You are on page 1of 3

St Control vs Tolerance Requirement

3. Low on control but 4. Process is in


meets customer statistical control and is
requirements. Special able to meet tolerance
cause variation needs to be
requirements.
Tolerance Requirement

identified.

2. Process is in control
1. Low on control but has excessive
and low on meeting common cause
tolerance variation. (low on
requirements. tolerance requirements)

Process Under statistical control


1
St Control vs Tolerance Reqt
• Situation 1: This process needs to be stopped immediately
as it is leading to wastages.
• Situation 2: Although, the process is running under
common causes, yet the common cause variation is high.
The equipment is not good enough to meet quality needs.
• Situation 3: The customer may allow it. Why? A) He is not
aware of Taguchi Loss Function. B) Removal of Special
Causes is economically not justified. C) Specials Causes have
been identified and documented as consistent and
predictable. D) Process Plan has been formulated
accordingly and a protection has been worked out.
• Situation 4: Excellent process. Just monitor the key
indicators.

2
Towards Personal Development and Personality Development

• Yash Khetrapal, the founder of KCC, started his career with Mukand Iron
and Steel in 1982. After a stint of 2 years, he moved over to Maruti Suzuki
where he worked for the next 38.5 years in various capacities.
• After his superannuation as HOD Training from Maruti, he established KCC.
• KCC is a team of senior trainers, who deliver trainings on 100+ topics.
• Please send us your love and your training enquiries at :
yash@khetrapalconsulting.com (from your workplace mail ID only).
• Or feel free to at 9811801111 (If there is no immediate response, it
will mean that a session is going on. So please leave a message.
• Glimpses of our sessions can be seen at : Yash Khetrapal
• Connect with us at : Yash Khetrapal for the latest updates.
• Visit us at www.khetrapalconsulting.com

Learn Earn Return 3

You might also like