm2


MEP Contractor
minimum wire size and with 450/750 V rating.
2.Thermosetting cables to be 3x4mm2 minimum and
with 300/500 V insulation rating.
3.PVC conduits are allowed for normal power wiring Drawing:-
SLD
and cables. Each circuit to be in a separate conduit.
MEP SUBMITTAL REVIEW STATUS NOTES
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA A.P


Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer MEP TEAM RACK

LC PLAN
Oak veneer- Natural lacquered
Shelves: Solid oak- natural lacquered
Oak veneer- Natural lacquered
Shelves: Solid oak- natural lacquered
Plant
1.Design to be coordinated with
2 partitioned wardrobe to display
Panels: MDF - white lacquered
Shoe Table
5 partitioned panel

2 partitioned wardrobe to display


Mirror
Panels: MDF - white lacquered
Shoe Table
6 partitioned panel Accessories table
other trades and as per site
condition, any necessary
modification by MEP team to be
implemented.
Metallic black enamel paint
2. Full system functionality and
Mid-Hanger Crossed Legged Nesting Table
Material: Solid Oak, Natural Lacquered Mid-Hanger
Metallic black enamel paint
Crossed Legged Nesting Table
Material: Solid Oak, Natural Lacquered Mid-Hanger
Metallic black enamel paint
Solid oak- natural lacquered
Counter of the cash desk
installation is tenant's
Circular Table Group
responsibility.
3.Any exposed conduits to be
Shoe Table Shoe Table
PVC.
Metallic black enamel paint

Back Cash Desk


4.It's not allowed to monitor
Mid-Hanger

mall's corridor.

Mid-Hanger Mid-Hanger Hanger

RACK
Plant

Curtain
Mid-Hanger Metallic black enamel paint Metallic black enamel paint
Metallic black enamel paint Denim Table
Material: Solid Oak, Natural Lacquered
Mirror
Mirror
Plant Plant Fitting Room

Mirror
Plant

Accessories frame

Accessories frame
Signage
A.P Mid-Hanger Mid-Hanger
Mid-Hanger Metallic black enamel paint Metallic black enamel paint
Hanger

Curtain
Metallic black enamel paint

Mirror A.P
Fitting Room

Mirror
Metallic black enamel paint

Signage
Mid-Hanger

Metallic black enamel paint


Hanger

Curtain
DRAWN BY REVISION APPROVED

Bamboo Display Unit


Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel
Shoe Table Shoe Table
Fitting Room

Mirror
Electrical Drawing
Circular Table Group

Cushion : Black leather upholstery


Legs:Solid oak- natural lacquered
Signage Details Sections Elevations Plans

Curtain
Metallic black enamel paint
Revision/Issue DATE No. DRAWING NUMBER:
Material: Solid Oak, Natural Lacquered Mid-Hanger Material: Solid Oak, Natural Lacquered
Crossed Legged Nesting Table Crossed Legged Nesting Table DRAWING Name: LC Layout

Pouf
Metallic black enamel paint DATE : 30/12/2023
Mid-Hanger
Fitting Room SCALE : 1:50 @ A3

Mirror
Plant

Signage
OXXO
MOA

Door 90x300 cm
4 partitioned wardrobe to display
Shoe Table
2 partitioned wardrobe to display
Shoe Table
Interior Designer
Panels: MDF - white lacquered 5 partitioned panel Panels: MDF - white lacquered 5 partitioned panel
Plant Plant Shelves: Solid oak- natural lacquered Mirror Shelves: Solid oak- natural lacquered
Oak veneer- Natural lacquered Oak veneer- Natural lacquered Oak veneer- Natural lacquered

Main Contractor
1.Design to be coordinated with other trades SWAT
and as per site condition, any necessary Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo

modification by MEP team to be implemented. TEL. 0225633748

2.Full system functionality and installation is MEP Contractor


tenant's responsibility and to be compliant as
per local telecoms service provider
requirement.
3.Two Cables from POS to mall tie in to be Drawing:-
installed by tenant LC Plan
MEP SUBMITTAL REVIEW STATUS -Design to be coordinated with other NOTES
trades and as per site condition, any
……
… Sound System Legend
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted necessary modification by MEP team to
Center MOA be implemented.
Unit Name /Unit No. Oxoo
Date 21/01/2024 -Sound system to be equipped with vc
Reviewer MEP TEAM amplifier.

