You are on page 1of 132

NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY

Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite


Business Department

A FEASIBILITY STUDY IN ESTABLISHING

COZY CONNECTIONS STUDY HUB IN BRGY. ZONE 4, PASONG TALA,

CITY OF DASMARINAS CAVITE

A Feasibility Study Presented to the

Faculty of Business Department of

National College of Science and Technology

In Partial Fulfillment

of the Requirements for the Degree of

Bachelor of Science in Accountancy

By:

BUSTAMANTE, WILFREDO JR.

ETIL, WENERISAH

LORENZO, NEIL FRANK

NACIONAL, HANNAH

SALDE, ALMA ROSE

February 2024

1
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

APPROVAL SHEET

In partial fulfillment of the requirements for the degree of Bachelor of

Science in Accountancy, this feasibility study entitled “Cozy Connections” has

been prepared by Bustamante, Wilfredo Jr., Etil, Wenerisah, Lorenzo, Neil

Frank, Nacional, Hannah, Salde, Alma Rose who are hereby recommended for

Oral Examination.

Ms. ROSALIA C. DE GUZMAN, CPA, MBA


Thesis Adviser

PANELS OF EXAMINERS

Has been accepted and approved by the Committee on Oral Examination with a

grade of ____.

Mr. JUDE RODMAN BRINGUELA, MBA Mr. JULIAN CHARLES LOPENA

_____________________ _____________________
Panel Member Panel Member

Mr. NORVIL JIMENEZ


_____________________
Head Panel

2
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

ACKNOWLEDGEMENT

The completion of this undertaking could not have been possible without

the participation and assistance of so many people whose names may not all be

enumerated. Their contributions are sincerely appreciated and gratefully

acknowledged. However, the researchers would like to express their deep

appreciation and indebtedness, particularly to the following people:

To their thesis adviser, Mrs. Rosalia De Guzman, CPA, MBA for her

support, advice, guidance, valuable comments, suggestions, and provisions that

benefited the researchers much in the completion and success of this study and

by giving endless help to finish this manuscript.

To their technical adviser, Ms. Edsa Lanuza, and their English Critic, Mrs.

Myrna Delima, for their time and effort in checking this manuscript and their

deep insights for the completion of this study.

Last but not the least, the proponents would like to praise and thank the

Almighty God for His showers of blessings throughout their study to complete

this successfully.

3
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

DEDICATION

This feasibility study is wholeheartedly dedicated to the researchers’

beloved families, partners, and friends. Their appreciation goes to Bustamante,

Myrna C., Bustamante, Wilfredo G., Macabontoc, Felicidad M., Lorenzo, Femie

A., Lorenzo, Jose R., Nacional, Lot-lot, Dalina, Mylene G.

They have given drive and discipline to tackle a task with determination.

This study would have not been possible without the help of these people who in

one way or another shared their moral, spiritual, emotional, and financial support.

4
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

TABLE OF CONTENTS

APPROVAL SHEET..........................................................................................................2
ACKNOWLEDGEMENT....................................................................................................3
DEDICATION.....................................................................................................................4
EXECUTIVE SUMMARY.................................................................................................14
INTRODUCTION.............................................................................................................18
BACKGROUND OF THE STUDY.......................................................................................18
STATEMENT OF THE PROBLEM.....................................................................................20
OBJECTIVES OF THE STUDY...........................................................................................22
SCOPE AND DELIMITATIONS...........................................................................................25
SIGNIFICANCE OF THE STUDY........................................................................................26
RESEARCH AND METHODOLOGY..................................................................................27
DEFINITION OF TERMS......................................................................................................31
CHAPTER 1: MANAGEMENT ASPECT........................................................................32
ABOUT THE COMPANY......................................................................................................32
1.1 BUSINESS LOGO.....................................................................................................32
1 .2 MISSION.........................................................................................................................33
1.3 VISION..............................................................................................................................33
1.2 FORM OF BUSINESS ORGANIZATION....................................................................34
1.2 ARTICLES OF PARTNERSHIP..............................................................................34
1.4 REGISTRATION OF THE BUSINESS.........................................................................39
1.5. INITIAL CAPITAL..........................................................................................................40
INITIAL PROJECT COSTS:............................................................................................41
1.6. ORGANIZATIONAL CHART........................................................................................42
1.7 JOB DESCRIPTION, QUALIFICATIONS, AND RESPONSIBILITIES...................44
1.7.1 JOB DESCRIPTION AND RESPONSIBILITIES.................................................44
1.7.2. JOB QUALIFICATION..........................................................................................45
1.8 EMPLOYMENT PROCESS...........................................................................................48
1.9 EMPLOYEE SCHEDULE...............................................................................................49

5
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1.10 SALARY RATE.............................................................................................................50


1.11 BUSINESS POLICIES.................................................................................................51
EMPLOYEE CONDUCT POLICY....................................................................................51
1.12. PRE-OPERATING ACTIVITIES................................................................................52
1.12.1. GANTT CHART....................................................................................................52
CHAPTER II: MARKETING ASPECTS..........................................................................53
2.1 MARKET ENVIRONMENT.......................................................................................54
2.2 PROSPECTIVE MARKET........................................................................................54
2.3 COMPETITORS ANALYSIS.........................................................................................54
2.4 DATA ANALYSIS...........................................................................................................55
2.5 PROJECT TARGET MARKET.....................................................................................56
2.6 DEMAND ANALYSIS.....................................................................................................58
2.7 SUPPLY ANALYSIS......................................................................................................59
2.8 MARKETABILITY RATES.............................................................................................59
2.9 SWOT ANALYSIS..........................................................................................................60
2.10 MARKETING MIX.........................................................................................................61
2.9 SURVEY ANALYSIS......................................................................................................66
CHAPTER III: TECHNICAL ASPECT.............................................................................84
3.1 LOCATION OF THE BUSINESS..................................................................................84
3.2 PLANT LAYOUT.............................................................................................................85
3.3 BUILDING AND FACILITIES........................................................................................86
3.4 SERVICES DESCRIPTION...........................................................................................88
3.5 OFFERED SERVICES...................................................................................................89
3.6 TECHNOLOGY WILL USE............................................................................................89
3.7.1 BREAKDOWN OF MACHINERIES AND EQUIPMENT AND OTHER
FACILITIES WITH CORRESPONDING COSTS..............................................................90
3.8 INITIAL COST OF UTILITY APPLICATIONS.............................................................96
UTILITY PROVIDERS.......................................................................................................97
3.9 OPERATIONAL FLOW CHART...................................................................................98
3.10 SERVICE FLOW CHART.........................................................................................99
3.11 ESTIMATED OPERATIONAL CAPACITY..........................................................100
3.12 BUSINESS HOURS.................................................................................................100
6
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

3.13 EMPLOYEE SCHEDULE.......................................................................................101


3.14 EMPLOYEES UNIFORM AND COMPANY ID....................................................101
3.15 WASTE DISPOSAL METHOD..............................................................................103
CHAPTER IV: FINANCIAL ASPECTS.........................................................................104
NOTES TO FINANCIAL STATEMENTS..........................................................................109
Cozy Connections.............................................................................................................110
Projected Notes to Financial Statement.......................................................................110
SCHEDULES.......................................................................................................................115
FINANCIAL RATIOS...........................................................................................................121
CHAPTER V: SOCIO-ECONOMIC ASPECT................................................................124
Contribution to the Economy..............................................................................................124
Contribution to the Environment...................................................................................124
Contribution to the Society.............................................................................................125
Contribution to the Government....................................................................................125
SUMMARY OF FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS...............126
Summary of Findings........................................................................................................126
Conclusion..........................................................................................................................126
Recommendations.............................................................................................................127
REFERENCES..............................................................................................................129

7
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

LIST OF FIGURES

Figure 1. Business Logo...................................................................................33

Figure 2. Organizational Chart.........................................................................43

Figure 3. Cozy Connections' Facebook Page.................................................65

Figure 4. Cozy Connections' Flyer...................................................................65

Figure 5. Loyalty Card.......................................................................................66

Figure 6. Age of the Respondents...................................................................67

Figure 7. Educational Status of the Respondents..........................................68

Figure 8. Schools of the Respondents............................................................69

Figure 9. Question No. 1...................................................................................70

Figure 10. Question No. 2.................................................................................71

Figure 11. Question No. 3.................................................................................72

Figure 12. Question No.4..................................................................................73

Figure 13. Question No. 5.................................................................................74

Figure 14. Question No. 6.................................................................................75

Figure 15. Question No. 7.................................................................................76

Figure 16. Question No. 8.................................................................................77

Figure 17. Question No. 9.................................................................................78

Figure 18. Question No. 10...............................................................................79

Figure 19. Question No. 11...............................................................................80

Figure 20. Question No. 12...............................................................................81

Figure 21. Question No. 13...............................................................................82


8
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Figure 22. Question No. 14...............................................................................83

Figure 23. Map................................................................................................... 84

Figure 24. Floor Plan.........................................................................................85

Figure 25. Operational Flow Chart of Cozy Connections..............................98

Figure 26.Service Flow Chart of Cozy Connections.......................................99

Figure 27. Employee’s Uniform......................................................................102

Figure 28. Employees' ID................................................................................102

9
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

LIST OF TABLES

Table 1. Number of Population.........................................................................31

Table 2. Licenses and Registration.................................................................40

Table 3. Licenses and Registration.................................................................41

Table 4. Initial Project Costs.............................................................................42

Table 5. Employee Schedule............................................................................50

Table 6. Employees’ Compensation................................................................50

Table 7. Gantt Chart.......................................................................................... 53

Table 8. Competitors Analysis.........................................................................55

Table 9. Historical Data.....................................................................................56

Table 10. Projected Target Market- Brgy.San Francisco II............................57

Table 11. Projected Target Market- Burol Main..............................................57

Table 12. Projected Target Market- Zone I-B...................................................57

Table 13. Total Projected Target Market..........................................................57

Table 14. Projected Annual Demand...............................................................58

Table 15. Projected Annual Supply..................................................................59

Table 16. Projected Marketable Rates.............................................................60

Table 17. SWOT Analysis..................................................................................61

Table 18. Prices of the rooms...........................................................................63

Table 19. Prices of printing services...............................................................63

Table 20. Areas and Corresponding Description...........................................88

Table 21. Offered Services of the Business....................................................89

Table 22. Machinery and Equipment Cost......................................................90


10
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Table 23. Office Equipment..............................................................................91

Table 24. Furniture and Fixtures......................................................................91

Table 25. Snack Supplies..................................................................................92

Table 26. Office Supplies- Annually.................................................................92

Table 27. Printing Supplies- Monthly...............................................................92

Table 28. Office Supplies- Six Months.............................................................93

Table 29. Cleaning Supplies- Monthly.............................................................93

Table 30. Cleaning Supplies- Annually............................................................93

Table 31. Comfort Room Supplies...................................................................94

Table 32. Books and Board Games.................................................................94

Table 33. Uniform.............................................................................................. 95

Table 34. Advertisement Promotional Expense.............................................95

Table 35. Medical Expense...............................................................................95

Table 36. Utility Cost.........................................................................................96

Table 37. Employee Schedule........................................................................101

Table 38. Financial Assumptions...................................................................104

Table 39. Projected Statement of Financial Position...................................105

Table 40. Projected Income Statement..........................................................106

Table 41. Projected Statement of Changes in Owner's Equity....................107

Table 42. Projected Statement of Cash Flows..............................................108

Table 43. Note 1- Cash....................................................................................110

Table 44. Note 2- Supplies..............................................................................110

Table 45. Note 3- Prepaid Rent.......................................................................110


11
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Table 46. Note 4-Furnitures and Fixtures, net..............................................110

Table 47. Note 5- Equipment, net...................................................................111

Table 48. Note 6-Leasehold Improvement, net.............................................112

Table 49. Note 7-Employee Benefits Payable...............................................112

Table 50. Notes 8- Utilities Payable...............................................................112

Table 51. Note 9- Net Revenues.....................................................................113

Table 52. Note 10- Costs of Sales..................................................................113

Table 53. Note 11- Operating Expenses........................................................114

Table 54. Note 12- Income Tax Expense.......................................................114

Table 55. Schedule 1- Annual Projected Customers and Unit....................115

Table 56. Schedule 2- Direct Material Cost..................................................116

Table 57. Schedule 3- Direct Labor................................................................116

Table 58. Schedule 4- Overhead....................................................................117

Table 59. Schedule 5- Other Supplies...........................................................118

Table 60. Schedule 6- Taxes and Licenses...................................................118

Table 61. Schedule 7- Advertising Expense.................................................119

Table 62. Schedule 8- Depreciation Expense- Non-Operating Equipment.119

Table 63. Schedule 9- Depreciation Expense- Furniture and Fixture.........119

Table 64. Schedule 10- Salary Expense – Manager......................................119

Table 65. Schedule 11- Employee Benefits Expense- Manager..................119

Table 66. Schedule 12- Pre-Operating Expenses.........................................120

Table 67. Depreciation Expense- Leasehold improvement.........................120

Table 68. Current Ratio...................................................................................122


12
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Table 69. Quick Ratio......................................................................................122

Table 70. Debt to Equity Ratio........................................................................122

Table 71. Debt Ratio........................................................................................122

Table 72. Net Profit Margin.............................................................................122

13
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

EXECUTIVE SUMMARY

PROPOSED NAME OF THE BUSINESS

Cozy Connections is the name of the business. The chosen business name

– Cozy Connections, enables it to immediately attract the attention of customers

who seek a quiet spot that gives out a peaceful ambiance — as the name of the

entity suggests, where they can fully concentrate on doing their academic loads

or work.

DESCRIPTION OF THE INDUSTRY

It provides a study or working area, such as a separate or solo desk, a

shared desk, and a private conference room. The study hub will be built on a

plan that can be comfortable for the customers for their convenience and a

conducive place they can utilize for studying, working, and accomplishing tasks

to be due.

LOCATION OF THE PROJECT

The Cozy Connections will be in Brgy. Zone-4, Pasong Tala, City of

Dasmarinas, Cavite, where it is accessible to the students and non-

professionals/professionals. The location will provide an advantage for the

business since it is close to many schools and establishments and is therefore

accessible to students and non-professionals/professionals who are seeking a

place to study and work. In addition, the location is also along the highway, which
14
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

makes it more accessible and visible to the market because potential customers

can spot it easily.

MANAGEMENT ASPECT

The management aspect of this study will analyze the effectiveness of the

organizational setup as well as the qualifications of the individuals who will be a

part of the organization's management team. Cozy Connections’ Study Hub has

built a management structure that flows from its partners down to its employees.

When it comes to the form of business organization, Cozy Connections will be

organized as a general partnership where all the parties voluntarily agree to

commit to preserve and regulate the proper management of the business, which

will be applied and recognized.

MARKETING ASPECT

The marketing part of this study intended to identify the factors to be

considered in establishing the business and assess the financial basis through

the projection of demand. Moreover, Cozy Connections has determined its

internal strengths and weaknesses, as well as analyzing possible opportunities

and threats in the external environment of a business. The result will enable the

proposed business to not only assess how well it is performing currently but also

to plan for and mitigate future risks. In addition, Cozy Connection utilized modern

technology, which is social media, as well as benefit factors like loyalty cards, as

a way to promote and market its business and for the customers to patronize it.

15
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

The proponents of the business also used a traditional marketing tactic, which is

through flyers directly to people as a means of making potential customers aware

of the offered services.

TECHNICAL ASPECT

The technicality of the study discusses the furniture and fixtures, the

machines and equipment utilized in the operational process, as well as other

components of the process of operations like printing. The operational and

service processes of Cozy Connections' Study Hub were also determined to

ascertain the flow of services that will be provided to the students. The costs for

machinery, furniture, fixtures, equipment, and supplies are examined to serve

their function and provide flow to the order of operations.

FINANCIAL ASPECT

The Cozy Connections Study Hub demonstrates consistent growth in net

revenues from 2024 to 2028 while showing an increase in operating expenses

and income taxes but a positive trend in net income.

The rising trend in Net Profit Margin reflects effective management of

expenses and operations, resulting in a higher percentage of net income relative

to net sales, highlighting the company's profitability and operational efficiency.

16
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

The upward trend in Gross Profit Margin indicates effective control over

operating costs, resulting in a higher percentage of gross profit relative to net

sales, signaling operational efficiency and strong financial performance.

17
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

INTRODUCTION

BACKGROUND OF THE STUDY

Study hubs have been more popular over the past several years, and they

are frequently related to freelancers and other self-employed individuals.

However, several studies show that multiple users can be identified, including

students, self-employed workers, small businesses, large businesses, extended

workers, and organizations of all sizes (Steward, 2022).

Study hub or co-working spaces are no longer just for freelance workers,

remote employees, and start-ups. Student populations are becoming more

accessible in coworking spaces. Students who work from coworking spaces are

increasingly seeking to balance employment and study. Without needing to build

an entire facility to manage their business operations, these places allow them to

work alone and together (Perree et al., 2019).

