You are on page 1of 3

SALES QUOTATION

Customer Details Document Detail


Party: HQ WORLDWIDE
SHOWS SQ Date 19-FEB-24. REV 1
Our Ref. No. PLF/KSA-1043/02-24
Atten. MR. ADNAN AKHTAR
Project: KSA
Address: PO BOX-61886
DUBAI, UAE
MOB : +971 50 280 4696

SUBJECT: SUPPLY DELIVERY & INSTALLATION OF GRP INSULATED & NON-INSULATED PANEL TANKS.
Dear Sir,
With reference to your enquiry, we would like to give our competitive offer for supply, Delivery & Installation of GRP
Sectional Water Tanks as follows.
SAR
SAR
Sr# Description Unit Qty Rate
Amount
GRP PANEL TANK – SUNGIL -KOREA – INTERNAL AND EXTERNAL REINFORCEMENT SYSTEM, HOT PRESSED INSULATED
(BOTTOM AND MANHOLE NON- INSULATED) & NON-INSULATED ( 10- YEARS WARRANTY)

HOT PRESSED NON- INSULATED PANEL TANK


OPTION
SIZE: 25.0 (13+12) (L) X 4.0 M (W) X 3.0 M (H) NOS 01 250,900.00 250,900.00
1
TOTAL CAPACITY: 300 M3, 79,260 USG
HOT PRESSED INSULATED PANEL TANKSIZE:
OPTION
25.0 (13+12) (L) X 4.0 M (W) X 3.0 M (H) NOS 01 289,500.00 289,500.00
2
TOTAL CAPACITY: 300 M3, 79,260 USG

Terms & Conditions


PAYMENT TERMS:
o PAYMENT SHOULD BE 50% ADVANCE AND 50% UP ON DELIVERY OF THE MATERIAL.
o SUPERVISION, TRASPORTATION TO THE SITE, CUSTOM DUTY & BOADER CLEARANCE , DELIVERY TO THE SITE IS ONLY FROM OUR SIDE.
Page-1-3
MATERIAL SPECIFICATION: -
❖ WRAS Approved Product.

❖ SS 316 External/Internal reinforcement system.


❖ Support: Internal – SS 316 & External HDG with SS 316
❖ Manhole: 750mm Dia. with sealed cover and Lock. – 1 No.
❖ Sealant Tape – PVC Foam.
❖ Air Vent, Inlet, Outlet, Overflow and Drain – 1 No. each with PVC flange connections up to 3”.
❖ Internal Ladder (GRP) and External Ladder for 1.5 Mtr. height tank and above only.
❖ Tube type level Indicator for 2 Mtr. height tank and above only.
❖ HDG Steel Skid for 2 Mtr. height tank and above only.

TERMS AND CONDITIONS: -


❖ Price : The given prices are based on the supply and installation of the tank
at your proposed site.
❖ Validity : The offer is valid for 30 days only.
❖ Delivery : Supply only 7- 10 days from the date of confirmed order along advance payment.
❖ Payment : 50% advance along with the confirmed order and 50% upon delivery of the material.

CONTRACTOR/CLIENT SCOPE: -

❖ Material offloading and safe storage and shifting near to the foundation (Basement/Ground/Roof).
❖ Crain/Boom Loader/other facilities for offloading.
❖ Scaffolding as per the site condition.
❖ Flanges other than specified.
❖ Water Thermos and Rest Room to be provided by the contractor/client.
❖ Water installation and testing purpose.
❖ Electricity/Generator for installation.
❖ Civil/other plumbing works at site.
❖ Float Valves/Valves/Float Switches.
❖ After the skid work, if grouting required for leveling the tank foundation (clearing the space between base
and skid and plinth) by the contractor/client.
❖ Accommodation for the technical staff, should be provided by the client/contractor.

Page-2-3
NOTE: -
❖ Any deviations from this quotation to suit the site condition will have additional cost implications.

❖ Until receiving the final settlement from the client, PURELINE FIBERGLASS L.L.C has
reserved the rights for using the supplied materials at the site.

❖ The water testing should be done within 7-10 days from the date of completion of
theinstallation to comply with the manufacturer’s warranty.

❖ For the net capacity, a minimum of 30 cm freeboard area to be calculated from the total
height of the tank.

WE TRUST THAT THE ABOVE MEETS WITH YOUR REQUIREMENTS AND SHOULD YOU REQUIRE ANY
FURTHER INFORMATION OR CLARIFICATION, PLEASE DO NOT HESITATE TO CONTACT OUR GENERAL

MANAGER, MR. PRAJEESH PILLAI ON +971 58 622 3144.

WE ASSURE YOU Of OUR ALL-TIME BEST SERVICE, WE REMAIN,

THANKS & REGARDS,

SALAH AFIF BARAKEH


REGIONAL SALES MANAGER (KSA/UAE/AFRICA)
Email : salah@purelinefiberglass.com
Mobile : +966 59 765 2024
WhatsApp(UAE): +971 58 561 1022

Page-3-3

You might also like