SOUND PLAN
4.28

0.41
(2x1.5)mm² cable

2.50
inside PVC conduit

3.10
6.34
4.86

RACK
0.38 3.00

5.62

4.48
DRAWN BY REVISION APPROVED

Electrical Team Eng/ Ahmed Turk ENG/ Ahmed Adel

(2x1.5)mm² cable Details Sections


Electrical Drawing

Elevations Plans

inside PVC conduit


Revision/Issue DATE No. DRAWING NUMBER:
DRAWING Name: Sound System Layout
4.95

DATE : 30/12/2023
4.67

SCALE : 1:50 @ A3

OXXO
MOA
Interior Designer

2.36
1.82

Door 90x300 cm
Main Contractor
SWAT
Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo
TEL. 0225633748

MEP Contractor

Drawing:-
Sound System Plan
MEP SUBMITTAL REVIEW STATUS

Scale Bar:
……
… General Notes
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 1.1) All works shall be conform to the applicable codes and authority rules.
1.2) All dimensions and levels are in millimeters (mm) unless mentioned
otherwise.
Center MOA 1.3) The drawing shall not be scaled. Only written dimensions shall be
followed.
Unit Name /Unit No. Oxoo 1.4) All Architectural drawings shall be read in conjunction with the
Structural, Services drawings and specifications for proper coordination.
Date 18/02/2024 Any discrepancies shall be brought to the attention of the Engineer.
1.5) All levels shown in the drawing are finished floor levels.
Reviewer MEP TEAM

(2x1.5)mm² 105° Shielded cable


EOL inside 3/4 EMT conduit

(2x2.5)mm² 105° Shielded cable


inside 3/4 EMT conduit Date Submission Stage

1/2024 Shop drawing


Rev: 1 Date: 1/2024 Revision note: By: Nadine Mamdouh
Sheet title

Below Ceiling Fire Alarm


EOL

General Contractor:
FACP

BOLD EGYPT

Owner:

1. Two zone one for above ceiling and another zone for below ceiling
2.Fire resistant cable 105 deg. C to be used. MAZAYA GROUP
3.Any exposed conduits to be EMT.
Install smoke 4.All areas to be covered. Consultant :

5.Maximum no of detectors in one zone is 15-17 detector. To be revised on site


detectors here according to that rule. Project:

6.Maximum distance between detectors is 7.5m, 4.5m to walls and 6.5m to corners.
7.Any smoke detector to be minimum 1 m away from any HVAC grill and 30 cm from OXXO - MALL OF ARABIA
lighting fixtures.
8. Above ceiling detectors to be with indicting lamb.
Project Code Discpline Locator Drawing No Size Scale
ox 2401 ARCH A3 To Fit
MEP SUBMITTAL REVIEW STATUS NOTES
……
… Fire Alarm Legend
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024 MS

Reviewer MEP TEAM FACP

EOL

PENDANT FA. PLAN


O

(2x1.5)mm² 105° Shielded cable


inside 3/4 EMT conduit

0.41
3.42
1.03

1.31
1.10

2.51

3.24
3.95

(2x1.5)mm² 105° Shielded cable


inside 3/4 EMT conduit
3.63

EOL

0.67

6.00
3.79

3.72

2.21
1.97
4.84

DRAWN BY REVISION APPROVED

Eng/ Ahmed Turk ENG/ Ahmed Adel


0.98 Electrical Team
3.12

Electrical Drawing

Details Sections Elevations Plans

1.11
4.24

Revision/Issue DATE No. DRAWING NUMBER:


DRAWING Name: Fire Alarm Above ceiling

(2x2.5)mm² 105° Shielded cable DATE : 30/12/2023

2.87
SCALE : 1:50 @ A3

inside 3/4 EMT conduit


OXXO
3.29

0.74
MOA

2.31
Interior Designer
1.58

Door 90x300 cm
1.36

EOL

0.60
0.42

FACP

Main Contractor
1. Two zone one for above ceiling and another zone for below ceiling SWAT
2.Fire resistant cable 105 deg. C to be used. Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo

3.Any exposed conduits to be EMT. TEL. 0225633748

4.All areas to be covered. MEP Contractor


5.Maximum no of detectors in one zone is 15-17 detector. To be revised on site
according to that rule.
6.Maximum distance between detectors is 7.5m, 4.5m to walls and 6.5m to corners.
7.Any smoke detector to be minimum 1 m away from any HVAC grill and 30 cm from Drawing:-
lighting fixtures.
8. Above ceiling detectors to be with indicting lamb. fire alarm Above Ceiling
MEP SUBMITTAL REVIEW STATUS

Scale Bar:
……
… General Notes
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 1.1) All works shall be conform to the applicable codes and authority rules.
1.2) All dimensions and levels are in millimeters (mm) unless mentioned

Center MOA 18 otherwise.


1.3) The drawing shall not be scaled. Only written dimensions shall be
followed.
Unit Name /Unit No. Oxoo 1.4) All Architectural drawings shall be read in conjunction with the
Structural, Services drawings and specifications for proper coordination.
Date 18/02/2024 Any discrepancies shall be brought to the attention of the Engineer.
1.5) All levels shown in the drawing are finished floor levels.

Reviewer MEP TEAM


EOL

EOL
INTERFACE TO SUPERVISORY
VALVE

TS
EOL

EOL

Date Submission Stage

1/2024 Shop drawing


Rev: 1 Date: 1/2024 Revision note: By: Nadine Mamdouh
Sheet title

Fire Alarm Diagram

General Contractor:

BOLD EGYPT
1. Two zone one for above ceiling and another zone for below ceiling
2.Fire resistant cable 105 deg. C to be used. Owner:

3.Any exposed conduits to be EMT.


4.All areas to be covered. MAZAYA GROUP
5.Maximum no of detectors in one zone is 15-17 detector. To be revised on site
according to that rule. Consultant :

6.Maximum distance between detectors is 7.5m, 4.5m to walls and 6.5m to corners.
7.Any smoke detector to be minimum 1 m away from any HVAC grill and 30 cm from Project:

lighting fixtures.
8. Above ceiling detectors to be with indicting lamb. OXXO - MALL OF ARABIA

Project Code Discpline Locator Drawing No Size Scale


ox 2401 ARCH A3 To Fit
Ø65mm
Up to upright network
Please install sprinklers here
NOTES
Ø65mm Ø50mm Ø40mm Ø40mm Ø32mm

Ø25mm Ø25mm

Ø25mm

Ø25mm
Ø25mm

Ø25mm

Ø25mm

Ø25mm

Ø25mm

Door 90x300 cm
MEP SUBMITTAL REVIEW STATUS 1.Design to be two
separate network one
for the upright other
……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted Firefighting Below Ceiling Plan one for pendent
sprinklers
2.Design to be
Center MOA coordinated with other
Unit Name /Unit No. Oxoo trades and as per site
Date 18/02/2024 condition, any
necessary modification
Reviewer MEP TEAM by MEP team to be
Ø50mm Ø50mm Ø40mm Ø40mm Ø32mm Ø25mm Ø25mm implemented.
3.Each sprinkler head
Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm
coverage is 12 m² , DRAWN BY REVISION APPROVED

with recommended grid Mech. Team Eng/ Ahmed Turk ENG/ Ahmed Adel

pattern is 4m x 3m or
3.45m x 3.45m. Mechanical Drawing

Details Sections Elevations Plans


4.Maximum distance
from the wall shall be Revision/Issue DATE No. DRAWING NUMBER: M - 01

½ of the sprinkler DRAWING Name: Firefighting Plan


DATE : 24/01/2024
spacing (2 m SCALE : 1:50 @ A1
maximum) and 2.3 m
from the corner. OXXO
5.Minimum distance Mall of Arabia
between two sprinkler
1.8 m. Interior Designer
6.Below ceiling
sprinkler head shall be
Recessed Pendent
type , Quick response,
temperature rating
68⁰C, chromo plated MEP Designer
brass/ Bronze , red SWAT
bulb with 3 mm Specialists With Advanced Tools
594 Al Narges Buildings ,New Cairo
diameter. TEL. 0225633748

7.Provide Fire
MEP Contractor
Door 90x300 cm

Extinguishers (Co2, dry


powder) for each 100
m² area and within 3m
from electric panel.
8.Provide Test and
drain valve after flow
switch ,air Vent Drawing:-
Firefighting Above Ceiling Plan Firefighting Plan
MEP SUBMITTAL REVIEW STATUS