Since most schools are now having hybrid classes, students can also find

coworking spaces conducive to studies. College students can benefit from the

flexibility and study-life balance that coworking spaces can provide. They can

take advantage of these coworking spaces for their studying sessions, project

huddles, and even space to brainstorm for their thesis. Study hubs offer a much

more comfortable, relaxed, and convenient environment where students can

focus on the tasks that they need to do. The pandemic has shown that young
18
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

people can study and work remotely with no harm to their progress. However,

their productivity can be affected by the space around them. By creating a study

hub, students surround themselves not only with conveniences but also with like-

minded people who can help them in the future in a very high-quality way in life,

study, and work (Deep, 2023).

Furthermore, finding a quiet, tranquil spot to read can be difficult for many

students, which can make it challenging for them to concentrate on finishing their

academic work and meet their deadlines. With that, the proponents came up with

the idea to establish a place where students can relax while studying. Cozy

Connections is a study hub for learning and a destination for book lovers and

students alike. It provides a setting for pre-arranged meetings and conversations

with peers to collaborate on projects and group tasks and a private space for

those who want to be alone.

Cozy Connections Study Hub not only typically provides services to

students who are naturally passionate about their educational career; these

people frequently spend their time either alone or with their friends in a secure

and relaxing environment. Given that the main target market of the business is

students. This is appropriate for students, professional and non-professional

workers, and graduate students who need a peaceful space to concentrate and

focus.

19
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

STATEMENT OF THE PROBLEM

To ensure the success of this feasibility study, the researchers attempt to

look for answers to the following questions related to the different aspects of the

business operations.

Management Aspect

1. The classification or form of the organization.

2. The requirements to establish the business.

3. The essential management objectives of the business.

4. The duties and responsibilities of the business are distributed among the

employees.

5. The feasibility timetable of the pre-operating activities.

Marketing Aspect

1. The target market of the business.

2. The current demand, supply, and demand-supply gaps of the business.

3. The uniqueness and competitive edge of the business among its

competitors.

4. The type of services the business offers.

5. The effective marketing and pricing strategies to implement to obtain a

portion of the overall market share.

Technical Aspect

20
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1. The operational flow of the business.

2. The accessibility of the location to the customers.

3. The equipment needed for the operation of the business.

4. The supplier of the business to get the materials it needs for its operation.

5. The proper disposal of the waste that the business will produce.

Financial Aspect

1. The required initial capital needed to establish a study hub and the source

of financing of the business.

2. The allocation of funds to the acquisition of equipment, daily operations,

and the expenses that would occur in the business.

3. The needed working capital for the operating activities of the business.

4. The period for the business to recover its initial investment.

5. The projected performance of the operation in terms of its financial

statements.

Socio-economic Aspect

1. The social responsibilities of the business in the surrounding community

and environment where it operates.

21
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

2. The fulfillment of the business to its social responsibility in line with its

establishment.

3. The benefits that the business will provide to the customers.

4. The effects of the business on the community.

5. The compliance of the business with the rules and regulations of the

community.

OBJECTIVES OF THE STUDY

The feasibility study aims to set goals to follow for the benefit of the

business, specifically:

Management Aspect

1. To determine the type of organization that is appropriate for the business.

2. To comply with the legal requirements in establishing a business.

3. To develop effective practices in utilizing the company's resources to

achieve the overall objectives of the business.

4. To determine the duties and responsibilities of the employees, motivate

them, and provide an environment where they can develop professionally

and personally.

5. To finish pre-operating activities accurately and effectively.

Marketing Aspect

22
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1. To identify the target market of the business.

2. To determine if there is sufficient demand and a present demand-supply

gap in the market.

3. To establish and provide excellent services and good quality products

distinctive from the competitors and exploit the advantage of its

competitive edge and opportunities.

4. To identify its product and service offerings to be offered by the business.

5. To deliberately choose and implement the appropriate marketing and

pricing strategies.

Technical Aspect

1. To know the operational flow and other procedures that will make up the

operation of the business.

2. To find a suitable location for the business and consider different factors

that will affect the overall setting of its business and design an optimized

floor plan that conforms to said factors.

3. To outsource where to buy the necessary materials to be used.

4. To determine the type, amount, and cost of the equipment for the

business.

5. To provide proper disposal of waste for the everyday operation of the

business.

Financial Aspect
23
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1. To identify the required initial capital and the sources of financing for the

business.

2. To have an appropriate amount of funds to allocate and apply to the

acquisition of equipment, daily operations, and expenses of the business.

3. To identify the amount of working capital needed for the operating

activities of the business.

4. To determine the period for the business to recover its initial investment

and determine the return on investment of its capital.

5. Prepare and present the projected performance and growth of the

business through financial statements throughout its entire operation and

evaluate it to facilitate decision-making on its future operations.

Socio-economic Aspect

1. To continuously adhere to the social responsibilities of the community in

which it operates.

2. To regularly check if the business is accomplishing the social

responsibilities of the community.

3. To ensure that the customers will yield benefits from the business

establishment.

4. To know the significant effects of the business in the community.

24
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

5. To ensure that the business obeys the rules and regulations in completing

the requirements and following the safety operation.

SCOPE AND DELIMITATION

The feasibility study will determine whether the proposed business "Cozy

Connections," a study hub suitable for studying and office work, could be

established. The proposed business will be along Brgy. Zone 4, Pasong Tala,

Dasmarinas, Cavite. Its target market will be the students from the schools and

non-professionals/professionals from the establishments near to the business

location.

The proponents will choose random students and professionals as

respondents at any year level and program in the nearby schools and

establishments of the proposed business, such as De La Salle University from

Dasmariñas Brgy. San Francisco II, Emilio Aguinaldo College, Cavite Campus

from Burol Main, and Lastly the Two Schools which having the same location

area which is National College of Science and Technology from Bgy. Zone I – B

and AISAT College – Dasmariñas from Bgy. Zone I - B. The conducted survey on

the chosen students and non-professionals/prossionals will determine their level

of interest in the proposed business.

25
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

SIGNIFICANCE OF THE STUDY

The findings accumulated by this study are seen with significance and

beneficial to the following:

1. Students: The study is beneficial to students because it will provide them

with a convenient place to relax and study, collaborate with their peers on

projects and group tasks, and have a private space for those who want to

enjoy being alone.

2. Educational Institutions: This research can help schools and universities

by addressing the possible importance of study hubs in their resource

allocation strategies. The study can guide the allocation of educational

resources to support these hubs.

3. Policy Makers: The study can offer recommendations for policymakers

and stakeholders in the education sector to support and regulate the study

hub industry.

4. Business: Understanding the factors that contribute to the success of

study hub businesses can provide entrepreneurs and investors interested

in this industry with significant insights. It can assist them in identifying

market demand, the best location, pricing strategies, and customer

preferences.

5. Community: The study can benefit the local community by providing a

safe and productive environment for students to learn, collaborate, and

26
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

interact with peers. The study will also look into how this affects the

community's well-being and sense of belonging.

6. Economy: The study will also be beneficial to the economy in terms of job

creation and local company development, which could be useful to local

governments and developers.

7. Future Researchers: The study serves as a reference that coordinates

their subject-related study as a master plan or advanced instructional

when it comes to studying related business industry and school materials.

RESEARCH AND METHODOLOGY

Research Design

The study will utilize a descriptive research design by using survey

questionnaires. A descriptive research design is a scientific method for

calculating frequencies, averages, and other statistical data. The proponents will

collect data from its respondents by providing structured questionnaires and

distributing them randomly to students from the schools along Brgy. Zone 4,

Pasong Tala, Dasmarinas, Cavite. The collected data will be compiled and

reviewed for proper presentation, analysis, and interpretation.

Sources and Methods of data collection

1. Primary

27
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Data Gathering Procedures

 Survey Questionnaires

The researchers utilized survey questionnaires to gather

data about the study hub preferences of students and young

professionals. The results from the survey will determine how

frequently the customers are willing to avail of service from the

Cozy Connections, their preferred time to study, and the factors

they consider when visiting a study hub.

Sampling Technique

The proponents will use Probability sampling, particularly stratified

random sampling, to gather information from the target market. A

sampling technique known as stratified random sampling grouped the

population into subgroup and enables the randomization of sample

selection in each subgroup that allows each respondent to have the same

chance of being chosen to represent the entire population.

Slovins Formula

The required number of respondents was determined using Slovin’s

Formula.

Formula:

28
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

N
n= 2
(1+ Ne )

Where: N = the number of people who qualify in the study.

E = margin of error which is 5%

n = number of needed respondents

Solution:

44,086
n=
¿¿

n= 396

NUMBER OF DISTRIBUTION
SCHOOLS POPULATION PERCENTAGE OF SAMPLE
National College of Science
and Technology 7,813 18% 71
Emilio Aguinaldo College 8,015 18% 71
De La Salle University 20,258 46% 183
AISAT College 8,000 18% 71
TOTAL 44,086 100% 396
Table 1. Number of Population

2. Secondary

Books, Internet, and other Feasibility Study

The researchers used the information from different books and the

internet as sources of their research to gather information about the

29
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

business. They also used other Feasibility Studies from other schools to

serve as a guiding tool and references for the related studies.

DEFINITION OF TERMS

Cozy: A welcoming and casual environment where individuals may relax and

study at the same time.

Conducive: The physical condition of the study hub, which is a favorable

surrounding suited for learning and will encourage productivity of the customers.

Co-working Space: A shared workspace where different individuals who does

not have anywhere to go to study or is looking for a place to have a meeting for

their important projects can rent for a space of their choice where they can

accomplish their tasks.

30
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Tranquil: A peaceful and free from disturbance environment in the study hub

that will allow the customers to focus on doing their tasks.

CHAPTER 1: MANAGEMENT ASPECT

ABOUT THE COMPANY

Cozy Connections is a study hub that primarily offer a safe and quiet

space with an access to internet connection and electrical outlets for customers

to utilize when doing their tasks. The business have a separate rooms for each

activity, including a space for board games that the customers can use if they are

having their breaks either from studying or from working, a study area with

partitions that the customers can choose from if ever they want a secluded area

where they can focus on working with their tasks alone, and a separate meeting

31
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

or conference area that is great for small to medium groups for pre-arranged

meetings and conversations with peers to collaborate and discuss important

matters on projects and group tasks without disturbing others. Additionally, the

business will also offer printing services for customers who will need to print a

file.

1.1 BUSINESS LOGO

Figure 1. Business Logo

32
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

The proponents came up with Cozy Connections as the name of the

business. The main aim of Cozy Connections is to provide a comfortable and

quiet place for students and professionals seeking a peaceful area with fast

internet, and a conducive environment for meetings and studies. The chosen

logo shows its business name – Cozy Connections, which enables it to easily

attract the attention of customers who seek a quiet spot that gives out a peaceful

ambiance — as the name of the entity suggests, where they can fully

concentrate on doing their academic loads or works.

1 .2 MISSION

The Cozy Connections is a co-working and study hub that will provide a

supportive and encouraging place that values the learning growth of students

and professionals through a flexible setting that will enhance the productivity of

our customers.

1.3 VISION

We aim to be one of the leading study hubs in the Philippines and help

everyone find a place to relax and study at the same time and to give our

customers a stress-free environment while learning.

33
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1.4 FORM OF BUSINESS ORGANIZATION

In establishing Cozy Connections, the proponents decided to have a

general partnership as a type of business organization wherein each of the

proponents will contribute capital for the business formation. The proponents

regarded partnership as the most feasible and suitable type of business

organization to adopt, considering its advantages and disadvantages.

In terms of contribution to the organization, the partners agreed to share an

equal amount of money for the initial capital of the business. Thus, the net profit

or loss, along with the liability that will be incurred in the operation of Cozy

Connections, will also be divided equally among all partners. Moreover, they also

agreed to contribute expertise in managing the business operations to ensure

that the business will provide a quality of service.

1.5 ARTICLES OF PARTNERSHIP

Articles of Partnership of Cozy Connections

KNOW ALL MEN BY THESE PRESENTS:

That we, the undersigned partners, all of legal age, residents and

citizens of the Philippines, have on this day voluntarily associated ourselves

together for the purpose of forming a general partnership under the following

34
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

terms and conditions and subject to existing and applicable laws of the Republic

of the Philippines:

AND WE HEREBY CERTIFY:

ARTICLE I. Partnership Name: That the name of this partnership shall be

"Cozy Connections" and shall transact business under the said company name.

ARTICLE II. Business Purpose: That the purpose(s) for which this

partnership is formed is to provide value to customers through products and/or

services in exchange for cash or equivalents. The money received should, at the

very least, cover the costs of operating the business.

ARTICLE III. Principal Place of Business: This partnership's principal

place of business will be at Established at the Building of Pasong Tala,

Dasmariñas City, Cavite.

ARTICLE IV. Term of Existence: This partnership shall have a term of

perpetual after the original recording of its Articles of Partnership by the

Securities and Exchange Commission.

ARTICLE V. Partners Circumstances: That the names, nationalities, and

complete residence addresses of the partners are as follows:

NAME NATIONALITY COMPLETE


RESIDENCE ADDRESS
Tagle Compound,
35
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Bustamante, Wilfredo Jr. Filipino Pasong Buaya 2, Imus


Cavite.
Blk. F-11, Lot 5, San
Salde, Alma Rose. Filipino Lorenzo Ruiz 1,
Dasmarinas, Cavite
Nacional, Hannah. Filipino Garden Grove Vill.,
Salitran 4, Dasmarinas,
Cavite
Blk 14, L37, Reed Street,
Lorenzo, Neil Frank. Filipino Ph2 Castillon Homes,
Pasong kawayan 2,
General Trias, Cavite.
165 T-Molina Street,
Etil, Wenerisah Filipino Purok 5, Alabang,
Muntinlupa City, Metro
Manila, 1770

ARTICLE VI. Capital Contributions: That the capital of this Partnership

shall be One Million Three Hundred Thousand Pesos (₱1,300,000), Philippine

pesos, contributed in cash by the partners, as follows:

NAME AMOUNT CONTRIBUTED


Bustamante, Wilfredo, Jr. ₱ 260.000.00
Salde, Alma Rose. ₱ 260.000.00
Nacional, Hannah. ₱ 260.000.00
Lorenzo, Neil Frank. ₱ 260.000.00
Etil, Wenerisah ₱ 260.000.00
TOTAL ₱ 1,300,000.00

That no transfer of interest shall be allowed or permitted to be recorded in

the proper books of the partnership if it reduces the ownership of Filipino citizens

to less than the required percentage of capital as provided by existing laws.

36
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

ARTICLE VII. Sharing Ratios: The partnership's profits and losses will be

divided and distributed proportionately based on the profit ratio of each partner.

DISTRIBUTIONS SHARING RATIO


Bustamante, Wilfredo Jr. 20%
Salde, Alma Rose. 20%
Nacional, Hannah. 20%
Lorenzo, Neil Frank. 20%
Etil, Wenerisah 20%

Total 100%

ARTICLE VIII. Undertaking to Change Name: That the partners

undertake to change the name of this partnership, as herein provided, or as

amended thereafter, immediately upon receipt of notice or directive from the

Securities and Exchange Commission that another corporation, partnership, or

person has acquired a prior right to the use of that name or that the name has

been declared as misleading, deceptive, confusingly similar to a registered

name, or contrary to public morals, good customs or public policy.

ARTICLE IX. Management: That this partnership shall be under

Bustamante, Wilfredo, Jr. as Managing Partner, who shall be in charge of the

management of the affairs of the company. He has the power to use the

partnership name and in otherwise performing such acts as is necessary and

expedient in the management of the firm and to carry out its lawful purposes.

37
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

IN WITNESS WHEREOF, we have hereunto affixed our signature this

31st day of NOVEMBER 2023 at Pasong tala, Dasmariñas City, Cavite.

_________________________ _______________________

Bustamante, Wilfredo, Jr. Salde, Alma Rose.

_________________________ _______________________

Nacional, Hannah. Lorenzo, Neil Frank.

_________________________

Etil, Wenerisah

REPUBLIC OF THE PHILIPPINES )


PROVINCE OF CAVITE ) S.S
DASMARIÑAS CITY, CAVITE )

ACKNOWLEDGEMENT

BEFORE ME, a Notary Public for and in Dasmariñas City, Cavite, this

26th day of October 2021, personally appeared the following persons with their

Tax Identification Number as follows:

DATE & PLACE

NAMES TIN ID NO. ISSUED

Bustamante, Wilfredo, Jr. 368-606-913-000 21-MAY-2020

Salde, Alma Rose. 213-224-762-00000 27-JAN-2022

38
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Nacional, Hannah 543-321-514-00000 10-OCT-2022

Lorenzo, Neil Frank. 917-232-198-00000 13-SEP-2023

Etil, Wenerisah 617-942-753-00000 24-NOV-2022

WITNESS MY HAND AND SEAL, on the date and place above written.

