Professional Documents
Culture Documents
Sistema Hidráulico de Cargador de Orugas Compacto (Interactivo) (Aislamiento de Función)
Sistema Hidráulico de Cargador de Orugas Compacto (Interactivo) (Aislamiento de Función)
GET
Adobe Acrobat Reader
SAVE
a copy of this schematic
THE BOOKMARKS PANEL WILL ALLOW YOU TO THE FUNCTION ISOLATION TOOLS ISOLATE
QUICKLY NAVIGATE TO POINTS OF INTEREST. CIRCUITS FOR TRACING HYDRAULIC LINES
Grids On/Off
Machine Views
FUNCTION KEYS
Zoom In “CTRL” / “+”
Zoom Out “CTRL” / “-”
Fit to Page “CTRL” / “0” (zero)
Hand Tool “SPACEBAR” (hold down)
Find “CTRL” / “F”
WHEN ONLY ONE CALLOUT IS SHOWING ON A Search “CTRL” / “SHIFT” / “F”
CHECK
Control
ACCUMULATORS Unidirectional Bidirectional
Valves
Line Restriction
(Variable)
VARIABLE DISPLACEMENT
Basic Spring Shuttle NON- COMPENSATED
Pilot
Symbol Loaded Line Restriction
Controlled Spring Loaded Gas Charged Restriction
(Fixed)
Unidirectional Bidirectional
2-Section
RELEASED PRESSURE Variable and Pressure
ROTATING SHAFTS Compensated
Pump
Internal
Simplified Complete Supply Pressure Hydraulic Pneumatic
Energy Triangles
COMBINATION CONTROLS
LINES MEASUREMENT
Solenoid Solenoid Solenoid Solenoid and Servo Thermal Detent Crossing Joining
or Manual and Pilot Pilot or Manual Pressure Temperature Flow
Push-pull Lever Manual Shutoff General Manual Push Button Pedal Spring Vented Pressurized Return Above Fluid Level Return Below Fluid Level
PUBLICATIONS.CAT.COM
© 2021 Caterpillar. All Rights Reserved. CAT, CATERPILLAR, LET’S DO THE WORK, their respective logos, “Caterpillar Corporate Yellow”, the “Power Edge”
and Cat “Modern Hex” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.
COMPONENT LOCATION
VOLUME 1 of 2 - STANDARD IMPLEMENTS
Schematic Machine
Description
Location Location
Accumulator GP A-4, H-12, G-10 1
Accumulator GP - Ride Control E-7, J-6 2
Breather - Hydraulic Tank C-7 3
Cylinder GP - Lift F-3, J-4 4
Cylinder GP - Tilt (LH) F-4, I-3 5
Cylinder GP - Tilt (RH) F-4, I-3 6
Filter AS - Hydraulic and Transmission Oil F-11 7
Fitting GP - Quick Coupler E-2, I-2 8
Manifold GP - Ride Control E-7, I-6 9
Motor GP - Fan G-9 10
Motor GP - Hydraulic Fan (Demand) E-10 11
Motor GP - Hydrostat (One Speed) (246D/262D/272D/272D2) H-14 12
Motor GP - Hydrostat (Two Speed) (277D/279D/287D/289D/297D/299D) F-13, F-14 13
Motor GP - Hydrostat (Two Speed) (LH) D-15 14
Motor GP - Hydrostat (Two Speed) (RH) D-13 15
Pump GP - Gear 1 Basic C-10 16
Pump GP - Hydrostat A-13 17
Pump GP - Implement and Charge (Standard Flow) B-10 18
Radiator and Hydraulic Oil Cooler GP A-10 19
Sensor GP - Pressure (Tilt) E-4 20
Sensor GP - Speed (246D/262D/272D/272D2) E-12, E-15, G-13, G-15 21
Sensor GP - Speed (277D/279D/287D/289D/297D/299D) F-15, F-12 22
Strainer AS - Hydraulic Tank C-8 23
Tank GP - Hydraulic C-7 24
Tee-o-ring J-3 25
Valve GP - Check (Cooler Bypass) A-15 26
Valve GP - Check (E) B-4, H-12, G-11 27
Valve GP - Check (Lift Cylinder) J-3 28
Valve GP - Check (Ride Control) E-7, I-5 29
Valve GP - Implement Control (Standard Flow) C-5, H-5 30
Valve GP - Loader Arms Manual Lower F-3, J-3 31
Valve GP - Pilot Shutoff (One Speed) H-12 32
Valve GP - Pilot Shutoff (Two Speed) B-4, G-11 33
COMPONENT LOCATION
VOLUME 2 of 2 - HIGH FLOW IMPLEMENTS