(A) Approved (B) Approved with Notsed


s
……

(C) Not Approved ,Resubmit as noted
NOTES
Center MOA
Unit Name /Unit No. Oxoo
Date 18/02/2024
Reviewer MEP TEAM

Ø25mm
Ø25mm
Ø25mm Ø25mm
Ø25mm Ø25mm
Ø65mm
Ø25mm Ø50mm Ø50mm Ø50mm Ø40mm Ø32mm

Ø65mm
Up to upright network

Ø25mm

Ø25mm
Ø40mm
Ø25mm

Ø25mm

Ø32mm
1.Design to be two
separate network one

Door 90x300 cm
Ø25mm Ø25mm

for the upright other


one for pendent
sprinklers
2.Design to be

Firefighting Below Ceiling Plan coordinated with other


trades and as per site
condition, any
Please install sprinklers here
necessary modification
by MEP team to be
implemented.
3.Each sprinkler head
coverage is 12 m² ,
with recommended grid
pattern is 4m x 3m or
3.45m x 3.45m. DRAWN BY REVISION APPROVED

4.Maximum distance Mech. Team Eng/ Ahmed Turk ENG/ Ahmed Adel
from the wall shall be
½ of the sprinkler Mechanical Drawing

Details Sections Elevations Plans


spacing (2 m
maximum) and 2.3 m Revision/Issue DATE No. DRAWING NUMBER: M - 01
from the corner. DRAWING Name: Firefighting Plan

5.Minimum distance DATE :

SCALE :
24/01/2024

1:50 @ A1
between two sprinkler
1.8 m. OXXO
6.Below ceiling Mall of Arabia
Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm
sprinkler head shall be
Recessed Pendent
type , Quick response,
Interior Designer
Ø65mm Ø65mm Ø50mm Ø50mm Ø50mm Ø40mm Ø25mm

temperature rating
68⁰C, chromo plated
brass/ Bronze , red
Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm Ø25mm
bulb with 3 mm
diameter. MEP Designer
7.Provide Fire SWAT
Extinguishers (Co2, dry Specialists With Advanced Tools
powder) for each 100 594 Al Narges Buildings ,New Cairo
TEL. 0225633748

m² area and within 3m


Door 90x300 cm

from electric panel. MEP Contractor


8.Provide Test and
drain valve after flow
switch ,air Vent

Drawing:-
Firefighting Above Ceiling Plan Firefighting Plan
Dedicated Outdoor Air System (DOAS) Sizing Summary for OXXO-MOA-CUSTOMER
Project Name: VALITAB DESIGN SERVICES 02/12/2024
Prepared by: VALI TAB 03:26ã

Air System Information


Air System Name OXXO-MOA-CUSTOMER Number of zones 1
Equipment Class TERM Floor Area 162.0 m²
Air System Type SPLT-FC Location Cairo, Egypt

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

NOTE: No other data is applicable for a Terminal Units air system without a Dedicated Outdoor Air System (DOAS).

MEP SUBMITTAL REVIEW STATUS

……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted

Center MOA
Unit Name /Unit No. Oxoo
Date 18/02/2024
Reviewer MEP TEAM

1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program 5.10 Page 1 of 6


Zone Sizing Summary for OXXO-MOA-CUSTOMER
Project Name: VALITAB DESIGN SERVICES 02/12/2024
Prepared by: VALI TAB 03:26ã

Air System Information


Air System Name OXXO-MOA-CUSTOMER Number of zones 1
Equipment Class TERM Floor Area 162.0 m²
Air System Type SPLT-FC Location Cairo, Egypt

Sizing Calculation Information 213 m2


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Terminal Unit Sizing Data - Cooling

Total Sens Coil Coil Water Time


Coil Coil Entering Leaving Flow of
Load Load DB / WB DB / WB @ 5.6 K Peak Coil Zone
Zone Name (kW) (kW) (°C) (°C) (L/s) Load L/(s·m²)
Zone 1 38.7 35.0 22.9 / 17.7 15.2 / 14.7 - Jun 1500 23.57