NOTARY PUBLIC

Doc. No. ______;


Page No. ______;
Book No. ______;
Series of 2023

1.4 REGISTRATION OF THE BUSINESS

Agencies Permits and Licenses Amount


Securities and Exchange Name of Registration and
6,750.00
Commission Payment Form
Filing Fee
(Registration of Partnership) Notarized Articles of
Partnerships
A. Cover Sheet
SEC Building, Edsa Greenhills Joint Undertaking to Change
Mandaluyong City
Metro Manila Philippines Sub-total 6,750.00
(Registration of Business Name) Documentary stamps 15.00
Sub-total 515.00
C. Bureau of Internal Revenue (BIR) BIR fORM 1903 (2 copies),
30.00
0605
(Securing Tax Identification
Articles of Partnerships
Number)
(Application for Authority to Print Securities and Exchange
Receipts and Invoices) Commision Certificate
Revenue District Office Goverment Issued ID
Brgy. San Agustin, Trece Martirez
Two Documentay Stamps
City
Cavite, Philippines Sales, Purchases and General
Journal Books and General

39
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Ledger Book
Authority to Print
Sub-total 30.00
Municipal City Hall Study Hub 300.00
(Securing Locational Clearances / Mayor's Fee- Study Hub 4,500.00
Business Permits) Garbage Fee 1,000.00
Sanitary Fee 300.00
Health Cert. Permit Fee 50.00
Building Fee 150.00
Electrical Fee 250.00
Mechanical Fee 200.00
Signboard Fee 40.00
G. Plumbing Fee 60.00
Zoning Fee 625.00
Other Fee 10.00
Fire Inspection Fee 1,386.75
Fiscal Fee 750.00
Occupational Mayor's Fee 200.00
Electronic Insp Fee 100.00
Processing Fee 10.00
Barangay Clearance 500.00
Sub-total 10,431.75
GRAND TOTAL ₱17,181.75
Table 2. Licenses and Registration

1.5. INITIAL CAPITAL

The contribution from the partners will be the primary source of funds for

the business. Each partner will contribute a specific amount based on the

agreed-upon amount of initial capital, making up the partnership's total capital

contribution.

The initial capitalization of Cozy Connection is one million three hundred

thousand pesos (₱1,300,000), which will be provided by five (5) partners with an

initial capital contribution of two hundred sixty thousand pesos (₱ 260,000) each.

40
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Type of Partner
Name of the As to As to Capital Profit/Loss
Partner Liability Contribution Contribution Sharing
Bustamante, Capitalist and
Wilfredo, Jr. General Industrial 260,000 20%
Capitalist and
Etil, Wenerisah General Industrial 260,000 20%
Capitalist and
Lorenzo, Neil Frank General Industrial 260,000 20%
Capitalist and
Nacional, Hannah General Industrial 260,000 20%
Capitalist and
Salde, Alma Rose General Industrial 260,000 20%
TOTAL INITIAL CAPITAL 1,300,000 100%
Table 3. Licenses and Registration

INITIAL PROJECT COSTS:

These are the key areas where the initial capital will be spent:

COZY CONNECTIONS STUDY HUB


WORKING CAPITAL (2 MONTHS)
Direct Materials 2,367.33
Salaries 162,292.00
Employee Benefits 36,650.94
Utilities 19,660.00
Operating Supplies 17,326.00
Prepaid Rent 195,000.00
Rent Expense 130,000.00
Other Supplies 12,480.33
Taxes and Licenses 17,726.75
Advertising 1,233.33
Pre-operating Expenses 7,700.00
Working Capital 602,436.69

41
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

COZY CONNECTIONS STUDY HUB


INITIAL PROJECT COST
Working Capital 602,436.69
Leasehold Improvement 100,000.00
Acquisition of PPE 258,722.60
Acquisition of Furniture &
Fixtures 290,303.00
Total Initial Project Cost 1,251,462.29
Table 4. Initial Project Costs

1.6. ORGANIZATIONAL CHART

Cozy Connections will use a hierarchical organizational structure to

properly distinguish the level of authority and allow an efficient flow of

communication within the organization by determining the right person to whom

to report and raise concerns. A hierarchical structure ensures that decisions are

being made by an appropriate individual by clearly defining the roles and

responsibilities of each person in the organization, thus leading to more effective

implementation of strategies and faster decision-making (Ravulapally, 2023).

The figure below is the organizational structure of Cozy Connections,

which shows the positions and responsibilities of the employees.

42
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

ORGANIZATIONAL CHART

Managing Partner

Operational Manager

Staff Staff Cashier

Figure 2. Organizational Chart

The proponents created the organizational chart using the Top-Down

Approach. This approach disseminates under the highest level of authority to

lower levels of the hierarchy, who are, to varying degrees, bound by it. The

organizational chart above depicts two (2) levels of management: the chain of

command will begin with the managing partner, who will be assigned and agreed

upon by the partners. He is responsible for the overall performance of the

company and its operations.

43
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1.7 JOB DESCRIPTION, QUALIFICATIONS, AND RESPONSIBILITIES

Every employee of Cozy Connections Company has a distinct

position along with duties and responsibilities that are necessary for the

business to fulfill its daily operations and achieve its goals and objectives.

1.7.1 JOB DESCRIPTION AND RESPONSIBILITIES

The personnel duties and responsibilities refer to the job description

of each employee in the organization. The purpose of it is to have a clear

distinction of duties and responsibilities between the employees. It makes

the flow of the business smooth and manageable.

 MANAGING PARTNER

 Implement policies and employees' morale.

 Establishing strategic goals involves obtaining relevant business,

financial, service, and operational data, spotting and analyzing

customer choices, deciding on a plan of action, defining goals, and

assessing results.

 Organize and maintain employee records.

 Schedule meetings and appointments.

 OPERATIONS MANAGER
44
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

 Oversee day-to-day operations.

 Ensure employees work productively and develop professionally.

 Oversee recruitment and training of new employees.

 Hiring employees.

 Maintain budgets and optimize expenses.

 CASHIER

 Receiving payments and issuing receipts.

 Keeping track of all cash and credit transactions.

 Pay invoices and prepare payroll.

 HELPERS/PART TIMERS

 Welcomes the customers and introduces them to the services offered

by the business.

 Attentive to customer needs and committed to providing excellent

service.

 Elevate complaints to management.

1.7.2. JOB QUALIFICATION

Putting the correct person in the position will be a high priority in job

specifications. Each employee would play an essential role in the business,

starting from the top position to the bottom. This section discusses the

45
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

qualifications or requirements of each employee to do the particular job. The

qualifications for the different job positions are as follows:

 MANAGING PARTNER

 Graduate of related business courses (HRM, Marketing, Operation,

Entrepreneurial, Industrial, and Financial).

 1 to 2 years of job experience.

 Experience in planning and budgeting.

 Knowledge of business processes and functions (finance, HR,

procurement, operations, etc.)

 Strong analytical ability.

 Excellent communication skills.

 Outstanding organizational and leadership skills.

 OPERATIONAL MANAGER

 Graduate of related business courses (HRM, Marketing, Operation,

Entrepreneurial, Industrial, and Financial).

 1 to 2 years of job experience.

 Must be computer literate and know how to use Microsoft software,

such as Excel, MS Word, etc.

 Must have excellent analytical, organizational, oral, and written

communication skills.

 CASHIER

46
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

 High School Graduate or Undergraduate in program.

 At least 20 years old and above.

 Must have a good command of basic Math so he can deal with and

handle money effectively.

 Honest and reliable with good communication skills.

 Must be good at utilizing printing machines, software editing, and

handling printing-related processes.

 Should have a strong work ethic and a high level of accuracy.

 STAFF

 High School Graduate or Undergraduate in program.

 18 years old and above

 Detail-oriented

 Flexibility to work around customer demand.

 Ability to work with team members to solve problems.

 Effective communication and customer service skills

 Readily adjusts schedule, tasks, and priorities when necessary to meet

business needs.

1.8 EMPLOYMENT PROCESS

Cozy Connections emphasizes the hiring process to provide high-quality

service. Finding competent individuals who will be a valuable resource and

help the business achieve its goals is a crucial part of the hiring process.

47
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1. Personnel Appropriations

Finding out how much staffing the organization needs is the first

step. It is important to consider the employees' shift schedules and the

number of working hours. Understaffing and overstaffing might result in

unwanted additional costs.

2. Job Placement and Employment Advertising

Print media and social media will be utilized for public distribution

and advertising of the job vacancy along with its detailed and specific

job requirements and descriptions.

3. Submission of Resume, Application Form and Other Requirement

As part of the application process, applicants must submit a CV and

a well-written application form that clearly states their objectives.

4. Conduct interview

A one-on-one interview will be required for applicants, during which

they will answer questions about the position they are applying for. If

an applicant meets the criteria stated by management, the manager

will reevaluate them after the interview.

5. Job Offers

When the evaluation is complete and the results are good, the

manager will let the applicants know to confirm the position being

48
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

offered. The candidate must obtain a letter of authorization from an

entity authorizing them to undergo a physical examination.

6. Physical Examination

Before employees begin working, the organization needs to make

sure the accepted applicants are in good physical and mental health

since the job will mainly involve dealing with people. Consequently,

they must undergo a few medical evaluations, including x-rays,

urinalysis, and stool tests, and submit their results to the management.

7. Final Approval and Orientation

The manager will notify the applicants of their approval and

employment offer with the company once they have passed all the

examinations. Applicants must appear before the manager for contract

signing and job orientation.

1.9 EMPLOYEE SCHEDULE

The Cozy Connection is only open Monday to Saturday, from 7:00 a.m. to

10:00 p.m. Additionally, there will be a shift in the schedules of the

employees, and a one-hour break is also given to employees for them to eat

their lunch or dinner. The opening shift will be from 7:00 a.m. to 3:00 p.m.,

and the closing shift will be from 3:00 p.m. until 10:00 p.m.

WORKING DAYS TIME


49
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

LUNCH/DINNER COFFEE
START END BREAK BREAK
Monday to
Saturday 7:00 AM 10:00 PM 1 HOUR 15 MINUTES
Full Time 7:00 AM 5:00 PM 1 HOUR 15 MINUTES
Part Time 5:00 PM 10:00 PM 1 HOUR 15 MINUTES
Table 5. Employee Schedule

1.10 SALARY RATE

All employees shall receive their respective salaries or wages as provided in

their Contracts of employment every 15th and last day of the month.

The business’ profit will be compensated first to the salaries of the employees

and then divided among the partners accordingly to their contribution.

Employee Monthly Compensation

Managerial ₱21,996.00
Operational Manager 24,310.00
Cashier 16,120.00
Part Time 1 9,360.00
Part Time 2 9,360.00
Table 6. Employees’ Compensation

Employees may be required to work beyond their shift or even on rest days

whenever needed. All overtime work should have prior written approval from the

Manager. However, every effort should made to avoid unnecessary overtime

work and to keep workloads within regular schedules. To be reimbursed, all

employees must file their overtime slips within the pay period. There will be no

overtime pay if there is no overtime slip.

50
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1.11 BUSINESS POLICIES

Business policies are the rules and guidelines that must followed when

making decisions and directing its activities. It also deals with the acquisition

of resources necessary to accomplish organizational objectives (Juneja,

2015). Therefore, Cozy Connections created the following policies for having

a better company and workplace:

EMPLOYEE CONDUCT POLICY

1. Cozy Connections will operate from Monday to Saturday

2. Cozy Connections’ operations will start from 8:00 AM to 10:00 PM

3. The employees are always required to wear the official uniform of

Cozy Connections.

4. Always wear ID during working hours.

5. Be professional.

6. Apply integrity at all times.

7. Prohibited use of gadgets during working hours

8. Follow the set of working schedules.

9. Notify the assigned manager for late absences.

10. The employees should be knowledgeable about the workplace health,

safety, and security guidelines.

11. The employee/s and manager/s should not be involved in sexual

harassment.

12. The employee/s and manager/s should promote anti-discrimination.


51
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

1.12. PRE-OPERATING ACTIVITIES

This part will provide you with a comprehensive overview of the Cozy

Connections pre-operating activities.

1.12.1. GANTT CHART

The Project Timetable depicts the estimated time required to set up Cozy

Connections, from the project feasibility until the commencement of business

operations. For this matter, the proponents will utilize the Gantt Chart to illustrate

the activities. A Gantt chart is a project management tool that shows the

relationship between work to be performed over time and the time scheduled for

the task (MEARDON, 2023). The proponents indicate they are to invest

resources in the following activities:

MONTHS & YEAR Sept.2023 Oct.2023 Nov.2023 Dec. 2023 Jan.2024

ACTIVITIES 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Planning
Canvasing of Tools,
Equipment, and
52
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Company’s Building
Facility.

Sources of Financing

License and Registration

Hiring and Training of


Employees, and
Advertising and
promotion.
Start of Business
Operation
Table 7. Gantt Chart

CHAPTER II: MARKETING ASPECTS

2.5 MARKET ENVIRONMENT

The Cozy Connections intends to be a co-working and study hub that

provides a supportive and encouraging place that values the learning growth of

students and non-professionals/professionals through a setting that is flexible to

53
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

enhance the productivity of our customers. The business will ideally be located at

Brgy. Zone 4, Pasong Tala, City of Dasmarinas Cavite. The location will provide

an advantage for the business since it is close to many schools and is therefore

accessible to students who are seeking a place to study. In addition, the location

is also near some establishments and malls and accessible and visible to the

market since it is along the highway, wherein potential customers can spot it

easily.

2.6 PROSPECTIVE MARKET

The target market of Cozy Connections is students and non-

professionals/professionals who are ages 15 to 50 years old. The proponents

specifically target the students within the vicinity of the business who prefer to

study outside their homes.

2.3 COMPETITORS ANALYSIS

By conducting a comprehensive market competition analysis, Cozy

Connections can gain valuable insights into the strengths and weaknesses of its

competitors. This analysis will help inform strategic decision-making, identify

opportunities for differentiation, and position Cozy Connections effectively in the

study market segment within the construction industry.

54
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Name of Location Strengths Weakness


Business
Starbucks Congressional -Established brand Limited flexibility in
Antlers Square Ave., name. pricing.
Dasmarinas Dasmarinas, -Good advertising
Cavite strategy.
So It Goes Zone 4 Bldg, J.B. Good -Limited space for
Coffee & Dominador ambiance/atmospher the customers.
Vintage Mangubat Blvd, e and for people who -Need to avail the
Dasmarinas loves milk tea. offered foods to
stay long.
The Busy Bean The One Dasma The Store has The cost of food
Co-Working Place, enough of space to and drinks is not
Cafe Congressional accommodate plenty affordable.
Road, Brgy. of students.
Burol,
Dasmarinas
Table 8. Competitors Analysis

2.4 DATA ANALYSIS

BARANGAY YEAR
2015 2016 2017 2018 2019 2020
San 3,363.00 3,392.00 3,418.00 3,444.00 3,469.00 3,495.00
Francisco II
Burol Main 8,260.00 8,990.00 9,719.00 10,447.00 11,176.00 11,902.00
Zone I - B 5,595.00 5,729.00 5,862.00 5,996.00 6,130.00 6,263.00
Table 9. Historical Data

The researchers determined each location area of target market which are

De La Salle University from Dasmariñas Brgy. San Francisco II, Emilio Aguinaldo

College, Cavite Campus from Burol Main, and Lastly the Two Schools which
55
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

having the same location area which is National College of Science and

Technology from Bgy. Zone I – B and AISAT College – Dasmariñas from Bgy.

Zone I - B. The researchers gathered the data shown above from the Philippine

Statistics Authority (PSA) and the World Population Review website. The most

recent demographic data released was in 2015 to 2020, and it showed that the

average growth rate over the last five (5) years has been 0.81% for the San

Francisco II, 7.99% for Burol Main, and lastly 2.35% for the Zone I – B. These

are the proponents used as the base percentage to calculate the net population

of the target market for the following years as of 2023 to 2027.