Schematic Machine
Description
Location Location
Accumulator GP F-10 1
Accumulator GP - Ride Control E-7, G-16 2
Breather - Hydraulic Tank C-7 3
Cylinder GP - Hydraulic Coupler D-4 4
Cylinder GP - Lift I-3, I-9, I-13 5
Cylinder GP - Tilt (LH) I-6, I-10, I-15 6
Cylinder GP - Tilt (RH) I-5, I-10, I-14 7
Filter AS - Hydraulic and Transmission Oil D-10 8
Fitting GP - Quick Coupler H-1, I-7, I-12 9
Manifold GP - Ride Control E-7, G-16 10
Motor GP - Hydraulic Fan (Demand) D-9 11
Motor GP - Hydrostat (Two Speed) (277D/279D/287D/289D/297D/299D) D-13, D-15 12
Pump GP - Hydrostat A-13 13
Pump GP - Implement and Charge (For XPS High Flow) B-10 14
Radiator and Hydraulic Oil Cooler GP A-9 15
Sensor GP - Pressure H-6, I-10, I-15 16
Sensor GP - Speed (277D/279D/287D/289D/297D/299D/297D2/299D2) D-12, D-15 17
Strainer AS - Hydraulic Tank C-8 18
Tank GP - Hydraulic C-7 19
Tee-o-ring J-9, J-13 20
Valve and Mounting GP - Hydraulic Coupler D-4 21
Valve GP - Check (Cooler Bypass) A-15 22
Valve GP - Check (E) F-11 23
Valve GP - Check (Lift Cylinder) J-9, J-13 24
Valve GP - Check (Ride Control) D-7 25
Valve GP - Implement Control (XPS/XHP High Flow TIER 4f) G-15, F-6
26
Valve GP - Implement Control (XPS/XHP High Flow TIER 4i) G-10, F-6
Valve GP - Loader Arms Manual Lower I-4, J-14, J-10 27
Valve GP - Pilot Shutoff (Two Speed) F-11 28
Valve GP - Shut Off I-7, I-12 29
TAP LOCATION
VOLUME 1 of 2 - STANDARD IMPLEMENTS
Tap Schematic
Description
Number Location
AA Implement Pump Pressure D-5, H-5
EE Charge Pressure A-14
MB Main System Pressure (Pump 2 Forward) C-14
MC Main System Pressure (Pump 1 Forward) C-13
SOS Oil Sampling E-10
TAP LOCATION
VOLUME 2 of 2 - HIGH FLOW IMPLEMENTS
Tap Schematic
Description
Number Location
AA Implement Pump Pressure E-3, G-8, G-12
EE Charge Pressure A-14
MB Main System Pressure (Pump 2 Forward) C-14
MC Main System Pressure (Pump 1 Forward) C-13
SOS Oil Sampling D-10
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
J (31) VALVE GP J
(4) CYLINDER GP LOADER ARMS MANUAL LOWER
LIFT 112-1817 (T4f & T4i untill 2015)
492-4504 (272D/299D)
437-2882 (T4f since 2015)
(Dimensions: 56 inches x 35 inches)
(28) VALVE GP
(2) ACCUMULATOR GP CHECK
RIDE CONTROL
R
123-4750 (TIER 4i)
310-8460
314-2403 (TIER 4f)
(25) TEE
149-1397 (TIER 4i)
P H (5) CYLINDER GP 471-1395 (TIER 4f)
(9) MANIFOLD GP (29) VALVE GP TILT (LH)
RIDE CONTROL CHECK (RIDE CONTROL) 293-5712 (6) CYLINDER GP
456-1824 304-6756 TILT (RH)
(32) VALVE GP
PILOT SHUTOFF (ONE SPEED) (30) VALVE GP
42 Page,
B2
L L LOC A-9 (10) MOTOR GP
FAN
TWO SPEED PILOT SHUTOFF FOR 258-2577 (OTHER MODELS)
277D/279D/287D/289D/297D/299D
442-5647 (272D/272D2/297D/297D2/299D/299D2)
(27) VALVE GP
X X CHECK (E)
6E-4701
REVERSING FAN MOTOR
(33) VALVE GP
TWO SPEED HYDROSTAT MOTORS 277D/279D/287D/289D/297D/299D PILOT SHUTOFF (TWO SPEED) E1
456-1839
LOC A-14
H1 B2 STANDARD FLOW FOR 272D/299D (TIER 4i)
LOC C-2 LOC A-9
CO
LOC A-9
STANDARD FLOW 2B
H
TWO SPEED HYDROSTAT MOTOR (277D/279D/287D/289D/297D/299D)
I I
RIDE CONTROL
A R
D D
Pg
(14) MOTOR GP (15) MOTOR GP AA
HYDROSTAT (TWO SPEED) LH HYDROSTAT (TWO SPEED) RH
358-5005 (246D/262D)
358-5007 (246D/262D)
398-7485 (272D/272D2) TIER 4f
398-7486 (272D/272D2) TIER4f
258-2835 (272D/272D2) TIER 4i B X