Terminal Unit Sizing Data - Heating, Fan, Ventilation

Heating Htg Coil


Heating Coil Water Fan OA Vent
Coil Ent/Lvg Flow Design Fan Fan Design
Load DB @11.1 K Airflow Motor Motor Airflow
Zone Name (kW) (°C) (L/s) (L/s) (BHP) (kW) (L/s)
Zone 1 7.3 19.5 / 21.1 - 3818 0.722 0.573 211

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 29.9 Jun 1500 4.5 162.0

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
OXXO-MOA-CUSTOMER AREA 1 29.9 Jun 1500 3818 4.5 162.0 23.57

1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program 5.10 Page 2 of 6


Air System Design Load Summary for OXXO-MOA-CUSTOMER
Project Name: VALITAB DESIGN SERVICES 02/12/2024
Prepared by: VALI TAB 03:26ã

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 41.4 °C / 23.0 °C HEATING OA DB / WB 7.2 °C / 3.2 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 162 m² 17255 - 162 m² 4550 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 162 m² 0 - 162 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 8100 W 8100 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 2000 W 2000 - 0 0 -
People 30 2595 3999 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 29950 3999 - 4550 0
Zone Conditioning - 29406 3999 - 4663 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Exhaust Fan Load 0 L/s 0 - 0 L/s 0 -
Ventilation Load 211 L/s 5002 -313 211 L/s 3254 1
Ventilation Fan Load 0 L/s 0 - 0 L/s 0 -
Space Fan Coil Fans - 573 - - -573 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 34981 3686 - 7345 1
Terminal Unit Cooling - 34981 3705 - 0 0
Terminal Unit Heating - 0 - - 7345 -
>> Total Conditioning - 34981 3705 - 7345 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program 5.10 Page 3 of 6


System Psychrometrics for OXXO-MOA-CUSTOMER
Project Name: VALITAB DESIGN SERVICES 02/12/2024
Prepared by: VALI TAB 03:26ã

June DESIGN COOLING DAY, 1500

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 41.4 0.01019 211 400 5002 -313
Vent - Return Mixing Outlet -17.8 0.00000 0 0 - -
Ventilation Fan Outlet -17.8 0.00000 0 0 0 -
Zone Air - 21.7 0.01069 3818 74 29406 3999
Return Plenum Outlet -17.8 0.01069 3818 74 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.197 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2921.9 W/(L/s)
Site Altitude = 73.8 m

TABLE 2: ZONE DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Zone 1 ( Cooling )
Ventilation Air - - - 211 - - -
Cooling Coil Inlet - 22.9 0.01067 3818 0 - -
Cooling Coil Outlet - 15.2 0.01034 3818 0 34981 3705
Heating Coil Inlet - 15.2 0.01034 3818 0 - -
Heating Coil Outlet - 15.2 0.01034 3818 0 0 -
Zone Air - 21.7 0.01069 3818 0 29406 -

1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program 5.10 Page 4 of 6


System Psychrometrics for OXXO-MOA-CUSTOMER
Project Name: VALITAB DESIGN SERVICES 02/12/2024
Prepared by: VALI TAB 03:26ã

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 7.2 0.00318 211 400 -3254 -1
Vent - Return Mixing Outlet -17.8 0.00000 0 0 - -
Ventilation Fan Outlet -17.8 0.00000 0 0 0 -
Zone Air - 20.1 0.00318 3818 0 -4663 0
Return Plenum Outlet -17.8 0.00318 3818 0 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.197 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2921.9 W/(L/s)
Site Altitude = 73.8 m

TABLE 2: ZONE DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Zone 1 ( Deadband )
Ventilation Air - - - 211 - - -
Cooling Coil Inlet - 19.5 0.00319 3818 0 - -
Cooling Coil Outlet - 19.5 0.00319 3818 0 0 0
Heating Coil Inlet - 19.5 0.00319 3818 0 - -
Heating Coil Outlet - 21.1 0.00319 3818 0 7345 -
Zone Air - 20.1 0.00318 3818 0 -4663 -