2.5 PROJECT TARGET MARKET

Brgy.San Francisco II
Period Total Population Percentage of 15 Target Market
- 64 years old
2023 3,573.00 65.06% 2324.59
2024 3,599.00 65.06% 2341.51
2025 3,625.00 65.06% 2358.43
2026 3,651.00 65.06% 2375.34
2027 3,677.00 65.06% 2392.26
Table 10. Projected Target Market- Brgy.San Francisco II

Burol Main
Period Total Population Percentage of 15 Target Market
- 64 years old
2023 14,080.00 71.73% 10099.58
2024 14,806.00 71.73% 10620.34
2025 15,532.00 71.73% 11141.10

56
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

2026 16,258.00 71.73% 11661.86


2027 16,984.00 71.73% 12182.62
Table 11. Projected Target Market- Burol Main

Brgy. Zone I – B
Period Total Population Percentage of 15 Target Market
- 64 years old
2023 6,662.00 67.41% 4,490.85
2024 6,795.00 67.41% 4,580.51
2025 6,928.00 67.41% 4,670.16
2026 7,061.00 67.41% 4,759.82
2027 7,194.00 67.41% 4,849.48
Table 12. Projected Target Market- Zone I-B

Total Target Market


Period Total Population of 3 Area
2023 16,915
2024 1,7542
2025 18,170
2026 18,797
2027 19,424
Table 13. Total Projected Target Market

The table above shows how the researcher calculated the projected target

market. To obtain data for the projected target market for the next five (5) years,

the proponents calculated the projected total population for the next five years by

adding the previous year's population to the product of the recent total population

multiplied by the annual growth rate. Upon getting the projected total population,

it is then multiplied by the percentage of 15-50year old, economically active

population and actual or potential members of the work force, constitute a total of

per Brgy of our target market which are De La Salle University from Dasmariñas

Brgy. San Francisco II with a total of 65.06% of the total population ages 15-64

57
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

years old, Emilio Aguinaldo College, Cavite Campus from Burol Main with a total

of 71.73% of the total population ages 15-50 years old, and Lastly the Two

Schools which having the same location of Barangay which is National College of

Science and Technology from Bgy. Zone I – B and AISAT College – Dasmariñas

from Bgy. Zone I - B with a total of 67.41% of the total population ages 15-50

years old.

2.6 DEMAND ANALYSIS

Total Customer Possible Frequency Projected


Period Target willing to Customer of going Annual
Market avail Demand
service

2023 16,915.00 90.40% 15,291.00 43.7% 6,682.17


2024 17,542.00 90.40% 15,858.00 43.7% 6,929.95
2025 18,170.00 90.40% 16,425.00 43.7% 7,177.73
2026 18,797.00 90.40% 16,993.00 43.7% 7,425.94
2027 19,424.00 90.40% 17,560.00 43.7% 7,673.72
Table 14. Projected Annual Demand

The table above illustrates the calculation of projected annual demand. To

obtain data for the projected annual demand for the next five years, the

researchers take the acceptability rate of (90.40%) from the number of

respondents who are willing to avail the service of a start-up Cozy Connection

and multiply it by the projected target market to get the number of their possible

customers. Then multiplied by the survey result of the percentage where

customers availed service in Trice a Week, which is equivalent to (43.7% within a

period.

58
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

2.7 SUPPLY ANALYSIS

Total Customer Direct Frequency Projected


YEAR Target already Competitor’s of going Annual
Market been to Capacity Supply
study hub
2023 16,915.00 58.2% 9,844.53 43.7% 4,302.06
2024 17,542.00 58.2% 10,209.44 43.7% 4,461.53
2025 18,170.00 58.2% 10,574.94 43.7% 4,621.25
2026 18,797.00 58.2% 10,939.85 43.7% 4,780.72
2027 19,424.00 58.2% 11,304.77 43.7% 4,940.18
Table 15. Projected Annual Supply

The table above shows how the proponent calculated the projected annual

supply. To obtain data for the projected annual supply for the next five years,

they calculated first the based capacity of their direct competitors by multiplying

the total target market by the percentage of customers already been to the study

hub (58.2%) to get director capacity multiplied by the total target market then

multiply it by the frequency of going (43.7%), which is the total customer availed

service in Trice a Week.

2.8 MARKETABILITY RATES

Projected
Projected Marketability
YEAR Annual Market Gap
Annual Supply Rates
Demand
2023 6,682.17 4,302.06 2,380.11 36%
2024 6,929.95 4,461.53 2,468.42 36%
2025 7,177.73 4,621.25 2,556.48 36%
2026 7,425.94 4,780.72 2,645.22 36%
2027 7,673.72 4,940.18 2,733.54 36%
Table 16. Projected Marketable Rates

59
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Cozy Connection's Marketable rates are represented in the table above.

For the next five (5) years, both projected demand and projected supply are

gradually increasing; however, projected demand exceeds projected supply. The

market gap or the market availability rate was calculated by subtracting demand

from supply.

2.9 SWOT ANALYSIS

The table below shows the SWOT Analysis in competitive analysis of

Cozy Connections to identify its strengths, opportunities, weaknesses, and

threats within the vicinity of the prospect area.

Strength Weakness
 Affordable Price.  New Entrant in the industry.
 Convenient locations for  A limited marketing budget to
students. develop brand awareness.
 The atmosphere and
ambiance of the place are
cozy, as the name of the
business suggests.
 Close to schools and
establishments.
 Accessible to public
transportation.
Opportunities Threats
 Ability to attract customers  Competitors who established a
60
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

 Expansion name in the industry.


 Ability to hire employees from  Study hub moving 24/7.
schools near the business
establishment.
 Close to business centers, that
is a good opportunity to be
exposed to the market.
Table 17. SWOT Analysis

2.10 MARKETING MIX

The firm must identify and assess the various types of marketing

programs used in the industry. Create a marketing plan that specifies the target

market, the price, the service to be provided, and the advertising and promotion

strategy. The important components of the marketing program may best be

summarized by the four components of this marketing mix which service, price,

place, and promotions. These four elements are adjusted until the right

combination is found that serves the satisfaction of the customers to the products

provided by the business.

1. SERVICE

The Cozy Connections will focus on providing a comfortable,

relaxed, and convenient place where students can focus on the tasks they

61
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

need to do. It will have a separate room for each activity, including a

space for board games that the customers can use if they are having their

breaks either from studying or from working, a study area with partitions

that the customers can choose from if ever they want a secluded space

where they can focus on working with their tasks alone, and a separate

meeting or conference area that is great for small to medium groups for

pre-arranged meetings and conversations with peers to collaborate and

discuss important matters on projects and group tasks without disturbing

others.

2. PRICE

Pricing is one of the essential aspects of the business. It is the first

thing a customer considers before purchasing or availing a service. The

rate per hour of the business will be Php 35.00 for the shared desk area,

Php40.00 for the solo area, and 300 for the meeting room. These prices

will adjust based on the economic growth of the country.

ROOM RATES
Solo Php 40.00
Shared Desk Php 35.00
Conference Room (in Php 300.00
limited of 12 persons)
Table 18. Prices of the rooms

PRINTING SERVICES
VARIANT
62
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

SIZE B&W COLORED


Short 2 5
A4 2 5
Legal 2 5
Table 19. Prices of printing services

3. PLACE

The proposed Cozy Connections business will be located at Brgy.

Zone 4, Pasong Tala, City of Dasmarinas Cavite. It runs alongside the

highway and is close to school campuses. Furthermore, because some

various structures and facilities surround the proposed business location,

it is easier for their target market to locate them due to the various distinct

facilities nearby, such as Walter Dasma, Puregold Dasma, and so on,

giving them an advantage and opportunity to gain more potential

customers.

4. PROMOTION

The Cozy Connection uses different promotional tools to introduce

and promote the business. Social media is one of the primary tools of

63
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Cozy Connections. It uses Facebook and Instagram to be aware and give

updates about the services it will offer to inform the market about the

business.

Figure 3. Cozy Connections' Facebook Page

64
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Figure 4. Cozy Connections' Flyer

Cozy Connections decided to use flyers as one of its marketing

advertisements to reach potential customers quickly and with the least amount of

effort. A flyer ensures easy access to their customers because a large number of

people can view the flyer on the go and learn about our business.

65
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Figure 5. Loyalty Card

2.9 SURVEY ANALYSIS

66
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Age of the Respondents


26-
Above

22-25

19-21

17-18

14-16

0 50 100 150 200 250 300

Figure 6. Age of the Respondents

The figure above shows that out of 396 respondents, 60% are

respondents ages 19-21, 20% or 80 of them ages 22-25, 15% are respondents

ages 17-18, while 4 or 1% out of 396 ages 26-above, and 0.5% or 2 of the

respondents ages 14-16. It means that Cozy Connections should expect that

most of its customers are ages 19-21 and some are 22-25.

67
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Educational Status of the Respondents

Professionals/ Faculty

College

Senior High School

0 50 100 150 200 250 300 350 400

Series 1

Figure 7. Educational Status of the Respondents

The figure above shows that out of 396 respondents, 91.7%, or 363, are

college students. The other 7.1%, or 28, are senior high school students, and the

last 1%, or 4, are professional/faculty workers. It means that most of the

customers of Cozy Connections are college students.

68
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Name of Schools of the Respondents

NCST

LA SALLE

EAC

AISAT

0 20 40 60 80 100 120 140 160 180 200

Figure 8. Schools of the Respondents

This table shows that the majority of the respondents, 183 with an average

of 46%, of the respondents are from De La Salle University, while EAC, AISAT,

and NCST have the same percentage of 17.9 or 71. From this, the business

could assume that the majority of its possible customers are from La Salle.

69
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

What time do you usually study?

Others

After School

Evening

Every Morning

0 20 40 60 80 100 120 140 160 180

Figure 9. Question No. 1

Figure 2.5 shows that 41.4% of the respondents usually study during the

evening, 29% of them study after school, 26.8% answered they study every

morning, and 2.8% answered others. It means that the Cozy Connections needs

to be open from morning, especially to evening, because students prefer to study

at that time.

70
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Which study style would you prefer?

Study in groups

Study Alone

0 50 100 150 200 250 300 350

Figure 10. Question No. 2

This figure shows that 304, or 76%, prefer to study alone than be with

groups of friends and classmates, which only have a percentage of 23.2% or 92.

It means that the Cozy Connections should allot more space for a solo room or

desk for those customers who like to study alone.

71
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Where do you most likely choose to study?

House

Café

Study Hub

School Campus/Library

0 50 100 150 200 250 300

Figure 11. Question No. 3

The figure above shows that 63.4% of the respondents most likely choose

to study in their house, while 40.7% of them usually study in the school campus.

Meanwhile, 30.6% answered that they preferred to study in a Café, and the

40.7% of the respondents preferred to study in a study hub. Therefore, if a new

study hub will be established, there will be a huge possibility that it will be

patronize by the students.

72
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Have you ever been to a Study Hub?

No

Yes

0 50 100 150 200 250

Figure 12. Question No.4

Most of this figure indicates that most of the respondents never have been

to a study hub with a 230 or 58.2%. While with an average of 41.8% or 165

answered Yes. This means that if Cozy Connections will be established, it will be

the first study hub around the area.

73
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Referring to the question above, if you answered 'Yes',


are you satisfied with the services being offered by the
existing study hub? (Ignore if answered 'No')

No

Yes

0 20 40 60 80 100 120 140 160

Figure 13. Question No. 5

The figure above shows that 81% of the respondents who have been to a

study hub are satisfied with their offered service, while 19% are unsatisfied.

74
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Do you prefer a place where you can focus on you


study or relax and have a place for meetings ?

No

Yes

0 50 100 150 200 250 300 350 400 450

Figure 14. Question No. 6

This figure shows that 97.5% or 386 out of 396 respondents answered

yes, which means they prefer a place where they can focus on their studies or

relax and have a place for meetings. And there are 10 or 2.5% who answered no.

This result implies that there is a demand for a study hub.

75
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

If a new study hub were to be established, are you willing


to experience and study from a new start-up “Cozy Con-
nections” Study Hub/Space?

No

Yes

0 50 100 150 200 250 300 350 400

Figure 15. Question No. 7

The majority of the respondents answered yes with an average of 90.4%

or 358, which means they are willing to experience and study from a new start-

up, “Cozy Connections” Study Hub/Space. However, 9.6 %, or 38, are unwilling

to try a new study hub.

76
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

What would make you go to a coworking space or study


hub?

Interior Aesthetic

Affordable Price

Free Wi-Fi

Accessible Location

Ambiance

0 50 100 150 200 250 300

Figure 16. Question No. 8

The figure above shows that 69.9% of the respondents want a study hub

that has free Wi-Fi, while 61.1% of them like an affordable price, 59.1% consider

the ambiance, 55.8% want an accessible location, and 23.7% want an interior

aesthetic. It implies that Cozy Connections should keep in mind that the

reasonable prices, pleasant atmosphere, convenient location, interior design for

a tranquil atmosphere, and most importantly, the free Wi-Fi for its customers are

some factors to consider when establishing a study hub business.

77
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

If you would go to a coworking space and study hub, what


desk would you prefer?

Meeting room

Shared desk

Dedicated desk

0 50 100 150 200 250 300

Figure 17. Question No. 9

The figure above shows that most of the respondents, with a percentage

of 70.7%, want a dedicated desk, while 29.3% prefer a shared desk, and 16.9%

want a meeting room. It means the business should have more dedicated desks

than the other offered desks because most of the customers prefer to study

alone.

78
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

What additional services would you like for a coworking


space or study hub to offer?

Others

Food

Rental Locker

Printing and Photocopy Service

0 50 100 150 200 250 300 350 400

Figure 18. Question No. 10

This figure shows that 370, or 93.4% of the respondents, would avail of

printing and photocopy services, and 82, or 20.7%, would avail of the rental

locker. Some of them also answered that they would want food and drinks to be

offered in a study hub. The results show that Cozy Connections should offer

printing and photocopy services.

79
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

How many hour/s do you prefer to study in a study hub?

Others

Four Hours

Three Hours

Two Hours

One Hour

0 20 40 60 80 100 120 140 160 180 200

Figure 19. Question No. 11

The figure above shows that 44.2% of the respondents will only have a

two-hour duration of stay in the study hub, 21.2% will study for three hours,

19.4% of the respondents preferred to stay for one hour, while 14.6% are willing

to stay in the study hub for four hours. Accordingly, the majority of clients will

have two hours to themselves for leisure and study.

80
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

How often are you willing to visit a study


hub?

Thrice a Week

Twice a Week

Everyday

0 20 40 60 80 100 120 140 160 180 200

Figure 20. Question No. 12

The figure above shows that 43.7% of the respondents are only willing to

rent in a study hub thrice a week, 31.3% answered once a week, while 25% of

the 396 are willing to rent every day. It means that most of the respondents are

willing to visit the study hub thrice a week.

81
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Are you willing to spend 40 pesos per hour to


avail the solo space/room service from the
study hub?

No

Yes

0 50 100 150 200 250 300 350 400

Figure 21. Question No. 13

The figure above shows that the majority answered ‘Yes’ with an average

of 87.9% or 348 while 12.1% or 48 answered No, which means that the

respondents are willing to spend 40 pesos per hour to avail of the solo

space/room service in the study hub.

82
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Are you willing to spend 150-300 pesos per hour to avail


a space/room for group discussion and conference in a
study hub that can occupy a minimum of 2-10 people?

No

Yes

0 50 100 150 200 250 300

Figure 22. Question No. 14

The figure above shows that the majority answered yes, with a percentage

of 70.2% or 278, while 29.8%, or 118 answered no. It means the respondents are

willing to spend 150-300 pesos per hour to avail of a space/room for group

discussion and conference in a study hub with a minimum of 2-10 people per

room.

83
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

CHAPTER III: TECHNICAL ASPECT

This section of the study goes over the offered services of the business as

well as its operational processes and activities. It determines the necessary

equipment, supplies, types of machinery, furniture, and fixtures, which are the

primary factors in our service operations included the associated costs and

funding sources. Additionally, the plant layout, its size, and the service schedule

are also presented to help identify the business operation.

3.1 LOCATION OF THE BUSINESS

The proposed business concept is to offer a study hub that is a safe and

quiet space for the customers, primarily the students and

non-professionals/professionals, to study and do their tasks at an affordable cost

within the area of interest. The Cozy Connections will be in Brgy. Zone-4, Pasong

Tala, City of Dasmarinas, Cavite, where it is accessible to the students. The

following will be the provided location map of the business.

3.2 PLANT

LAYOUT

Figure 23. Map


The

Cozy Connections facility is designed to give comfort to the customers while they

are studying or working on their tasks. It is well-organized and divided into areas

84
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

where they can all perform effectively and efficiently. The lot area for the facility is

a total of 84 sqm.

Figure 24. Floor Plan

3.3 BUILDING AND FACILITIES

Cozy Connection will lease a space for 65, 000.00 per month. The shop

has a simple interior design with three main areas: The shared desk/open area

table, the food area and the separated conference room. Other than that, the

85
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

printing area and the cubicle corner are branch of open area. We also have

information on space costs, consumption, and other capital expenditures related

to space utilization. The purpose of requiring physical space was to consider and

provide employees with a safe and sufficient environment in which to carry out

business operations and ensure that the customers are in a safe and secure

environment.

Main Areas
The Open Area will be for the
customers who are willing to share the
area with either their friends or a
stranger. It is located beside the
Open Area/ Function Hall cubicle side corner and has a lot area
of 20 sq. meters. The open area can
accommodate 24 customers who want
to share their study area with other
people.
The lounge area serves as a food
corner located in front of the function
hall and has a lot area of 10.375 sq.
meters. This area is similar to a food
Lounge Area court in a common area where you
can access multiple foods to be
served or a common way of self-serve
dinner. The lounge area in our
business serves as a place where the
customer can enjoy sipping coffee,
relaxing, and reading books or playing
board games during study breaks.
The Separated Conference Room is
for customers who wish to have a
group discussion. It is located beside
Separated Conference Room the open area and has room to keep
everything private. It can
86
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

accommodate a maximum of 12
people. This Separated Area is
designed to keep confidential
information and conversation behind
the other areas. This room has a lot
area of 11.543 sq. meters.
Other Areas
Dedicated desk/Cubicle Side Corner The Cubicle Side Corner is an area for
customers who want a private space
to study alone. It has a total of 16.237
sq. meters, consisting of 15 cubicles.
Each cubicle will have a table and
chair. It is located on the left side of
the room and has a partition for each.
The partition between each cubicle is
important for the customer to have
focused on what they are doing.
The Printing Area is located at the left
side of the front desk with a lot area of
Printing Area 1.835 sq. meters. It consists of
printing materials and equipment
necessary for customers who want to
avail of printing services.