258-2836 (272D/272D2) TIER4i WORK TOOL
PUMP
(16) PUMP GP
STANDARD FLOW
GEAR 1 BASIC IMPLEMENT PUMP
487-6181 (246D/262D/277D/279D/287D/
289D272D/277D2/299D/299D2)
H1
(3) BREATHER
HYDRAULIC TANK STANDARD FLOW FOR 277D/279D/287D/289D/297D/299D
258-2829 (ALL MODELS) (30) VALVE GP
B1 IMPLEMENT CONTROL
(STANDARD FLOW)
C (24) TANK GP 479-0648 C
HYDRAULIC
345-4581(ALL MODELS)
TWO SPEED HYDROSTAT MOTOR (246D/262D/272D/272D2)
(23) STRAINER AS
MB MC HYDRAULIC TANK
262-5689 (ALL MODELS)
X7
M3
C
B
L2 L1
MB B A M3 X7 D C MC
WORK TOOL PUMP
TWO SPEED HYDROSTAT MOTOR
(277D/279D/287D/289D/297D/299D)
(27) VALVE GP
CHECK (E) HYDRAULIC CIRCUIT COLOR DESCRIPTIONS
D1 C2 6E-4701
PILOT CONTROL CIRCUIT
B1
B M 456-1839 A1
T
SUPPLY LINE
QUICK COUPLER CIRCUIT
Pressure Line B
DRAIN / RETURN LINE Pilot / Load Sensing Pressure
WORK TOOL PUMP
STEERING CIRCUIT
STANDARD FLOW IMPLEMENT PUMP TRAVEL CONTROL CIRCUIT Drain / Return Lines
S
LIFT CYLINDER CIRCUIT Air Line
B1
STANDARD FLOW IMPLEMENT PUMP
Component Group
CALLOUTS
Do not operate or work on this product unless you have YY Taps (Pressure, Sampling, Sensor - by letter)
read and understood the instruction and warnings in the
E L3 relevant Operation and Maintenance Manuals and
L2 MA L1 MD DL DL D Connectors (By letter)
relevant service literature. Failure to follow the instruc-
E1 (17) PUMP GP W1 B2 (1) ACCUMULATOR GP tions or heed the warnings could result in injury or
HYDROSTAT CO 149-0686 death. Proper care is your responsibility. Callout Number Component
CI (52) VALVE GP - CONTROL Name
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
H A B A B T0 Ls Pp A B H
G From Charge
Pump B2
(10) MANIFOLD GP
RIDE CONTROL G
437-2878 P
B2
LOC B-10
Pg P T
XHP HIGH FLOW FOR 272D/272D2/297D/297D2/299D/299D2 TIER 4f Pg P T
XHP HIGH FLOW FOR 272D/299D TIER 4i
H
(26) VALVE GP AA
IMPLEMENT CONTROL (26) VALVE GP AA
(HIGH FLOW) P C2 IMPLEMENT CONTROL
T R 456-1770 (TIER 4f) LOC E-3 LOC B-7 (HIGH FLOW) P C2
B2
345-5153 (272D/299D ONLY) TIER 4i LOC E-3 LOC B-7
LOC A-9
To Tank
F CHECK (E)
6E-4701 F
(26) VALVE GP
IMPLEMENT
CONTROL
(HIGH FLOW)
456-1770 (TIER 4f)
(1) ACCUMULATOR GP 345-5153 (TIER 4i) P
TWO SPEED HYDROSTAT MOTORS 277D/279D/287D/289D/297D/299D/297D2/299D2 A1 A1
149-0686
Pg P T
XPS HIGH FLOW FOR 277D/279D/287D/289D/297D/299D/297D2 AND 299D2
(28) VALVE GP
PILOT SHUTOFF (TWO SPEED)
456-1839
(11) MOTOR GP
HYDRAULIC FAN (DEMAND)
258-2577 (ALL MODELS)
2
1 40 BAR
DEMAND FAN RIDE CONTROL
4
1
3
(8) FILTER AS
HYDRAULIC AND 2 3
TRANSMISSION OIL P 2 1
479-0592 (ALL MODELS)
S2 C1
FO FI
C (19) TANK GP C
HYDRAULIC
345-4581(ALL MODELS)
(18) STRAINER AS
X B2 C2
MB MC B1 X HYDRAULIC TANK
262-5689 (ALL MODELS) LOC B-10 LOC B-7
From Charge Pump To Tank
MB B A M3 X7 D C MC
(14) PUMP GP
IMPLEMENT AND CHARGE PUMP
(FOR XPS HIGH FLOW)
423-0086 (For XPS High Flow)
341-7635 (For XHP High Flow)
D1 C2 C2
LINE PATTERNS
B M Pressure Line
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
FRONT VIEW
30
3
1
32
33
27
17
24 18
16
21
12
5
6
REAR VIEW
19 10 11
SOS
7
13 13
EE 26 22
RIGHT SIDE VIEW
MB AA MC
20
4
4
28 29
9
25
2
31
14
23
8
15
21
FRONT VIEW
24
16
13
1
19
28
14
18 21
7 6
4
REAR VIEW
15 11
SOS
8
12 12
EE
22 17
RIGHT SIDE VIEW
AA
26 29
5 5
23
20
25
27
10
MB
2
MC
9