1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program 5.10 Page 5 of 6


Space Input Data
VALITAB DESIGN SERVICES 02/15/2024
VALI TAB 02:38ã

OXXO-MOA-CUSTOMER AREA

1. General Details:
Floor Area 162.0 m²
Avg. Ceiling Height 4.7 m
Building Weight 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage RETAIL: Sales (except other categories here)
OA Requirement 1 3.8 L/s/person
OA Requirement 2 0.60 L/(s·m²)
Space Usage Defaults ASHRAE Standard 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type Recessed (Unvented) Occupancy 30.0 People
Wattage 50.00 W/m² Activity Level Medium Work
Ballast Multiplier 1.00 Sensible 86.5 W/person
Schedule Multi purpose Schedule Latent 133.3 W/person
Schedule Multi purpose Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage 0.00 W/m² Sensible 0 W
Schedule None Schedule Multi purpose Schedule
Latent 0 W
Schedule Multi purpose Schedule
2.3. Electrical Equipment:
Wattage 2000.0 Watts
Schedule Multi purpose Schedule

3. Walls, Windows, Doors:


(No Wall, Window, Door data).

4. Roofs, Skylights:

.Exp (m²) Roof Gross Area (.deg) Roof Slope .Skylight Qty
H ١٦٢٫٠ ٠ ٠

4.1. Construction Types for Exposure H


Roof Type Default Roof Assembly

5. Infiltration:
Design Cooling 1.00 ACH
Design Heating 0.00 L/s
Energy Analysis 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type Slab Floor On Grade
Floor Area 162.0 m²
Total Floor U-Value 0.568 W/(m²·K)
Exposed Perimeter 0.0 m 1-Design to be coordinated with other trades and as per site condition, any
Edge Insulation R-Value 0.00 (m²·K)/W necessary modification by MEP team to be implemented.
7. Partitions: 2.Tenant is fully responsible for cooling
(No partition data).
loads and for providing full functioning
HVAC system as per design
requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer.
6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.

Hourly Analysis Program v5.10 Page 1 of 1


OXXO-MOA-CUSTOMER Input Data
Project Name: VALITAB DESIGN SERVICES 02/15/2024
Prepared by: VALI TAB 02:41ã

1. General Details: 1-Design to be coordinated with


Air System Name OXXO-MOA-CUSTOMER other trades and as per site
Equipment Type Terminal Units condition, any necessary
Air System Type Split DX Fan Coil modification by MEP team to be
Number of zones 1 implemented.
Ventilation Direct Ventilation
2.Tenant is fully
2. Dedicated Outdoor Air System Components:
(Dedicated Outdoor Air System not used: no inputs) responsible for
3. Zone Components:
cooling loads and
Space Assignments: for providing full
functioning HVAC
Zone 1: Zone 1
OXXO-MOA-CUSTOMER AREA x1 system as per
Thermostats and Zone Data:
design
T-Stat requirements.
Cooling T-Stat Cooling T-Stat Heating T-Stat Heating T-Stat Throttling 3.Main duct velocity is 4m/s,
Zone .Occ .Unocc .Occ .Unocc Range Branches and flex. duct velocity is
(°C) (°C) (°C) (°C) (°C) 2.5m/s and maximum length is
1200mm.
١ ٢١٫٠ ٢٣٫٠ ٢٠٫٠ ١٩٫٠ ٠٫٨٣ 4.All supply/return grills locations
to be adjusted to avoid
Thermostat Schedule Fan/Thermostat Schedule short-circuit
Unoccupied Cooling is Available 5.All freon pipes length should be
as per AC units manufacturer.
Common Terminal Unit Data: 6-Please ensure that all the
Cooling Coil: equipments to be hanged as per
Design Supply Temp. 14.4 °C the landlord technical team details.
Coil Bypass Factor 0.100
Cooling Source Air-Cooled DX 7-Units selection catalogues to be
Schedule JFMAMJJASOND submitted with a highlight on the
selected unit.
Heating Coil: 8-FCUs to be with minimum static
Design Supply Temp. 35.0 °C pressure of 50 Pa. Otherwise,
Heating Source Electric Resistance Please provide the static pressure
Schedule JFMAMJJASOND of the selected units.
8-Please ensure that the selected
Fan Control Fan On units fits the total cooling coil load
Ventilation Sizing Method Sum of Space OA Airflows and the required air flow.
9-Please provide a maintenance
Terminal Units Data: platform for all HVAC equipment.