Employee Office It is an area to keep important files


and a place to welcome customers for
their concerns. It is located beside the
lounge area and has a lot area of
2.812 sq. meters.

Cashier Desk The Cashier Desk is where the filling


out of forms and payments will take
place. It has a lot area of 1.401 sq.
meters and is located beside the main
entrance.

87
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Storage Room The stock room will serve as an extra


space to store the other unused
supplies the business needs in its
operation. This room will have a lot
area of 3.325 sq. meters and is
located beside the comfort room.
Comfort Room The comfort room is located on the
right side of the lounge area, with a lot
area of 1.499 sq. meters. It is two
small rooms, for males and females,
that consist of a toilet bowl and sink
for the employees and customers to
use.
Table 20. Areas and Corresponding Description

3.4 SERVICES DESCRIPTION

The Cozy Connections offers three services that the customers can

choose from that will suit their preferred area. The study hub is built on a plan

that can be comfortable for the customers for their convenience. They can

choose to have a separate space, share with another person, or have a private

room where small to medium groups can have their discussion and collaborate

on group tasks without being disturbed. Furthermore, Cozy Connections also has

a separate area for board games that the customers can utilize during their study

breaks and have coffee to boost their productivity.

3.5 OFFERED SERVICES

Below are the descriptions of the services that will be provided by the

business to the customers:

88
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

SERVICES DESCRIPTION

Meeting room A private room designed for meetings and


private discussions for small to medium
groups of people.
Share Desk A desk or area a customer can share with
friends or another stranger.
Dedicated Desk An individual desk or own corner
dedicated to those individuals who want to
be alone.
Table 21. Offered Services of the Business

Additional Services:

● Printing and Photocopy Services

3.6 TECHNOLOGY WILL USE

Technology is essential in day-to-day operations, either business or any

particular event. Nowadays, technology is used in almost every industry. The

technologies that Cozy Connection will utilize are listed below:

 CCTV Camera - By placing CCTV cameras outside and inside at cozy

connections or any strategic locations throughout our business's operating

area, we can help prevent acts of vandalism, break-ins, and other serious

crimes.

89
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

 Computer set for printer – The printer is usually connected to a computer

to run it and allows documents, spreadsheets, and other programs to run

and print out. A computer is usually for supporting the printer to run some

programs.

 Document Printer Machine – Connected to a device and print out any

digital pictures onto paper easily.

3.7.1 BREAKDOWN OF MACHINERIES AND EQUIPMENT AND OTHER

FACILITIES WITH CORRESPONDING COSTS

The costs for machineries, furniture, fixtures, equipment, supplies and

materials to be incurred by the business upon its establishment are shown in

the table below.

Machinery
Items Qty Price Total
.
Photocopy 1 ₱40,950.00 ₱40,950.00
Machine
Table 22. Machinery and Equipment Cost

Office Equipment
Item Qty Price Total
Smart TV (32-inch) 1 13, 13,298.00
298.00
Computer set 1 11,98 11,985.00
5.00
Receipt printer 1 1,19 1,190.00
90
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

0.00
Inverter Aircon 2 31,80 63,600.00
0.00
Coffee Maker 1 2,22 2,224.00
4.00
Cash Box with lock 1 6 680.00
80.00
Air Cooler 2 29,01 58,035.60
7.80
CCTV 2set 6,49 12,9
9.00 98.00
Printer/photocopier 1 8,80 8,800.00
0.00
Total 164,012.60
Table 23. Office Equipment

Furniture and Fixtures


Item Qty. Price Total
Conference Table
3 78,436.00 235,308.00
with 12 chairs
Office Chair 15 988.00 14,820.00
Round Table with
1 8,999.00 8,999.00
4 Chairs
Padlocks 4 1,080.00 4,320.00
Table with 2 chairs 4 2,078 8,312.00
Blinds 4 424.00 1,696.00
Fire extinguisher 1 2500.00 2,500.00
Bookshelf 2 1,998.00 1,998.00
Fluorescent Light 5 800.00 4000.00
Desk lamp 15 250.00 3,750.00
Desk with drawer 2 1,195.00 2,390.00
Mirror 2 521.00 1,042.00
Water dispenser 1 2,730.00 2,730.00
White board 1 1,698.00 1,698.00
Total 293,563.00
Table 24. Furniture and Fixtures

Snacks Supplies (Monthly) Qty. Unit Cost Total Cost


Mugs 60 pcs. 35.00 2,100.00
Spoon 30 pcs. 8.00 240.00
Black Coffee/Coffee Beans 5 kl. 405.00 2,025.00
91
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Sugar 5 kl. 105.00 1,500.00


Creamer 3(500 g) 180.00 540
Stirrer 2 99.00 198.00
Peanuts 5 kl. 170.00 850.00
Total 7,453.00
Table 25. Snack Supplies

Office Supplies- Annually


Item Qty. Unit Price Total
Puncher 1 Piece 55.00 55.00
Tape Dispenser 1 Piece 215.00 215.00
Calculator 1 Piece 350.00 350.00
Stapler 1 Piece 152.00 152.00
Total 772.00

Table 26. Office Supplies- Annually

Printing Supplies- Monthly


Item Qty. Unit Price Total
Bond 1 Boxes 1,025.00 1,025.00
Paper(long)
Bond Paper 1 Boxes 875.00 875.00
(Short)
Bond Paper (A4) 1 Boxes 925.00 925.00

Printer Ink 1 Sets 725.00 725.00

Total 3,550.00
Table 27. Printing Supplies- Monthly

Office Supplies- 6 months


Table 28. Office Supplies- Six Months
Item Qty. Unit Price Total
Official Receipts 100 Booklet 105.00 10,500.00
Logbook 3 Piece 85.00 255.00
Ballpen 2 Boxes 400.00 800.00
Bond Paper 1 Ream 1,343.00 1,343.00
92
Staple wire 1 Boxes 159.00 159.00
Filling Folder 12 Piece 275.00 3,300.00
Fastener 1 Boxes 42.00 42.00
Total 16,399.00
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Cleaning Supplies (Monthly)


Items Qty. Unit Unit Price Total Cost
Air Freshener 3 Piece ₱33.00 ₱99.00
Liquid Hand Soap 2 Bottle 90.00 180.00
Detergent Powder 1 Kilo 80.00 80.00
Garbage Bag 1 Pack 60.00 60.00
Sponge 1 Piece 20.00 20.00
Mineral Water 15 Galloon 35.00 525.00
Rugs 2 Piece 895.00 1790.00
Total ₱1,014.00
Table 29. Cleaning Supplies- Monthly

Cleaning Supplies (Annually)


Items Qty. Unit Unit Price Total Cost
Dustpan 2 Piece ₱65.00 130.00
Broom 2 Piece 185.00 370.00
Toilet brush 1 Piece 50.00 50.00
Door mat 10 Piece 20.00 200.00
Trash Bins 3 Piece 250.00 750.00
Floor Mop 2 Piece 150.00 300.00
Total 1,350.00
Table 30. Cleaning Supplies- Annually

Comfort Room Supplies


Item Qty. Price Total Cost
Tissue 12 pcs. 130.00 130.00
Alcohol 1 gal. 520.00 520.00
Liquid Hand Soap 4 199.00 796.00
Total 1,446.00
Table 31. Comfort Room Supplies.

Books and Board Games

93
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Item Qty. Unit Total


A short history of nearly everything by Bill Bryson 1 Piece 185
Tuesdays with Morrie by Mitch Albom 1 Piece 129
The Alchemist by Paulo Coelho 1 Piece 139
The Goldfinch by Donna Tartt 1 Piece 200
The Subtle Art of not giving a f*ck by Mark Manson 1 Piece 110
IKIGAI by Hector Garcia and Francesc Miralles 1 Piece 115
The five people you meet in heaven by Mitch Albom 1 Piece 119
Atomic habits by James Clear 1 Piece 119
Silent Patient by Alex Michaelides 1 Piece 145
The Seventh Function of Language by Lauren Binet 1 Piece 135
The Great Gatsby by F. Scott Fitzgerald 1 Piece 250
Behind the beautiful forevers by Katherine Boo 1 Piece 265
Warped Passages Unraveling the Mysteries of the
1 Piece 350
Universe’s Hidden Dimension by Lisa Randall
A Gentle Reminder 1 Piece 185
Why Has Nobody Told This Before By Dr. Julie
1 Piece 160
Smith
The bell Jar by Sylvia Plath 1 Piece 180
The Six of Crows by Leigh Bardugo 1 Piece 249
Jenga 1 Piece 70
Scrabble 1 Piece 399.00
Chess 1 Piece 498.00
Total 4,002.00
Table 32. Books and Board Games.

Uniform
Item Qty. Price Total Cost
Cashier Uniform 2 250.00 500.00
Store Manager Uniform 2 250.00 500.00
Operational Manager 2 250.00 500.00
Id 7 100.00 700.00
Part timer 2 250.00 500.00
Total 1,100.00 2,700.00
Table 33. Uniform.

Ads Promotional Materials Qty. Unit Cost Total Cost


94
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Colored Leaflets 1,000 5.00 5,000.00

Tarpaulins 3 650.00 1,950.00


150.00 (for
Loyalty Card 300 pcs. 100 pcs.) 450.00

Total 7,400.00
Table 34. Advertisement Promotional Expense

Medical Expense
Item Qty. Price Total Cost
Biogesic 12 4.75 57.00
Neosep 12 7.00 84.00
Medicol 12 6.75 81.00
Loperamide 12 8.00 96.00
Gaza 10 4.50 45.00
Alcohol 60 ml 29.00 29.00
First Aid Kit 1 425.00 425.00
Triangular Bandage 1 45.00 45.00
Total 530.00 862.00
Table 35. Medical Expense

3.8 INITIAL COST OF UTILITY APPLICATIONS

Utilities are one of the most vital elements of running a business. It

includes electricity, water, and the internet. The table below shows the projected

monthly and annual consumption based on the typical utility bill for a single

business in the City of Dasmarinas, Cavite. One of the most important aspects

of running a business is the utilities. The table below shows the business's

estimated monthly and annual consumption.


95
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

UTILITY EXPENSES MONTHLY COST ANNUAL COST

WATER BILL ₱830.00 ₱9,960.00

ELECTRIC BILL ₱6,500.00 ₱78,000.00

TELEPHONE AND ₱2,500.00 ₱30,000.00

INTERNET

TOTAL ₱9,830.00 ₱117,960.00

Table 36. Utility Cost

UTILITY PROVIDERS

1. Electricity is widely used to power structures, electric devices, and all

other machines that run on electricity. Manila Electric Company

(Meralco) is the company in charge of providing it. It serves 6.3 million

customers in 36 cities and 75 municipalities across a franchise area of

9,685 km squared, which includes Metro Manila, the provinces of

Rizal, Cavite, and Bulacan, as well as portions of the provinces of

Pampanga, Batangas, Laguna, and Quezon.

2. Prime water Infrastructure Corporation serves as a specialist water

company since water is both a source of life and a cleaning agent. It

96
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

works throughout the Philippines, assisting communities, real estate

development firms, water authorities, and local government units.

3. The Internet is a global computer network made up of interconnected

networks that use standardized communication protocols that provide

a variety of information and communication services. Their internet

provider will be CONVERGE, a telecommunications service provider in

the Philippines.

3.9 OPERATIONAL FLOW CHART

97
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Figure 25. Operational Flow Chart of Cozy Connections

3.10 SERVICE FLOW CHART

98
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

SELECTION OF
START INQUIRE DESIRED STUDY
SPACE OR ROOM

ASSISTANCE TO
ISSUANCE OF
PAYMENT THE DESIRED
RECEIPTS
AREA

END

Figure 26.Service Flow Chart of Cozy Connections

Figure 3.4 and 3.5 shows the operation and service flow in Cozy

Connections. In the inquiry part, an employee will explain to the customer the

services offered by the business and its rate per hour. After the customer decides

to avail of one of the services of Cozy Connections, he will wait for the

assessment of the cashier for the payment and issuance of receipts. Following

that, one of the staff will guide him to the designated area of his chosen service.

3.11 ESTIMATED OPERATIONAL CAPACITY

99
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

The operational capacity of Cozy Connections will depend on the duration

of service hours that the customer will avail. However, the maximum number of

customers the business can accommodate is 51.

3.12 BUSINESS HOURS

For busy businesses, operating hours are critical for them to be able to

prioritize their job responsibilities and reach their objectives quickly. The business

will be able to take on new possibilities and build the business in a sustainable

way if they manage their time well.

The researchers decided that the business will operate from 7:00 o'clock

in the morning to 10:00 o'clock in the evening. The business will be open from

Monday to Saturday. The business will be closed every Sunday for the staff to

have a rest day; this will also serve as a day off for the employees in the

establishment.

3.13 EMPLOYEE SCHEDULE

WORK SCHEDULE: MANAGER, OPERATIONAL, CASHIER, AND


100
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

STAFF
DAYS OF MORNING BREAK AFTERNOON BREAK EVENING
WEEK TIME TIME
7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10
TURN
OVER
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday DAY OFF/REST DAY
Table 37. Employee Schedule.

This table shows Cozy Connections fixed schedule of the employees from
managing partners, operational manager to cashier and staffs. The work
schedule shows the same working hours of all employees that starts in 7 am in
the morning until 10 pm in the evening. It also shows the break time that
separate the working hours between 12 pm and 7 pm. The shift time is indicated
from 2pm to 3pm which the schedule of every employees turn-over. The working
days of Cozy Connections operates from Monday to Saturday and Day off/Rest
day from Sunday.

3.14 EMPLOYEES UNIFORM AND COMPANY ID

The employees of Cozy Connections will have their uniforms. These

uniforms will assist in projecting a professional business image that will attract

and retain customers. Employees will be required to wear uniforms with the Cozy

Connections logo to help brand and distinguish their company in the market they

represent.

101
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Figure 27. Employee’s Uniform

Figure 28. Employees' ID

102
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

3.15 WASTE DISPOSAL METHOD

A waste management system is a process used to eliminate, recycle, and

avoid waste. Among the waste disposal techniques are recycling, composting,

incineration, landfills, bioremediation, waste-to-energy, and waste minimization. It

includes collection, transport, treatment, and disposal of waste, together with

monitoring and regulation.

The Cozy Connections will practice the solid waste management

procedure, which includes garbage segregation. The business will have distinct

trash cans for Recyclable, Biodegradable, and Non-Biodegradable garbage. The

employees will plan for the waste management of the store and coordinate with

Dasmarinas City Waste Management when to pick up the store's waste in the

area where the enterprise belongs.

In this, the business will maintain the cleanliness and organization inside

its facilities. It will also ensure that the health of the customers and employees is

not at risk and will help to prevent future damage from happening to nature.

103
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

CHAPTER IV: FINANCIAL ASPECTS

COZY CONNECTIONS STUDY HUB


Financial Assumptions
All operating expenses and selling prices and rates will increase by 5% yearly to account
for economic fluctuations (inflation rate)
Percentage of projected annual customers/room for solo (cubicle) is 70% in 2024; for
sharing (function hall) is 60% in 2024; for conference room is 50% in 2024. All will
Schedule 1 increase by 5% yearly.
Schedule 4.2 Useful life of Machinery & Equipment is 3 years.
Schedule 4.3 70% of the Operating Supplies will be used for the year.
Schedule 5 60% of the Other Supplies will be used for the year.
Schedule 8 Useful life of Office Equipment is 2 years, Other Equipment is 2 years.
Schedule 9 Useful life of Furniture and Fixtures is 5 years.
Schedule 13 Useful life of Leasehold Improvement is 5 years.
Note 7 One month employee benefits remain unpaid.
Note 8 One month utilities remain unpaid.
Note 12 Corporate tax rate is 25%
All partners will have an equal capital contribution amounting to Php 260,000 each. They
will likewise equally
SCE share to the net income result of their operations. Moreover, all partners will likewise
withdraw equal amounts
of Php 30,000 in 2024 and their withdrawals will increase by 40% yearly.
Table 38. Financial Assumptions

104
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

COZY CONNECTIONS STUDY HUB


Projected Statement of Financial Position
As of December 2024-2028

Assets Notes 2024 2025 2026 2027 2028


Current Assets
Cash 1 2,145,796.93 4,162,851.70 6,524,675.36 9,232,042.58 12,276,232.93
Supplies 2 61,139.60 85,533.74 97,409.69 105,039.19 111,310.56
Prepaid Rent 3 195,000.00 195,000.00 195,000.00 195,000.00 195,000.00
Total Current
2,401,936.53 4,443,385.44 6,817,085.05 9,532,081.77 12,582,543.49
Asset

Non-Current
Asset
Furniture and
4 261,272.70 232,242.40 203,212.10 174,181.80 145,151.50
Fixture, net
Equipment,
5 229,309.00 199,895.40 170,481.80 141,068.20 111,654.60
net
Leasehold 6
Improvement, 91,666.67 83,333.33 75,000.00 66,666.67 58,333.33
net
Total Non-
582,248.37 515,471.13 448,693.90 381,916.67 315,139.43
Current Asset
Total Asset 2,984,184.90 4,958,856.58 7,265,778.95 9,913,998.44 12,897,682.92

Liabilities
and Owner's
Equity
Current
Liabilities
Employee
Benefits 7 18,325.47 19,241.75 20,203.83 21,214.02 22,274.73
Payable
Utilities
8 9,830.00 10,321.50 10,837.58 11,379.45 11,948.43
Payable
Total
28,155.47 29,563.25 31,041.41 32,593.48 34,223.15
Liabilities
Partners'
Equity
Bustamante,
567,419.92 938,286.73 1,375,589.61 1,881,137.13 2,453,762.12
Capital
Salde, Capital 567,419.92 938,286.73 1,375,589.61 1,881,137.13 2,453,762.12
Nacional,
567,419.92 938,286.73 1,375,589.61 1,881,137.13 2,453,762.12
Capital
Lorenzo,
567,419.92 938,286.73 1,375,589.61 1,881,137.13 2,453,762.12
Capital
Etil, Capital 567,419.92 938,286.73 1,375,589.61 1,881,137.13 2,453,762.12
Total
Partners' 2,837,099.59 4,691,433.67 6,877,948.04 9,405,685.63 12,268,810.60
Equity
Total
Liabilities
2,865,255.06 4,720,996.91 6,908,989.45 9,438,279.10 12,303,033.76
and Owner's
Equity
Table 39. Projected Statement of Financial Position

105
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

COZY CONNECTIONS STUDY HUB


Projected Income Statement
For the Years Ended December 2024-2028

Note 2024 2025 2026 2027 2028


Net Revenues 8 4,691,520.00 5,328,216.00 6,015,974.40 6,758,334.90 7,559,063.51
Less: Cost of
9 1,898,459.37 2,013,041.61 2,118,071.44 2,223,768.29 2,333,374.66
Sales
Gross Profit 2,793,060.63 3,315,174.39 3,897,902.96 4,534,566.61 5,225,688.86
Less: Operating
10 543,594.51 562,728.96 590,550.46 615,449.83 639,868.89
Expense
Net Income
2,249,466.12 2,752,445.43 3,307,352.51 3,919,116.78 4,585,819.97
before taxes
Less: Income
562,366.53 688,111.36 826,838.13 979,779.19 1,146,454.99
Tax 11
Net Income 1,687,099.59 2,064,334.07 2,480,514.38 2,939,337.58 3,439,364.98
Table 40. Projected Income Statement

106
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

COZY CONNECTIONS STUDY HUB


Projected Statement of Changes in Owner's Equity
For the Years Ended December 2024-2028

Net Income Bustamante, Nacional, Total Partnership


Salde, Capital Lorenzo, Capital Etil, Capital
Capital Capital Capital
Capital, January 1,
2024 260,000.00 260,000.00 260,000.00 260,000.00 260,000.00 1,300,000.00
Add: Partner's
Share in Net 337,419.92 337,419.92 337,419.92 337,419.92 337,419.92
Income 1,687,099.59 1,687,099.59
Total Capital 597,419.92 597,419.92 597,419.92 597,419.92 597,419.92 2,987,099.59
Less: Partners'
Drawings 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 150,000.00
Capital, December
31, 2024 567,419.92 567,419.92 567,419.92 567,419.92 567,419.92 2,837,099.59

Net Income Bustamante, Nacional, Total Partnership


Salde, Capital Lorenzo, Capital Etil, Capital
Capital Capital Capital
Capital, January 1,
2025 567,419.92 567,419.92 567,419.92 567,419.92 567,419.92 2,837,099.59
Add: Partner's
Share in Net 412,866.81 412,866.81 412,866.81 412,866.81 412,866.81
Income 2,064,334.07 2,064,334.07
Total Capital 980,286.73 980,286.73 980,286.73 980,286.73 980,286.73 4,901,433.67
Less: Partners'
Drawings 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 210,000.00
Capital, December
31, 2025 938,286.73 938,286.73 938,286.73 938,286.73 938,286.73 4,691,433.67

Net Income Bustamante, Nacional, Total Partnership


Salde, Capital Lorenzo, Capital Etil, Capital
Capital Capital Capital
Capital, January 1,
2026 938,286.73 938,286.73 938,286.73 938,286.73 938,286.73 4,691,433.67
Add: Partner's
Share in Net 496,102.88 496,102.88 496,102.88 496,102.88 496,102.88
Income 2,480,514.38 2,480,514.38
Total Capital 1,434,389.61 1,434,389.61 1,434,389.61 1,434,389.61 1,434,389.61 7,171,948.04
Less: Partners'
Drawings 58,800.00 58,800.00 58,800.00 58,800.00 58,800.00 294,000.00
Capital, December
31, 2026 1,375,589.61 1,375,589.61 1,375,589.61 1,375,589.61 1,375,589.61 6,877,948.04

Net Income Bustamante, Nacional, Total Partnership


Salde, Capital Lorenzo, Capital Etil, Capital
Capital Capital Capital
Capital, January 1,
2027 1,375,589.61 1,375,589.61 1,375,589.61 1,375,589.61 1,375,589.61 6,877,948.04
Add: Partner's
Share in Net 587,867.52 587,867.52 587,867.52 587,867.52 587,867.52
Income 2,939,337.58 2,939,337.58
Total Capital 1,963,457.13 1,963,457.13 1,963,457.13 1,963,457.13 1,963,457.13 9,817,285.63
Less: Partners'
Drawings 82,320.00 82,320.00 82,320.00 82,320.00 82,320.00 411,600.00
Capital, December
31, 2027 1,881,137.13 1,881,137.13 1,881,137.13 1,881,137.13 1,881,137.13 9,405,685.63

Net Income Bustamante, Nacional, Total Partnership


Salde, Capital Lorenzo, Capital Etil, Capital
Capital Capital Capital
Capital, January 1,
2028 1,881,137.13 1,881,137.13 1,881,137.13 1,881,137.13 1,881,137.13 9,405,685.63
Add: Partner's
Share in Net 687,873.00 687,873.00 687,873.00 687,873.00 687,873.00
Income 3,439,364.98 3,439,364.98
Total Capital 2,569,010.12 2,569,010.12 2,569,010.12 2,569,010.12 2,569,010.12 12,845,050.60
Less: Partners'
Drawings 115,248.00 115,248.00 115,248.00 115,248.00 115,248.00 576,240.00
Capital, December
31, 2028 2,453,762.12 2,453,762.12 2,453,762.12 2,453,762.12 2,453,762.12 12,268,810.60

Table 41. Projected Statement of Changes in Owner's Equity

107
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

COZY CONNECTIONS STUDY HUB


Projected Statement of Cash Flows
For the Years Ended December 2024-2028
CASH FLOW FROM
OPERATING 2024 2025 2026 2027 2028
ACTIVITIES
Earnings Before Income
2,249,466.12 2,752,445.43 3,307,352.51 3,919,116.78 4,585,819.97
Taxes
Depreciation Expenses –
43,429.67 43,429.67 43,429.67 43,429.67 43,429.67
Machinery & Equipment
Depreciation Expense -
64,216.80 64,216.80 64,216.80 64,216.80 64,216.80
Non-operating Equipment
Depreciation Expenses -
58,060.60 58,060.60 58,060.60 58,060.60 58,060.60
Furniture and Fixture
Depreciation Expense -
20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
Leasehold Improvement
Increase in Supplies -61,139.60 -24,394.14 -11,875.95 -7,629.51 -6,271.36
Increase in Prepaid Rent -195,000.00 0.00 0.00 0.00 0.00
Increase in Employee
18,325.47 916.27 962.09 1,010.19 1,060.70
Benefits Payable
Increase in Utilities
9,830.00 491.50 516.08 541.88 568.97
Payable
Income tax paid -562,366.53 -688,111.36 -826,838.13 -979,779.19 -1,146,454.99
Net Cash (used
in)/provided by 1,644,822.53 2,227,054.77 2,655,823.66 3,118,967.21 3,620,430.35
Operating Activities

CASH FLOW FROM


INVESTING ACTIVITIES
Acquisition of Equipment -258,722.60 0.00 0.00 0.00 0.00
Acquisition of Furniture
and Fixtures -290,303.00 0.00 0.00 0.00 0.00
Cash paid for Leasehold
Improvement -100,000.00 0.00 0.00 0.00 0.00
Net cash (used
in)/provided by
Investing Activities -649,025.60 0.00 0.00 0.00 0.00

CASH FLOW FROM


FINANCING ACTIVITIES
Partners' Capital
1,300,000.00 0.00 0.00 0.00
Investment 0.00
Partners' Drawings -150,000.00 -210,000.00 -294,000.00 -411,600.00 -576,240.00
Net Cash (used
in)/provided by 1,150,000.00 -210,000.00 -294,000.00 -411,600.00 -576,240.00
Financing Activities

Net Increase/Decrease in
Cash 2,145,796.93 2,017,054.77 2,361,823.66 2,707,367.21 3,044,190.35
Cash, beginning 0.00 2,145,796.93 4,162,851.70 6,524,675.36 9,232,042.58
Cash, ending 2,145,796.93 4,162,851.70 6,524,675.36 9,232,042.58 12,276,232.93
Table 42. Projected Statement of Cash Flows

108
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

NOTES TO FINANCIAL STATEMENTS

109
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Cozy Connections
Projected Notes to Financial Statement
For the Years Ended December 2024-2028

Note 1: Cash
2024 2025 2026 2027 2028
Cash 2,145,796.93 4,162,851.70 6,524,675.36 9,232,042.58 12,276,232.93
Total
Cash 2,145,796.93 4,162,851.70 6,524,675.36 9,232,042.58 12,276,232.93
Table 43. Note 1- Cash

Note 2: Supplies
Schedule 2024 2025 2026 2027 2028
Operational 4.3 31,186.8 42,102.1
47,014.10 50,206.85 52,969.81
Supplies 0 8
5 29,952.8 43,431.5
Other Supplies 50,395.59 54,832.34 58,340.75
0 6
61,139.6 85,533.7 105,039.1
Total Supplies 97,409.69 111,310.56
0 4 9
Table 44. Note 2- Supplies

Note 3: Prepaid Rent


2024 2025 2026 2027 2028
195,000.0
Prepaid Rent 195,000.00 195,000.00 195,000.00 195,000.00
0
Total Prepaid 195,000.0
195,000.00 195,000.00 195,000.00 195,000.00
Rent 0
Table 45. Note 3- Prepaid Rent

Note 4: Furniture and Fixture, net


2024 2025 2026 2027 2028
Conference Table with 12 chairs 235,308.00 235,308.00 235,308.00 235,308.00 235,308.00
Office chair 14,820.00 14,820.00 14,820.00 14,820.00 14,820.00
20
8,999.00 8,999.00 8,999.00 8,999.00 8,999.00
Round table with 4 chairs 0
Table with 2 chairs 8,312.00 8,312.00 8,312.00 8,312.00 8,312.00
Office Table with 2 chairs 4,292.00 4,292.00 4,292.00 4,292.00 4,292.00
Blinds 1,696.00 1,696.00 1,696.00 1,696.00 1,696.00
Bookshelf 3,996.00 3,996.00 3,996.00 3,996.00 3,996.00
Fuorescent Light 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00
Desk lamp 3,750.00 3,750.00 3,750.00 3,750.00 3,750.00
Desk with drawer 2,390.00 2,390.00 2,390.00 2,390.00 2,390.00
White board 1,698.00 1,698.00 1,698.00 1,698.00 1,698.00
Mirror 1,042.00 1,042.00 1,042.00 1,042.00 1,042.00
Total Cost of Furniture and
290,303.00 290,303.00 290,303.00 290,303.00 290,303.00
Fixture
Accumulated Depreciation - 29,030.30 58,060.60 87,090.90 116,121.20 145,151.50

110
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Furniture and Fixture


Furniture and Fixture, net 261,272.70 232,242.40 203,212.10 174,181.80 145,151.50
Table 46. Note 4-Furnitures and Fixtures, net

Note 5: Equipment, net


20
2024 2025 2026 2027 2028
24
Machinery and Equipment
10
40,950.00 40,950.00 40,950.00
Photocopy Machine 00 40,950.00 40,950.00
20
11,985.00 11,985.00 11,985.00
Computer Set 0 11,985.00 11,985.00
35
63,600.00 63,600.00 63,600.00
Inverter Aircon 0 63,600.00 63,600.00
Coffee Maker 60 2,224.00 2,224.00 2,224.00 2,224.00 2,224.00
12
03
Printer/photocopier 8 8,800.00 8,800.00 8,800.00 8,800.00 8,800.00
13
64
2,730.00
Water Dispenser 8 2,730.00 2,730.00 2,730.00 2,730.00
Total Cost of Machinery & 130,289.00 130,289.00 130,289.00 130,289.00 130,289.00
Equipment
Accumulated Depreciation - 13,028.90 26,057.80 39,086.70 52,115.60 65,144.50
Machinery & Equipment
Machinery & Equipment, net 117,260.10 104,231.20 91,202.30 78,173.40 65,144.50
Office Equipment
Smart TV (32-inch) 13,298.00 13,298.00 13,298.00 13,298.00 13,298.00
Receipt printer 1,190.00 1,190.00 1,190.00 1,190.00 1,190.00
Cashbox with lock 680.00 680.00 680.00 680.00 680.00
Air Cooler 58,035.60 58,035.60 58,035.60 58,035.60 58,035.60
Fire extinguisher 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
Inverter Aircon 31,800.00 31,800.00 31,800.00 31,800.00 31,800.00
CCTV 12,998.00 12,998.00 12,998.00 12,998.00 12,998.00
Total Cost of Office Equipment 120,501.60 120,501.60 120,501.60 120,501.60 120,501.60
Accumulated Depreciation - Office 15,062.70 30,125.40 45,188.10 60,250.80 75,313.50
Equipment
Office Equipment, net 105,438.90 90,376.20 75,313.50 60,250.80 45,188.10
Other Equipment
Padlocks 4,320.00 4,320.00 4,320.00 4,320.00 4,320.00
Mugs 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00
Spoons 240.00 240.00 240.00 240.00 240.00
Puncher 555.00 555.00 555.00 555.00 555.00
Tape Dispenser 215.00 215.00 215.00 215.00 215.00
Calculator 350.00 350.00 350.00 350.00 350.00
Stapler 152.00 152.00 152.00 152.00 152.00
Dustpan 130.00 130.00 130.00 130.00 130.00
Broom 370.00 370.00 370.00 370.00 370.00
Toilet Brush 50.00 50.00 50.00 50.00 50.00
Door mat 200.00 200.00 200.00 200.00 200.00
Trashbins 750.00 750.00 750.00 750.00 750.00
Floor Mop 300.00 300.00 300.00 300.00 300.00
Books & Board Games 4,002.00 4,002.00 4,002.00 4,002.00 4,002.00
Total Cost of Other Equipment 7,932.00 7,932.00 7,932.00 7,932.00 7,932.00
Accumulated Depreciation - Other
Equipment 1,322.00 2,644.00 3,966.00 5,288.00 6,610.00
Other Equipment, net 6,610.00 5,288.00 3,966.00 2,644.00 1,322.00
Total Equipment, net 229,309.00 199,895.40 170,481.80 141,068.20 111,654.60
111
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Table 47. Note 5- Equipment, net

Notes 6: Leasehold Improvement, net


2024 2025 2026 2027 2028
Total Cost of Leasehold 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
Improvement
Accumulated Depreciation - 8,333.33 16,666.67 25,000.00 33,333.33 41,666.67
Leasehold Improvement
Leasehold Improvement, net 91,666.67 83,333.33 75,000.00 66,666.67 58,333.33
Table 48. Note 6-Leasehold Improvement, net

Note 7: Employee Benefits Payable


2024 2025 2026 2027 2028
Total Employee Benefits - Direct
160,296.50 168,311.33 176,726.89 185,563.24 194,841.40
Labor Employees
Employee Benefits paid: 11 months 146,938.46 154,285.38 161,999.65 170,099.63 178,604.61
Employee Benefits Payable -
Direct Labor Employees 13,358.04 14,025.94 14,727.24 15,463.60 16,236.78