Air
Distribution Air Design
Air Effectiveness Distribution Fan Supply
Zone Terminal Type Distribution Specification Effectiveness Minimum Airflow Fan Performance Efficiency .Temp
/ Ceiling supply
١ Fan coil Not Used - L/s/person ٠٫٠٠ Pa ٧٥ % ٥٠ -
ceiling return

4. Sizing Data (Computer-Generated):


System Sizing Data:
Sizing Data:
Cooling Supply Temperature 14.4 °C
Heating Supply Temperature 35.0 °C

Hydronic Sizing Specifications:


Chilled Water Delta-T 5.6 K
Hot Water Delta-T 11.1 K

Safety Factors:
Cooling Sensible 0 %
Cooling Latent 0 %
Heating 0 %

Zone Sizing Data:


Zone Airflow Sizing Method Sum of space airflow rates
Space Airflow Sizing Method Individual peak space loads

Zone Supply Airflow Zone Htg Unit Reheat Coil Ventilation


(L/s) (kW) (kW) (L/s)

Hourly Analysis Program 5.10 Page 1 of 2


MEP SUBMITTAL REVIEW STATUS

……

(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted
Scale Bar:
General Notes
Center MOA 1.1) All works shall be conform to the applicable codes and authority rules.
Unit Name /Unit No. Oxoo 1.2) All dimensions and levels are in millimeters (mm) unless mentioned
otherwise.
1.3) The drawing shall not be scaled. Only written dimensions shall be
Date 18/02/2024 followed.
1.4) All Architectural drawings shall be read in conjunction with the
Reviewer MEP TEAM Structural, Services drawings and specifications for proper coordination.
Any discrepancies shall be brought to the attention of the Engineer.
1.5) All levels shown in the drawing are finished floor levels.

AD

8''

V.D
AD

1800,0
S.A.D S.A.D
V.D 8''
400x300 V.D Ø250
670 CFM 245 CFM
V.D

V.D
S.A.D
AD
Ø300
S.A.D S.A.D 490 CFM
450x400 400x350
V.D 1200 CFM 370 CFM

V.D

8''
1200,0
AD

8''
V.D

V.D

S.A.D S.A.D
450x400 350x300
1200 CFM S.A.D
750 CFM S.A.D
V.D

V.D

450x250
V.D

V.D

8'' 8''
600 CFM 450x400
V.D
8'' 670 CFM
8'' V.D

1800,0
V.D V.D
8''
V.D

V.D
V.D V.D

V.D

V.D

AD Date Submission Stage

1/2024 Shop drawing


Rev: 1 Date: 1/2024 Revision note: By: Nadine Mamdouh

Door 90x300 cm
Sheet title

AC Plan

General Contractor:

BOLD EGYPT

Owner:

MAZAYA GROUP

Consultant :

1-Design to be coordinated with other trades and as per site condition, any necessary
modification by MEP team to be implemented.
Project:
2.Tenant is fully responsible for cooling loads and for providing full functioning HVAC system
as per design requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and maximum length is OXXO - MALL OF ARABIA
1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer. Project Code Discpline Locator Drawing No Size Scale
ox 2401 ARCH A3 To Fit
6-Please ensure that all the equipments to be hanged as per the landlord technical team
details.
7-Units selection catalogues to be submitted with a highlight on the selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please provide the static
pressure of the selected units.
8-Please ensure that the selected units fits the total cooling coil load and the required air flow.
9-Please provide a maintenance platform for all HVAC equipment.
MEP SUBMITTAL REVIEW STATUS

……
… Scale Bar:
General Notes
(A) Approved (B) Approved with Notsed
s (C) Not Approved ,Resubmit as noted 1.1) All works shall be conform to the applicable codes and authority rules.
1.2) All dimensions and levels are in millimeters (mm) unless mentioned
otherwise.
Center MOA 1.3) The drawing shall not be scaled. Only written dimensions shall be
followed.
Unit Name /Unit No. Oxoo 1.4) All Architectural drawings shall be read in conjunction with the
Structural, Services drawings and specifications for proper coordination.
Date 18/02/2024 Any discrepancies shall be brought to the attention of the Engineer.
1.5) All levels shown in the drawing are finished floor levels.
Reviewer MEP TEAM