Total Employee Benefits - Manager 59,609.16 62,589.62 65,719.10 69,005.05 72,455.31


Employee Benefits paid: 11 months 54,641.73 57,373.82 60,242.51 63,254.63 66,417.36
Employee Benefits Payable -
Manager 4,967.43 5,215.80 5,476.59 5,750.42 6,037.94
Total Employee Benefits Payable 18,325.47 19,241.75 20,203.83 21,214.02 22,274.73
Table 49. Note 7-Employee Benefits Payable

Note 8: Utilities Payable


2024 2025 2026 2027 2028
123,858.0 130,050.9 143,381.1
Total Annual Utilities Expense 117,960.00 136,553.45
0 0 2
113,536.5 119,213.3 131,432.6
Utilities paid: 11 months 108,130.00 0 3 125,173.99 9
Utilities payable 9,830.00 10,321.50 10,837.58 11,379.45 11,948.43
Table 50. Notes 8- Utilities Payable

112
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Note 9: Net Revenues


Schedule 2024 2025 2026 2027 2028
Annual no. of customers - Solo
1 3,024 3,240 3,456 3,672 3,888
(Cubicle)
Multiply by: Number of operating
15 15 15 15 15
hours 5
Multiply by: Rate per hour ₱40 ₱42 ₱44 ₱46 ₱49
Annual Revenue - Solo
1,814,400.00 2,041,200.00 2,286,144.00 2,550,479.40 2,835,532.98
(Cubicle)
Annual no. of customers -
Sharing (Function Hall) 1 4,147 4,493 4,838 5,184 5,530
Multiply by: Number of operating
15 15 15 15 15
hours 5
Multiply by: Rate per hour ₱35 ₱37 ₱39 ₱41 ₱43
Annual Revenue - Sharing
(Function Hall) 1 2,177,280.00 2,476,656.00 2,800,526.40 3,150,592.20 3,528,663.26
Annual frequency of Conference
Room was booked 144 158 173 187 202
Multiply by: Number of operating
15 15 15 15 15
hours
Multiply by: Rate per hour 5 ₱300 ₱315 ₱331 ₱347 ₱365
Annual Revenue - Conference
Room 648,000.00 748,440.00 857,304.00 975,183.30 1,102,707.27
Total Revenues from Room
Rental 4,639,680.00 5,266,296.00 5,943,974.40 6,676,254.90 7,466,903.51
Annual pages expected to be
printed per year - B&W Print 11,520 12,960 14,400 15,840 17,280
Multiply by: Selling price per
₱2.00 ₱2.00 ₱2.00 ₱2.00
page ₱2.00
Annual Sales - B&W Print 23,040.00 25,920.00 28,800.00 31,680.00 34,560.00
Annual pages expected to be
printed per year - Colored Print 5,760 7,200 8,640 10,080 11,520
Multiply by: Selling price per
page ₱5.00 ₱5.00 ₱5.00 ₱5.00 ₱5.00
Annual Sales - Colored Print 28,800.00 36,000.00 43,200.00 50,400.00 57,600.00
Total Sales from Printing
Service 51,840.00 61,920.00 72,000.00 82,080.00 92,160.00
Total Net Revenues 4,691,520.00 5,328,216.00 6,015,974.40 6,758,334.90 7,559,063.51
Table 51. Note 9- Net Revenues

Note 10: Cost of Sales


Schedule 2024 2025 2026 2027 2028
Direct Material 2 14,204.00 14,914.20 15,659.91 16,442.91 17,265.05
1,007,245.4
Direct Labor 3 870,096.50 913,601.33 959,281.39 1,057,607.73
6
1,014,158.8 1,143,130.1 1,200,079.9
Overhead 4 1,084,526.09 1,258,501.87
7 4 3
Total Cost of 1,898,459.3 2,118,071.4 2,223,768.2
2,013,041.61 2,333,374.66
Sales 7 4 9
113
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Table 52. Note 10- Costs of Sales

Note 11: Operating Expense


Schedul
2024 2025 2026 2027 2028
e
Other Supplies Expense 5 44,929.20 65,147.34 75,593.38 82,248.52 87,511.13
Taxes and Licenses 6 17,726.75 7,795.00 7,795.00 7,795.00 7,795.00
Advertising Expense 7 7,400.00 7,770.00 8,158.50 8,566.43 8,994.75
Depreciation Expense -
64,216.80 64,216.80 64,216.80 64,216.80 64,216.80
Non-operating Equipment 8
Depreciation Expense -
58,060.60 58,060.60 58,060.60 58,060.60 58,060.60
Furniture and Fixtures 9
Salary Expense - Manager 10 263,952.00 277,149.60 291,007.08 305,557.43 320,835.31
Employee Benefit Expense -
59,609.16 62,589.62 65,719.10 69,005.05 72,455.31
Manager 11
Pre-operating Expenses 12 7,700.00 0.00 0.00 0.00 0.00
Depreciation Expense -
20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
Leasehold Improvement 13
Total Operating Expense 543,594.51 562,728.96 590,550.46 615,449.83 639,868.89
Table 53. Note 11- Operating Expenses

Note 12: Income Tax Expense


2024 2025 2026 2027 2028
Net Income before
taxes 2,249,466.12 2,752,445.43 3,307,352.51 3,919,116.78 4,585,819.97
Multiply by: 25%
corporate tax rate 25% 25% 25% 25% 25%
Income Tax 562,36
Expense 6.53 688,111.36 826,838.13 979,779.19 1,146,454.99
Table 54. Note 12- Income Tax Expense

114
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

115
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

SCHEDULES

Schedule 1: Annual Projected Customers & Units


2024 2025 2026 2027 2028
Projected Customers
Solo (Cubicle)
No. of solo cubicles 15 15 15 15 15
Multiply by: number of operating days per week 6 6 6 6 6
Weekly capacity 90 90 90 90 90
Multiply by: number of weeks per month 4 4 4 4 4
Monthly capacity 360 360 360 360 360
Multiply by: number of months per year 12 12 12 12 12
Annual Capacity 4,320 4,320 4,320 4,320 4,320
Multiply by: % of Cubicles expected to be occupied 70% 75% 80% 85% 90%
Annual no. of customers 3,024 3,240 3,456 3,672 3,888
Sharing (Function Hall)
No. of capacity for sharing area 24 24 24 24 24
Multiply by: number of operating days per week 6 6 6 6 6
Weekly capacity 144 144 144 144 144
Multiply by: number of weeks per month 4 4 4 4 4
Monthly capacity 576 576 576 576 576
Multiply by: number of months per year 12 12 12 12 12
Annual Capacity 6,912 6,912 6,912 6,912 6,912
Multiply by: % of sharing area expected to be occupied 60% 65% 70% 75% 80%
Annual no. of customers 4,147 4,493 4,838 5,184 5,530
Conference Room
No. of Conference Room 1 1 1 1 1
Multiply by: number of operating days per week 6 6 6 6 6
Weekly capacity 6 6 6 6 6
Multiply by: number of weeks per month 4 4 4 4 4
Monthly capacity 24 24 24 24 24
Multiply by: number of months per year 12 12 12 12 12
Annual Capacity 288 288 288 288 288
Multiply by: % of times the conference room is expected
to be booked 50% 55% 60% 65% 70%
Annual no. of times conference room is booked 144 158 173 187 202
Total Annual Projected Customers/Frequency
Conference Room is booked 7,315 7,891 8,467 9,043 9,619
Projected Units/Pages (Printing Services)
B&W Print
Daily no. of pages expected to be printed 40 45 50 55 60
Multiply by: number of days per week 6 6 6 6 6
No. of pages printed per week 240 270 300 330 360
Multiply by: number of weeks per month 4 4 4 4 4
No. of pages printed per month 960 1,080 1,200 1,320 1,440
Multiply by: number of months per year 12 12 12 12 12
Annual pages expected to be printed per year - B&W 11,52
Print 0 12,960 14,400 15,840 17,280
Colored Print
Daily no. of pages expected to be printed 20 25 30 35 40
Multiply by: number of days per week 6 6 6 6 6
No. of pages printed per week 120 150 180 210 240
Multiply by: number of weeks per month 4 4 4 4 4
No. of pages printed per month 480 600 720 840 960
Multiply by: number of months per year 12 12 12 12 12
Annual pages expected to be printed per year -
Colored Print 5,760 7,200 8,640 10,080 11,520
Total Annual Projected pages expected to be printed 17,28
and sold 0 20,160 23,040 25,920 28,800
Table 55. Schedule 1- Annual Projected Customers and Unit

116
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Schedule 2: Direct Materials


2024 2025 2026 2027 2028
Short bond paper - 500pages/ream - Php
175/ream 700.00 700.00 700.00 700.00 700.00
Long bond paper - 500pages/ream - Php
268/ream 1,072 1,072 1,072 1,072 1,072
A4 bond paper - 500pages/ream - Php
188/ream 752.00 752.00 752.00 752.00 752.00
11,680.0 11,680.0 11,680.0
Printer ink - Php 730/pc 11,680.00 0 0 11,680.00 0
14,914.2 15,659.9 17,265.0
Total Direct Material Cost 14,204.00 0 1 16,442.91 5
Table 56. Schedule 2- Direct Material Cost

Schedule 3: Direct Labor


2024 2025 2026 2027 2028
Operational Manager
Monthly Salary 24,310.00 25,525.50 26,801.78 28,141.86 29,548.96
Multiply by: Number of months 12 12 12 12 12
Annual Salary Expense 291,720.00 306,306.00 321,621.30 337,702.37 354,587.48
SSS Contribution (9.5%) 27,713.40 29,099.07 30,554.02 32,081.72 33,685.81
PhilHealth Contribution (2.75%) 8,022.30 8,423.42 8,844.59 9,286.82 9,751.16
Pag-Ibig Contribution (2%) 5,834.40 6,126.12 6,432.43 6,754.05 7,091.75
13th Month Pay 24,310.00 25,525.50 26,801.78 28,141.86 29,548.96
Annual Employee Benefits 65,880.10 69,174.11 72,632.81 76,264.45 80,077.67
Annual Direct Labor - Operational
357,600.10 375,480.11 394,254.11 413,966.82 434,665.16
Manager
Cashier
Monthly Salary 16,120.00 16,926.00 17,772.30 18,660.92 19,593.96
Multiply by: Number of months 12 12 12 12 12
Annual Salary Expense 193,440.00 203,112.00 213,267.60 223,930.98 235,127.53
SSS Contribution (9.5%) 18,376.80 19,295.64 20,260.42 21,273.44 22,337.12
PhilHealth Contribution (2.75%) 5,319.60 5,585.58 5,864.86 6,158.10 6,466.01
Pag-Ibig Contribution (2%) 3,868.80 4,062.24 4,265.35 4,478.62 4,702.55
13th Month Pay 16,120.00 16,926.00 17,772.30 18,660.92 19,593.96
Annual Employee Benefits 43,685.20 45,869.46 48,162.93 50,571.08 53,099.63
Annual Direct Labor - Cashier 237,125.20 248,981.46 261,430.53 274,502.06 288,227.16
Part Timer Workers
Monthly Salary 9,360.00 9,828.00 10,319.40 10,835.37 11,377.14
Multiply by: Number of workers 2 2 2 2 2
Multiply by: Number of months 12 12 12 12 12
Annual Salary Expense 224,640.00 235,872.00 247,665.60 260,048.88 273,051.32
SSS Contribution (9.5%) 21,340.80 22,407.84 23,528.23 24,704.64 25,939.88
PhilHealth Contribution (2.75%) 6,177.60 6,486.48 6,810.80 7,151.34 7,508.91
Pag-Ibig Contribution (2%) 4,492.80 4,717.44 4,953.31 5,200.98 5,461.03
13th Month Pay 18,720.00 19,656.00 20,638.80 21,670.74 22,754.28
Annual Employee Benefits 50,731.20 53,267.76 55,931.15 58,727.71 61,664.09
Annual Direct Labor - Part Timer Workers 275,371.20 289,139.76 303,596.75 318,776.59 334,715.41
Total Direct Labor 870,096.50 913,601.33 959,281.39 1,007,245.46 1,057,607.73
Table 57. Schedule 3- Direct Labor

117
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Schedule 4: Overhead
Schedule 2024 2025 2026 2027 2028
Utilities Expense 4.1 117,960.00 123,858.00 130,050.90 136,553.45 143,381.12
Depreciation Expense - Machinery
4.2 43,429.67 43,429.67 43,429.67 43,429.67 43,429.67
& Equipment
Operating Supplies Expense 4.3 72,769.20 98,238.42 109,699.57 117,149.32 123,596.21
Rent Expense 4.4 780,000.00 819,000.00 859,950.00 902,947.50 948,094.88
1,258,501.8
Factory Overhead 1,014,158.87 1,084,526.09 1,143,130.14 1,200,079.93
7

Schedule 4.1: Utilities Expense 2024 2025 2026 2027 2028


Water 9,960.00 10,458.00 10,980.90 11,529.95 12,106.44
Electricity 78,000.00 81,900.00 85,995.00 90,294.75 94,809.49
Telephone & Internet 30,000.00 31,500.00 33,075.00 34,728.75 36,465.19
Utility Expense 117,960.00 123,858.00 130,050.90 136,553.45 143,381.12

Schedule 4.2: Depreciation


Expense - Machinery & 2024 2025 2026 2027 2028
Equipment
Total cost of Machinery &
130,289.00 130,289.00 130,289.00 130,289.00 130,289.00
Equipment
Divided by: Useful Life 3 3 3 3 3
Depreciation Expense -
43,429.67 43,429.67 43,429.67 43,429.67 43,429.67
Machinery & Equipment

Schedule 4.3: Operating


2024 2025 2026 2027 2028
Supplies
Snack Supplies
Black coffee/coffee beans 24,300.00 25,515.00 26,790.75 28,130.29 29,536.80
Sugar 18,000.00 18,900.00 19,845.00 20,837.25 21,879.11
Creamer 6,480.00 6,804.00 7,144.20 7,501.41 7,876.48
Stirrer 2,376.00 2,494.80 2,619.54 2,750.52 2,888.04
Peanuts 10,200.00 10,710.00 11,245.50 11,807.78 12,398.16
Total 61,356.00 64,423.80 67,644.99 71,027.24 74,578.60
Printing Supplies
Bond paper (long) 12,300.00 12,915.00 13,560.75 14,238.79 14,950.73
Bond paper (short) 10,500.00 11,025.00 11,576.25 12,155.06 12,762.82
Bond paper (a4) 11,100.00 11,655.00 12,237.75 12,849.64 13,492.12
Printer Ink 8,700.00 9,135.00 9,591.75 10,071.34 10,574.90
Total 42,600.00 44,730.00 46,966.50 49,314.83 51,780.57
Total purchased Operating 103,956.00 109,153.80 114,611.49 120,342.06 126,359.17
Supplies
Operating Supplies, beg. 0.00 31,186.80 42,102.18 47,014.10 50,206.85
Assumption: 70% supplies used 72,769.20 98,238.42 109,699.57 117,149.32 123,596.21
Production Supplies, end 31,186.80 42,102.18 47,014.10 50,206.85 52,969.81

Schedule 4.5: Rent Expense 2024 2025 2026 2027 2028


Monthly Rental Fee 65,000 68,250.00 71,662.50 75,245.63 79,007.91
Multiply by: number of months per
year 12 12 12 12 12
Annual Rent Expense 780,000.00 819,000.00 859,950.00 902,947.50 948,094.88
Table 58. Schedule 4- Overhead

118
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Schedule 5: Other Supplies (Sanitary, Office & Medical Supplies)


2024 2025 2026 2027 2028
Office Supplies
21,000.0 24,310.1
22,050.00 23,152.50 25,525.63
Official Receipts 0 3
Logbook 510.00 535.50 562.28 590.39 619.91
Ballpen 1,600.00 1,680.00 1,764.00 1,852.20 1,944.81
Bondpaper 2,686.00 2,820.30 2,961.32 3,109.38 3,264.85
Staple wire 318.00 333.90 350.60 368.12 386.53
Filing Folder 6,600.00 6,930.00 7,276.50 7,640.33 8,022.34
Fastener 84.00 88.20 92.61 97.24 102.10
Total 32,798.0 34,437.90 36,159.80 37,967.7 39,866.17
0 8
Cleaning Supplies
Air Freshener 1,188.00 1,247.40 1,309.77 1,375.26 1,444.02
Liquid hand soap 2,160.00 2,268.00 2,381.40 2,500.47 2,625.49
Detergent powder 960.00 1,008.00 1,058.40 1,111.32 1,166.89
Garbage bag 720.00 756.00 793.80 833.49 875.16
Sponge 240.00 252.00 264.60 277.83 291.72
Mineral Water 6,300.00 6,615.00 6,945.75 7,293.04 7,657.69
Rugs 5,370.00 5,638.50 5,920.43 6,216.45 6,527.27
Total 16,938.0 17,784.90 18,674.15 19,607.8 20,588.24
0 5
Comfort Room Supplies
Tissue 1,560.00 1,638.00 1,719.90 1,805.90 1,896.19
Alcohol 6,240.00 6,552.00 6,879.60 7,223.58 7,584.76
Liquid hand soap 9,552.00 11,057.6
10,029.60 10,531.08 11,610.52
3
Total 17,352.0 18,219.60 19,130.58 20,087.1 21,091.46
0 1
Medical Supplies
Medicines 3,816.00 4,006.80 4,207.14 4,417.50 4,638.37
Gaza 540.00 567.00 595.35 625.12 656.37
Alcohol 348.00 365.40 383.67 402.85 423.00
First aid kit 2,550.00 2,677.50 2,811.38 2,951.94 3,099.54
Triangular Bandage 540.00 567.00 595.35 625.12 656.37
Total 7,794.00 8,183.70 8,592.89 9,022.53 9,473.66
Total purchased Other Supplies 74,882.0 78,626.10 82,557.41 86,685.2 91,019.54
0 8
Other Supplies, beg. 0.00 29,952.80 43,431.56 50,395.5 54,832.34
9
Assumption: 60% other supplies used 44,929.2 65,147.34 75,593.38 82,248.5 87,511.13
0 2
Other Supplies, end 29,952.8 43,431.56 50,395.59 54,832.3 58,340.75
0 4
Table 59. Schedule 5- Other Supplies

Schedule 6: Taxes and Licenses


2024 2025 2026 2027 2028
SEC Registration 6,765.00 6,765.00 6,765.00 6,765.00 6,765.00
BIR Registration 530.00 530.00 530.00 530.00 530.00
Business Permits & Clearances (Municipal Level) 10,431.75 500.00 500.00 500.00 500.00
Taxes and Licenses 17,726.75 7,795.00 7,795.00 7,795.00 7,795.00
Table 60. Schedule 6- Taxes and Licenses

119
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Schedule 7: Advertising Expense


2024 2025 2026 2027 2028
Colored Leaflets 5,000.00 5,250.00 5,512.50 5,788.13 6,077.53
Tarpaulins 1,950.00 2,047.50 2,149.88 2,257.37 2,370.24
Loyalty Card 450.00 472.50 496.13 520.93 546.98
Advertising Expense 7,400.00 7,770.00 8,158.50 8,566.43 8,994.75
Table 61. Schedule 7- Advertising Expense

Schedule 8: Depreciation Expense - Non-operating Equipment


2024 2025 2026 2027 2028
Total Cost of Office Equipment 120,501.60 120,501.60 120,501.60 120,501.60 120,501.60
Divided by: Useful Life 2 2 2 2 2
Depreciation Expense - Office
Equipment 60,250.80 60,250.80 60,250.80 60,250.80 60,250.80
Total Cost of Other Equipment 7,932.00 7,932.00 7,932.00 7,932.00 7,932.00
Divided by: Useful Life 2 2 2 2 2
Depreciation Expense - Other
Equipment 3,966.00 3,966.00 3,966.00 3,966.00 3,966.00
Total Depreciation Expense - Non-
operating Equipment 64,216.80 64,216.80 64,216.80 64,216.80 64,216.80
Table 62. Schedule 8- Depreciation Expense- Non-Operating Equipment

Schedule 9: Depreciation Expense - Furniture and Fixture


2024 2025 2026 2027 2028
Furniture and Fixture 290,303.00 290,303.00 290,303.00 290,303.00 290,303.00
Divided by: Useful Life 5 5 5 5 5
Total Depreciation
58,060.6
Expense - Furniture and 58,060.60 58,060.60 58,060.60 58,060.60
0
Fixture
Table 63. Schedule 9- Depreciation Expense- Furniture and Fixture

Schedule 10: Salary Expense - Manager


2024 2025 2026 2027 2028
Monthly Salary 21,996.00 23,096 24,251 25,463 26,736
Multiply by: Number of
12 12 12 12 12
months
Annual Salary - Managing 263,952.0 291,007.0 305,557.4
277,149.60 320,835.31
Partner 0 8 3
Table 64. Schedule 10- Salary Expense – Manager

120
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Schedule 11: Employee Benefits Expense - Manager


2024 2025 2026 2027 2028
26,329.2 29,027.9
SSS Contribution 25,075.44 27,645.67 30,479.35
1 6
PhilHealth Contribution 7,258.68 7,621.61 8,002.69 8,402.83 8,822.97
Pag-Ibig Contribution 5,279.04 5,542.99 5,820.14 6,111.15 6,416.71
23,095.8 25,463.1
13th Month Pay 21,996.00 24,250.59 26,736.28
0 2
Employee Benefits Expense - 62,589.6 69,005.0
59,609.16 65,719.10 72,455.31
Manager 2 5
Table 65. Schedule 11- Employee Benefits Expense- Manager

Schedule 12: Pre-operating Expenses


202
2024 2025 2026 2028
7
Cashier Uniform 500.00 0.00 0.00 0.00 0.00
Store Manager Uniform 500.00 0.00 0.00 0.00 0.00
Operational Manager Uniform 500.00 0.00 0.00 0.00 0.00
Part timer Uniform 500.00 0.00 0.00 0.00 0.00
I.D 700.00 0.00 0.00 0.00 0.00
5,000.0
Feasibility Study 0 0.00 0.00 0.00 0.00
7,700.0
Total Pre-operating Expenses 0 0.00 0.00 0.00 0.00
Table 66. Schedule 12- Pre-Operating Expenses

Schedule 13: Depreciation Expense - Leasehold Improvement


2024 2025 2026 2027 2028
Leasehold Improvement
(Repainting, Woodworks for
100,000.00 100,000.00 100,000.00 100,000.00 100,000.00
partitions, ceiling, door &
reconstruction of wirings)
Divided by: Useful Life 5 5 5 5 5
Total Depreciation
Expense - Leasehold 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
Improvement
Table 67. Depreciation Expense- Leasehold improvement

121
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

FINANCIAL RATIOS

122
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

LIQUIDITY RATIOS
CURRENT RATIO
2024 2025 2026 2027 2028
2,401,936.5 6,817,085.0 9,532,081.7
Current Assets 4,443,385.44 12,582,543.49
3 5 7
Current
28,155.47 29,563.25 31,041.41 32,593.48 34,223.15
Liabilities
Current Ratio 85.3 150.3 219.6 292.5 367.7
Table 68. Current Ratio

QUICK RATIO
2024 2025 2026 2027 2028
2,145,796.9 6,524,675.3 9,232,042.5
Cash 4,162,851.70 12,276,232.93
3 6 8
Current
28,155.47 29,563.25 31,041.41 32,593.48 34,223.15
Liabilities
Quick Ratio 76.2 140.8 210.2 283.2 358.7
Table 69. Quick Ratio

LEVERAGE RATIOS
DEBT TO EQUITY RATIO
2024 2025 2026 2027 2028
Total Liabilities 28,155.47 29,563.25 31,041.41 32,593.48 34,223.15
4,691,433.6 9,405,685.6
Total Partners' Equity 2,837,099.59 6,877,948.04 12,268,810.60
7 3
Debt to Equity
0.010 0.006 0.005 0.003 0.003
Ratio
Table 70. Debt to Equity Ratio

123
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

DEBT RATIO
2024 2025 2026 2027 2028
Total Liabilities 28,155.47 29,563.25 31,041.41 32,593.48 34,223.15
Total Assets 2,984,184.90 4,958,856.58 7,265,778.95 9,913,998.44 12,897,682.92
Debt Ratio 0.009 0.006 0.004 0.003 0.003
Table 71. Debt Ratio

PROFITABILITY RATIOS
NET PROFIT MARGIN
2024 2025 2026 2027 2028
2,064,334.0 2,480,514.3 3,439,364.9
Net Income 1,687,099.59 2,939,337.58
7 8 8
5,328,216.0 6,015,974.4 7,559,063.5
Net Sales 4,691,520.00 6,758,334.90
0 0 1
Net Profit
35.96% 38.74% 41.23% 43.49% 45.50%
Margin
Table 72. Net Profit Margin

OPERATING PROFIT MARGIN


2024 2025 2026 2027 2028
2,752,445.4 3,307,352.5 3,919,116.7
Operating Income 2,249,466.12 4,585,819.97
3 1 8
5,328,216.0 6,015,974.4 6,758,334.9
Net Sales 4,691,520.00 7,559,063.51
0 0 0
Operating Profit
47.95% 51.66% 54.98% 57.99% 60.67%
Margin
Table 73. Operating Profit Margin

GROSS PROFIT MARGIN


2024 2025 2026 2027 2028
3,315,174.3 3,897,902.9 4,534,566.6 5,225,688.8
Gross Profit 2,793,060.63
9 6 1 6
5,328,216.0 6,015,974.4 6,758,334.9 7,559,063.5
Net Sales 4,691,520.00
0 0 0 1
Gross Profit
59.53% 62.22% 64.79% 67.10% 69.13%
Margin
Table 74. Gross Proft Margin

124
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

RETURN ON INVESTMENT
2024 2025 2026 2027 2028
1,687,099.5 2,064,334.0 2,480,514.3 2,939,337.5
Net Income 3,439,364.98
9 7 8 8
1,300,000.0 1,300,000.0 1,300,000.0 1,300,000.0
Initial Investment 1,300,000.00
0 0 0 0
Return on
129.78% 158.79% 190.81% 226.10% 264.57%
Investment
Table 75. Return on Investment

CHAPTER V: SOCIO-ECONOMIC ASPECT

The socio-economic aspect describes how the business will affect the

society. Cozy Connections' goal is to have a positive effect on the society and

economics of the City Government of Dasmarinas Cavite by establishing a

business in the area.

Contribution to the Economy

The prospective business will benefit the local economy by creating jobs.

Most students today are seeking opportunities to earn additional income to

minimize their daily expenses. Establishing this kind of business in Pasong Tala,

125
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Dasmarinas City, Cavite, will help the students to have decent jobs that would

give them a better opportunity to earn money to cover their school expenses.

Contribution to the Environment

Cozy Connections will contribute to the environment by implementing

proper waste disposal. Proper handling and allocation of waste will be observed

to ensure that the business will not cause any harm to the environment. Bins will

be labeled separately as Biodegradable, Non-biodegradable, and recyclable to

ensure proper waste segregation and waste disposal will be done regularly. In

addition, Cozy Connections will guarantee the establishment’s cleanliness and

sanity by compliance with all environmental provisions and laws.

Contribution to the Society

Cozy Connections’ main goal is to provide a quality service to its target

market. The business will offer a comfortable ambiance, friendly personnel, and

an engaging atmosphere that is suited to the needs of the customers for an area

that will enhance their productivity and allow them to accomplish their tasks.

Contribution to the Government

In many ways, a country's government and business entities are linked

and interdependent. Cozy Connections’ primary contributions to doing business

in the community are greater employment and discretionary income, as well as


126
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

higher tax revenue for local governments. As a Filipino citizen, the owners of

Cozy Connections will pay taxes and other fees rendered as mandated by the

law to avoid any violations happening and for the continuous operation of the

business. Taxes will enable the government to raise more funds for road repairs,

school development, and public service improvements. The outcome will

therefore provide development to the economy.

SUMMARY OF FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS

Summary of Findings

Establishing a study hub is feasible. It is a good business venture because

students or even professionals nowadays are seeking for a place that offers a

comfortable, relaxed, and convenient environment where they can focus on the

tasks that they need to do. Cozy Connections Study Hub is feasible. The

increasing trend of its return on investments means that their financial

performance is improving throughout the five-year projected operations and they

are considered profitable.

127
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Conclusion

The proponents conclude that the proposed business is feasible based on

the study's findings, presentation, and results. Cozy Connections demonstrates a

thorough and strategic approach to establishing a study hub. The location of the

business is a perfect spot where it would be in a well-known and easily

accessible because of the nearby schools surrounding the establishment where it

is visible and noticeable to potential clients in the area. Cozy Connections Study

Hub is a great business idea because most students prefer a place where they

can work on their tasks and study their lessons without much disturbance. With a

well-defined business structure, clear differentiation strategies, market analysis,

and detailed technical aspects, the foundation of Cozy Connections is laid for a

successful launch and efficient operations. In addition, the financial projections

indicated that the business would generate a positive income during the first five

years of operation. The projected cash flow statement and income statement

outcomes substantiate the business’ viability and are financially feasible. From

the information given, it is possible to determine that this proposed business is

feasible.

Recommendations

Based on the following studies, the researchers suggest the following:

128
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

 The proponents recommended keeping up with the current trends in the

industry to keep up with market competition. It is also important to

maintain a high customer volume by improving the services offered.

Employees should also be more cooperative about the business and how

to improve their work, as well as to support their professional

development.

 The part-timer to be hired should have related training or be

knowledgeable in managing facilities, especially since the main goal of the

business is to satisfy the needs and expectations of the students or any

possible customer and to always be able to approach.

 Establishing a study hub is highly recommended to give the business its

distinct feature. The proposed business, like any other study hub in its

early stages, is far from perfect but can be improved over time, and this

business should be applied and operated for further research.

 Maintain a cozy and conducive environment with reasonable prices.

 Annually, the business should measure customer satisfaction to identify

both the positive and negative aspects. The goal is to improve service

quality, increase customer satisfaction, and build trust.

 The researchers propose extending the facility and branching out after five

years in nearby towns where there are no or few direct competitors.

129
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

REFERENCES

(PDF) Owl Day (feasibility study) - researchgate. (n.d.-f).


https://www.researchgate.net/publication/355549485_OWL_DAY_FEASIBI
LITY_STUDY

5 ways to turn a school into a student learning hub. Arch2O.com. (2022, October
22). https://www.arch2o.com/5-ways-to-turn-a-school-into-a-student-
learning-hub/#:~:text=A%20student%20learning%20hub
%20includes,making%20them%20eager%20to%20learn.

Advantages of organizing co-working-cooperation areas within the ... (n.d.-a).


https://cajad.centralasianstudies.org/index.php/CAJAD/article/view/334

Atlassian. (n.d.). Gantt charts. https://www.atlassian.com/agile/project-


management/gantt-chart#:~:text=a%20Gantt%20chart%3F-,A%20Gantt
%20chart%20is%20a%20project%20management%20tool%20that
%20illustrates,schedule%20bars%20that%20visualize%20work

Burol, city of Dasmariñas, province of cavite. PhilAtlas. (n.d.-a).


https://www.philatlas.com/luzon/r04a/cavite/dasmarinas/burol.html
130
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

Company policies: 17 to consider for your business - indeed. (n.d.-b).


https://www.indeed.com/recruiting/c/info/company-policies?hl=de&co=US

From co-working places to new education places - taylor & francis online. (n.d.-
c). https://www.tandfonline.com/doi/abs/10.1080/14606925.2017.1352986

Full article: Analysing user preferences for co-working space ... (n.d.-d).
https://www.tandfonline.com/doi/full/10.1080/09613218.2018.1463750

Mitev, N., Vaujany, F.-X. de, Laniray, P., Bohas, A., & Fabbri, J. (1970, January
1). Co-working spaces, collaborative practices and entrepreneurship.
SpringerLink. https://link.springer.com/chapter/10.1007/978-3-319-94487-
6_2

MSG Management Study Guide. Business Policy - Definition and Features;


Difference between Policy and Strategy. (n.d.).
https://www.managementstudyguide.com/business-policy.htm

Nwpc.dole.gov.ph. (n.d.-e).
https://nwpc.dole.gov.ph/wp-content/uploads/2023/09/Wage-Order-No.-IVA-
20.pdf

Ravulapally, A. K. (2023, May 16). “understanding the role of hierarchical


structures in large organizations: Benefits and implications for growth.”
LinkedIn. https://www.linkedin.com/pulse/understanding-role-hierarchical-
structures-large-ravulapally/

San francisco II, city of Dasmariñas, province of cavite. PhilAtlas. (n.d.-b).


https://www.philatlas.com/luzon/r04a/cavite/dasmarinas/san-francisco-
ii.html#:~:text=San%20Francisco%20II%20is%20a,the
%202020%20Census%20was%203%2C363.

Space matters: The impact of formal learning ... - wiley online library. (n.d.-g).
https://bera-journals.onlinelibrary.wiley.com/doi/abs/10.1111/j.1467-
8535.2010.01098.x

Ubaldo, J. A. (2018, December 2). Feasibility Study Isko Lounge chapter 1 9 final
ready to print hardbound. Academia.edu.
https://www.academia.edu/37899506/Feasibility_Study_ISKO_LOUNGE_C
HAPTER_1_9_FINAL_READY_TO_PRINT_HARDBOUND

Zone I-B, city of Dasmariñas, province of cavite. PhilAtlas. (n.d.-c).


https://www.philatlas.com/luzon/r04a/cavite/dasmarinas/zone-i-b.html

131
NATIONAL COLLEGE OF SCIENCE AND TECHNOLOGY
Amafel Building, Aguinaldo Highway, Dasmariñas, Cavite
Business Department

132

You might also like