SPLIT TYPE AIR CONDITIONING UNITS SCHEDULE


NOMINAL COMPRESSOR POWER ELECTRICAL DATA
UNIT NO. LOCATION TYPE QTY COOLING CAP.
( KW )
BTU/HR VOLTS PHASE HERTZ

DX-01 AS SHOWN IN PLAN CONCEALED UNIT 1 12000 1.2 220 1 50

DX-02 AS SHOWN IN PLAN CONCEALED UNIT 2 24000 2.3 220 1 50

DX-03 AS SHOWN IN PLAN CONCEALED UNIT 2 48000 4.2 380 3 50

please note that :-


-Acoustic Lining (9mm) is applied up to 3 m from the fan mouth
-Duct manufacturing & installation will be subjected to SMACNA
-Access Doors is add for Fan and coordinate with RCP
Date Submission Stage

-Air outlets are coordinate with RCP 1/2024


Rev: 1 Date: 1/2024
Sheet title
Revision note:
Shop drawing
By: Nadine Mamdouh

HVAC Schedule
-duct work will be coordinate with other trade 1-Design to be coordinated with other trades and as per site condition, any
necessary modification by MEP team to be implemented.

2.Tenant is fully responsible for cooling


-the flex. length will not exceeds 1200 mm
General Contractor:

loads and for providing full functioning


BOLD EGYPT
HVAC system as per design
requirements.
Owner:

3.Main duct velocity is 4m/s, Branches and flex. duct velocity is 2.5m/s and MAZAYA GROUP
maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid short-circuit
5.All freon pipes length should be as per AC units manufacturer. Consultant :

6-Please ensure that all the equipments to be hanged as per the landlord
technical team details.
7-Units selection catalogues to be submitted with a highlight on the Project:
selected unit.
8-FCUs to be with minimum static pressure of 50 Pa. Otherwise, Please
provide the static pressure of the selected units. OXXO - MALL OF ARABIA
8-Please ensure that the selected units fits the total cooling coil load and
the required air flow.
9-Please provide a maintenance platform for all HVAC equipment. Project Code Discpline Locator Drawing No Size Scale
ox 2401 ARCH A3 To Fit
(A) Approved
MEP SUBMITTAL REVIEW STATUS

(B) Approved with Notsed


s
……

(C) Not Approved ,Resubmit as noted
NOTES
Center MOA
Unit Name /Unit No. Oxoo
Date 21/01/2024
Reviewer MEP TEAM

Down in Wall Connected to Drain Network

25 mm
Slope 0.5%

C.O 25 mm
Slope 0.5%

25 mm
Slope 0.5%

25 mm 25 mm
Slope 0.5% Slope 0.5% 25 mm
Slope 0.5%
C.O

Down in Wall Connected to Drain Network

25 mm
Slope 0.5%

Down in Wall Connected to Drain Network

C.O

DRAWN BY REVISION APPROVED


25 mm
Slope 0.5% Mech. Team Eng/ Ahmed Turk ENG/ Ahmed Adel

Mechanical Drawing

Details Sections Elevations Plans

Revision/Issue DATE No. DRAWING NUMBER: M - 01


DRAWING Name: AC Drain Plan
DATE : 17/01/2024

SCALE : 1:50 @ A1

C.O
OXXO
Mall of Arabia

Door 90x300 cm
Interior Designer
1-Design to be coordinated with other trades and as per site
condition, any necessary modification by MEP team to be
implemented.
2.Tenant is fully responsible for cooling loads and for providing
full functioning HVAC system as per design requirements.
3.Main duct velocity is 4m/s, Branches and flex. duct velocity is MEP Designer
2.5m/s and maximum length is 1200mm.
4.All supply/return grills locations to be adjusted to avoid
SWAT
Specialists With Advanced Tools
short-circuit
594 Al Narges Buildings ,New Cairo
5.All freon pipes length should be as per AC units TEL. 0225633748

manufacturer.
6-Please ensure that all the equipments to be hanged as per MEP Contractor
the landlord technical team details.
7-Units selection catalogues to be submitted with a highlight on
the selected unit.
8-FCUs to be with minimum static pressure of 50 Pa.
Otherwise, Please provide the static pressure of the selected
units.
8-Please ensure that the selected units fits the total cooling coil Drawing:-
AC Drain Plan load and the required air flow.
9-Please provide a maintenance platform for all HVAC
equipment.
AC Drain Plan

You might also like